Submitted by Final Report SUBMITTED TO BUTTE COUNTY ASSOCIATION OF GOVERNMENTS (BCAG) August 2010

Transcript of Submitted by - bcag.org Triennial Performance Audits/… · 2010 P AGE 7 E XECUTIVE S UMMARY This...

  • Submitted by

    Final Report

    SUBMITTED TOBUTTE COUNTYASSOCIATION OFGOVERNMENTS (BCAG)

    A u g u s t 2 0 1 0

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 1

    TA B L E O F C O N T E N T S

    TABLE OF TABLES _______________________________________________ 3

    TABLE OF FIGURES ______________________________________________ 4

    EXECUTIVE SUMMARY ____________________________________________ 7

    OVERVIEW _______________________________________________________________________________ 7

    Compliance ________________________________________________________________________ 8

    Prior Audit Recommendations _________________________________________________________ 8

    Performance Measures & Trends ______________________________________________________ 9

    Functional Review ___________________________________________________________________ 11 RECOMMENDATIONS _____________________________________________________________________ 16

    Recommendation 1 __________________________________________________________________ 16

    Recommendation 2 __________________________________________________________________ 17

    Recommendation 3 __________________________________________________________________ 17

    INTRODUCTION _________________________________________________ 19

    AUDIT SCOPE & METHODOLOGY ___________________________________________________________ 19

    DESCRIPTION OF BUTTE REGIONAL TRANSIT (B-LINE) _________________________________________ 20

    Transit Center ______________________________________________________________________ 21

    Transit Modes _____________________________________________________________________ 22

    Fare Structure _____________________________________________________________________ 25

    COMPLIANCE REPORT ____________________________________________ 27

    PRIOR AUDIT RECOMMENDATIONS _________________________________ 31

    Prior Recommendation 1 _____________________________________________________________ 31

    Prior Recommendation 2 ____________________________________________________________ 32

    Prior Recommendation 3 ____________________________________________________________ 33

    Prior Recommendation 4 ____________________________________________________________ 34

    Prior Recommendation 5 ____________________________________________________________ 35

    Prior Recommendation 6 ____________________________________________________________ 36

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 2 AUGUST2010

    PERFORMANCE MEASURES & TRENDS _______________________________________________________ 39

    TDA Required Indicators ____________________________________________________________ 39

    Tables & Graphs ____________________________________________________________________ 41

    FUNCTIONAL REVIEW ____________________________________________ 98

    GENERAL MANAGEMENT & ORGANIZATION __________________________________________________ 98

    Service Planning ___________________________________________________________________ 104

    Scheduling, Dispatching & Operations _________________________________________________ 114

    Personnel Management & Training ___________________________________________________ 114

    Administration _____________________________________________________________________ 115

    Marketing & Public Information ______________________________________________________ 119

    Contract Management ______________________________________________________________ 124

    Maintenance ______________________________________________________________________ 125

    FINDINGS & RECOMMENDATIONS _________________________________ 130

    SUMMARY OF FINDINGS __________________________________________________________________ 130

    Compliance _______________________________________________________________________ 131

    Prior Audit Recommendations ________________________________________________________ 131

    Performance Measures & Trends _____________________________________________________ 131

    Functional Review __________________________________________________________________ 134 RECOMMENDATIONS ____________________________________________________________________ 141

    Recommendation 1 _________________________________________________________________ 141

    Recommendation 2 _________________________________________________________________ 143

    Recommendation 3 _________________________________________________________________ 144

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 3

    TA B L E O F TA B L E S

    Table 1: B-Line Recommendations.........................................................................................................................18

    Table 2: Change in B-Line fixed route fares ..........................................................................................................26

    Table 3: TDA Compliance Chart ............................................................................................................................28

    Table 4: Performance Measures & TDA Performance Indicators, Fixed Route Services .............................43

    Table 5: Performance Measures & TDA Performance Indicators, Paratransit Services ................................44

    Table 6: Performance Measures & TDA Performance Indicators, All Services .............................................45

    Table 7:10-Year Performance Trend Analysis, Urban Fixed Route ..................................................................46

    Table 8: 10-Year Performance Trend Analysis, Rural Fixed Route...................................................................47

    Table 9: 10-Year Performance Trend Analysis, All Fixed Route Services .......................................................48

    Table 10: 10-Year Performance Trend Analysis, Urban Paratransit .................................................................49

    Table 11: 10-Year Performance Trend Analysis, Rural Paratransit ...................................................................50

    Table 12: 10-Year Performance Trend Analysis, All Paratransit Services ........................................................51

    Table 13: 10-Year Performance Trend Analysis, All Services Combined ........................................................52

    Table 14: Operations Contractor Turnover Rates ............................................................................................. 115

    Table 15: B-Line Grants ........................................................................................................................................ 117

    Table 16: Marketing as a Percent of Budget and Operating Expenditures ................................................... 121

    Table 17: Complaints by Service Type ................................................................................................................ 123

    Table 18: B-Line Complaints and Compliments by Issue ................................................................................ 123

    Table 19: CHP Inspection Results. ...................................................................................................................... 128

    Table 20: Table 20: B-Line Recommendations .................................................................................................. 145

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 4 AUGUST 2010

    TA B L E O F F I G U R E S

    Figure 1 Butte Regional Transit is also known as B-Line ..................................................................................... 7

    Figure 2: B-Line began operation in 2005. .............................................................................................................. 8

    Figure 3: B-Line's Rural Fixed Route experienced the greatest amount of ridership growth. ......................10

    Figure 4: B-Line began operation July 5, 2005. .....................................................................................................19

    Figure 5: This new transit center opened on February 20th, 2008. ...................................................................21

    Figure 6: The Urban Fixed Route and Urban Paratransit services serve the City of Chico .........................22

    Figure 7: B-Line bus shelters and transit station shield riders from the elements. .........................................23

    Figure 8: B-Line Paratransit is a shared ride service. ............................................................................................24

    Figure 9: Operating Costs, All Services, 10-Year Trend (Constant $) ..............................................................53

    Figure 10: Fare Revenue, All Services, 10-Year Trend (Actual $) ......................................................................55

    Figure 11: Passengers, All Services, 10-Year Trend .............................................................................................57

    Figure 12: Vehicle Service Hours (VSH), All Services, 10-Year Trend ............................................................58

    Figure 13: Vehicle Service Miles (VSM), All Services, 10-Year Trend ..............................................................59

    Figure 14: Full-Time Equivalent (FTE) Employees, All Services, 10-Year Trend..........................................60

    Figure 15: Passengers, Urban Fixed Route, 10-Year Trend ................................................................................62

    Figure 16: Operating Cost per VSH, Urban Fixed Route, 10-Year Trend .......................................................63

    Figure 17: Operating Cost per VSM, Urban Fixed Route, 10-Year Trend ......................................................64

    Figure 18: Operating Cost per Passenger, Urban Fixed Route, 10-Year Trend ..............................................65

    Figure 19: Passengers per VSH, Urban Fixed Route, 10-Year Trend ...............................................................66

    Figure 20: Passengers per VSH, Urban Fixed Route, 10-Year Trend ...............................................................67

    Figure 21: VSH per FTE, Urban Fixed Route, 10-Year Trend ..........................................................................68

    Figure 22: Farebox Recovery Ratio, Urban Fixed Route, 10-Year Trend ........................................................69

    Figure 23: Fare Revenue per Passenger (Actual $), Urban Fixed Route, 10-Year Trend ..............................70

    Figure 24: Passengers, Rural Fixed Route, 10-Year Trend..................................................................................71

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 5

    Figure 25: Operating Cost per VSH, Rural Fixed Route, 10-Year Trend ........................................................72

    Figure 26: Operating Cost per VSM, Rural Fixed Route, 10-Year Trend ........................................................73

    Figure 27: Operating Cost per Passenger, Rural Fixed Route, 10-Year Trend ................................................74

    Figure 28: Passengers per VSH, Rural Fixed Route, 10-Year Trend .................................................................75

    Figure 29: Passengers per VSM, Rural Fixed Route, 10-Year Trend ................................................................76

    Figure 30: VSH per FTE, Urban Fixed Route, 10-Year Trend ..........................................................................77

    Figure 31: Farebox Recovery Ratio, Rural Fixed Route, 10-Year Trend ..........................................................78

    Figure 32: Fare Revenue per Passenger (Actual $), Rural Fixed Route, 10-Year Trend ................................79

    Figure 33: Passengers, Urban Paratransit, 10-Year Trend ...................................................................................80

    Figure 34: Operating Cost per VSH, Urban Paratransit, 10-Year Trend..........................................................81

    Figure 35: Operating Cost per VSM, Urban Paratransit, 10-Year Trend .........................................................82

    Figure 36: Operating Cost per Passenger, Urban Paratransit, 10-Year Trend .................................................83

    Figure 37: Passengers per VSH, Urban Paratransit, 10-Year Trend ..................................................................84

    Figure 38: Passengers per VSM, Urban Paratransit, 10-Year Trend .................................................................85

    Figure 39: VSH per FTE, Urban Fixed Route, 10-Year Trend ..........................................................................86

    Figure 40: Farebox Recovery Ratio, Urban Paratransit, 10-Year Trend ...........................................................87

    Figure 41: Fare per Passenger (Actual $), Urban Paratransit, 10-Year Trend ..................................................88

    Figure 42: Passengers, Rural Paratransit, 10-Year Trend ....................................................................................89

    Figure 43: Operating Cost per VSH, Rural Paratransit, 10-Year Trend ...........................................................90

    Figure 44: Operating Cost per VSM, Rural Paratransit, 10-Year Trend ...........................................................91

    Figure 45: Operating Cost per Passenger, Rural Paratransit, 10-Year Trend...................................................92

    Figure 46: Passengers per VSH, Rural Paratransit, 10-Year Trend....................................................................93

    Figure 47: Passengers per VSM, Rural Paratransit, 10-Year Trend ...................................................................94

    Figure 48: VSH per FTE, Urban Fixed Route, 10-Year Trend ..........................................................................95

    Figure 49: Farebox Recovery Ratio, Rural Paratransit, 9-Year Trend ...............................................................96

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 6 AUGUST 2010

    Figure 50: Fare Revenue per Passenger (Actual $), Rural Paratransit, 10-Year Trend ...................................97

    Figure 51: BCAG/B-Line Organization Chart .................................................................................................. 101

    Figure 52: Figure 52 BCAG's revised website .................................................................................................... 102

    Figure 53: The new Transit Center is powered by solar energy ...................................................................... 102

    Figure 54 B-Line's current bus facility ................................................................................................................. 106

    Figure 55: Flow Chart for the Development of the Market Based Transit Study ........................................ 107

    Figure 56: BCAG provides general administration and support. .................................................................... 116

    Figure 57: An agreement with Stott enabled B-Line to build 50 new bus shelters. ..................................... 118

    Figure 58: Example of B-Line advertising. ......................................................................................................... 120

    Figure 59: B-Line marketing material carries the green and gold branding................................................... 121

    Figure 60: BCAG's website informs the public of any upcoming meetings or schedule changes. ............ 122

    Figure 61: At the time of the Audit, BCAG was negotiating a new contract with CSUC .......................... 125

    Figure 62: Mechanic assignments for bus maintenance. .................................................................................. 126

    Figure 63: Separating cash may aid in reporting. ............................................................................................... 132

    Figure 65: It is B-Line personnel who make the service efficient and effective. .......................................... 138

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 7

    E X E C U T I V E S U M M A RY

    This chapter summarizes key findings and

    recommendations developed during the Triennial

    Performance Audit (TPA) of the Butte County

    Association of Governments (BCAG), as the

    operator for Butte Regional Transit (B-Line). This

    report covers a three-year period ending June 30,

    2009. The California Public Utilities Code requires

    all public transit agencies to conduct a Triennial

    Performance Audit (also herein referred to as a

    TPA) in order to be eligible for Transportation

    Development Act (TDA) funding.

    The Performance Audit was conducted in

    accordance with the processes established by the

    California Department of Transportation, as

    outlined in the Performance Audit Guidebook

    for Transit Operators and Regional

    Transportation Planning Entities (3rd edition,

    September 2008) issued by the California

    Department of Transportation (Caltrans), and the

    Standards for Audit of Governmental

    Organizations, Programs, Activities, and

    Functions (2007 Revision), published by the

    United States General Accounting Office and the

    U.S. Comptroller General.

    The Performance Audit has four elements:

    1. Evaluation of compliance with relevant statutes and

    regulations;

    2. Follow-up to determine status of prior Performance Audit

    report recommendations;

    3. Verification and analysis of performance indicators;

    4. Identification and review of functions and activities;

    5. Delineation of key findings and recommendations for

    improvement.

    Figure 1 Butte Regional Transit is also known as B-Line

    OVERVIEW B-Line (Butte Regional Transit) provides fixed

    route and paratransit services to Butte County and

    its Cities and Town.

    B-Line, which began operation July 5, 2005,

    was formed from the consolidation of six transit

    services in Butte County: Butte County Transit

    (BCT), Chico Area Transit (CATS), Chico

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 8 AUGUST 2010

    Figure 2: B-Line began operation in 2005.

    Clipper, Oroville Area Transit (OATS),

    Oroville Express, and Paradise Express.

    B-Line is operated by Butte County

    Association of Governments (BCAG), a JPA

    between the County and its Cities and Town.

    BCAG is also the County’s RTPA and MPO. The

    BCAG Board of Directors is the policy-making

    authority for B-Line.

    BCAG contracts with a private operator,

    Veolia Transportation, for B-Line’s operation.

    B-Line service is divided into four modes:

    Urban Fixed Route;

    Rural Fixed Route;

    Urban Paratransit;

    Rural Paratransit.

    During FY 2006/07, adjustments were made

    to multiple local and regional routes, including

    time changes, interlining, route/stop changes and

    service additions. Fares for all paratransit services

    were raised to $2 one way in July of 2006.

    In FY 2007/08, fixed route vehicles were

    equipped with GFI Odyssey fareboxes that use

    magnetic stripe tickets and passes.

    Based on a presentation at the April 2009

    BCAG Board meeting, new higher fixed route

    fares went into effect August 1, 2009. These will

    be analyzed in the following Audit period.

    COMPLIANCE

    BCAG, as the transit operator, administers

    Transportation Development Act (TDA) laws and

    regulations in an efficient and effective manner,

    and is in full compliance with TDA rules and

    regulations, with three exceptions:

    1. The Farebox Recovery Ratio for Urban and Rural Paratransit services were each below the

    10% TDA requirement for transportation

    services for the elderly and disabled in the last

    two of three years of the Audit period;

    2. The State Controller’s Report was submitted beyond the specified timeframe in FY

    2008/09 (PUC 99243);

    3. The Fiscal and Compliance Audits were completed and submitted beyond the

    specified timeframe in FY 2007/08.

    PRIOR AUDIT RECOMMENDATIONS

    BCAG, as operator of B-Line, has

    demonstrated exceptional progress in improving

    the efficiency and effectiveness of transit

    operations by fully or partially implementing all six

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 9

    of the recommendations from the prior Triennial

    Performance Audit of B-Line.

    Of the six, two are fully implemented, one is

    in progress to be completed within the next Audit

    period, and three were partially implemented;

    these will be carried forward in whole or in part in

    this Audit’s recommendations:

    1. Develop a Short-Range Transit Plan to guide B-Line growth. (In Progress; due

    for completion by July, 2010.)

    2. Provide the Board and the public with an annual report on B-Line performance,

    with quarterly updates. (Fully

    Implemented.)

    3. Develop an Annual Marketing Plan and regularly assess progress toward achieving

    marketing goals. (Partially

    Implemented. This recommendation

    will be carried forward.)

    4. Continue to monitor system performance on a monthly basis to determine

    productivity improvements. (Fully

    Implemented.)

    5. Work with contractor to ensure that all performance measures are correctly

    reported. (Partially Implemented.)

    6. Ensure definitive separation of BCAG as the RTPA from BCAG as the transit

    operator. (Partially Implemented. This

    is a valid recommendation and will be

    carried forward with modification.)

    PERFORMANCE MEASURES & TRENDS

    Performance measures are accurately collected

    and reported, with one minor exception:

    inconsistent calculation of Full-Time Equivalents

    (FTEs); some concern may also exist regarding

    whether all fares and/or passengers have been

    correctly captured during the Audit period.

    Operating Costs, which were obtained

    from fiscal audit reports and not

    independently validated, increased

    approximately one percent per year in

    constant dollars.

    Fare Revenue collection and cash

    management appears to be consistent

    with industry guidelines for a transit

    operation of B-Line’s size and scope. The

    new GFI fareboxes appear to correct the

    issues with the previous fare collection

    system.

    Vehicle Service Hours and Miles (VSH

    and VSM) are correctly reported and held

    relatively steady over the Audit period.

    Full Time Equivalents (FTEs) reported

    on the State Controller’s Reports (SCRs)

    were not consistent with internal reports

    from the contractor. Supporting

    documentation was not available to

    determine the source of the SCR-reported

    numbers, and BCAG internal staff

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 10 AUGUST 2010

    allocated to B-Line management and

    administration may have been omitted.

    Based on internal reports, FTEs for the

    system increased 12.4% over the Audit

    period.

    Ridership grew each year of the Audit,

    to 1,390,881 in FY 08/09. Fixed Route

    services gained riders in each year,

    while Paratransit services lost

    ridership.

    Figure 3: B-Line's Rural Fixed Route experienced the greatest amount of ridership growth.

    Performance measures provide insight as to the

    efficiency and effectiveness of B-Line’s

    operations. TDA has five required performance

    indicators:

    Cost efficiency, as measured by increases in

    Operating Cost per VSH and VSM1,

    declined for the system and each

    service mode over the Audit period.

    1 Operating Cost per VSM, while a measure of

    cost efficiency, is not a TDA-required performance

    indicator.

    Cost effectiveness, as measured by Operating

    Cost per Passenger, improved for the

    system and the Fixed Route services

    over the Audit period, while cost

    effectiveness for Paratransit service

    weakened.

    Service effectiveness or productivity, as

    measured by Passengers per VSM and

    Passengers per VSH, improved

    significantly for both fixed route services,

    but declined for both paratransit services

    over the Audit period.

    System productivity, as defined as VSH

    per FTE, declined for the system and for

    each service over the Audit period.

    FAREBOX RECOVERY

    While not a TDA-required indicator, a

    Farebox Recovery Ratio of 20 percent is required

    for transit systems serving urban areas. A ratio of

    10 percent is required for systems serving rural

    areas and systems for exclusive use of the elderly

    and persons with disabilities.

    Both Fixed Routes services increased during

    the Audit Period. In FY 2008/09 Urban Fixed

    Route achieved a Farebox Recovery Ratio of

    22.8%, and Rural Fixed Route achieved a ratio of

    18.9%.

    The Farebox Recovery Ratios for both Urban

    and Rural Paratransit fell below the mandated 10

    percent in both FY 2007/08 and FY 2009/09.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 11

    FUNCTIONAL REVIEW

    GENERAL MANAGEMENT & ORGANIZATION

    The JPA for BCAG was most recently signed

    in July 2005 for the continuation of BCAG for a

    ten-year period, and to assign responsibility for B-

    Line (Butte Regional Transit)—then newly created

    by consolidating six previous transit operations in

    Butte County into BCAG.

    This is the first Triennial Performance Audit

    in which B-Line has been in existence for each of

    the three years of the Audit period.

    B-Line policy guidance is provided by the

    BCAG Board of Directors, which is advised by

    the Transit Administrative Oversight Committee

    (TAOC). The TAOC includes administrative and

    other staff representatives from the County,

    Cities, Town and BCAG.

    Overall, Board members were satisfied with

    B-Line’s operations and management. Board

    members expressed a desire for increased

    frequencies and more inter-county connections,

    but were cognizant of funding and revenue

    limitations. The poor economy and the high rate

    of unemployment in Butte County were major

    concerns; environmental issues were also

    considered important.

    B-Line is administered by BCAG staff,

    headed by an Executive Director (who also serves

    as BCAG’s Chief Operating Officer) selected by

    and reporting to the Board. B-Line’s operations

    are managed by two Senior Planners, Transit

    Administration and Transit Operations, with the

    support of an Assistant Planner, a new position in

    FY 2007/08. These three positions report to the

    Executive Director.

    Other BCAG staff members provide

    administrative and financial management support

    to B-Line.

    CHANGES & ACCOMPLISHMENTS

    Major accomplishments and program changes

    were made during the Audit period:

    FY 2006/07

    Contract to provide Americans with

    Disabilities Act (ADA) eligibility

    determinations.

    FY 2007/08

    Addition of Assistant Planner position;

    Bus Stop Improvement Plan completion;

    Opening of the Chico Transit Center;

    Improvement of webpage;

    Installation of GFI electronic fareboxes.

    FY 2008/09

    Completion of On-Board Survey;

    Initiation of the Market-Based Transit

    Study;

    Publication of a new Paratransit Rider’s

    Guide;

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 12 AUGUST 2010

    Update of Fixed Route collateral;

    Approval of interior advertising;

    Negotiations based on an RFP for

    installation and maintenance of shelters;

    Replacement of older vehicles;

    Public outreach for the 2009 fare increase;

    Implementation of Phase I Homeland

    Security Grant to install cameras;

    Instillation of Phase I for Automatic

    Vehicle Locator/Geographic Positioning

    System (AVL/GPS) for Fixed Route

    dispatching.

    After the Audit period, in FY 09/10, other

    improvements were achieved or begun—including

    installation of stop-specific schedule holders and

    maps; wrap-up of the design phase for the Oroville

    Transit Center; a fare increase of approximately

    40%; and approval to obtain appraisals for a new

    administration and maintenance building, with

    three locations under review.

    SERVICE PLANNING

    BCAG has not developed a formal strategic

    or long-range plan for public transportation. The

    agency has moved forward in realizing a strategic

    vision for B-Line in both integrating advanced

    technology and improving facilities.

    Long-range transportation projects over the

    next 20-plus years are outlined in the Regional

    Transportation Plan (RTP), which is also the

    basis for the Federal Transportation Improvement

    Program (FTIP) and Regional Transportation

    Improvement Program (RTIP).

    The RTP’s goal for transit is:

    “…to provide an efficient, effective, coordinated

    regional transit system that increases mobility for

    urban and rural populations, including

    transportationally disadvantaged persons.”

    It includes four objectives:

    1. Meet all transit needs that are “reasonable to meet”;

    2. Increase transit ridership that exceeds annual population growth rate for Butte

    County;

    3. Promote citizen participation and education in transit planning and

    operations;

    4. Maintain a reliable transit system.

    BCAG has already made significant progress

    toward achieving the goals, objectives and actions

    delineated in the RTP.

    Market-Based Transit Study

    The Market-Based Transit Study initiated

    during the Audit period represents a major

    planning achievement. BCAG. Objectives

    included identifying market needs, determining the

    most cost-effective routing and scheduling to

    meet these needs with available resources, and

    improving and/or maintaining other specific

    aspects of system performance. Four Working

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 13

    Papers have been completed—the final one after

    this Audit period

    BCAG has taken steps to make improvements

    in areas identified by the On-Board Survey:

    information at the stops and shelters, and on-time

    performance. BCAG has installed stop-specific

    signage, and is contracting to install new shelters.

    The completion and implementation of the Study

    should also improve on-time performance.

    The Community Telephone Survey and E-

    Survey, both conducted in the spring of 2009,

    provided valuable data about potential rider

    markets that can be used in planning routing and

    scheduling.

    In addition to outreach for the Study, BCAG

    has implemented multiple media to support public

    participation with B-Line.

    Also, during FY 07/08, BCAG developed a

    Coordinated Public Transit-Human Services

    Transportation Plan, discussed in detail in the

    separate BCAG Audit.

    PERFORMANCE MONITORING

    B-Line management reviews and monitors key

    indicators by route, maintaining a spreadsheet for

    each route in order to decipher trends. Evaluation

    has been thorough though informal.

    Staff may want to consider comparing

    performance to minimum and desired standards.

    Standards should include those for on-time

    performance, Passengers per Revenue Hour,

    Farebox Recovery, and complaints per x number

    of passenger trips per month.

    SCHEDULING, DISPATCHING & OPERATIONS

    BCAG contracts with a private provider,

    Veolia Transportation, for B-Line’s operation.

    Drivers bid on their work schedules, based on

    seniority, on a quarterly basis.

    One dispatcher for Fixed Route and two to

    three dispatchers for Paratransit are on duty

    during service hours. Paratransit dispatchers use

    Trapeze software.

    PERSONNEL MANAGEMENT & TRAINING

    BCAG’s Personnel and Administrative

    Manager oversees all human resources issues,

    including hiring for BCAG transit administration

    employees, who are subject to BCAG employee

    policies.

    Drivers, dispatchers, customer service

    representatives, maintenance personnel and

    operations management are employees of the

    operations contractor, Veolia Transportation.

    Veolia recruits through the website and postings;

    applicants also apply directly.

    Drivers, dispatchers, mechanics, and customer

    service representatives belong to Teamsters 137,

    and union contract terms apply.

    Drivers and maintenance technicians receive

    comprehensive, regular training:

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 14 AUGUST 2010

    New driver training is extensive and

    includes classroom instruction, pre-

    driving skills and behind-the-wheel

    training and observation. It is provided by

    two FTA-certified trainers.

    Drivers’ ongoing safety training meets

    state requirements.

    Maintenance technicians receive regular

    training from Veolia corporate offices and

    original equipment manufacturers.

    The turnover rate has decreased substantially

    over the Audit period. The 2007 turnover rate was

    29%, compared to 20% in 2009.

    ADMINISTRATION BCAG’s Chief Financial Officer (CFO),

    helped by the administrative assistant, oversees

    budgeting, financial management, and accounts

    payable, reviewing payment claims before

    forwarding them to the County Treasurer.

    BCAG’s Personnel and Administrative Services

    Manager monitors accounts payable and receivable

    and payroll, and develops and maintains purchasing

    and contract procedures.

    BCAG has been successful in securing and

    administering multiple federal and state grants

    over the Audit period.

    FACILITIES MANAGEMENT In FY 08/09, after a bid process, BCAG

    negotiated with Stott Outdoor Advertising for

    amenities and maintenance at stops, as well as

    outdoor, on-bus, and at-stop advertising.

    BCAG sold or relinquished three of its four

    Compressed Natural Gas (CNG) fueling systems

    throughout the county, which it had gained upon

    consolidation, to the entities that own the facilities

    where the systems were located. These entities had

    also been using the systems, which were no longer

    funded and required costly ongoing maintenance

    and repairs. The system at the County maintenance

    yard remains under BCAG’s ownership.

    BCAG has begun research to build a new B-

    Line Operations and Maintenance Facility. The

    current Facility, at 326 Huss Street, is leased and

    maintained by Veolia. For the new Facility, BCAG

    is reviewing three possible property locations.

    MARKETING & PUBLIC INFORMATION

    MARKETING

    Maps and schedules are well designed, and

    carry the yellow and green color scheme

    throughout.

    A spreadsheet including predicted marketing

    expenditures is prepared each year as part of the

    Annual Transit Service Plan and Budget. The

    spreadsheet provides guidance on media, but does

    not fully meet the requirements of a marketing

    plan.

    Overall marketing objectives and strategies

    have not been defined. Ad campaigns do not

    appear to be focused, and a clear brand image is

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 15

    not evident—although the ads in various media

    are creative and memorable, with spots that use a

    consistent jingle.

    Marketing expenditures were approximately

    1.1% of each year’s Operating Costs, which is

    below the recommended levels of 2% to maintain

    ridership or 3% to 5% to grow it.

    PUBLIC INFORMATION

    BCAG makes information regarding B-Line

    available through multiple media, and solicits

    public input.

    B-Line information is available as a tab on the

    BCAG website, or by automatic transfer from

    www.BlineTransit.com; BCAG plans to develop a

    separate website for B-Line. Information on the

    B-Line web pages is comprehensive and easy to

    access; its appeal would be enhanced by a more

    graphically rich home page.

    CUSTOMER RELATIONS

    The kiosk at the new Chico Transit Center

    puts a human face on B-Line’s customer service.

    A representative is available for questions,

    comments/complaints, and pass sales: in person

    during regular business hours, and by phone on

    evenings and weekends.

    BCAG reviews, addresses as necessary, and

    responds to all comments and complaints. However,

    these are not classified or reviewed for trends;

    quarterly analysis of this information could help to

    improve service.

    CONTRACT MANAGEMENT

    The Project Manager, which is either of the

    two Senior Planners as relevant, is primarily

    responsible for contract negotiation and

    management; however, both Senior Planners are

    involved to some degree. BCAG’s Personnel and

    Administrative Services Manager provides key

    assistance with contract development, compliance,

    and review.

    The contract with Veolia for operation of B-

    Line, signed upon consolidation in 2005, is for

    five years with two one-year options; the BCAG

    board approved a two-year contract extension in

    May 2010. During negotiations, staff reduced the

    option years’ contracted rate increase.

    The Senior Planner, Transit Administration is

    responsible for approval and validation of invoices

    for the operations contractor, though three BCAG

    personnel are involved in the review.

    BCAG staff reviews and charts performance

    indicators each month, and works with the

    contractor to improve these. Recent focus has

    been on paratransit losses, improving service

    effectiveness, and identifying any system errors in

    counting fare revenues due to farebox changes.

    During the Audit period, BCAG had a five-

    year contract with California State University,

    Chico to provide transit for the students, staff and

    faculty, using school identification card as a swipe

    passes in order to track rides and bill for them. In

    FY 09/10, BCAG began negotiating a new

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 16 AUGUST 2010

    contract, which would provide unlimited rides for

    a flat fee.

    MAINTENANCE

    The five-bay maintenance facility is leased by

    Veolia as part of the operations contract. It

    includes two drive-through bays, and all required

    safety equipment—including a CNG monitor.

    The facility is open nearly 20 hours each

    weekday, and 12-15 hours on weekend days. The

    routine is to perform minor repairs during

    weekdays, and conduct major repairs and

    inspections on evenings and weekends. Vehicle

    cleaning occurs weekly.

    A Maintenance Manager, seven utility workers,

    and eight technicians (two Class A, four Class B

    and two Class C) compose the maintenance staff.

    Veolia uses RTA maintenance software to track

    mileage, repairs and inspections. Daily and weekly

    reports are prepared, and reports and files are

    reviewed regularly by Veolia regional management.

    Maintenance files and records appear to be in

    excellent order.

    Drivers inspect the vehicles before pull-out,

    using a Daily Vehicle Inspection form. Vehicles

    with critical safety issues are held out of service

    until they can be inspected further and repaired.

    The Preventive Maintenance Inspection

    schedule varies by make and model, using a form

    tailored to each manufacturer’s requirements.

    During the Audit period, BCAG and the

    contractor improved the Preventive Maintenance

    (PM) Program, improving the rate of completion

    within guidelines from 60% to 70% of PMIs at

    the beginning of the period to a rate of

    approximately 98% in 2009.

    Most work is done in-house, including minor

    maintenance of GFI fareboxes, which are covered

    by warranty for major issues. Examples of

    outsourced work are bodywork, glass and

    alternators.

    RECOMMENDATIONS

    RECOMMENDATION 1

    DEVELOP AN ANNUAL MARKETING PLAN

    AND REGULARLY ASSESS PROGRESS TOWARD

    ACHIEVING MARKETING GOALS.

    This recommendation is carried forward from

    a recommendation in the prior Performance

    Audit. An allocation of between two and three

    percent of the operating budget for marketing and

    public information purposes is considered

    appropriate for growing a ridership. B-Line’s

    marketing budget averages about one percent,

    which is below the recommended amount to

    sustain ridership (2%).

    In addition, an evaluation mechanism should

    be built into each marketing program and

    campaigns. For a small transit marketing budget,

    the impact is often cumulative. Each program and

    campaign needs to build on the previous one, with

    a common look and feel among all collateral and

    ads.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 17

    RECOMMENDATION 2

    ENSURE DEFINITIVE SEPARATION OF

    BCAG AS THE RTPA FROM BCAG AS THE

    TRANSIT OPERATOR.

    This recommendation is to be carried forward

    from a recommendation in the prior Performance

    Audit. During this Audit period, BCAG made

    considerable progress in separating BCAG as the

    RTPA from BCAG as the transit operator on the

    staff level. The two Senior Planners who are

    responsible for the transit operations no longer

    report to the Program Manager, who is

    responsible for processing TDA claims. Both

    now report to the Executive Director, along with

    the Assistant Planner, who supports ADA and

    paratransit services.

    Discussion with BCAG management indicate

    that more definitive separation of the transit

    operations from the RTPA responsibilities is

    planned over the next several years. BCAG will

    continue to provide Butte Regional Transit with

    administrative support. However, a distinct

    separation between the BCAG, the RTPA, and

    BCAG, the transit operator, diminishes any

    likelihood that a conflict of interest might be

    perceived regarding the RTPA’s oversight

    responsibilities.

    Although a separation of the Board’s dual

    responsibilities is preferred, BCAG is not disposed

    to form a separate joint powers authority (JPA) to

    oversee public transportation at this time. While it

    respects and understands the need for separation

    of responsibilities, the added administrative

    burden and complication of two separate entities

    is not considered necessary.

    RECOMMENDATION 3

    ENSURE THAT ALL FINANCIAL AND

    PERFORMANCE DATA IS CORRECTLY

    REPORTED ON THE STATE CONTROLLER’S

    REPORTS AND THAT SUPPORTING

    DOCUMENTATION IS MAINTAINED FOR A

    MINIMUM OF FOUR YEARS.

    Complete documentation was not available to

    determine how performance measures and Full

    Time Equivalents (FTE) were collected and

    reported during the Audit period. Documentation

    had to be recreated, and the source documents for

    the original report were not available.

    At a minimum, both hard copies and

    electronic files should be retained for all source

    documents used in compiling the State

    Controller’s Reports. Any calculations and/or

    assumptions also need to be documented.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 18 AUGUST 2010

    Table 1: B-Line Recommendations

    Recommendation Priority Responsibility Timeframe 1 Develop an Annual

    Marketing Plan and

    regularly assess progress

    toward achieving

    marketing goals.

    Medium Senior Planner,

    Transit Operations

    FY 2011-12

    2 Ensure definitive

    separation of BCAG as

    the RTPA and BCAG as

    the transit operator.

    Medium Executive Director FY 2012-13

    3 Ensure all financial and

    performance data is

    correctly reported on the

    State Controllers Reports

    and supporting

    documentation is

    maintained for a minimum

    of four years.

    High Senior Planner,

    Transit

    Administration

    FY 2010-11

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 19

    I N T R O D U C T I O N

    This report of the Triennial Performance Audit

    for Butte County Association of

    Governments (BCAG), as operator for Butte

    Regional Transit (B-Line), covers a three-year

    period ending June 30, 2009. The California

    Public Utilities Code (PUC) requires all public

    transit agencies to conduct a Triennial

    Performance Audit in order to be eligible for

    Transportation Development Act (TDA)

    funding.

    Figure 4: B-Line began operation July 5, 2005.

    The Audit is designed to be an independent

    and objective evaluation of BCAG, as the transit

    operator. The Audit has four objectives:

    1. Assess compliance with TDA regulations;

    2. Review improvements that have been implemented and progress

    toward goals;

    3. Evaluate the efficiency and effectiveness of B-Line operations;

    4. Provide sound, constructive recommendations for improving the

    efficiency and functionality of the

    operations.

    AUDIT SCOPE & METHODOLOGY

    The Performance Audit was conducted in

    accordance with the processes established by

    the California Department of Transportation, as

    outlined in the Performance Audit Guidebook for

    Transit Operators and Regional Transportation

    Planning Entities, as well as Government Audit

    Standards, published by the U.S. Comptroller

    General.

    The Performance Audit is a high-level

    review evaluating the efficiency, economy, and

    effectiveness of the transit operations. While the

    primary purpose of the Audit is to ensure

    compliance with Transportation Development

    Act requirements, it should also provide BCAG

    with practical and useful recommendations to

    improve the efficiency and effectiveness of its

    transit operations. The Audit of B-Line

    operations comprised the evaluation of four

    elements:

    1. Compliance with TDA requirements and regulations;

    2. Implementation of recommendations contained in prior

    Performance Audits;

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 20 AUGUST 2010

    3. Methodology for calculating performance indicators and

    significant performance measures;

    4. Major functions performed by BCAG to support its public

    transportation operations,

    including−

    General management and

    organization;

    Service planning;

    Scheduling, dispatching, and

    operations;

    Personnel management and

    training;

    Administration;

    Marketing and public information;

    Maintenance.

    The Audit presents conclusions and

    recommendations to address opportunities for

    improvement based upon analysis of the

    previous four elements.

    The methodology for this Audit

    encompassed interviews with key personnel

    from BCAG and the operations contractor; site

    visits; verification of data sources; examinations

    of financial and statistical reports; and reviews

    of relevant planning documents and reports.

    The Audit Report comprises four sections:

    1. Executive Summary

    A brief summary of the key findings and

    recommendations developed during the

    Performance Audit processes.

    2. Introduction

    Methodology of the Audit and pertinent

    background information.

    3. Audit Results

    In-depth discussion of findings surrounding

    each of the major elements of the Audit:

    Compliance with statutory and regulatory requirements;

    Progress in implementing prior Audit recommendations;

    Performance measures and trends;

    Functional review.

    4. Findings and Recommendations

    A delineation of the key findings of the

    Performance Audit, and recommendations for

    improving the efficiency and effectiveness of B-

    Line transit service operations, and a timeline

    for implementing the recommendations.

    DESCRIPTION OF BUTTE REGIONAL TRANSIT (B-LINE)

    Butte Regional Transit, or B-Line, provides

    fixed route and paratransit services to the cities,

    town, and Butte County. The Butte County

    Association of Governments (BCAG) Board of

    Directors is the policy-making authority.

    BCAG is a Joint Powers Authority (JPA)

    operating under a Joint Powers Agreement (also

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 21

    a JPA) between the County of Butte and the

    incorporated cities of Chico, Gridley, Biggs,

    Oroville, and the Town of Paradise. BCAG is

    the state-designated Regional Transportation

    Planning Agency (RTPA) and the federally

    designated Metropolitan Planning Organization

    for Butte County.

    Prior to this audit period, all transit systems

    in Butte County, with the exception of Gridley

    Golden Feather Flyer, were consolidated as

    Butte Regional Transit or B-Line. B-Line service

    began in July 2005, although administrative

    consolidation took place in January 2005.

    BCAG contracts the operation of B-Line to

    a private contract operator, Veolia

    Transportation Services.

    TRANSIT CENTER

    The Chico Transit Center is the city's hub

    for Butte Regional Transit. It is located at

    Second and Salem in the former site of the

    Hotel Oaks. All buses that serve Chico,

    including regional service from Chico to other

    cities such as Oroville, pulse at the center.

    In 2007, the transit center was temporarily

    moved to 2nd Street and Normal Avenue to

    facilitate construction of the new center at a

    cost of $1.2 million. This new center was

    constructed by the City of Chico.

    Figure 5: This new transit center opened on February 20th, 2008.

    The facility has three shelters for travelers,

    as well as benches and public bathrooms. In

    addition, it is powered by solar energy, collected

    from the tops of the shelters. The bus hub's

    central location directly across the street from

    California State University Chico makes taking

    the mass transportation ideal for students,

    downtown workers, and shoppers. However,

    one complaint about the new center is that

    regional travelers are still out in the winter rains

    and summer sunshine on the Normal Avenue

    side of the center.

    B-Line customer service representatives are

    available at the Center’s kiosk from 8:00 a.m. to

    5:30 p.m., Monday through Friday. Riders may

    purchase passes, lodge complaints or leave

    compliments, and obtain information about B-

    Line routes and schedules at this location.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 22 AUGUST 2010

    TRANSIT MODES

    B-Line service is divided into four service

    modes:

    1. URBAN FIXED ROUTE (Routes 1-10)

    2. URBAN PARATRANSIT

    3. RURAL FIXED ROUTE (Routes 20 and over)

    4. RURAL PARATRANSIT

    URBAN FIXED ROUTE SERVICE

    Figure 6: The Urban Fixed Route and Urban Paratransit services serve the City of Chico, which is the only urbanized area in Butte County.

    The Urban Fixed Routes serve the City of

    Chico. These routes operate from 6:50 a.m. to

    9:45 p.m. Monday through Friday, and 8:50 a.m.

    through 6:15 p.m. on Saturdays. The routes are

    based on timed connections from the Transit

    Center at Second Street and Salem in downtown

    Chico. Eight routes operate year round:

    Route 1: Bi-directional hourly service

    between downtown and Sycamore Glen

    (Ceres and Lassen) via Esplanade and

    Lassen;

    Route 2: Bi-directional hourly service

    between downtown and Sycamore Glen

    (Ceres and Lassen) via Mangrove

    Avenue;

    Route 3: Bi-directional hourly service

    between downtown and North Valley

    Plaza via Nord Avenue and East

    Avenue;

    Route 4: Bi-directional service every

    half hour between downtown and

    North Valley Plaza via East First

    Avenue and East Avenue;

    Route 5: Bi-directional service every

    half-hour between downtown and

    Chico Mall via Eighth Street;

    Route 6: Bi-directional service every

    half hour between downtown and

    Chico Mall via Park Avenue and Dr.

    Martin Luther King Jr. Parkway;

    Route 7: Bi-directional hourly service

    between Chico Mall and Pleasant Valley

    High School via Bruce Road and

    Manzanita Avenue;

    Route 10: Bi-directional hourly service

    between downtown and Highway 99

    along the Esplanade.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 23

    Two student shuttles operate on weekdays

    only during the California State University

    Chico school year when classes are in session.

    The services are open to the general public:

    Route 8: Student shuttle service every

    half hour between the downtown

    Transit Center and West Eighth

    Avenue and Nord Avenue;

    Route 9: Student shuttle service every

    half hour between Seventh Street and

    Hickory Street, and Fourth Avenue and

    Cedar via the downtown Transit

    Center.

    CHANGES TO FIXED ROUTE

    The following changes were made during the

    2006/07 fiscal year:

    Route 1 Times adjusted. Interlined with

    route 2 at Ceres/Lassen.

    Route 2 Times adjusted. Northern

    portion of route changed. Interlined

    with route 1 at Ceres/Lassen.

    Route 7 Times adjusted. Northern

    portion of route changed for better on-

    time performance.

    Route 8 Interlined with route 9.

    Route 9 Times adjusted. Interlined

    with route 8.

    Route 24 Added deviation by Wal-Mart

    upon request, and added a new stop

    location for return trip.

    Route 41 Saturday service added

    between Magalia and Paradise.

    Paradise Transit Center Moved from

    Skyway/Foster to Almond/Birch.

    Figure 7: B-Line bus shelters and transit station shield riders from the elements.

    URBAN PARATRANSIT SERVICE

    The Urban Paratransit service provides

    paratransit service for the elderly (65 years or

    older) who live more than a quarter mile from

    the nearest bus stop, as well as individuals

    certified by the Americans with Disabilities Act

    (ADA) in order to complement the fixed route

    service in the greater Chico area.

    RURAL FIXED ROUTE SERVICE

    The Rural Fixed Route service provides

    local service within the City of Oroville (routes

    in the 20s) and intercity routes connecting

    communities within Butte County (routes in the

    30s and 40s). One route also operates within

    the town of Paradise.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 24 AUGUST 2010

    Four routes operate Monday through Friday

    from 6:46 a.m. to 5:28 p.m. in the City of

    Oroville and surrounding area:

    Route 24: Bi-directional service every

    two to three hours between Oroville

    Transit Center (Mitchell and Spencer)

    and County Center via Thermalito;

    Route 25: Clockwise service every hour

    between Oroville Transit Center along

    5th and Mitchell;

    Route 26: Clockwise service every two

    hours between Oroville Transit Center

    and Oroville Hospital with bi-

    directional service along Olive Highway

    from Foothill Boulevard to Tyme;

    Route 27: Bi-directional service every

    two hours from Oroville Transit Center

    and Las Plumas High School.

    RURAL PARATRANSIT SERVICE

    The five intercity routes include—

    Route 20: Bi-directional hourly service

    between Chico and Oroville, between

    the hours of 5:50 a.m. and 7:20 p.m.

    Monday through Friday;

    Route 30: Four trips each way Monday

    through Friday, and four trips each way

    on Saturday—between Oroville,

    Palermo, Gridley and Biggs;

    Route 31: Morning commute service

    from Paradise to Oroville, with an

    afternoon return;

    Route 40: Bi-directional service

    between Chico and Paradise every two

    hours, Monday through Friday, with

    limited hours of operation on Saturday

    and Sunday;

    Route 41: Bi-directional service

    between Chico and Paradise

    Pines/Magalia, every two hours on

    weekdays, with limited hours of

    operation on Saturday.

    One route operates within the Town of

    Paradise:

    Route 46: Weekday service in the

    Town of Paradise between Almond and

    Birch Streets and Feather River

    Hospital.

    Figure 8: B-Line Paratransit is a shared ride service designed to meet the needs of seniors and persons with qualifying disabilities who are unable to use the B-Line fixed route services.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 25

    B-Line’s Rural Paratransit service provides

    paratransit services in the Oroville area and

    Paradise area seven days a week. The service is

    available to riders who are age 65 or older and

    live more than a quarter mile from the nearest

    bus stop, and to riders who have an ADA-

    certified disability.

    FARE STRUCTURE

    B-Line fixed route fares have a two-tier

    structure:

    Local Fares for travel within a single

    local jurisdiction (Chico, Paradise,

    Oroville, or Gridley/Biggs);

    Regional Fares for intercity travel

    from one local jurisdiction to another.

    Up to two children under the age of six may

    ride free with each paying adult. Free transfers

    are available.

    One-way regular local fares maintained a

    rate of $1.00, and one-way regular regional fares

    maintained a $1.25 fare during this audit period.

    Regional transfers are valid for two hours from

    the time issued. Local transfers are valid for one

    hour. A local pass, ticket or transfer may be

    upgraded for use on a regional bus by paying

    the fare difference of 25 cents (or ten cents on

    discount).

    Fares for all paratransit services were raised

    in July of 2006. B-Line one-way fare for both

    Urban Paratransit and Rural Paratransit services

    is $2.00. A non-discounted 10-ride ticket book

    is available for $20.00.

    All B-Line fixed route buses are equipped

    with GFI Odyssey fareboxes. The fareboxes use

    magnetic stripe tickets and passes. Although the

    old B-Line paper tickets are no longer sold, they

    are still valid for rides.

    At the April 2009 BCAG Board of

    Directors meeting, BCAG staff presented a

    proposed fare increase for B-Line. The

    proposed fare increase was recommended to

    take effect at the beginning of the 2009/10 FY

    and is the result of:

    Increased operating costs;

    Declining farebox recovery

    revenues;

    Recent state funding cuts for

    transit.

    New transit fares went into effect on

    August 1, 2009 and will be analyzed during the

    following audit period.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 26 AUGUST 2010

    Table 2: Change in B-Line fixed route fares

    FARE TYPE LOCAL SERVICE REGIONAL SERVICE LOCAL SERVICE REGIONAL SERVICE

    THROUGH JUNE 2009 CURRENT FARES CASH CASH

    Regular $1.00 $1.25 $1.40 $1.80 Discount $0.50 $0.60 $0.70 $0.90 Student (6-18) $0.75 $1.00 $1.00 $1.30 Child (under 6) 2 free 2 free 2 free 2 free

    2-RIDE PASS 2-RIDE PASS Regular $2.00 $2.50 $2.80 $3.60 Discount $1.00 $1.20 $1.40 $1.80 Student (6-18) $1.50 $2.00 $2.00 $2.60

    10-RIDE PASS 10-RIDE PASS Regular $9.00 $11.00 $12.60 $16.20 Discount $4.50 $5.00 $6.30 $8.10 Student (6-18) $6.50 $8.50 $9.00 $11.70

    30-DAY PASS 30-DAY PASS Regular $30.00 $37.50 $35.00 $43.00 Discount $15.00 $18.00 $18.00 $22.50 Student (6-18) $20.00 $25.00 $25.00 $30.00

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 27

    C O M P L I A N C E R E P O R T

    This section examines BCAG’s compliance

    with the Transportation Development Act (TDA)

    and relevant sections of the California Code of

    Regulations. An annual certified fiscal audit

    confirms TDA funds were apportioned in

    conformance with applicable laws, rules, and

    regulations. Although compliance verification is not

    a TPA responsibility, several specific requirements

    concern issues germane to the Performance Audit.

    Compliance was determined through interviews

    with BCAG staff and the operation’s contractor

    (Veolia) and through inspection of relevant

    documents including fiscal audits, planning

    documents, performance reports, and other related

    documentation.

    BCAG administers TDA laws and regulations

    related to the operation of Butte Regional Transit,

    B-Line in an efficient and effective manner and is

    in compliance with TDA rules and regulations with

    three exceptions.

    1. The paratransit service for the exclusive use of elderly and

    handicapped persons, has

    maintained the required fare ratio of

    10 percent for only two of the three

    years (FY 2007/08 and FY 2008/09)

    The other two exceptions are minor

    administrative issues:

    2. The State Controllers Report was submitted beyond the specified

    timeframe in FY 2008/09 (PUC

    99243);

    3. The Fiscal and Compliance Audits were completed and submitted beyond

    the specified timeframe in FY 2007/08.

    The TPA compliance findings and related

    comments are delineated in the table on the

    following pages.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 28 AUGUST 2010

    Table 3: TDA Compliance Chart

    REFERENCE REQUIREMENT COMPLIANCE COMMENTS

    PUC 6754 (A) (3) If the operator receives State Transit Assistance funds, the operator makes full use of funds available to it under the Urban Mass Transportation Act of 1964 before TDA claims are granted.

    In Compliance B-Line has applied for and received federal transit assistance grants:

    FY 06/07—$1,876,344;

    FY 07/08—$2,023,731 and $1,600,000 CMAQ grant;

    FY 08/09—$2,089,603.

    PUC 99243 The transit operator annually reports to the RTPA, based upon the Uniform System of Accounts and Records established by the State Controller, within 90 days of the end of the fiscal year.

    Exception Noted

    State Controller’s Reports were filed within the 90-day window (110 days for filling electronically) with the exception of FY 08/09:

    FY 06/07 filed 10/1/07;

    FY 07/08 filed 9/24/08;

    FY 08/09 filed 10/28/09 (ten days later than the deadline when filling electronically).

    PUC 99245 The operator has submitted annual fiscal and compliance audits to its RTPA and to the State Controller within 180 days following the end of the fiscal year, or has received the appropriate 90-day extension allowed by law.

    Exception Noted

    Fiscal and Compliance audits have consistently been completed within the 180-day window with the exception of FY 07/09. Only FY 08/09 was submitted within the required timeframe:

    FY 06/07 completed 11/6/07, filed 2/20/07;

    FY 07/08 completed 1/20/09, filed 3/3/09;

    FY 08/09 completed 12/18/09, filed 12/29/09. The audit conforms to all TDA requirements.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 29

    PUC 99251 The CHP has, within the 13 months prior to each TDA claim submitted by an operator, certified the operator’s compliance with Vehicle Code Section 1808.1 following a CHP inspection of the operator’s terminal.

    In Compliance Satisfactory CHP Terminal Reports were completed:

    3/13/07

    3/20/08

    3/11/09

    PUC 99261 The operator’s claim for TDA funds is submitted in compliance with rules and regulations adopted by the RTPA for such claims.

    In Compliance Claims are submitted by the individual jurisdictions.

    PUC 99264 The operator does not routinely staff two or more persons with public transportation vehicles designed to be operated by one person.

    In Compliance Vehicles are staffed appropriately.

    PUC 99266 The operator’s operating budget has not increased by more than 15% over the preceding year, nor is there a substantial increase or decrease in the scope of operations or capital budget provisions for major new fixed facilities unless the operator has reasonably supported and substantiated the charge(s)

    In Compliance Operating budgets were analyzed excluding depreciation, contingency, and capital reserve. During the three years of the Audit, operating budgets did not increase by more than 15%:

    FY 06/07—(1.7%)

    FY 07/08—4.2%

    FY 08/09—0.0%

    PUC 99268.2, 99268.3, 99268.12, 99270.2

    If the operator serves an urbanized area, it has maintained a ratio of fare revenues to operating costs at least equal to one-fifth (20 percent), unless it is in a county with a population of less than 500,000, in which case it must maintain a ratio of fare revenues to operating costs of at least equal to three-twentieths (15%), if so determined by the RTPA.

    In Compliance Farebox Recovery Ratio for Urban Fixed Route service was consistently above 20%:

    FY 06/07—20.7%

    FY 07/08—21.3%

    FY 2008/09—22.8%.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 30 AUGUST 2010

    PUC 99268.2, 99268.4, & 99268.5

    If the operator serves a rural area, it has maintained a ratio of fare revenues to operating costs at least equal to one-tenth (10 percent).

    In Compliance Farebox Recovery Ratio for Urban Fixed Route service was consistently above 20%:

    FY 06/07—14.6%

    FY 07/08—15.1%

    FY 2008/09—17.9%

    PUC 99268.5 If an operator’s services are for the exclusive use of elderly and handicapped persons, it has maintained a fare ratio of at least one-tenth (10 percent).

    Exception Noted

    Farebox Recovery Ratio for combined paratransit services was below 10% for two of the three years of the Audit:

    FY 06/07—10.9%

    FY 07/08—9.9%

    FY 2008/09—8.9%

    PUC 99271 The current cost of the operator’s retirement system is fully funded with respect to officers and employees of its public transportation system or the operator is implementing a plan approved by the RTPA, which will fully fund the retirement system within 40 years.

    In Compliance B-Line employees with BCAG are covered by PERS. Contract employees are under the contractor’s (Veolia’s) retirement system.

    PUC 99314.5 If the operator receives State Transit Assistance funds, the operator is not precluded by contract from employing part-time drivers or from contracting with common carriers.

    In Compliance The operator is not precluded from employing part-time drivers.

    CCR 6634 Operator funding provided through the Transportation Development Act makes up no more than 50% of operating, maintenance, capital, and debt service requirements.

    Not Relevant Butte Regional Transit meets the farebox recovery ratio requirements.

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 31

    P R I O R AU D I T

    R E C O M M E N DA T I O N S

    The implementation of the prior Triennial

    Performance Audit recommendations provides

    a measure of each transit operator’s efforts to

    improve its efficiency and effectiveness.

    During the last year of the prior Audit

    period, the operations of four entities and six

    transit services were consolidated as Butte

    Regional Transit, known as B-Line.

    Recommendations focused on optimizing this

    new system.

    The prior Audit had a total of six

    recommendations, four of which were

    considered high priority, and two of which were

    considered medium priority. Two of the six

    addressed planning, three addressed reporting,

    and one addressed organizational structure.

    PRIOR RECOMMENDATION 1

    RECOMMENDATION: Develop a Short-

    Range Transit Plan to guide B-Line growth.

    STATUS: In Progress; due for completion by

    July, 2010.

    RATIONALE: The prior Audit recommended

    short-term planning as fundamental to effective

    resource use and development of a transit

    system to meet Butte County’s future needs.

    The Audit noted that Butte County

    Association of Governments (BCAG) had

    elected to incorporate a Short Range Transit

    Plan (SRTP) and a Long Range Transit

    Plan as elements of the Reg ional

    Transportation Plan (RTP), and that this

    could allow for a more efficient use of planning

    funds and better integration between short- and

    long-term objectives.

    However, the prior Audit recommended

    that the RTP should still provide the same level

    of detail normally found in a stand-alone SRTP,

    including:

    5. Overview of existing transit system; 6. Transit demand analysis; 7. Goals, objectives, measures, and

    standards;

    8. Service and system evaluation; 9. Operations plan; 10. Operations budget; 11. Capital Improvement Program.

    The prior Audit also noted potential state

    and federal funding sources for this purpose.

    This recommendation was considered a

    high priority for FY 2007/08, under the likely

    supervision of the Senior Planner, Transit

    Administration.

    DISCUSSION: In November 2008, BCAG

    released a Request for Proposals to perform a

    Market Based Transit Study for the Butte

    Regional Transit System. Proposals were

    submitted in December of 2008. A consultant

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 32 AUGUST 2010

    was selected, and the study commenced in

    February of 2009.

    The approach has five key components:

    1. Market research; 2. Gather and illustrate facts on existing

    conditions;

    3. Develop and evaluate four alternatives; 4. Extensive public outreach; 5. Recommend preferred alternative.

    Four working papers have been completed:

    Working Paper I: Survey Results

    Working Paper II: Existing

    Conditions

    Working Paper III: Four

    Alternatives

    Working Paper IV: Preferred

    Alternative

    The Study is in the final stage of

    incorporating the last series of public comments

    into the plan for implementing the preferred

    alternative.

    Although the Market Based Transit Study is

    not in the format of a traditional Short Range

    Transit Plan or Transit Development Plan, the

    Study presents a plan for the most effective use

    of resources in providing a transit system to

    meet Butte County’s current and future transit

    needs. The plan does not address capital needs

    and fleet replacement. This element could be

    addressed as part of the budget development.

    Longer term projections of capital requirements

    would assist the jurisdictions in understanding

    budget allocations including the capital reserve

    requirement.

    PRIOR RECOMMENDATION 2

    RECOMMENDATION: Provide the Board and

    the public with an annual report on B-Line

    performance, with quarterly updates.

    STATUS: Fully Implemented.

    RATIONALE: This recommendation was a

    carryover from the then-previous BCAG

    Triennial Performance Audit. The most recent

    prior Audit noted that since BCAG has become

    the transit operator, as well as the Regional

    Transportation Planning Agency (RTPA),

    this reporting recommendation had become

    more appropriate than it had been previously.

    The prior Audit noted that, although

    BCAG staff receives and analyzes performance

    data on a regular basis, B-Line performance is

    not reported to the Board or member agencies.

    The Audit recommended an Annual Report

    with quarterly updates to provide accountability

    to the Board and the public, and suggested an

    outline for the Report and updates to include:

    1. Annual/quarterly accomplishments; 2. Ridership compared to prior year; 3. Key performance indicators compared

    to prior year and to adopted standards.

    The Audit noted that such a Report would

    provide valuable information to key officials and

    the public, and that it could be submitted as part

    of the B-Line Annual Transit Service Plan

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 33

    and Budget, with the addition of performance

    data to provide a more complete overview of

    operations.

    This recommendation was considered a

    medium priority for FY 2007/08, also under the

    likely supervision of the Senior Planner, Transit

    Administration.

    DISCUSSION: BCAG implemented an Annual

    Report in FY 2007/08. The Report covers all

    BCAG responsibilities, in addition to B-Line

    operations.

    The Message from the Executive states: “Looking

    back at the past year, the sole intention is not to

    focus on what was accomplished as much as to

    look at where we’re headed, based on the type

    of planning that is being developed to help

    guide our future here within the region.”

    The Report provides an overview of BCAG and

    a summary of major projects. In the FY

    2007/08 Report, one page addresses B-Line

    accomplishments and one page is devoted to

    the B-Line financials and changes in ridership.

    In the FY 2008/09 Report, two pages are

    devoted to B-Line accomplishments, including

    information on the Market Based Transit Study,

    and one page on B-Line financials.

    In FY 2009/10, staff began preparing quarterly

    reports for the Board. The quarterly reports

    highlight key performance and operational

    statistics, along with accomplishments for the

    quarter.

    PRIOR RECOMMENDATION 3

    RECOMMENDATION: Develop an Annual

    Marketing Plan and regularly assess

    progress toward achieving marketing goals.

    STATUS: Partially Implemented. This

    recommendation will be carried forward.

    RATIONALE: The prior Audit noted that B-

    Line’s marketing was on a program-by-program

    basis, and recommended that a marketing plan

    be developed as the foundation for a marketing

    program that would effectively achieve ridership

    and outreach goals.

    The Audit recommended that this

    marketing plan should contain:

    Long-term marketing and positioning

    goals;

    Objectives regarding ridership and

    public awareness;

    Strategies, including branding and

    positioning, to provide focus;

    Tactics defining the message and media

    for implementing the strategies;

    Program descriptions and schedules,

    including milestones (or control points),

    and budgets;

    Monitoring and evaluation mechanisms,

    including measures and standards, for

    each strategy, tactic, and program.

    The Audit noted that B-Line’s marketing

    budget had been averaging about one percent,

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 34 AUGUST 2010

    which was below the recommended amount to

    sustain ridership (2%). The Audit suggested

    that an allocation of three to five percent of the

    operating budget be made for marketing and

    public information purposes—an amount that is

    generally considered appropriate for an

    established transit operation to grow ridership.

    This recommendation was considered a

    high priority for FY 2007/08, under the likely

    supervision of the Senior Planner, Transit

    Operations.

    DISCUSSION: As part of the development of

    the Annual Transit Service Plan and Budget,

    an Excel spreadsheet is prepared each year with

    all predicted marketing expenditures delineated.

    During the year, the Senior Planner, Transit

    Operations, tracks actual expenditures to budget

    projections. The spreadsheet provides some

    guidance as to tactics with respect to media, but

    not message. Many of the ads are very creative

    and memorable; the jingle provides a consistent

    hood for television and radio.

    The plan does not appear to included “earned”

    or “bartered” media or public relations that

    might support the advertising campaign.

    The B-Line marketing includes sponsorship of

    the athletic program at Cal State Chico, and

    adds in several specialized publications, such as

    101 Things to Do…in and Around Butte

    County and The Source, as well as local

    newspapers, including the Chico Enterprise

    Record and the Paradise Post.

    The marketing programs and campaigns do not

    appear to be evaluated on a regular basis.

    During FY 08/09, a strategic decision was made

    to shift television advertising dollars from cable

    to network using broad rotators. The decision

    was based on the greater reach afforded with

    network television, although no formal analysis

    of reach/frequency/cost appears to have been

    made.

    Overall marketing strategies, including branding

    and positioning for B-Line, have not been

    clearly defined to support marketing objectives

    regarding ridership and public awareness.

    PRIOR RECOMMENDATION 4

    RECOMMENDATION: Continue to monitor

    system performance on a monthly basis to

    determine productivity improvements.

    STATUS: Fully Implemented

    RATIONALE: The prior Audit noted that major

    changes in a transit system, especially in

    conjunction with a fare increase, often have a

    temporary negative effect. The Audit

    recommended that BCAG staff and the

    contractor regularly monitor performance and

    schedule adherence, and make adjustments as

    required.

    Areas of concern noted by the prior Audit,

    based on the first year of consolidation (FY

    2005/06), included:

    Increased Operating Cost per VSH and

    VSM (particularly for Urban services);

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT AUGUST 2010 PAGE 35

    Increased Operating Cost per Passenger;

    Decreased Passengers per VSH and

    VSM;

    Decreased Farebox Recovery Ratio,

    with the Ratios for both Urban and

    Rural Paratransit services below the

    10% required ratio.

    The Audit noted that BCAG had worked

    with the operations contractor’s general

    manager to increase service effectiveness for the

    paratransit services during FY 2005/06, with

    good success. The recommendation was made

    that BCAG staff continue working with the

    contractor to determine where improvements in

    productivity and further efficiencies could be

    instituted.

    This recommendation was considered a

    high priority for FY 2006/07, also under the

    likely supervision of the Senior Planner, Transit

    Operations.

    DISCUSSION: BCAG receives performance data

    from its contractor on a monthly basis in both

    hard copy and electronic formats. The data is

    reviewed by both Senior Planners and the

    Assistant Planner for accuracy and performance.

    Data is examined on a route-by-route basis. In

    addition, key performance measures are tracked

    on a monthly spreadsheet to determine trends

    and outliers.

    Questionable data is reviewed with the

    contractor on a regular basis, and the contractor

    appears willing to provide any additional reports

    as requested.

    PRIOR RECOMMENDATION 5

    RECOMMENDATION: Work with contractor

    to ensure that all performance measures are

    correctly reported.

    STATUS: Partially Implemented.

    RATIONALE: The prior Audit found minor

    discrepancies in the reporting of TDA

    performance measures:

    Vehicle Service Miles and Hours did not

    include figures for backup buses for

    Route 2;

    Employee counts rather than employee

    hours were used to calculate Full-Time

    Equivalents (FTEs).

    The Audit noted that corrections were made

    as soon as the miscalculations were brought to

    the attention of the contractor and BCAG staff.

    The Audit recommended that BCAG staff

    review the TDA definitions of VSM, VSH,

    FTE, and Passenger counts with the contractor

    annually when the State Controller’s Report

    is being prepared, in order to ensure that

    performance continues to be correctly

    calculated.

    This recommendation was considered a

    medium priority for FY 2006/07, under the

  • BUTT E COUN TY ASSO CI ATI ON OF GOVERN MEN TS TRI EN N I AL PERFORMA N CE AUDI T

    FINAL REPORT PAGE 36 AUGUST 2010

    likely supervision of the Senior Planner, Transit

    Administration.

    DISCUSSION: Both the contractor and BCAG

    staff are conscientious about reporting

    performance measures and indicators correctly.

    However, a discrepancy was noted in the

    reporting of Full Time Equivalents, and

    documentation supporting the numbers on the

    State Controller’s Report were not readily

    available.

    Some of the issues noted in this Audit may be

    due in part to turnover in staff at BCAG, and

    with the operations contractor.

    PRIOR RECOMMENDATION 6

    RECOMMENDATION: Ensure definitive

    separation of BCAG as the RTPA from

    BCAG as the transit operator.

    STATUS: Partially Implemented. This is a

    valid recommendation and will be carried

    forward with modification.

    RATIONALE: The prior Audit found that the

    effect of incorporating B-Line’s operation into

    BCAG was that the separation between BCAG as

    the Regional Transportation Planning Agency

    (RTPA) and BCAG as the transit operator was

    blurred.

    The Audit noted that maintaining a division

    between these two roles provided some checks

    and balances, because they have very separate and

    different responsibilities:

    B-Line, as the transit operator, is

    responsible for the delivery of effective

    and efficient public transportation in

    Butte County;

    BCAG the RTPA is responsible for

    regional intermodal transportation

    planning and the administration and

    oversig