Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H...

41
Dockie Nos. 50-390/391 June 23, 1988 APPLICANT: Tennessee Valley Authority (TVA) FACILITY: Watts Bar Nuclear Plant, Units 1 and 2 SUBJECT: MEETING SUMMARY FOR THE JUNE 3, 1988 MEETING BETWEEN NRC AND TVA REGARDING WATTS BAR PROGRAM PLAN (WBPP) AND THE SCHEDULE COMPLETING THE PROGRAM PLAN On June 3, 1988, a meeting was held in Rockville, Maryland, at the request of TVA between the NRC staff and representatives of TVA regarding the WBPP and the schedule of various submittals for NRC review. Attachment I is the list of attendees and Attachment 2 is a copy of the handout provided by TVA at the meeting. TVA opened the meeting by stating that numerous issues and programs exist at Watts Bar and there are numerous corrective actions that have been underway or completed to address these issues. The WBPP will perform a systematic and comprehensive evaluation of the plant as built. The objective of the WBPP is to provide reasonable assurance that all the design and construction deficiencies have been detected and the appropriate corrective actions have been defined. The final product of the team will be the Watts Bar Nuclear Performance Plan, Volume 4. Sargent and Lundy (S&L), the contractor selected by TVA to perform a Vertical Slice Review (VSR) of two systems, described the overall program for the VSR including the selection of the key review staff. S&L will also include horizontal interface for the two selected systems. The review will be exploratory as well as confirmatory. S&L further stated that the VSR program is a subset of the overall Watts Bar systematic evaluation program. TVA is scheduled to start the VSR program by mid June 1988 and complete by September 1988. TVA intends to submit the details of the corrective action programs during the next three months. The NRC staff has several questions regarding the adequacy of the programs and will review in depth the VSR program whenever it is submitted for the NRC staff review. TVA concluded by saying that they will respond to NRC concerns in the meeting scheduled for June 7, 1988. Original Signed by Rajender Auluck, Project Manager TVA Projects Division Office of Special Projects Attachments: 1. List of Attendees 2. TVA Handout 8807050418 880623 cc w/attachments: PDR ADOCK 05000390 See next page A PDR Distribution Docket File NRC PDR Local POR Those On Attached List OSP:TVA •S'kV MS6 8u:8as TSBIc k / 6F•/88 16/77/88 61-7,88

Transcript of Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H...

Page 1: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

Dockie Nos. 50-390/391 June 23, 1988

APPLICANT: Tennessee Valley Authority (TVA)

FACILITY: Watts Bar Nuclear Plant, Units 1 and 2

SUBJECT: MEETING SUMMARY FOR THE JUNE 3, 1988 MEETING BETWEEN NRC ANDTVA REGARDING WATTS BAR PROGRAM PLAN (WBPP) AND THE SCHEDULECOMPLETING THE PROGRAM PLAN

On June 3, 1988, a meeting was held in Rockville, Maryland, at the request ofTVA between the NRC staff and representatives of TVA regarding the WBPP andthe schedule of various submittals for NRC review. Attachment I is the listof attendees and Attachment 2 is a copy of the handout provided by TVA at themeeting.

TVA opened the meeting by stating that numerous issues and programs exist atWatts Bar and there are numerous corrective actions that have been underway orcompleted to address these issues. The WBPP will perform a systematic andcomprehensive evaluation of the plant as built. The objective of the WBPP isto provide reasonable assurance that all the design and constructiondeficiencies have been detected and the appropriate corrective actions havebeen defined. The final product of the team will be the Watts Bar NuclearPerformance Plan, Volume 4.

Sargent and Lundy (S&L), the contractor selected by TVA to perform a VerticalSlice Review (VSR) of two systems, described the overall program for the VSRincluding the selection of the key review staff. S&L will also includehorizontal interface for the two selected systems. The review will beexploratory as well as confirmatory. S&L further stated that the VSR programis a subset of the overall Watts Bar systematic evaluation program. TVA isscheduled to start the VSR program by mid June 1988 and complete by September1988. TVA intends to submit the details of the corrective action programsduring the next three months. The NRC staff has several questions regardingthe adequacy of the programs and will review in depth the VSR program wheneverit is submitted for the NRC staff review. TVA concluded by saying that theywill respond to NRC concerns in the meeting scheduled for June 7, 1988.

Original Signed by

Rajender Auluck, Project ManagerTVA Projects Division

Office of Special Projects

Attachments:1. List of Attendees2. TVA Handout

8807050418 880623cc w/attachments: PDR ADOCK 05000390

See next page A PDR

DistributionDocket File NRC PDRLocal POR Those On Attached List

OSP:TVA •S'kVMS6 8u:8as TSBIc k /6F•/88 16/77/88 61-7,88

Page 2: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

0$Ja-tts Bu~r Nuclear Plant

cc:General CounselTennessee Valley Authority400 West Summit Hill DriveEli B33Knoxville, Tennessee 37902

Mr. R. L. GridleyTennessee Valley Authority5N 157B Lookout PlaceChattanooga, Tennessee 37402-2801

Mr. George TotoTennessee Valley AuthorityWatts Bar Nuclear PlantP.O. Box 800Spring City, Tennessee 37381

Mr. J. A. McDonaldTennessee Valley AuthorityWatts Bar Nuclear PlantP.O. Box 800Spring City, Tennessee 37381

Mr. D. L. WilliamsTennessee Valley Authority400 West Summit Hill DriveW10 B85Knoxville, Tennessee 37902

Honorable Johnny PowellCounty JudgeMeigs County CourthouseRoute 2Decatur, Tennessee 37322

Tennessee Department of Healthand Environment

ATTN: Director, Bureau of EnvironmentT.E.P.R.A. Building, 1st Floor150 9th Avenue NorthNashville, Tennessee 37219-5404

Regional Administrator, Region IIU.S. Nuclear Regulatory Commiission101 Marietta Street, N.W.Atlanta, Georgia 30323

Resident Inspector/Watts Bar NPc/o U.S. Nuclear Regulatory CommissionRoute 2, Box 300Spring City, Tennessee 37381

Mr. Richard Kingc/o U.S. GAO1111 North Shore DriveSuite 225, Box 194Knoxville, Tennessee 37919

Dr. Henry Myers, Science AdvisorCommittee on Interior

and Insular AffairsU.S. House of RepresentativesWashington, D.C. 20515

Mr. S. A. WhiteManager of Nuclear PowerTennessee Valley Authority6N 38A Lookout Place1103. Market StreetChattanooga, Tennessee 37402-2801

Honorable Dan WadeCounty JudgeRhea County CourthouseDayton, Tennessee 37321

Page 3: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

S SENCLOSURE I

LIST OF ATTENDEES

R. Auluck NRCR. Hermann NRCT. A. Ippolito TVAR. C. Heider S&LH. C. Garg NRCS. Black NRCEd Fuller TVAP. R. Maudaira TVABob Pierson NRC

Page 4: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

0

-W~tts Bar Nuclear Plant

cc:General CounselTennessee Valley Authority400 West Summit Hill DriveEli B33Knoxville, Tennessee 37902

Mr. R. L. GridleyTennessee Valley Authority5N 157B Lookout PlaceChattanooga, Tennessee 37402-2801

Mr. George TotoTennessee Valley AuthorityWatts Bar Nuclear PlantP.O. Box 800Spring City, Tennessee 37381

Mr. J. A. McDonaldTennessee Valley AuthorityWatts Bar Nuclear PlantP.O. Box 800Spring City, Tennessee 37381

Mr. D. L. WilliamsTennessee Valley Authority400 West Summit Hill DriveW10 B85Knoxville, Tennessee 37902

Honorable Johnny PowellCounty JudgeMeigs County CourthouseRoute 2Decatur, Tennessee 37322

Tennessee Department of Healthand Environment

ATTN: Director, Bureau of EnvironmentT.E.R.R.A. Building, 1st Floor150 9th Avenue NorthNashville, Tennessee 37219-5404

Regional Administrator, Region 11U.S. Nuclear Regulatory Commi~ssion101 Marietta Street, N.W.Atlanta, Georgia 30323

Resident Inspector/Watts Bar NPc/o U.S. Nuclear Regulatory CommissionRoute 2, Box 300Spring City, Tennessee 37381

Mr. Richard Kingc/o U.S. GAO1111 Morth Shore DriveSuite 225, Box 194Knoxville, Tennessee 37919

Dr. Henry Myers, Science AdvisorCommittee on Interior

and Insular AffairsU.S. House of RepresentativesWashington, D.C. 20515

Mr. S. A. WhiteManager of Nuclear PowerTennessee Valley Authority6N 38A Lookout Place1101 Market StreetChattanooga, Tennessee 37402-2801

Honorable Dan WadeCounty JudgeRhea County CourthouseDayton, Tennessee 37321

Page 5: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

.DISTRIBUTION FOR MEETING SUMMARY DATED:

Facility: Watts Bar Nuclear Plant, Units 1 and 2*

Docket FileNRC PDRLocal PDRProjects ReadingS. EbneterJ. PartlowJ. AxelradS. RichardsonS. BlackB. D. LiawR. AuluckM. SimmsF. McCoyJ. RutbergR. HermannH. GargB. PiersonACRS (10)GPA/PAGPA/CA (M. Callahan) (5)F. MiragliaE. JordanP. GwynnJ. ScarboroughG. MarcusC. MillerT. ElsasserC. AderTVA-RockvilleWB Rdg. File

*cc: Licensee/Applicant and Service List

Page 6: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WATTS BAR PROGRAM PLAN

- PURPOSE -

o Numerous Issues and Programs Exist at Watts Bar

o Numerous Corrective Actions Completed and Underway

" A Systematic, Comprehensive Evaluation

Page 7: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WATTS BAR PROGRAM PLAN

- PROGRAM OBJECTIVE -

o Provide Reasonable Assurance That:

- Design and Construction Deficiencies

Have Been Detected

- Appropriate Corrective Actions

Have Been Defined

o Develop WBN NPP

o Successful Implementation of WBN NPP Wirl Confirm

that WBN is Ready for Licensing

Page 8: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WATTS BAR PROGRAM PLAN

- APPROACH -

o Establish Program Team with Oversight Advisors

o Develop Program Plan

o Conduct Systematic Evaluation of WBN

o Develop WBN NPP, Volume 4

o Implementation of NPP Will Confirm that WBN is

Ready for Licensing

Page 9: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

OVERSIGHTADVISORS

I NRC *Rome

WBPT INTERFACE CHART

LEGEND:-- FUNCTIONAL DIRECTION

....... TECHNICAL/ADMINISTRATIVEDIRECTION

PROGRAM COORDINATION/OVERSIGHT/DIRECTION

*'.. WBPT/NRC INTERFACE

Page 10: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WATTS BAR PROGRAM TEAM

- NRC INTERFACE -

o Openness and Close Coordination

o All Actions Open to NRC

o Periodic General Review Meetings

o Normal WBN/DNLRA Interaction

o Concurrence Sought for:

- Watts Bar Program Plan

- VSR Plan

- Corrective Action Plans

- Nuclear Performance Plan

o Notification of Changes to WBPT Membership

!

Page 11: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WAT-S BAR PROGRAM PLAN

- PRINCIPLES -

o Objectivity and Credibility

o Industry Experience

o Systematic Evaluation

o Corrective Actions

o Procedures

o Documentation and Records

o Program Oversight

" Close Coordination with NRC

Page 12: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

r0

I II II II I

COLLECT DEVELOP IIINDUSTRY -E PROGRAMI

EXPERIENCE PLANI

.•PROGRAM

SASSESSMENT

ATTRIBUTES DEVELOP ISSUE

COVERED By CORRECTIVE WBNSPECIAL ACTIONS NPP~PROGRAMS

DEELPRGA I SYSTEMATIC

WATSRARPRGRMALA

OCEURE EVALUATION

' ADDITIONAL ICORRECTIVE I

- ACTIONSREQUIRED

ACCEPTABLEAS FOUND I

PHASE I PHASE IIPHS I

PLNNNGEALATI DEVELOP CORRECTIVE ACTIONS

PLANIN I EV•ALUTION .

WATTS BAR PROGRAM PLAN

Page 13: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

+ __- VERTICAL SLICE REVIEW BOUNDARY

SELECTED 0

FROM VSP ADDITIONAL I

IU CORRECTIVERVEACE BACTIONSL[ REQUIRED

I _DEVELOP

!I VERTICAL ATTRIBUTES CORRECTVEi REVIEWSLC ACCEPTABLENO ACT. IONS

COVEREDBY SPECIALPROGRAMS

ATT IBUTESI- ACCEPTABLEI

AS FOUND I

L-----------------------------------------

EVALUATION PROCESSSYSTEMATIC

Page 14: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SYSTEMATIC EVALUATION

- ACCEPTANCE CRITERIA -

o Design:

- Codes and Standards

- Design Criteria

- System Descriptions

- FSAR and Licensing Commitments

o Construction:

- Drawings

- Specifications

o QA/QC Records

- Codes and Standards

- Specifications

- Procedures

Page 15: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SYSTEMATIC EVALUATION

- VERTICAL SLICE REVIEW (VSR) -

o Objective:

- Exploratory

- Confirmatory

o Contractor Selection Criteria

o System Selection Criteria

o Methodology, Procedures, and Protocol

o Exclusions from VSR

o Findings and Resolutions

Page 16: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SYSTEMATIC EVALUATION

- VSR CONTRACTOR SELECTION CRITERIA -

o Full Scope A/E Firm

o Independent from Original WBN Design and Construction

o Independent from Ongoing Production Work

o Previous IDR/IDVP Experience

o Strong Management Team

Page 17: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SYSTEMATIC EVALUATION

- PROTOCOL -

o Principles:

-Independence Not Compromised

-Document That Independence

o Formal Communications:

- Discussion of Findings or Recommendations

- Discussion of Resolutions

- Prior Notification of Meetings and Telecons Required

- Documentation Required

" Informal Communications

- Requests for Data or Additional Information

- Requests for Clarifications

- No Prior Notification of Meetings and Telecons Required

" Commercial Matters Outside Protocol

Page 18: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SYSTEMATIC EVALUATION

-EXCLUSIONS FROM VSR SCOPE-

o Welding Evaluation

o Concrete Quality Evaluation

o Environmental Qualification of Equipment

o Hanger and Analysis Update Program

- All Safety-Related Large Bore Piping

- Class 1 Small Bore Piping

o Detailed Control Room Design Review

o Seismic Analysis (Generation of In-Structure ResponseSpectra and Seismic Shear, etc., on Str~uctures)

Page 19: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

VERTICAL SLICE REVIEW PROCESS

Page 20: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WATTS BAR PROGRAM PLAN

- NUCLEAR PERFORMANCE PLAN, VOLUME 4 -

o Watts Bar NPP to Include:

- Description of Results

- Corrective Actions to Resolve Issues

- Operational Readiness Review

o Submit to NRC after NPG Approval

Page 21: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WATTS BAR PROGRAM PLAN

- CONCLUSIONS -

o Comprehensive, In-depth Review

o Assure Design and Construction Meet

Licensing Requirements

o WBN Obtains Operating License After

Implementation of NPP

Page 22: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

WATTS BAR PROGRAM PLAN

- SCHEDULE -

Submittal of WBPP

Submittal of VSR Plan

Begin Vertical Slice Review

VSR Final Report

Presentation of CAPS

WBN NPP

May 27, 1988

June 6, 1988

June 15, 1988

September 15, 1988

June-August, 1988

December 1988

Page 23: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SR. VICE PRESIDENT INUCLEAR OPERATIONS

S. A. WHITE

PROTOCOL

TVA - WBNLINE ORGANIZATION

I JJ.

MCDONALDR, LYONS

TECHNICAL OFFICERENGR. REPRESENTATIVE

WATTS BAR PROGRAM TEAM

E. FULLER tHAIRMANP. R. MANDAVA ENGINEERINGW, V, HORN CONSTRUCTIONVACANT LICENSINGVACANT ELECTRICAL/ISCR. E. LEWIS QAT, A. IPPOLITO ADVISOR

WBNSITE DIRECTOR

R. PEDDE

S&L

VERTICALSLICE REVIEW

TEAM

0

Page 24: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

TVA Watts Bar Nuclear PlantVertical Slice Review Program Project Director

B. A. Erler

Internal ReviewCommittee Chairman

H. S. Taylor

Internal ReviewCommittee .

E. B. BranchA. K. SinghL. R. StenslandR. L. Givan

Projec

R. C. H

Engineering

Verification Manager

0. A. Hrynewych

-L

Mechanical SystemMechanical ProjectEngineer

D. DeMoss

Electrical SystemElectrical ProjectEngineer

T. M. McCauley

IManager

elder

Construction andQA/QC RecordsVerification Manager

R. L. Humphreys

[S&L Engineers

FContractor Inspectors

Special HorizontalReview TopicsProject Engineer

T. J. Ryan

C1631.002 5-10-88

iA Coordinatori mi

I =

Page 25: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

Design-Vertical Slice Review Project Team Organization

Etcctrial Proect Suprvisin Cm ponae nt

R. C. He.der DocumenA

F. B.Sandqiut SSpecialists (3)

ProectEninererrePrtecio

Verification Manager

M. A. Hrynewych

Mechanical System Elctrical SystemecaMechanical Senior Eleoctr'ical Review lopics

Prouect Engineer Project Engineer Project EngineerD.Deos JT. M. McCauley T. J. Ryan

'.e~s I

Project Engineer Engineer(s) Design Engineer Qualification Project Engineer

L. J. RoCenbloom R. Sadlow.kI Structural Project Engineer J.p. SWittenauer Analyst

wb~N r. Me.htaG.

R. B. Sandquist J. S. Mowbra 0.P. Gupta A. Pattanay ak A. W. Ah ren si

J. W ind iale Eloectr Eni neer -.Fire Protecto

r4

Structural Control andtMeh nc lEngineer(s) Instrumnentatlion Enginee r "on

Mechanical SEn ier-H ig Project Engineer H.SnhML. J.mw l REl e rica l..

T. awsk G.nSalys ProEngineerngine

Structura B.D Dnewsa i Mep.Whtanic er

* Engineer Design Cnin e 003 6.C hng

M. Shomara Structura

T.~~~~~A KawkG.SaPrjct Engnerhad

CoIEndgineersK.A.PaeIn tM. S to t a i n .P*oo l u .S d ai g lS up risinga d

Pro ec E n inerl N .adioloagca

.. ' Harit Contron Engineer

ASsessmetua

-- A Projec~t Engnee :C. D~erhas

-roicngineer S ig

li. Keisse•Radiological

*QuaityCnto Asse3.00sm-1-t

M.. Dhoma

Page 26: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

Construction Verification Organization

Construction andQAIQC RecordsVerilication Manager

R. L. Humphreys

QAIQC RecordsVerification SupervisorJ. R. Hlxon

Ir -- I Reviewers

I ILevel III Lead

Mechanical InspectorM. R. Hearndon

T. Brewer Mechanical Inspectors

Level III Lead

Electrical InspectorH. E. Cameron

Engineers Level 11

A. Deb Electrical inspectors___ I,

Level II LeadC/S InspectorM. 0. Smith

C1631.004 6-1-88 Level ICIS Inspectors

Page 27: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

THREE SEPARATE AREAS

* DESIGN

. CONSTRUCTION

. QA/QC RECORDS

Page 28: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

OVERVIEW OF VERTICAL SLICE REVIEW

* TWO SYSTEMS PLUS HORIZONTAL

INiVESTIGATION

@ EXPLORATORY AN'D CONFIRMATORY

# SUBSET OF WB SYSTFEMATIC EVALUATION

LEADING TO CLOSURE PLAN

Page 29: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

Vertici.. Review of Design - General Concept

Vertical review -design process

Station/ regulatoryrequirements

fDesign inputs

Design process

Horizontalreview -GenerictopicsReview I&EBulletins/industryexperience

Design outputs

C1627.002 4-20-88

Fire protection: /

Select systems(selection criteria)

./[ 1 2 //

,.,/-"" //. ..

System 3 System 4 System 6 System 9--.--."• I . ' ,, l , i . .-+ -- -- m 9../.-

- ~~naratIon7 7/

_ _ _ ... . _ .. J

.... I . .... . ..... 0......... ..... " ... ................... , ..... . .7- . - - * - * -. .... - I.. .. _ _ _ _ ..... ..................- ..... ......... ..

Separation7 HELB/MELB..-4 -.. "

-. I''~ 1L.....2. ______________ .-. *--

/ 171 I...~ ~ ___ __ ____ _______

____________ ____________ K-i 1."~

/ 1/1// J/J/ /.

7

.. . / . .

_ _ _t.~~-4 , .. i•: . . .. • .. a. I;-" • .. . .:' -

. . " . ... . .. . ..

I. - .//

! / iI

4

/

/ ! Z :.I :

Page 30: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SYSTEMATIC EVALUATION

- SYSTEMS/AREAS SELECTED FOR VSR -

o Mechanical System:

- Component Cooling System

o Electrical System:

- AC Shutdown Power System

o Hot Piping Systems

- Portions of Steam Generator Blowdown System

" HVAC System:

- Control Building-Electrical Board Room

Air Conditioning System

o Horizontal Review for Spatial Features,

e.g., Fire Protection, Flooding

Page 31: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SAIRGENT & L.UND]YWatts Bar Vertical Slice Review

Criteria for System Selection

The systems selected to be reviewed in the Watts BarVerticle Slice Review Program will be chosen consideringthe following criteria:

1. The system must be safety-related, essential to plantsafety

2. The system should involve a cross-section ofengineering and design disciplines within the TVAdesign organization

3. The concept and implementation of the system designshould be by TVA

4. The system should be generally representative ofsafety-related features of other systems

5. The system should be reasonably compplex, requiringseveral modes of operation involving redundancy andsingle failure considerations

6. The system design should involve internal interfacesbetween functional areas such as:

* Mechanical* Civil/structural* Electric power* Instrumentation and control

and the external interfaces with Westinghouse,component vendors, and TVA engineering

7. Major portions of the system should already be installed

8. The system should have a clearly defined design basis

9. The system should have required design changes overthe plant design period

It is recognized that each of the systems selected maynot encompass all of the above criteria. However, bychoosing additional sections of other systems for review, itis intended that the above criteria be covered. Otherconsiderations in selecting systems for review are:

A A

Page 32: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

p

SARGENT a LUNDY

I. The system should include new or unique designfeatures.

2. If a PRA has been performed on the WBN, considera-tion of the results of the PRA will be included in thesystem selection.

3. Results of other inspections such as; IDVPs, IDRs, IDIsand CAPs will be considered in system selection.

Page 33: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

0

I]FSIGN VRqTFTfATTflN

o DESIGN IS IN CONFORMANCE

WITH LICENSING COMMITMENTS

o REVIEW DESIGN PROCESS FOR

ADEQUACY

DESIGN APPROACH IN TWO PARTS

* s FUNCTIONAL REVIEW

* PARTIAL PHYSICAL REVIEW

- SYSTEM COMPONENTS

- SYSTEM INTERFACE WITH

PLANT

Page 34: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

CONSTRUCTION VERIFICATION

* CONSTRUCTED PLANT IS IN

ACCORDANCE WITH DESIGN

OUTPUT DOCUMENTS

AREA BASIS FOR EVALUATION

@ SELECTED ELEMENTS IN

IDENTIFIED AREAS

o SOME ELEMENTS WILL BE

COMMON IN El! AND CV & RV

PROGRAM

Page 35: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

0

QA/OC RECORDS VERIFICATION•

* RECORDS AGREE WITH THE

CONSTRUCTED PLANT

* SLICE OF THE CV ELEMENTS

Page 36: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

0

SAR~GENT i LUNDY Project Design and Construction

Requirements

Licensing requirements for Watts Bar as identified byTVA and as contained in the following documents:

" Final Safety Analysis Report (FSAR)

" Watts Bar Safety Evaluation Report (SER)

" Code of Federal Regulations

• Industry codes and standards as committed to inFSAR

• Applicable IE bulletins, information notices, andcirculars

NRC-NRR, I&E Branches, and ACRS design andlicensing requirements

* Fire protection report

Page 37: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SARGET a UNDYDocuments Required for DesignControl and Interface Adequacy

Review

. TVA Quality Assurance Manuals

. Watts Bar Project Manual

. TVA Design Guides and Standards

. TVA Generic Engineering Procedures

. TVA current organization charts that representdesign flow

. Interface design specifications (TVA andWestinghouse)

Page 38: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SARGENT & LUNDYRequired Documents

Documents or information anticipated to be pertinentto the systems, structures or components being reviewedinclude:

• System piping and instrumentation diagrams* General arrangement drawings• Applicable engineering standards* System and component design criteria• Technical specifications• Design installation and test specifications* Installation/Construction Drawings* Non-Conformance Reports (NCR)* Condition Adverse to Quality Reports (CAQR)* Field Change Request (FCR)* Engineering Change Notices (ECN)* Design drawing hierarchy* Logic diagrams (with legend sheets)* Loop diagrams* Instrument index* Instrument data sheets* Instrument location drawings* Computer I/O list* Annunciator drawings* Instrument procurement specifications• Control board arrangement drawings* Control board physical drawings* Control board wiring drawings* Intermediate instrumentation cabinet physical

drawings• Intermediate instrumentation cabinet wiring

drawings* Instrument impulse line routing drawings* Electrical calculations* Electrical single-line drawings. Electrical schematic diagrams• Electrical raceway and routing drawings. Electrical wiring drawings. Cable tabs. Termination cards. Master control diagrams or equivalento Design basis criteria calculations and/or analysis

for:- a-c on-site power systems- d-c power systems- a-c instrumentation power systems- power cable ampacity and derating- power and control circuit voltage drop

Page 39: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SARGENT ak LUND3Y

*Equipment specifications and equipment datapackages

*Equipment list*Valve list*Specification index*ASME design specifications*System piping drawings*Piping isometric drawings*Seismic 11 over I assessment report*Flooding report*Pipe whip restraint drawings*Westinghouse system design specifications and data

sheets*Westinghouse instrument data sheets*Approved design change documents*Hanger sketches*Hanger installation drawings*The following design basis documentation:

- Pipe support restraint calculations- Pipe support auxiliary steel calculations- Data prepared for input to the pipe program

used in analysis- Special calculations used for flange

qualification- Stress indices calculations used for non-

standard fitting including integral attachments- Structural anchor calculations, if any- Calculations for fluid transient Loads, if any- Pipe sizing for pressure and flow including

corrosion allowances used in calculating pipewall thickness

*Stress reports including the following aspects:- Functional capability assurance- Pipe break location identifications, based on

stress criteria or lack thereof- Any ISI requirements

- Thermal transient stress evaluation- Fatigue evaluation of gamma plugs- Class I fitting details and contours from field

measurements- Stress indices for small taps

Page 40: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

AR T UN

SARGENT &LUNDY

* Existing input data including:- Site seismic g-level and related geological data- Building seismic response spectra- Instrumentation and controls standard

specifications- Standard equipment product literature and test

reports supplied by vendors to TVA- Generic engineering or test data supplied by

Westinghouse- Structural Calculations- *Installation - Construction- *Installation - Construction

discipline- *Installation - Construction

and Storage- *Manufacturing records- *Procurement records

Records - GeneralRecords - Each

Records - Receiving

- *Construction progress status for selectedsystems

- *Discipline construction specifications for alldisciplines

*To be provided at site only

Page 41: Summary of 880603 meeting w/util & Sargent & Lundy in … · 2012-11-30 · Mechanical S En ier-H Project Engineer ig H.SnhML. l J.mw REl e rica l.. T. awsk G.nSalys ProEngineerngine

SARGENT aLUNDY

C. Definitions and Resolu-tion of Findings

ObservationsA design, construction, or records related conditionwhich is perceived by a reviewer or inspector to bein nonconformance with the licensing or otherdocuments imposing safety-related requirements.

*Non-Discrepant ObservationsAn Observation which is confirmed, after a review,to be in conformance with the licensing or otherdocuments imposing safety-related requirements.

*DiscrepancyAn Observation which is confirmed, after review, tobe in nonconformance with the licensing or otherdocuments imposing safety-related requirements.For the design and records review this determina-tion will be made by the IRO.

*Design-Significant DiscrepancyA design, construction, or records relatedDiscrepancy which, after engineering evaluation, isfound to be in nonconformance with the appropriatecode, standard, or licensing requirements.

*Safety-Significant DiscrepancyA design, significant Discrepancy which, if itremained undetected, could result in the loss ofcapability of the affected system or structure toperform its intended safety function. For thisevaluation, credit is not allowed for redundancy atsystem or train level.