SUBDIVISION ACCEPTANCE
Transcript of SUBDIVISION ACCEPTANCE
SARITA VALLEY
2A
2B
2B
2A
2B
2B
2B
3B
2B
2B
2B
RONA
LD W
REA
GAN
BLVD
BROM
E DR
ARROWFEATHER PASS
WEST
BORO
UGH L
N
SARITA DR
RABBITS TAIL DR
ZOYSIA DR
WEDGESCALE PASS
FEAT
HER R
EED D
R LYME RIDGE DR
PURP
LE M
OOR P
ASS
SUMMERBROOKE CIR
WARFIELD
PLUME CV
183A
CR 279
RM 2243
S US
183
US 183
RM 2243
± 0 300Feet
SUBDIVISION ACCEPTANCE Location Map - Sarita Valley Phase 7
Acceptance AreaSFRSFSSFU
SFC MFLCGC
CITY MAPË
This map has been produced by the City of Leander for informational purposes only. No warranty is made by the City regarding completeness or accuracy, please refer to the official ordinance for zoning verification. This data should not be construed as a legal description or survey instrument. No responsibility is assumed for damages or other liabilities due to the accuracy, availability, completeness, use or misuse of the information herein provided.
Signature Homes6/10/2021
-
$12,675.03 $0.00
$133,216.12 $127,727.65
$273,618.80
Item Qty Unit $/Unit Item Total
300 1 LS $12,675.03 $12,675.03
$12,675.03
Item Qty Unit $/Unit Item Total
$0.00
$0.00
Item Qty Unit $/Unit Item Total
400 2 EA $1,490.46 $2,980.92 410 812 LF $50.45 $40,965.40 420 3 EA $8,164.97 $24,494.91 430 1 Ea $7,771.86 $7,771.86 440 12 EA $3,414.26 $40,971.12 450 3 EA $2,599.41 $7,798.23 460 812 LF $2.54 $2,062.48 470 812 LF $3.80 $3,085.60 480 812 LF $3.80 $3,085.60
$133,216.12SUBTOTAL FOR WATER LINE IMPROVEMENTS
Water Improvements
8" C900 DR-14 PVC Waterline
Fire Hydrant Assembly
Air Release Valve
Double Water Service
General Overhead Estimate
Street and Pavement Improvements
General Overhead
Bleyl EngineeringQuantities From: Actual Bid, Contract and Change OrdersUnit Costs From: Actual Bid, Contract and Change Orders
ENGINEER'S FINAL COSTOF
PUBLIC IMPROVEMENTSProject: Sarita Valley Condos - Phase 7Project No.: 17-PICP-018
Description
Description
Utility Mobilization
None
Connection to Existing Water Stub
SUBTOTAL FOR GENERAL OVERHEAD
SUBTOTAL FOR WATER LINE IMPROVEMENTS
Single Water Service
Construction Staking
Trench SafetyWaterline Testing
SUBTOTAL FOR GENERAL OVERHEAD
SUBTOTAL FOR WATER LINE IMPROVEMENTS
TOTAL PROJECT PUBLIC IMPROVEMENTS COST
SUBTOTAL FOR WATER LINE IMPROVEMENTS
SUBTOTAL FOR WASTEWATER IMPROVEMENTS
Description
12007 Technology Blvd., Suite 150
Austin, TX 78727
(512) 454‐2400
Ph 7 (Phase 2)
Item Qty Unit $/Unit Item Total
600 1 EA $1,147.44 $1,147.44 610 576 LF $44.76 $25,781.76 620 12 EA $3,582.10 $42,985.20 630 3 EA $2,787.84 $8,363.52 640 5 EA $7,272.65 $36,363.25 650 38 LF $190.68 $7,245.84 660 576 LF $2.54 $1,463.04 670 576 LF $3.80 $2,188.80 680 576 LF $3.80 $2,188.80
$127,727.65
Steven L. Ihnen, P.E. Date
Description
Connection to Existing WW Stub
8" SDR-26 PvC WW Line
Double WW Service
Wastewater Improvements
Single WW Service
SUBTOTAL FOR WASTEWATER IMPROVEMENTS
4' Precast Concrete Manhole
12" Steel Encasement
Construction Staking
Trench SafetyWastewater Testing
Advanc ing s t r o nger , sa f e r co mmun i t i e s ac r o s s T ex as s i n c e 1 9 9 7 .
bleylengineering.com
Tex Reg. No. F‐678
06/10/2021