Suisun Valley School K-8 2013 Classroom Addition Project
description
Transcript of Suisun Valley School K-8 2013 Classroom Addition Project
Suisun Valley School K-8 2013 Classroom Addition Project
Suisun Valley K-8 Classroom Addition Summary
SITE MODIFICATION FEATURES
•7 New classrooms centered around ‘courtyard’ spaces•3 New restrooms (Boys, Girls, Staff)•4 Existing portables relocated to accommodate a ‘finger plan’ design for better visibility•New stamped concrete surface with tree planter boxes•Revised parking lot•New grass turf athletic field located behind the multi-use building•New fenced Kindergarten playground area
Suisun Valley K-8New Classrooms
NEW BUILDING FEATURES
•Cool roofs for energy efficiency•Abundant natural lighting (windows)•Solar tube skylights for additional natural lighting•Front and rear classroom exits•Buildings set at grade- no ramps•Roof overhangs for rain•Central layout to allow better collaboration between classes
Enlarged Site Plan
Aerial View from North West
Aerial View from South West
View from South East
View from East