Transcript of Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc....
![Page 1: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/1.jpg)
Subsurface Utility Engineering(SUE)
Kenneth SlaninkaDirector / Senior Project Manager
Cardno, Inc.
Utility Coordination Training
![Page 2: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/2.jpg)
What is Subsurface Utility Engineering (SUE)?
Overview of SUE - Definitions When to Use SUE How to Use SUE Why Use SUE
Outline
![Page 3: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/3.jpg)
What is Subsurface Utility Engineering?
![Page 4: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/4.jpg)
What is Subsurface Utility Engineering?
A branch of ENGINEERING PRACTICE that involves managing certain risks associated with: Utility Mapping at appropriate ASCE Quality Levels Utility Coordination Utility relocation and adjustment through conflict matrix
resolution Utility relocation design and cost estimates Communication of utility data to concerned parties Implementation of Utility Accommodation Policies and utility
design
![Page 5: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/5.jpg)
CI/ASCE Standard 38-02
The American Society of Civil Engineers (ASCE) has developed a National Consensus Standard, CI/ASCE 38-02, titled “Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data”. This National Consensus Standard (NCS) is used by courts and lawyers, along with contractual instruments, to assist in both defining a professional’s standard of care and level of responsibility.
![Page 6: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/6.jpg)
ASCE Standard – Quality Levels
QL-B
QL-A
QL-C
QL-D
ASCE UTILITY QUALITY LEVELS
![Page 7: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/7.jpg)
ASCE Quality Level D (QL-D) Existing Utility Records
Involves the use of existing utility records, permits, plans to depict the ‘approximate’ horizontal position of underground utilities.
![Page 8: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/8.jpg)
ASCE Quality Level C (QL-C) Survey of Visible Features
Involves surveying visible above ground utility facilities to assist with determining ‘approximate’ horizontal position of underground utilities. Used with QL-D.
Manholes Power poles Hydrants / valves Phone Pedestals
![Page 9: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/9.jpg)
ASCE Quality Level B (QL-B) Utility Designating
Involves the use of geophysical prospecting equipment to determine the existence and horizontal position of underground utilities.
Paint markings Flags Field Sketch
![Page 10: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/10.jpg)
Designating Equipment
Electromagnetic (metallic) Acoustical – Pulse (non-
metallic with fluid) Sonic / Sonde (open access) Ground Penetrating Radar
(GPR) Non-destructive probing
![Page 11: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/11.jpg)
Designating Equipment
Radiodetection 8000Multi-Frequency512Hz 8KHz 33Khz 65KHz Low Medium
Metrotech 810/ Vivax 810Single Frequency83KHz High
Subsite 950Multi-Frequency512Hz 1Khz 8KHz 29Khz 80KHz Low Medium High
Metrotech 9890xtMulti-Frequency982Hz 9.8KHz 82KHz Low High
Metrotech 530Single Frequenc332KHzHigh
Rycom 8876Dual Frequency 815Hz 82KHzLow High
Pipehorn 800 HzDual Frequency 480 KHzVery High Low
3M Dynatel 2250Multi-Frequency5772Hz 8Khz 33KHz 133Khz Low Medium High
![Page 12: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/12.jpg)
Designating Approach: QA/QC
All data is checked and cross-checked for accuracy – Records research vs. designating file
Field sketch Designating data point &
numbering systemUtility
# of points
Comments/ Notes/ Location
W1 20 East side of road
W2 4 West side of road
W3 12 NB lane
![Page 13: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/13.jpg)
One-Call is NOT Quality Level B
![Page 14: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/14.jpg)
Why One-Call is NOT Quality Level B
One-Call is a risk based system used for excavation One-Call Utility locator uses one piece of equipment No traffic control allowing necessary geophysical
methods, or opening/investigating of utility structures The information received has no guarantee of reliability One-Call Utility locator has a narrow focus and limited by
time Utility data records research, interpretation, and
designation not performed under the responsible charge of a registered professional, no QA/QC performed
![Page 15: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/15.jpg)
Quality Level B is..
Using Appropriate Methods (Inductive vs Conductive) Inductive – inducing current along utility Conductive – directly connecting to utility
Using Appropriate Equipment Single or multi-frequency electromagnetic units GPR Magnetics Sonde or sonic methods
Supported by QL-D and QL-C Sealed by a Professional Engineer
GPR
![Page 16: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/16.jpg)
ASCE Quality Level A (QL-A) Utility Locating
Involves the use of non-destructive digging equipment at critical points to determine the precise horizontal and vertical position of underground utilities, as well as the type, size, material, and other characteristics.
![Page 17: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/17.jpg)
Locating Approach
Permitting Minimal disturbance
Saw cut in pavement Air vacuum excavation
Centerline of facility Permanent reference
points Proper restoration
Compaction in 6” lifts Perma-Patch
![Page 18: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/18.jpg)
Locating Approach: QA/QC
Test Hole Data Collection – 2 photographs of every test hole for permanent record
Final QA/QC of all Subsurface Utility Engineering work is done by registered Professional Engineer
![Page 19: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/19.jpg)
When to Use SUE?
![Page 20: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/20.jpg)
When to Use SUE?
Type of Project Piping and Facility Design
(storm, sanitary, water) Site and Plant Design Roadway / Bridge const. Widening / Intersection
Improvements Signal Replacement
Location of Project Urban / Suburban Rural
![Page 21: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/21.jpg)
When to Use SUE?
Utilities involved Major or Minor
Conflicts with utilities
Compensable interest
Limited Access R/W Accuracy required
ASCE Quality Level? Level of Risk
![Page 22: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/22.jpg)
What are the Risks?
? ?? ???
![Page 23: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/23.jpg)
What are the Risks?
Project delays Damage to
utilities Safety of workers Safety of public Redesign costs Higher bids Change orders
Extra work orders Construction claims Higher insurance /
financing / construction costs
Detours for travelling public
Negative publicity
![Page 24: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/24.jpg)
Risk Management
DES IGNENGINEER
Without SU E With SU E
TOTAL R ISK
R ISK EL IM INAT ED
SU EENGINEER
D C B ADE F IN ED QUA L IT Y L EV ELU N DEF IN E D QUA L IT Y L EV EL
TOTAL ENGINEERING RISK POOL
ALLOCATION OF RISK WITHIN ENGINEERING POOL
![Page 25: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/25.jpg)
How Do We Use SUE?
Commitment to avoid unnecessary utility relocations
Communicate with Utilities early & often Records Research – QLD Utility Designating – QLB Topographic Survey – QLC Review of QLB, QLC & QLD Preliminary Design Utility Conflict Analysis Utility Locating – QLA Design Alternatives
![Page 26: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/26.jpg)
Design Alternatives
Geometric Alignment Change grade Shift alignment Widen on one side of the road Shift ramps or driveways
![Page 27: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/27.jpg)
Design Alternatives
Structure Design Alter footing / piling designs Provide alternative foundations Modify bridge layout Shift or modify retaining walls Add retaining walls Add guardrail
![Page 28: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/28.jpg)
Design Alternatives
Drainage Design Dual trunk line in lieu of single trunk Shift ditches Shift structure locations (inlets, pipes,
manholes) Open vs. closed system Modify side slopes or ditch slopes
![Page 29: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/29.jpg)
How Do We Use SUE?
Utilities in Plan View
![Page 30: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/30.jpg)
How Do We Use SUE?
Utilities in Profile View
![Page 31: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/31.jpg)
How Do We Use SUE?
Utilities in Cross Section View
![Page 32: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/32.jpg)
How Do We Use SUE?
Utility Matrix
![Page 33: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/33.jpg)
Why Use Subsurface Utility Engineering?
![Page 34: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/34.jpg)
Why Use Subsurface Utility Engineering?
![Page 35: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/35.jpg)
Why Use SUE?
Make Informed Design Decisions Designers require accurate utility information,
including constructability of multi-phase projects. Avoid Using Unreliable Underground
Utility Information Avoid uncertainty and second guessing where a utility
may be located.
![Page 36: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/36.jpg)
Why Use SUE?
Avoid Costly Conflicts / Utility Relocations By knowing the exact horizontal and vertical locations
of underground utilities, costly conflicts and utility relocations may be avoided, along with not having to depend upon the utilities to relocate before construction can occur.
Savings and Safety Inaccurate information can result in costly conflicts,
utility damage, construction delays, service disruptions, redesign, claims, and even injuries and loss of life.
![Page 37: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/37.jpg)
Relative Cost Savings & Benefits
Purdue Study Commissioned by FHWA 71 projects studied in 4 states (VA,
NC, OH, TX) Projects valued at >$1B SUE was < 0.5% of construction
costs Both QLB & QLA performed
![Page 38: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/38.jpg)
Relative Cost Savings & Benefits
Purdue Study Cost savings of $4.62 per $1.00
spent on Subsurface Utility Engineering
Largest return on investment was $208/$1
1.9% savings on construction costs Quantitative costs only (Qualitative
costs not included) SUE is a viable practice that
reduces project costs related to the risks associated with underground utilities
If used properly it could result in a minimum savings of $1 billion per year
![Page 39: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/39.jpg)
SUE Current Practice Owner and Engineer Responsibility
In an increasing number of states, lawyers and courts are using guidelines, agency policies, and contractual instruments to define and hold professionals accountable for their standards of care.
It is an Engineer’s responsibility, on behalf of an Owner, to utilize all available resources and methods to gather and provide the most accurate information possible.
![Page 40: Subsurface Utility Engineering (SUE) Kenneth Slaninka Director / Senior Project Manager Cardno, Inc. Utility Coordination Training.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649d765503460f94a56d72/html5/thumbnails/40.jpg)
Question and Answer Session
There are more difficult things
to deal with on the job than
utilities!