SUBMISSION TO COMMUNITY BOARD 8 & LANDMARKS PRESERVATION COMMISSION
CICOGNANI KALLA ARCHITECT PLLC6 EAST 46TH STREET
NEW YORK, NEW YORK 10017
MAY 2020
10 E 92nd STREETNEW YORK, NY 10128
AERIAL VIEW DESIGNATION MAP
TAX PHOTOGRAPH - 1940’S CURRENT PHOTODESIGNATION PHOTO
BLOCK & LOT PLAN BLOCK 1503, LOT 66SCALE 1”=100’
E 92ND STREET
5TH
AVE
NUE
DESIGNATION REPORT
10 E 92ND STREET
10 E 92ND STREET10 E 92ND STREET
MAY 2020 | PAGE 210 E 92ND STREET - BLOCK STUDY AND ROOF PHOTOS
BLOCK STUDY - ROOF/REAR YARD ADDITION1/32” = 1’-0”
10 E 92ND STREET
EXISTING ROOF ADDITION - 8 E 92ND STREET EXISTING BULKHEAD - 10 E 92ND STREET EXISTING ROOF ADDITION - 12 E 92ND STREET
MAY 2020 | PAGE 3EXISTING NORTH ELEVATION SCALE 1/4” = 1’-0”
PROPOSED NORTH ELEVATION SCALE 1/4” = 1’-0”
DEMOLITION ELEVATION NOTES:
01. EXISTING BEAM TO BE REMOVED
02. EXISTING STAIR BULKHEAD.
02
01
PROPOSED ELEVATION NOTES:
01. NEW ROOFTOP ADDITION (NOT VISIBLE AT
STREET)
02. NEW MECH. EQUIPMENT (NOT VISIBLE AT
STREET)
02. NEW ALUMINIUM LADDER, PTD. BM 2125-20
DEEP SPACE TO MATCH WINDOWS
(NOT VISIBLE FROM STREET)
03
02
01
MAY 2020 | PAGE 410 E 92ND STREET - FLOOR PLANS
EXG BULKHEAD ROOF DEMOLITION PLAN SCALE 1/4” = 1’-0”
EXG ROOF DEMOLITION PLAN SCALE 1/4” = 1’-0”
PROPOSED PENTHOUSE ROOF PLAN SCALE 1/4” = 1’-0”
PROPOSED ROOF FLOOR PLAN SCALE 1/4” = 1’-0”
312.92 SQ.FT
142.76 SQ.FT
MAY 2020 | PAGE 510 E 92ND STREET - SECTIONS, SIGHTLINES, ROOF MASSING, AND MOCK-UP
EXISTING BULKHEAD ELEVATION SCALE 1/4” = 1’-0”
PROPOSED PENTHOUSE SECTION SCALE 1/4” = 1’-0”
MOCK-UP PHOTOS
EXISTING
PROPOSED
EXISTING ROOF PHOTOS
AXONOMETRIC VIEW OF ROOFNTS
PROPOSED NORTH PENTHOUSE ELEVATION SCALE 1/4” = 1’-0”
PROPOSED SOUTH PENTHOUSE ELEVATION SCALE 1/4” = 1’-0”
MAY 2020 | PAGE 6
KEYPLAN NTS
10 E 92ND STREET - SITE SECTION
SITE SECTION - PROPOSEDSCALE 1/8” = 1’-0”
10 E 92nd STREETAPPENDIX
MAY 2020 | APPENDIX IREAR ELEVATION
BASEMENT
FIRST FLOOR
SECOND FLOOR