Summary Kick-off meeting AIP-6(March 28-29, NOAA, Washington DC)
Slides provided byBart De LathouwerOpen Geospatial ConsortiumAIP Lead
Architecture Implementation Pilot
• „The GEOSS Architecture Implementation Pilot (AIP) develops and deploys new process and infrastructure components for the GEOSS Common Infrastructure (GCI) and the broader GEOSS architecture.“
• AIP is an agile, evolutionary development process, that proves the maturity of the infrastructure components.
• Need to establish a good set of standards and results that show web access to large sets of EO data.
• The process was initiated in 2007. AIP-5 results:– http://www.ogcnetwork.net/pub/ogcnetwork/GEOSS/AIP5/
index.html
OperationalCapability
OperationalCapability
UserNeeds,
Scenarios
UserNeeds,
Scenarios
Design, Develop,Deploy
Design, Develop,Deploy
ADC activities including:
ArchitectureImplementation
Pilot (AIP)Task AR-09-01b
GEOSS CommonInfrastructure (GCI)Task AR-09-01a
support
persistentimplementation
requirements
SBA Tasks,UIC, CBC, STC
A process, elaboration of GEOSS Architecture
URR, Data Sharing Task Force
GCI-Coordination Team
Transfer to operations
2011-2015
SIF outreach
Activities in an AIP phase
GEOSS Components – AIP Baseline
AIP Agile Development Phases• AIP-1 Kickoff: Jun 2007; Alpha operations Nov 2007; Arch Workshop Feb 2008
– "Core" Architecture defined initial version of GCI
• AIP-2 Kickoff Sep 2008; demo ISRSE May 2009; Beta operations Sep 2009
– SBA implementations of common cross-cutting architecture; Refined GCI concept supporting transition to operations
• AIP-3 Kickoff Mar 2010; results to Beijing Plenary; Complete Feb 2011
– Network building in GEOSS SBA communities; Piloted Broker and Processing capabilities
• AIP-4 Kickoff May 2011; results to Istanbul Plenary; Complete Dec 2011
– Increased access to priority earth observation data; via server software, tutorials and application clients
• AIP-5 Kickoff May 2012; results to Brazil Plenary; Complete Dec 2012
– SBA application scenarios; Research prototypes
“Fostering interoperability arrangements and common practices for GEOSS”
GEO Task IN-05GEOSS Design & Interoperability
Priority Actions •GEOSS Research and Prototyping•GEOSS Interoperability Analysis and Support•Encourage mature systems to interoperate with GCI•Ensure access to GEOSS Data-CORE
Approach •Manage evolutionary architecture of GEOSSStandards and Interoperability Forum (SIF)Architecture Implementation Pilot, Phase 5 (AIP-5)
Responses to AIP-6 Call for Participation
• CITE-SENSE• COBWEB• Compusult• Esri• FCU• GEOSS Water Services• Geoviqua• GEOWOW & EarthServer• …
• GLOS• INCOSE• ITRI• MEDINA• MINES ParisTech• NASA• Afriterra Foundation• GMU• …
Many more, as part of response. Please visit
http://www.ogcnetwork.net/node/1890
AIP-6 Kickoff Objectives
• Mature AIP-5, SBA & Technical
• Ministerial showcases - Sprint-to-Summit
• Focus on Authentication & Data Sharing
• More In-Situ observations
• Involvement of Developing Countries
• Increase Capacity Building
• For the End-User (direct of indirect)
• Increase awareness
– Use metrics
AIP-6 Working Group Leaders
• Water– David Arctur
• Argiculture & Disasters Managemnt– Liping Di, Joan Maso
• Energy– Lionel Menard
• Health & Climate & Weather– Arne Berre
• Data Sharing– Steve Browdy
• Capacity Building– Lucia Lovison-Golob
• GCI Research– Joan Maso
• System Design– Larry McGovern
SBA Technical
Organisation He Cl We Dm Ag Wa Bd En Eco Auth GCI Sys Crowd Mobi In-Situ
Dev Countr
iesEnd User Capacity Building
CITI-SENSE S,R S,R S,R V V V
COBWEB V
Compusult S,R V V V
Esri S,R,A S,R V
FCU1 S,R
FCU2 S,R GEOSS Water Services S,R,A V V V
GeoViqua S,R S,R V V GEOWOW & EarthServer V
GLOS S,R V
Incose A A A A A A A A V
ITRI S,R,A V V V
MEDINA S,R,A S,R,A
MINES ParisTech S,R,A V V
NASA S,R,A S,R,A V V V V V V V(Afriterra Foundation) V V VGMU S,R,A
1 2 1 5 2 5 1 1 1
AIP-6 Contributions – initial analysis
AIP-6 Master Schedule
CFP Issued 09-Feb-2013CFP Response Due 15-MarKickoff, Washington 28-MarShowcases 15-MaySBA Testing 01-DecGEO Plenary, Geneva 17-Jan-2014
AIP Communication Plan
• Telecons– AIP Plenary telecon – Tuesdays
• http://www.ogcnetwork.net/AIPtelecons– WG Telecons – as determined by WG Leaders
• E-mail list-servers– [email protected]– Lists for working groups (see twiki)
• Collaboration Resources– www.ogcnetwork.net/AIPilot– Geoviqua Wiki for AIP internal dev.
http://twiki.grumets.uab.es/twiki/bin/view/AIP6/WebHome– GEO Best practice Wiki http://seabass.ieee.org
Thanks to all who made the AIP-6 Kickoff a success
• Thanks to Session Leaders, Rapporteurs and Participants
• Thanks to NOAA for hosting the workshop– Martin Yapur!
• Please contact Bart De Lathouwer if you would like to participate– Call remains open for the duration of the project
References
• GEO– www.earthobservations.org
• GEO Architecture Implementation Pilot– www.ogcnetwork.net/AIPilot
• GEOSS resources and SIF– geossregistries.info