M cKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina. THE CHALLENGE The project had a very aggressive schedule coupled with extensive scope in a small area making the jobsite congested with both personnel and materials. At times, the workforce on the project exceeded 200 people. THE SOLUTION McKenney’s utilized Building Information Modeling (BIM)—along with prefabricating nearly all of the steel piping mains—to minimize on-site congestion and optimize installation efficiency. Pipe deliveries were sequenced just-in-time and set in place upon arrival, reducing on-site storage. To ensure an on-time installation of the chiller plant, the construction team created a detailed installa- tion schedule utilizing heavy BIM coordination, numerous trips to the factory and major collaboration with all trades. THE RESULTS With the exception of the chiller plant installation which took two rather than the scheduled four weeks—on-site pipe-fitting crew size was kept under 10. Success is in the Details PROJECT NAME Colocation Data Centers PROJECT LOCATION Durham, North Carolina PROJECT TEAM Owner: Data Centers General Contractor: Holder Construction Architect: O’Brien/Atkins Associates, PA Engineer: DLB Associates Consulting Engineers, P.C. Contractor: McKenney’s, Inc. SPECIALIZATIONS Building Information Modeling Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS Mission Critical The content of this document is not intended as an endorsement. www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

description

McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina.

Transcript of Success is in the Details - Colocation Data Centers

Page 1: Success is in the Details - Colocation Data Centers

McKenney’s installed a new prefabricated chiller plant and piping loop to support

up to nine megawatts of critical load for a colocation data center in North Carolina.

THE CHALLENGEThe project had a very aggressive schedule coupled with extensive scope in a small area making the jobsite congested with both personnel and materials. At times,

the workforce on the project exceeded 200 people.

THE SOLUTIONMcKenney’s utilized Building Information Modeling (BIM)—along with prefabricating nearly all of the steel piping mains—to minimize on-site congestion and optimize installation efficiency. Pipe deliveries were sequenced just-in-time and set in place upon arrival, reducing on-site storage. To ensure an

on-time installation of the chiller plant, the construction team created a detailed installa-tion schedule utilizing heavy BIM coordination, numerous trips to the factory and major collaboration with all trades.

THE RESULTSWith the exception of the chiller plant installation which took two rather than the scheduled four weeks—on-site pipe-fitting crew size was kept under 10.

Success is in the DetailsPROJECT NAME

� Colocation Data Centers

PROJECT LOCATION

� Durham, North Carolina

PROJECT TEAM

� Owner: Data Centers

� General Contractor: Holder Construction

� Architect: O’Brien/Atkins Associates, PA

� Engineer: DLB Associates Consulting Engineers, P.C.

� Contractor: McKenney’s, Inc.

SPECIALIZATIONS

Building Information Modeling

Pipe Shop Prefab

Sheet Metal Shop Prefab

MARKETS

� Mission Critical

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214