Substation Plans - @NSWDepartmentofEducation
Transcript of Substation Plans - @NSWDepartmentofEducation
405.000
CH 420.000
CH 435.000
CH 450.000
CH 465.000
CH 480.000
CH 495.000
SAG 488.647
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
E
DBYD
32778
231927
8
8
4
0
6
7
8
8
4
0
6
8
8
8
4
0
6
9
9
0
9
2
4
0
9
0
9
2
4
1
9
0
9
2
4
2
9
0
9
2
4
3
8
8
4
0
7
1
8
8
4
0
7
2
9
0
9
2
3
8
9
0
9
2
3
9
1
2
5
0
3
3
1
2
5
0
3
2
1
3
5
6
9
3
1
3
5
6
9
4
1
3
5
6
9
5
1
3
5
6
9
6
1
3
5
6
9
7
1
3
5
6
9
3
A
1
3
5
6
9
4
A
1
2
5
0
4
0
1
2
5
0
4
2
1
2
5
0
4
1
1
2
5
0
3
8
1
2
5
0
3
5
1
2
5
0
3
7
1
2
5
0
3
6
1
2
5
0
3
4
60
69
67
9
0
4
8
6
8
8
9
2
1
9
3
1
60
58
56
3
2
3
7
3
9
2
3
2
3
2
5
2
5
1
2
3
4
3
8
3
6
3
1
3
3
3
5
2
1
2
7
8
6
1
0
3
5
7
9
1
1
6
8
1
0
9
1
1
9
4
1
2
7
525351
525353
525360
525377
525480
321643
350521
820116
909248
909249
909250
S
T
A
L
B
A
N
S
R
D
J
U
N
C
T
I
O
N
R
D
L
I
L
B
U
R
N
S
T
L
I
L
B
U
R
N
S
T
B
R
I
N
S
L
E
Y
A
V
E
S
T
A
L
B
A
N
S
R
D
Q
U
E
E
N
S
B
U
R
Y
S
T
5
4
3
2
1
301
302
303
304
305
306
Q
U
E
E
N
S
B
U
R
Y
S
T
J
U
N
C
T
I
O
N
R
D
36852
/
/
/
/
/
/
/
/
/
/
/
3
22069
S
1
5
5
4
9
7
1
1
2
5
0
3
1
8
8
4
0
6
6
8
8
4
0
6
5
2
4
Cadastre: Ⓒ Land and Property Information 2016
REFERENCE DRAWING'S WORK ORDERS C THIS DRAWING
AND THE
COPYRIGHT
THEREIN IS THE
PROPERTY OF
ENDEAVOUR ENERGY AND
MAY NOT BE COPIED,
REPRODUCED,
DISTRIBUTED, LOANED OR
USED WITHOUT THE
WRITTEN CONSENT OF
ENDEAVOUR ENERGY
01
N
REF. NUMBERconnect
connectI N F R A S T R U C T U R E
®
6 Progress Cct, Prestons NSW 2170PO Box 484, Casula Mall NSW 2170
Electrical Infrastructure
Consultancy, Design &
Construction
Connect Design Pty Ltd
Tel: 02 9733 3333
Fax: 02 9733 3330
Email: [email protected]
-
DT540
E1 10
APPROVAL TO CONNECT TO PUBLIC LIGHTING
This approval is issued subject to Endeavour Energy's General Terms &
Conditions for connection of Public Lighting Assets and is specifically for
Drawing No. xxxxxx Amendment x.
Reviewers Name:
Date Approved:
Reviewers
Signature:
EXISTING DUCT
USAGE CHARGES (exc GST)
Includes but not limited to:
- Pegging of easements, property boundaries &
infrastructure locations
- Registering of easements
- Providing site access
- Own service & service connection
- Confirm finished ground levels
- 1 x POLE SUB Tx No. 22069 (300kVA)
- 7/2.00HDCu = 4x32m
(Assets to be returned to Endeavour Energy
complete with "Equipment to be returned to
Endeavour Energy" forms FPJ4252 and FPJ4253)
ENDEAVOUR ENERGYSUPPLIED MATERIALS
ASP LEVEL 1 ELECTRICAL WORKS CUSTOMER
FUNDING ARRANGEMENTS FOR SCOPE OF WORKS
CUSTOMER FUNDEDNON-CONTESTABLE WORKS
CUSTOMER FUNDED
CUSTOMER FUNDEDCONTESTABLE WORKS
ENDEAVOUR ENERGYFUNDED & CONSTRUCTED
(TO BE CONFIRMED BY THE CUSTOMER)
DAY: 26 MONTH: 03 YEAR: 2019
CO-ORDINATIONSUPPLY REQUIRED DATE
- NIL
All other works and materials including
but not limited to:
- Installation & establishment of PM Substation
- Trenching
- Duct Installation
- Cable laying and/or installations
- Jointing
- Overhead installation
ENDEAVOUR ENERGY FUNDED& ASP L1 CONSTRUCTED
- REIMBURSEMENT (exc GST)
Inspection and Access Authority
- System switching
- Provision of Access Authority (As per Fee sent by EE's CWA's)
ASSET TO BE RETURNED TONEAREST ENDEAVOUR ENERGY
DEPOT BY L1 ASP
Works Required Prior to
Completion of Customer
Contestable Project
Works Required in
Association of Customer
Contestable Project
- NIL - NIL
- NIL
C.A.P.
No
FILE No
LOT
Nos
No.of
LOTS
DEVELOPER
DEVELOPERS
REP
THIS DRAWING SUPPLIES ASSSET RELOCATION AND SCHOOL DEVELOPMENT
PHONE No
ULL2741 2017/05244/001
LOT 20 & 21
- BCC
DP2912
KINGSLEY PAGE (02) 9839 6359
AUTHORISATION OF ESTIMATE VALUEOF ENDEAVOUR ENERGY FUNDED ASSETS
Signed:
Print Name:
Service Number:
Funding Amount: $
Date:
WORKS COMPLETED/FIELD BOOK
CONSTRUCTED BY:
ASSET RECORDING
INSPECTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
I:
OF:
CONTACT No.:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWING HAVE BEEN
RECORDED AS PER ENDEAVOR ENERGY STANDARD SAD 0004.
SIGNATURE:
DATE:
SIGNATURE: DATE:
Date Approved:
This Certification is issued subject to
Endeavour Energy's
Standard Certification Terms
CERTIFIED BY ENDEAVOUR ENERGY
Amendment:
Print Name:
Examiner's Signature:
KEY DOCUMENTS TABLE
THE CERTIFICATION OF THIS PROJECT IS SUPPORTED BY THE FOLLOWING KEY DOCUMENTS
DOCUMENT NAME NOTATION DATE
SUMMARY ENVIRONMENTAL REPORT (SER) - FAT0038 part of EMS0001
26/06/2018
AGREEMENT FOR ENTRY, GRANT and CREATION OF EASEMENT -
FPJ5013
12/09/2018
EQUIPMENT TO BE RETURNED TO ENDEAVOUR ENERGY - FPJ4252 26/06/2018
EQUIPMENT TO BE RETURNED TO ENDEAVOUR ENERGY - FPJ4253 N/A
TELECOMMUNICATION ASSET AGREEMENT - FPJ4184 N/A
PROJECT DEFINITION N/A
DESIGN SAFETY REPORT 6/04/2018
LIST ANY KEY DOCUMENTS SUPPORTING THE CERTIFICATION:
1) PROPOSED RETAINING WALLS 'FOOTING LAYOUT PLAN'
20/03/2018
2) COMPLIANCE CERTIFICATE - DESIGN (ENGINEERING STUDIO)
10/22/2018
COMMUNICATION ASSETS ALTERATION/RELOCATIONTelecommunication Assets are not affected by this project.
The construction ASP must coordinate the work with the following Telecommunication Companies:
Comms Co. Contact Name Phone No. Initial Contact Date
Arrangement Details and Date Agreed
N/A N/A N/A N/A N/A
Technical details of the arrangements are available from the Design ASP.
/ /
SITE PLAN LEGENDEXISTING OVERHEAD CONDUCTOR
REMOVE OVERHEAD CONDUCTOR
EXISTING UNDERGROUND MAINS
LAY 40MM PVC DUCT
HIGH VOLTAGE TRENCHING
INSTALL DUCTS
EXISTING DUCTS
LOW VOLTAGE TRENCHING
NEW PADMOUNT SUBSTATION
EXISTING PILLAR
NEW PILLAR
EXISTING COLUMN
EXISTING PADMOUNT SUBSTATION
REMOVE POLE SUBSTATION
REMOVE POLE
EXISTING POLE
EXISTING LANTERN
SITE PLAN
20
1520 10 5
0
SCALE 1:1000 @ A1
40 60 80 100m
DESIGN COMPLIANCE AND INDEMNITY
This design complies with Endeavour Energy's relevant standards as current at this
time and as listed on the Endeavour Energy Accredited Service Provider's
Internet site. These standards include, but are not limited to:
GT&C: General Terms and Conditions
EMS: Environmental Management Standard
MCI: Mains Construction Instruction
MDI: Mains Design Instruction
PDI: Protection Design Instruction
SDI: Substation Design Instruction
SAD 0001: Design Drawing Standard
MMI: Mains Maintenance Instruction
SMI: Substation Maintenance Instruction
LDI 0001: Public lighting Electrical Design Element
Additionally, where relevant, the design complies with AS/NZS 7000 "Overhead Line
Design - Detailed Procedures" published by SAI Global Ltd and other relevant
Australian Standards
Signed:
Name:
Service Provider Number:
Date:
indemnifies Endeavour Energy
for any loss or damage resulting from non-compliance
of the design with the above standards.
04.01.20191104
SACHIN JOSHI
CONNECT INFRASTRUCTURE DESIGN PTY LTD
H
FIELD POLE
NUMBER
LANTERNS CONSTRUCTION HOLE POLE
NE
W
EX
IS
TIN
G
NE
W
RE
MO
VE
EX
IS
TIN
G
RE
PL
AC
E
BR
AC
KE
T
SP
AN
LE
NG
TH
LIN
E D
EV
DE
GR
EE
S
HV
LV
SL
DIA
mm
DE
PT
H
m
TY
PE
ST
AY
FO
OT
IN
G
RE
LO
CA
TE
RE
PL
AC
E
NE
W
EX
IS
TIN
G
RE
MO
VE
NU
MB
ER
909247 X 1
525393 X X SL UGOH X X 2
321642 X 3
884081 X X SL UGOH X X 4
NOTES
1. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE RELEVANT ENDEAVOUR ENERGY'S NETWORK
STANDARDS AND CONNECTION POLICY.
2. ENDEAVOUR ENERGY'S GENERIC EMP, EMS 0001, IS PART OF THIS DESIGN.
3. ENDEAVOUR ENERGY CONTACT: PHONE 131 081
4. ALL SERVICE WORK TO BE INSTALLED IN ACCORDANCE WITH AS3000:2007 AND THE NSW SERVICE AND
INSTALLATION RULES
5. CUSTOMER TO ARRANGE FOR INSTALLATION & CONNECTION OF SERVICE MAINS BY A LEVEL 2 ACCREDITED
SERVICE PROVIDER.
6. DO NOT PLACE ANY RELIANCE ON ANY QUANTITIES OR DIMENSIONS GIVEN IN THIS DRAWING QUANTITIES AND
DIMENSIONS GIVEN ON THIS DRAWING ARE BASED ON DESIGN INFORMATION AND SITE CONDITIONS AT THE
TIME OF DESIGN. AS QUANTITIES AND DIMENSIONS ARE SUBJECT TO CHANGE, THE BUILDER OF THIS PROJECT
MUST CHECK ALL QUANTITIES AND DIMENSIONS ON SITE PRIOR TO TENDERING AND PRIOR TO CONSTRUCTION.
7. DESIGN CERTIFICATION SHALL LAPSE WHERE:
(i) NOTICE OF INTENT HAS NOT BEEN RECEIVED WITHIN SIX (6) MONTHS OF THIS
CERTIFICATION, OR
(ii) CONSTRUCTION HAS BEEN INTERRUPTED FOR MORE THAN SIX (6) MONTHS.
WHERE DESIGN CERTIFICATION HAS LAPSED, THE DESIGN MUST BE RESUBMITTED FOR CERTIFICATION BY THE
ACCREDITED LEVEL 3 SERVICE PROVIDER.
8. ATTENTION:
PERMANENT SURVEY MARKS MAY EXIST IN THIS AREA. THESE ARE TO BE LOCATED BY A SURVEYOR PRIOR TO
COMMENCEMENT OF WORK.
9. ATTENTION:
THE PREPARATION OF THIS DESIGN, HAS BEEN UNDERTAKEN GIVING DUE CONSIDERATION TO THE EXISTING
SERVICES. THE PROJECT CONSTRUCTOR IS, HOWEVER, WHOLLY RESPONSIBLE FOR VERIFYING THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENT SURVEY MARKS BEFORE CONSTRUCTION COMMENCES,
AND NO RESPONSIBILITY NOR LIABILITY WILL BE ACCEPTED BY THE DESIGNER OF THIS PROJECT FOR DAMAGE
TO EXISTING SERVICES AS A RESULT OF THIS DESIGN AND/OR POLE PEGGING.
10. ATTENTION:
ALL SERVICES SEARCHES MUST BE CHECKED BEFORE CONSTRUCTION.
11. WARNING:
LIVE ENDEAVOUR ENERGY CABLES & OTHER SERVICES IN THIS AREA. LOCATE PRIOR TO DIGGING. PLEASE
CONTACT 'DIAL BEFORE YOU DIG' TELEPHONE: 1100 FOR SERVICES TWO DAYS PRIOR TO EXCAVATION.
12. ATTENTION:
SERVICE PROVIDER TO NOTIFY ENDEAVOUR ENERGY'S NETWORK DATA DAILY WHEN CABLE WORKS IS IN
PROGRESS. TELEPHONE 131 081
13. OPERATIONAL LIMITS
UNLESS APPROVED OTHERWISE, INTERRUPTIONS TO ANY CUSTOMER'S SUPPLY MUST BE AVOIDED. THE
FOLLOWING ALTERNATIVES SHOULD BE CONSIDERED:
- MOBILE GENERATORS OR SUBSTATIONS
- LIVE LINE WORK
- DESIGN ALTERNATIVES
- WORK PRACTICES/STANDARDS
- LOW VOLTAGE PARALLELS
THE COST IS TO BE FUNDED BY THE CUSTOMER/DEVELOPER
14. SUBSTATION TO BE INSTALLED IN ACCORDANCE WITH MCI0006.
15. A) AN EASEMENT FOR PADMOUNT SUBSTATION OF 3.75m x 7.5m TO INCLUDE RETAINING WALL (REFER TO
SHEET 2) IS REQUIRED IN FAVOUR OF ENDEAVOUR ENERGY WITHIN EXISTING LOT 21 DP2912. THIS EASEMENT
AND FOLLOWING RESTRICTION ZONE ARE TO BE SHOWN ON THE LINEN PLAN AND DOCUMENTED ON THE 88B
INSTRUMENT.
B) A RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS. MEASURED 3m
FROM THE PROPOSED SUBSTATION PLINTH.
16. EARTHING OF THE SUBSTATION TO BE CARRIED OUT IN ACCORDANCE WITH ENDEAVOUR ENERGY EDI 100.
COMMON EARTHING PREFERRED AND PREDICTED.
17. PADMOUNT SUBSTATION LOCATION IS TO BE PEGGED BY THE DEVELOPER AS SHOWN IN THE EASEMENT AND
RESTRICTION ZONE DIAGRAM PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION WORKS.
18. CONSTRUCTOR TO CONFIRM FINISHED GROUND LEVELS WITH DEVELOPER PRIOR TO COMMENCING
CONSTRUCTION.
19. ALL THE EXISTING ASSETS HAVE BEEN FIELD CHECKED AND ARE ACCURATE AT THE TIME OF DESIGN.
20. 24/7 SITE ACCESS TO BE PROVIDED TO ENDEAVOUR ENERGY STAFF TO SUB 36484 IN ACCORDANCE WITH
MCI0006.
21. ALL STREET LIGHT CABLES ARE TO BE INSTALLED IN 50mm DUCTS.
ESTABLISH NEW PADMOUNT SUBSTATION No.: 36852
TRANSFORMER SIZE: 1000kVA VOLTAGE (11/22kV): 11kV
HV SWITCHGEAR: 8DJH-RTR
HV FUSES: 100A
LV SWITCHGEAR: TYPE 2 CB (2500A) + 1 x CAT 2 FUSESTRIP
WITH 400A FUSES
SUBSTATION CUBICLE SIZE: 16
EARTHING SYSTEM: COMMON EARTHING TO EDI 100
LOT 21
DP2912
LOT 20
DP2912
H
V
L
V
NOTEHV STJ SHOULD NOT BE
LOCATED UNDER DRIVEWAYS
SCHOFIELDS
PUBLIC SCHOOL
SCHOFIELDS
PUBLIC SCHOOL
PIONEER COST SHARE REIMBURSEMENT SCHEME - Expiry Date: 14/03/2023
Pro-Rata Reimbursement for Customer Load Over 50kVA
Asset
Asset Cost
Estimate ($)
Unit Quantity
Net Asset Capacity
(kVA)
Original Customer Utilisation
(kVA)
Maximum
Reimbursement
Amount ($)
HV Mains N/A N/A N/A N/A N/A
LV Mains N/A N/A N/A N/A N/A
Substation N/A N/A N/A N/A N/A
REFER INSET 'A'
ON SHEET 2
FOR DETAILS
Padmount Substation:
- Install 1 x New PM Substation: $2,860
- Install 1 x Sub Culvert: $2,320
- 1 x Value of 1000kVA 11kV Transformer only: $20,125
- 1 x Siemens RTR HV Switchgear: $10,745
- 1 x 2500 CB (Weber): $11,590
- 1 x Size 16 Fibreglass Cubicle: $4,070
- 1 x Size 14-16 Concrete Plinth: $1,233
- 1 x PM Substation Culvert: $1,223
- 1 x Fuse Strip (Including 3 x 400A fuses) - Weber $573
Total EE Capital Contribution (excluding PM & Design) = $54,739
Total EE Capital Contribution (HV reimbursed) = $60,049
J
REFER INSET 'B'
ON SHEET 2
FOR DETAILS
CH 435.000
CH 435.000CH 420.000
CH 435.000
CH 450.000
CH 465.000
CH 480.000
CH 495.000
SAG 488.647
1
9
1
2
3
2
3
2
5
2
1
Cadastre: Ⓒ Land and Property Information 2016
REFERENCE DRAWING'S WORK ORDERS C THIS DRAWING
AND THE
COPYRIGHT
THEREIN IS THE
PROPERTY OF
ENDEAVOUR ENERGY AND
MAY NOT BE COPIED,
REPRODUCED,
DISTRIBUTED, LOANED OR
USED WITHOUT THE
WRITTEN CONSENT OF
ENDEAVOUR ENERGY
01
N
REF. NUMBERconnect
connectI N F R A S T R U C T U R E
®
6 Progress Cct, Prestons NSW 2170PO Box 484, Casula Mall NSW 2170
Electrical Infrastructure
Consultancy, Design &
Construction
Connect Design Pty Ltd
Tel: 02 9733 3333
Fax: 02 9733 3330
Email: [email protected]
-
DT540
E2 10
INSET 'A'
4 3 12
0
SCALE 1:200 @ A1
4 8 12 16 20m
DUCT REIMBURSEMENT SCHEDULE
NODES CONFIGURATION
ROUTE
LENGTH
(m)
REIMBURSEMENT
(m) X ($)
EXISTING DUCT USAGE
CHARGE (m) X ($)
A - B
(ROAD CROSSING)
TOTAL - NIL $92
20m - NIL - NIL
HV
SPARE DUCT
DUCT WITH NEW CABLE
DUCT WITH EXISTING CABLE
CABLE/DUCT TO BE REMOVED
LEGEND
DIRECT BURIED CABLE
NEW TRENCH
EXISTING TRENCH
UNDERBORE
4m
4m
LV
INSTALL
2 x 50mm
6 x 125mm
UPVC DUCTS
B - C
NEW
HV
LV
INSTALL
2 x 50mm
4 x 125mm
UPVC DUCTS
B - E
NEW
HV
INSTALL
6 x 125mm
UPVC DUCTS
C - D
EXISTING
HV
LV
- NIL - NIL
- NIL - 4m of 125mm duct @
$23/m = $92
- NIL - NIL
- NIL - NIL
24m
38mF - G
NEW
INSTALL
6 x 125mm
UPVC DUCTS
45mG - H
NEW
HV
LV
INSTALL
4 x 125mm
UPVC DUCTS
- NIL - NIL
NEW
E - F
NEW
INSTALL
6 x 125mm
UPVC DUCTS
- NIL - NIL
14m
(ROAD CROSSING)
SL
SL
LVLV
REPLACE WITH
NEW CABLE
EXISTING DIRECT BURY
10mH - J - NIL - NIL
FUNDED BY CLIENT
S
FUNDED BY ENDEAVOUR ENERGY
E
S
S
S
S
S
S
S
SS
S
S
LV
HV
S
S
LV
HV
S
S
LV
(A) STANDARD (2.75m x 5.5m) PADMOUNT SUBSTATION EASEMENT TO BE
EXTENDED TO INCLUDE RETAINING WALL 3.75m x 7.5m.
(B) RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF
BUILDINGS MEASURED 3 METRES FROM SUBSTATION PLINTH
SUBSTATION PLINTH 1.35x3.17 AT TOP OF CONCRETE (ALL OFFSETS TO PLINTH
SHOWN FROM TOP OF CONCRETE)
IF A PLAN OF SURVEY, PLEASE SHOW SUBSTATION NUMBER AND AT LEAST TWO
OFFSETS TO PLINTH
F
R
O
N
T
P
R
O
P
E
R
T
Y
B
O
U
N
D
A
R
Y
H
V
L
V
(
A
)
(
B
)
EASEMENT AND RESTRICTION ZONE DIAGRAM
FOR PADMOUNT SUBSTATION 36852
COMMON EARTHING - NON-RESIDENTIAL
4 3 12
0
SCALE 1:200 @ A1
4 8 12 16 20m
J
U
N
C
T
I
O
N
R
D
LOT 21
DP2912
LOT 20
DP2912
RETAINING WALL
"REFER TO STRUCTURAL
ENGINEER'S DETAIL
(ENGINEERING STUDIO)
DRAWING No. 17495-S01.0 - Rev.B
SCHOOL
HALL
Date Approved:
This Certification is issued subject to
Endeavour Energy's
Standard Certification Terms
CERTIFIED BY ENDEAVOUR ENERGY
Amendment:
Print Name:
Examiner's Signature:
DESIGN COMPLIANCE AND INDEMNITY
This design complies with Endeavour Energy's relevant standards as current at this
time and as listed on the Endeavour Energy Accredited Service Provider's
Internet site. These standards include, but are not limited to:
GT&C: General Terms and Conditions
EMS: Environmental Management Standard
MCI: Mains Construction Instruction
MDI: Mains Design Instruction
PDI: Protection Design Instruction
SDI: Substation Design Instruction
SAD 0001: Design Drawing Standard
MMI: Mains Maintenance Instruction
SMI: Substation Maintenance Instruction
LDI 0001: Public lighting Electrical Design Element
Additionally, where relevant, the design complies with AS/NZS 7000 "Overhead Line
Design - Detailed Procedures" published by SAI Global Ltd and other relevant
Australian Standards
Signed:
Name:
Service Provider Number:
Date:
indemnifies Endeavour Energy
for any loss or damage resulting from non-compliance
of the design with the above standards.
04.01.20191104
SACHIN JOSHI
CONNECT INFRASTRUCTURE DESIGN PTY LTD
WORKS COMPLETED/FIELD BOOK
CONSTRUCTED BY:
ASSET RECORDING
INSPECTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
I:
OF:
CONTACT No.:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWING HAVE BEEN
RECORDED AS PER ENDEAVOR ENERGY STANDARD SAD 0004.
SIGNATURE:
DATE:
SIGNATURE: DATE:
3
0
0
0
3
0
0
0
3
0
0
0
K
E
R
B
F
O
O
T
P
A
T
H
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
321643
36852
22069
3
A
B
C
D
APPROX. HV STJ
LOCATION
H
V
L
V
J
U
N
C
T
I
O
N
R
D
REMOVE POLE
SUB 22069
1
2
5
0
3
1
4
2
S
1
5
5
4
9
7
G
F
E
ASP1 TO INSTALL
DOUBLE LINK KIT IN
EXISTING PILLAR 125031
SUPPLY TO THE SCHOOL
TO BE MAINTAINED UNTIL
NEW SUB IS INSTALLED
AND COMMISSIONED
DIVERT EXISTING OH SERVICES
TO PILLAR 155497. NEW STEEL
SERVICE POLE REQUIRED.
a
p
p
r
o
x
.
7
m
PROPOSED DRIVEWAY
1
7
0
0
7
0
0
1
9
1
5
2
4
1
5
1
/
/
/
/
/
/
/
/
/
/
/
/
/
/
1
3
5
6
9
6
INSET 'B'
4 3 12
0
SCALE 1:200 @ A1
4 8 12 16 20m
J
H
a
p
p
r
o
x
.
1
7
m
APPROX. HV STJ
LOCATION.
TURN DOWN HV UGOH
AND STJ TO
UNDERGROUND CABLE
TURN DOWN LV UGOH
AND TERMINATE TO
PILLAR 135696
J
U
N
C
T
I
O
N
R
D
J
U
N
C
T
I
O
N
R
D
COUNCIL HAS CONFIRMED 2.1m
PALISADE FENCE WILL BE
INSTALLED ON TOP OF
RETAINING WALL AFTER
COMMISSION THE SUBSTATION.
2
3
2
1
NOTEENSURE THE FENCE WILL NOT
BE INSTALLED WITHIN THE
STANDARD (2.75m x 5.5m)
EASEMENT AREA.
7
.
5
m
o
S
1
2
5
0
3
2
Cadastre: Ⓒ Land and Property Information 2016
REFERENCE DRAWING'S WORK ORDERS C THIS DRAWING
AND THE
COPYRIGHT
THEREIN IS THE
PROPERTY OF
ENDEAVOUR ENERGY AND
MAY NOT BE COPIED,
REPRODUCED,
DISTRIBUTED, LOANED OR
USED WITHOUT THE
WRITTEN CONSENT OF
ENDEAVOUR ENERGY
01
N
REF. NUMBERconnect
connectI N F R A S T R U C T U R E
®
6 Progress Cct, Prestons NSW 2170PO Box 484, Casula Mall NSW 2170
Electrical Infrastructure
Consultancy, Design &
Construction
Connect Design Pty Ltd
Tel: 02 9733 3333
Fax: 02 9733 3330
Email: [email protected]
-
DT540
E3 10
Date Approved:
This Certification is issued subject to
Endeavour Energy's
Standard Certification Terms
CERTIFIED BY ENDEAVOUR ENERGY
Amendment:
Print Name:
Examiner's Signature:
DESIGN COMPLIANCE AND INDEMNITY
This design complies with Endeavour Energy's relevant standards as current at this
time and as listed on the Endeavour Energy Accredited Service Provider's
Internet site. These standards include, but are not limited to:
GT&C: General Terms and Conditions
EMS: Environmental Management Standard
MCI: Mains Construction Instruction
MDI: Mains Design Instruction
PDI: Protection Design Instruction
SDI: Substation Design Instruction
SAD 0001: Design Drawing Standard
MMI: Mains Maintenance Instruction
SMI: Substation Maintenance Instruction
LDI 0001: Public lighting Electrical Design Element
Additionally, where relevant, the design complies with AS/NZS 7000 "Overhead Line
Design - Detailed Procedures" published by SAI Global Ltd and other relevant
Australian Standards
Signed:
Name:
Service Provider Number:
Date:
indemnifies Endeavour Energy
for any loss or damage resulting from non-compliance
of the design with the above standards.
04.01.20191104
SACHIN JOSHI
CONNECT INFRASTRUCTURE DESIGN PTY LTD
NEW PM
SUB 36852
INSTALL 1 x TYPE 2 CIRCUIT BREAKER +
1 x CAT 2 FUSESTRIP
FINAL LV & SL CIRCUIT
NOT TO SCALE
NEW LABELSSUB 36852
'R' - PILLAR S155497
'S' - TO LOT 20 & 21
NOT TO SCALE
FINAL HV CIRCUIT (11kV)
HV CIRCUIT LEGEND
EXISTING OVERHEAD CONDUCTOR
EXISTING UNDERGROUND MAINS
LAY 11kV, 240mm² Al 3c XLPE/PVC/HDPE CABLE
R.L. = 145m C.L. = 200m
x x
JOINT / TERMINATION TYPE:______________________
NETWORK ACCESS AUTHORISATION:______________
JOINT / TERMINATION KIT #:______________________
JOINT / TERMINATION BATCH #:___________________
DATE OF MANUFACTURE:________________________
INSTALL RTR
SWITCHGEAR
NEW PM
SUB 36852
J
U
N
C
T
I
O
N
R
D
S
T
A
L
B
A
N
S
R
D
Q
U
E
E
N
S
B
U
R
Y
S
T
J
U
N
C
T
I
O
N
R
D
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
A
0
1
7
6A
0
1
7
7A
0
1
7
8
A
0
1
7
9
P
M
S
L
EXISTING SUB
32778
T
O
T
E
E
:
P
O
L
E
S
U
B
2
6
1
7
7
(
E
N
D
O
F
C
I
R
C
U
I
T
)
&
A
B
S
6
3
1
2
7
T
O
S
W
C
0
2
7
3
I
N
S
U
B
3
4
3
2
4
F
8
4
3
2
F
8
4
3
1
F
8
4
3
3
F
8
4
3
4
F
8
4
3
5
F
8
4
3
6
P
S
8
D
J
H
NEW HV STJ
NEW HV STJ
EXISTING 240mm²
AL 3c XLPE
EXISTING 240mm²
AL 3c XLPE
o
o
o
o
o
o
1
2
5
0
3
3
1
3
5
6
9
6
J
U
N
C
T
I
O
N
R
D
J
U
N
C
T
I
O
N
R
D
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
R
S
T
O
P
I
L
L
A
R
S
1
2
5
3
0
4
T
O
L
V
U
G
O
H
P
O
L
E
5
2
5
4
8
0
&
O
P
E
N
P
O
I
N
T
A
T
P
O
L
E
S
5
2
5
3
5
2
&
5
2
5
4
6
6
T
O
P
I
L
L
A
R
1
4
7
9
1
5
LV & SL CIRCUIT LEGEND
EXISTING UNDERGROUND MAINS
LAY 240mm² AL 4c XLPE/PVC UG CABLE
R.L = 152m C.L = 255m
LAY 2x16mm² 1C Cu PVC/PVC CABLE in 50mm UPVC CONDUIT
R.L = 12m C.L = 40m
PROPOSED SERVICE MAINS (BY OTHERS)
PHOTOELECTRIC CONTROLLED
EXISTING LANTERN NUMBER
EXISTING POLE NUMBER
BOND NEUTRAL TO EARTH
x x
o o
T
O
M
S
B
L
O
T
2
0
&
2
1
oo
JOINT / TERMINATION TYPE:______________________
NETWORK ACCESS AUTHORISATION:______________
JOINT / TERMINATION KIT #:______________________
JOINT / TERMINATION BATCH #:___________________
DATE OF MANUFACTURE:________________________
JOINT / TERMINATION TYPE:______________________
NETWORK ACCESS AUTHORISATION:______________
JOINT / TERMINATION KIT #:______________________
JOINT / TERMINATION BATCH #:___________________
DATE OF MANUFACTURE:________________________
WORKS COMPLETED/FIELD BOOK
CONSTRUCTED BY:
ASSET RECORDING
INSPECTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
I:
OF:
CONTACT No.:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWING HAVE BEEN
RECORDED AS PER ENDEAVOR ENERGY STANDARD SAD 0004.
SIGNATURE:
DATE:
SIGNATURE: DATE:
JOINT / TERMINATION TYPE:______________________
NETWORK ACCESS AUTHORISATION:______________
JOINT / TERMINATION KIT #:______________________
JOINT / TERMINATION BATCH #:___________________
DATE OF MANUFACTURE:________________________
1
2
5
0
3
1
11kV FEEDER SC1271
S
1
3
5
6
9
7
S
1
3
5
6
9
5
2
4
8
8
4
0
6
6
8
8
4
0
6
5
L245042
C884066
PE
L245041
C884065
PE
o
L245049
P884081
PE
L199018
P525393
PE
NEW SL UGOH
NEW SL UGOH
FEEDER
SC1271
x
x
x
x
x
x
x
S
1
5
5
4
9
7
Q
U
E
E
N
S
B
U
R
Y
S
T
9
0
9
2
4
0
9
0
9
2
4
3
9
0
9
2
3
9
L257123
C909239
PE
L257124
C909240
PE
L257127
C909243
PE
P
A
D
M
O
U
N
T
S
U
B
S
T
A
T
I
O
N
E
A
S
E
M
E
N
T
K
E
R
B
L
I
N
E
H
V
.
E
N
D
.
2
.
4
m
4
.
6
m
I
N
S
U
L
A
T
E
D
B
A
R
E
2
.
4
m
2
.
4
m
L
V
.
E
N
D
.
0
.
5
m
F
R
O
N
T
P
R
O
P
E
R
T
Y
B
O
U
N
D
A
R
Y
T
O
L
V
N
E
U
T
R
A
L
/
E
A
R
T
H
B
A
R
T
O
H
V
E
A
R
T
H
B
A
R
I
N
S
I
D
E
L
V
S
W
I
T
C
H
FOOTPATH
LV. SWITCHGEAR
COMPARTMENT.
COMMON EARTH ELECTRODE
SYSTEM LAID IN CABLE TRENCH OR
SEPERATE TRENCH.
SUPPLEMENTARY
4.8m EARTH ROD.
TO HV. EARTH BAR.
HV. SWITCHGEAR
COMPARTMENT .
NOT TO SCALE.
PADMOUNT SUBSTATION 36852
COMMON EARTHING LAYOUT
EARTHING PLAN LEGEND
CABLE CU. ANNEALED 19/2.14 660V PVC/PVC
CABLE CU. ANNEALED 19/2.14 BARE
EARTH ELECTRODE LOCATION & LENGTH.
(LENGTH SHOWN IN METRES).
J
U
N
C
T
I
O
N
R
D
EARTHING DETAILS
Soil Resistively
(ohms.m)
Layer 1
29.45
Depth (m)
10.00
Layer 2
4.47 --
Designed earth resistance limit (ohms) 7.03
Measured earth resistance (ohms)
Number of electrodes2
Length of bare electrode (m)2.4
Connector type (CAD or CRIMP)CRIMP
LXXXXX
CXXXXX
PE
3
.
7
5
m