1
Suggested Engineering Changes to Modular Coil Lead
Area
James H. Chrzanowski
June 13, 2006
![Page 2: Suggested Engineering Changes to Modular Coil Lead Area](https://reader035.fdocuments.net/reader035/viewer/2022062314/56812cad550346895d91615a/html5/thumbnails/2.jpg)
2
Lead Area Design Changes
• Lead Area upper chill plate
• Lead Area lower cladding
• Improve tracking distance hardware to jumpers
• Eliminate floating Hardware– Jumper studs– Power bus joint
![Page 3: Suggested Engineering Changes to Modular Coil Lead Area](https://reader035.fdocuments.net/reader035/viewer/2022062314/56812cad550346895d91615a/html5/thumbnails/3.jpg)
3
Lead Area Chill Plates
- If possible eliminate upper chill plate
- Difficult to insulate
- Potential problem in future??
![Page 4: Suggested Engineering Changes to Modular Coil Lead Area](https://reader035.fdocuments.net/reader035/viewer/2022062314/56812cad550346895d91615a/html5/thumbnails/4.jpg)
4
Lead Area Cladding- Lower
• Replace lower cladding in lead area with G-11cr [eliminate floating pieces]
![Page 5: Suggested Engineering Changes to Modular Coil Lead Area](https://reader035.fdocuments.net/reader035/viewer/2022062314/56812cad550346895d91615a/html5/thumbnails/5.jpg)
5
Power Bus Tie-in Area
• Improve tracking distance- install barrier
• Eliminate floating through bolts- tie studs to one side of joint
![Page 6: Suggested Engineering Changes to Modular Coil Lead Area](https://reader035.fdocuments.net/reader035/viewer/2022062314/56812cad550346895d91615a/html5/thumbnails/6.jpg)
6
Improve Tracking Distance
• Improve tracking distance
• Install 032 in. thick G-11cr insulator under jumpers covering bolts
![Page 7: Suggested Engineering Changes to Modular Coil Lead Area](https://reader035.fdocuments.net/reader035/viewer/2022062314/56812cad550346895d91615a/html5/thumbnails/7.jpg)
7
Lead Area Floating Hardware-Link the [3] jumper studs to the bottom jumper using G-11cr [1] insulator and copper plate [2]