Summary Bill No Amount 1 PRELIMINERIES 0.00 2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 7 CIELINGS 0.00 8 PAINTING 0.00 9 ELECRICAL INSTALLATIONS 0.00 10 TENDERER'S ADJUSTMENTS 0.00 GRAND TOTAL carried to form of bid 0.00 GN. FUVAHMULAKU JETTY Description SUMMARY OF BILL OF QUANTITIES Page 1

Transcript of SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4...

Page 1: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Summary

Bill No Amount

1 PRELIMINERIES 0.00

2 GROUND WORK 0.00

3 CONCRETE 0.00

4 MASONRY, PLASTERING 0.00

5 METAL AND TIMBER WORKS 0.00

6 ROOFING 0.00

7 CIELINGS 0.00

8 PAINTING 0.00

9 ELECRICAL INSTALLATIONS 0.00

10 TENDERER'S ADJUSTMENTS 0.00

GRAND TOTAL carried to form of bid 0.00

GN. FUVAHMULAKU JETTY

Description

SUMMARY OF BILL OF QUANTITIES

Page 1

Page 2: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 01PRELIMINARIES

1.1 General Notes(1) Abbreviations

m - metreNo - numbersm3 - cubic metrem2 - square metreLm - Linear metret - tonnesincl - includingmm - millimetredia - diameterSS - Stainless steel GI - Galvonized iron

1.2 Site Management Costs

(1) Allow for all on and off site management costincluding costs of forman and asistants, temporaryservices,telephone,fax,hoardings and similar item 1.00 0.00

1.3 Sign Board(1) Allow for sign boards item 1.00 0.00

1.4 Clean-up(1) Allow for clean-up of completed works and site upon

completion. item 1.00 0.00

BILL No: 01 - PRELIMINERIESTOTAL OF BILL No: 01 - Carried over to summary 0.00

Page 2

Page 3: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 02GROUND WORKS

2.1 General (a) Rates shall include for: levelling, Grading, Trimming,Compacting to faces of excavation, keeping sides plumb,backfilling, consolidating and disposing surplus soil.

2.2 Site Clearing(1) Clearing site including trees less than 0.5m girth complete

with situmps and roots. item 1.00 0.00

2.3 Excavation(a) Excavation quantities are measured to the faces ofconcrete members. Rates shall include for all additionalexcavation required to place the formwork.Excavation for

(1) Foundation beam TB1 & TB2 m3 1.49 0.00

2.4 Back Filling(a) Rates shall include for levelling, grading, trimming and compacting.

(1) Backfilling to get level of 150mm below G.L item 1.00 0.00(2) Minimum 150mm thick hardcore on compacted ground item 1.00 0.00(3) 25mm thick sand bedding on hardcore item 1.00 0.00

BILL No: 02 - GROUND WORKSTOTAL OF BILL No: 02 - Carried over to summary 0.00

Page 3

Page 4: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 03CONCRETE

3.1 General (a) Rates shall include for: placing in position; making good after removal of formwork and casting in all required itemsto conform to structural and excavated tolerences (b) Rates shall include making and transporting of formwork, oil, nails (c) Mix ratio for reinforced concrete shall be 1:2:3and lean concrete shall be 1:2:6 by volume.(d) Rates shall include for: cleaning, fabrication,placing, the provision for all necessary temporary fixings and supports including tie wire and chair supports, laps and wastage(e) All reinforcing bars shall be high strength bars

(1) Allow for concrete testing item 1.00 0.00

3.2 Lean Concrete(a) Quantity is measured to the edges of concrete foundationmemebers. Rates shall be inclusive of any additional concrete required to place the formwork.

50mm thick lean concrete to bottom of (1) Foundation beam TB1 & TB2 m3 0.39 0.00

3.3 Reinforced ConcreteIn-situ reinforced concrete to:

3.3.1 Foundations(1) Foundation Pad F1 m3 0.63 0.00(2) Foundation Beam TB1 & TB2 m3 1.50 0.00

3.3.2 Ground floorColumns

(1) C1 Column, 250x250 m3 1.55 0.00(2) C2 Column, 200x200 m3 1.63 0.00

Stair & Slab(1) Stair & Slab m3 5.91 0.00

3.3.3 Roof LevelAttached Beams

(1) Beam RB, 300x200 m3 0.74 0.00

3.3.4 WATER PROOFING(1) Apply slurry type water proofing to all surfaces of concrete

below ground level in accordance with manufacturer's instructions. item 1.00 0.00

BILL No: 03 - CONCRETE WORKSTOTAL OF BILL No: 03 - Carried over to summary 0.00

Page 4

Page 5: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 04MASONRY AND PLASTERING

4.1 GENERAL

(a) Rates shall include for: cleaning out cavities, formingrebated reveals and pointing and cleaning down to reveals where necessary; fractional size blocks, all necessary machine cutting, cutting or forming chases or edges offloor slabs, cutting or leaving holes and openings as recesses for and building in pipes, conduits, sleeves and similar as required for all trades; leaving surfaces rough orraking out joints for plastering and flashings, beddingframes or plates, building in joists, bearers or similar,temporary supports to openings, templates, reinforcement inwalls and for all necessary making good

4.2 Cement blockwork4.2.1 100 mm wide Cement Solid blocks, laid on and incl. mortar,

tie rods, compression joint gap filler, nylon / plastic mesh asspecified

(1) Ground Floor m2 4.70 0.00

4.3 Plastering(a) Cement plastering on walls and concrete surfaces as specified incl. wire mesh at the joints of concrete surfacesand walls and water proofing additives / admixtures for allsurfaces

4.3.1 12mm plaster on exterio of walls and concrete faces(1) Ground Floor m2 4.70 0.00

BILL No: 04 - MASONRY AND PLASTERINGTOTAL OF BILL No: 04 - Carried over to summary 0.00

Page 5

Page 6: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 05METAL AND TIMBER WORKS

5.1 GENERAL

(a) Rates shall include for: all fabrication work, welding, marking,drilling for bolts including those securing timbers, steel plates, bolts,nuts and any type of washer, riveted work, counter sinking andtapping for bolts or machine screws.

(b) Rates shall include for all polishing and finishing as specified(c) Rates shall include for fabrication and erection and temporarysupports and fixing into position

5.2 SS railing (1)

50mm dia SS pipe handrail (railing between columns) including all fixings and finishes complete as shown in the drawing Item 0.00

5.3 Timber Roof structureTimber roof structure, including all fixings and complete as shown in the drawings to;

(1) 50 x 150mm timber ridge members m 8.10 0.00(2) 50 x 100mm timber rafters m 120.50 0.00(3) 50 x 35mm timber battens m 176.00 0.00(4) 100 x 50mm timber wall plate m 14.00 0.00(5) Timber concealings Item 0.00(6) Timber Decorative partitions Item 0.00

BILL No: 05 - MASONRY AND PLASTERINGTOTAL OF BILL No: 05 - Carried over to summary 0.00

Page 6

Page 7: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 06ROOFING

6.1 General(a) Rates shall include for: fair edges,dressing overangel fillets, turning into grooves, all other labours,circular edges, nails, screws and other fixings and laps.

6.2 Roof Coverings6.2.1 Roofing Sheets

(1) Lysaght (or equivalent) roofing sheets, inclusive of all fixtures, fixed in accordance with manufacturer's instructions m2 46.42 0.00

6.2.2 Capping and Flashing(1) 400 mm Girth Ridge Capping (HIP flashing) fixed in

accordance with manufacturer's instructions (Rateshall include all fixtures) m 24.00 0.00

6.3 Gutters & Downpipes6.3.1 Gutter

(1) 150 x 150 mm Lysaught Gutter or equivalent, rates shall include for framing, supports, clips, brackets, stop-ends,down-pipe outlets, fixing and fastening m 16.00 0.00

(2) 100mm dia. PVC Downpipes including all bends junctions, straps, brackets and clips m 12.00 0.00

6.4 Insulations6.4.1 Rock Wool Insulation

(1) Rock Wool Insulation with Aluminium foil on both sides, Ratesshall include for wire mesh, nails, and all necessary fixtures m2 46.00 0.00

BILL No: 06 - ROOFINGTOTAL OF BILL No: 06 - Carried over to summary 0.00

Page 7

Page 8: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 7CEILINGS

7.1 Plasterboard (External)Plasterboard ceiling panels on timber framework including trimming, nails, screws and other fixings.

(1) Ground floor m2 46.00 0.00

BILL No: 07 - CEILINGSTOTAL OF BILL No: 07 - Carried over to summary 0.00

Page 8

Page 9: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 8PAINTING

8.1 General(a) Rates shall include for: the provision, erection and removal of scaffolding, preparation, rubbing down betweencoats and similar work, the protection and / or maskingfloors, fittings and similar works

(b) All painting work shall be in accordance with thespecifications

8.2 Columns8.2.1 Ceramic paint finish

(1) Circuler columns no 16.00 0.00

8.3 Ceilings8.3.1 Emulsion paint finish shall be "nippon" or equivalent on ceilings

(1) Ground floor m2 46.00 0.00

BILL No: 08 - PAINTINGTOTAL OF BILL No: 08 - Carried over to summary 0.00

Page 9

Page 10: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 09ELECTRICAL INSTALLATIONS

9.1 General

(a) Rates shall include for: screws, nails, bolts, nuts,standard cable fixing or supporting clips, brackets, straps,rivets, plugs and all incidential accessories.

(b) Rates for work in trench shall include for: excavation,maintaining faces of excavations, backfilling, compaction,appropriate cable covers, warning tape and disposal of surplus spoil.(c) Rates for work in trench shall include for electrical condiuts, fittings, equipment and similar all fixings to variousbuilding surfaces

(d) Each Light / light fixtures and its switch is measured asone point; similarly each fan or each socket oulet is measuredas one point; installation(f) All main distribution boards are 3 phase.

9.2 Electrical wiringElectrical wiring with copper conductor cable in conduits inwalls and in casing on soffits of slab as specified to:

(1) Wiring with 1.5mm2 cable to lighting points 27.00 0.00

9.3 Lighting(1) Ceiling mount light (weatherproof) nos 20.00 0.00

9.4 Light switches(a) All light switches shall be "Clipsal" or equivalent

(1) One way switch no 7.00 0.00

BILL No: 09 - ELECTRICAL INSTALLATIONSTOTAL OF BILL No: 09 - Carried over to summary 0.00

Page 10

Page 11: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber

Gn. Fuvahmulaku Jetty Bill of Quantities

Item Description Unit Qty Rate Total

BILL No: 10TENDERER'S ADJUSTMENTS

(a) Provide detail description of work items under each billand insert extra page if required

10.1 Additions1 Premilinaries - Bill no:12 Ground works - Bill no:23 Concrete - Bill no:34 Masonry and plastering - Bill no:45 Metal and Timber works - Bill no: 56 Roofing - Bill no:67 Ceiling - Bill no:78 Painting - Bill no:89 Electrical installations - Bill no:9

ADDITIONAL TOTAL10.2 Omissions

1 Premilinaries - Bill no:12 Ground works - Bill no:23 Concrete - Bill no:34 Masonry and plastering - Bill no:45 Metal and Timber works - Bill no: 56 Roofing - Bill no:67 Ceiling - Bill no:78 Painting - Bill no:89 Electrical installations - Bill no:9

OMISSIONS TOTAL

BILL No: 10 - TENDERER'S ADJUSTMENTSTOTAL OF BILL No: 10 - Carried over to summary 0.00

Page 11

Page 12: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 13: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 14: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 15: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 16: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 17: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 18: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 19: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 20: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 21: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 22: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 23: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 24: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 25: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 26: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 27: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber
Page 28: SUMMARY OF BILL OF QUANTITIES - Ministry of · PDF file2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6 ROOFING 0.00 ... 100 x 50mm timber