Submittal Cover Sheet -...
Transcript of Submittal Cover Sheet -...
Submittal Cover Sheet High Point Elementary School Modernization Smolen, Emr, Ilkovitch Architects Bid # 17CN-034, 2A Sitework
Construction Manager: J. Vinton Schafer & Sons, Inc. 1309-Q Continental Drive Abingdon, MD 21009 410-335-3000 [email protected]
Contractor: Urban N. Zink Contractor, Inc. P.O. Box S Chase, MD 21027 410-335-3456 [email protected]
Architect: Smolen, Emr, Ilkovitch Architects 1355 Piccard Drive, Suite 200 Rockville, MD 20850 301-770-0177
CM Submittal №:
Contractor Submittal №:
Subcontractor:
Supplier(s):
Specification №/Dwg. Reference:
Section Title:
Submittal Description/Items Submitted:
Construction Manager’s Stamp
Contractor’s Stamp I certify that the Contract Document requirements have been met and all dimension, conditions and quantities are verified as shown and/or as corrected on those drawings. Name: Date: Company: Urban N. Zink Contractor, Inc.
Engineer’s Stamp Architect’s Stamp