NAl'IONAL POWER TRANSMISSION CORPORATION TRANSMISSION AND DISTRIBUTION II PROJECT - CREDIT 4107-VN IPP136 VOL. 5 SUB-PROJECT: \ J- DUC TRONG 220KV SUBSTATION AN ONNECTION LIN* % * J Y Code: 4601 7 - JI \ L / March, 2009. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation...

Page 1: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

NAl'IONAL POWER TRANSMISSION CORPORATION

TRANSMISSION AND DISTRIBUTION II PROJECT - CREDIT 4107-VN

IPP136 VOL. 5

SUB-PROJECT: \ J-

DUC TRONG 220KV SUBSTATION AN ONNECTION LIN* % * J Y Code: 4601 7 -

JI \

L /

March, 2009.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 3: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

NATIONAL POWER 'TRANSMISSION CORPORA1-ION

SOUTHERN POWER PROJECT MANAGEMENT BOARD

TRANSMISSION AND DISTRIBUTION II PROJECT - CREDIT 4107-VN

SUB-PROJECT: 7 I CTY CP TU

DUC TRONG 220KV SUBSTATION AND CONNECTION / LINES I 2 *

Code: 4607 7

ETHNIC MINORITY DEVELOPMENT PLAN (EMDP)

Head of Environment and Computer Dept.: Duong Thi Thanh Truc k Member : Nguyen 'Thanh Long

/

HCM City, March, 2009 POWER ENGINEERING CONSIKTING

JOINT STOCK COMPANY No.3

GENERAL DIRECTOR

Page 4: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 5: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution 11 project - Credit 4107-VN EkIDP Duc Trong 220kV Substation and connection line -- -- -. -. .

TABLE OF CONTENT

TABLE OF CONTENT

0. EXECUTIVE SUMMARY

0.2 SOCIO-ECOIVOMIC STATUS OF ETHNIC MINORITY IN THE PROJECTAREA

0.3 LEGAL FRAMEWORK

0.4 PROJECT IMPACT ON ETHNIC hIIiVORITY

0.5 PEOPLE'S PARTICIPATION

0.6 IIVSTITUTIONA L ARRANGEMENT

0.7 DEVELOPMENT ACTIVITIES

0.8 IhfPLEhfENT ARRANGEMENT

0.9 MONITORING AIVD EVA LUA TION

0.10 COST AND FINANCING PLAN

1. INTRODUCTION

1. I The project

1.2 Ethnic Minority Development Plan 1.2.1 Policy framework for ethnic minority 1.2.2 Ethnic minorities in Vietnam

2. SOCIO-ECONOMIC STATUS OF ETHNIC IMINORITY IN THE PROJECT AREA

2. I ' Ethnic minority in the project area

2.2 Socio-economic condition of ethnic minority in the project area 2.2.1 Education: 2.2.2. Health care: 2.2.3. Culture:

2.3 Land use actuality of the ethnic minority in the project area 2.3.1 Chu Ru EM 2.3.2 Tho EM 2.3.3 K' Ho EM 2.3.4 Chinese EM

3.1 The OP 4.10 on indigenous people of the World Bank

3.2 Vietnam Law

4. PROJECT IMPACT ON ETHNIC MINORITY

4. I lmpacts on EM 4.1.1 ChuRuEM 4.1.2 Chinese EM 4.1.3 Tho EM 4.1.4 K ' H o E M

4.2. Impacts on land use system 4.2.1. Impact on land acquisition of the project 4.2.2 Impacts on land use system

4.3 Impacts on hozises and strzictzires

4.4 Impacts on farming system 4.4.1 Impacts on trees and crops

Page 6: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution I I project - Credit 41 07-VN Duc Trone 220kV Substation and connection line

4.4.2 Impacts on farming land

5. PEOPLE'S PARTICIPATION

6. INSTITUTIONAL ARRANGEiMENT

7. DEVELOPMENT ACTIVITIES

7. I For ethnic minorify in affected area

7.2 Mifigafion measzrres

7.3. Technical idenf ification of developrnenf assisfance

8. IMPLEMENT ARRANGEMENT

Program

Action 1

Action 2

Action 3

Action 4

Action 5

Action 6

9. MONITORING AND EVALUATION

10. COST AND FINANCING PLAN

Page 7: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution [ I project - Credit 4107-VN EMDP Duc Trong 220liV Substation and connection line --

APPENDICES

I . Map of the project areas with EM people

2. Preliminary screening of ethnic minority

ABBREVIATIONS

BARD Bank for Agricultural and Rural Development

CRC

DMS

DP

EM

EMP

EMDP

EVN

GOV

HH

OP 4.10

PC

PECC 3

PMB

PPC

ROW

RP SIA

T/L

TD2

VND

WB

ElMHH

Compensation and Resettlement Committee

Detailed measurement survey

Displaced person

Ethnic minority

Environmental management plan

Ethnic minority development plan

Vietnam Electricity

Government

Household

World Bank's operation policy 4.10

People's Committee

Power Engineering Consulting Joint Stock Company 3

Project management board

Provincial People's Committee

Right of way

Resettlement plan

Social impact assessment

Transmission line

Transmission and Distribution I1 project

Vietnam Dong

World Bank

Ethnic minority households

Page 8: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution I1 project - Credit 41 07-VN EMDP

Duc Trong 27-0kV Substation and connection line pp

0. EXECUTIVE SUIMLVARY

Duc Trong 220kV substation and its connection lines include these components: + Duc Trong 22011 lOkV substation has the capacity of 2xl251MVA with . + Construction and installation of connecting line: the 220kV connection line (two routes) with the 1,100m length and the 1 lOKV connection line (two routes) with the 6,000m length. In the project area, there are many ethnic minorities such as the Churu and K'Ho mainly living at Chi Rong A hamlet, Phu Hoi commune, the Tho and the Chinese scattering in Ward 2, 12, Lien Nghia township. Implementing the project components, there will be impacted on local people bec.ause land acquisition required for tower foundations and tree chopping in ROW. However, the project does not cause permanently affected houses; therefore, involuntary resettlement is not required.

0.2 SOCIO-ECONOMIC STATUS OF ETHNIC MINORITY IN THE PROJECT AREA

Ethnic minorities in the project area are Chu Ru, Tho, K'Ho, and Chinese people who are living intermix with Kinh people in Duc Trong district, Lam Dong province. Chu Ru EM is one of the communities whose language stems from the Malayo - Polynesian. The population of Chu Ru EM is quite small; they mainly live in Lam Dong, Ninh Thuan and Binh Thuan province. Tho language belongs to the Viet - Muong system. These people mainly live at the west of Nghe An. Its population is about 5 1,000 people. K'Ho people are over 92,190, and language's one belongs to Mon -- Kho Me system (Nam - A family). These people mainly lived long - standing at Tay Nguyen, then migrated to Lam Dong. Some specific production tools are yoas (chop down a tree), plough, rake and Kor (level the field). . . The percentage of Chinese people in Vietnam is 1.13% Vietnamese population and is ranked in the fourth position. In Lam Dong province, Chinese people are over 12,000. Most of Chinese people in Lam Dong are those who migrate from Quang Ninh in 1955 - 1975. Those people are a part of Chinese people who did farming in Quang Ninh and later set up their house in Lam Dong.

0.3 LEGAL FRAMEWORK

This plan is developed based on policy OP 4.10 of the World Bank on indigenous people (previous as OD 4.20) and policies for EM of GOV. A policy framework and guidelines for EMDP has been prepared for TD2 project to ensure that ethnic minorities are well informed, consulted and mobilized to participate in the sub-projects to be supported by the TD2 project.

0.4 PROJECT IMPACT ON ETHNIC lMINORITY

The project will affect Chu Ru EM people and K' Ho EM people in Chi Rong hamlet, Phu Hoi commune, Chinese EM people in Lien Nghia town, and Tho

Page 9: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'Transmission and distribution I1 project -- Credit 4107-VS EMDP Duc Trong 130kV Substation and connection linc --

EM people in Lien Nghia township, Duc Trong district, Lam Dong province. There are 13 Chu Ru EM households (64 people), 14 Chinese EM h.ouseholds (68 people), and 18 Tho ELM households (88 people) affected.

0.5 PEOPLE'S PARTICIPATION

During the project preparation (along with RP preparation), Management Board and consulting companies have held many community meetings at the commune level in the project area with the participation of DPs and representatives of Commune People's Committees, authorities and non- governmental organisations (Women's union, youth organisation, farmers' union, fatherland front, veterans7 organisation, etc.) In these meetings, project related issues i.e. investment financial resources, project objectives, project components, compensation policy, allowances, etc. are explained by consulting institutions.

0.6 INSTITUTIONAL ARRANGEMENT

To implement this EMDP smoothly, PMB will: - Assigning adequate number of staff for ElMDP implementation. - Contracting with skillful experts for EMDP implementation. - Setting up offices at the site for advantageous implementation.

- Periodically monitoring the EMDP implementation. - Transparency in implementation through information campaign. - Ensuring that EM leaders (elders and those who prestigious on publicity) are

represented in local EMDP committees.

0.7 DEVELOPMENT ACTIVITIES

The plans are not only for EM DPs who are directly affected by land acquisition but also for the EMS who are living in the project affected areas. As mentions in RP, this ElMDP is developed based on the results of consultation with and participation of EM and their local authorities. Special resettlement provisions for ethnic minorities to ensure consideration of impacted ethnic people's views on various issues and to represent their legal rights.

0.8 IMPLEMENT ARRANGEMENT

The EMDP implementation program will be carried out in parallel with the RP implementation program. The details of implementation arrangement are described in Chapter 8 of the RP report of this project.

0.9 MONITORING AND EVALUATION

The implementation of RPElMDP shall be constantly supervised and monitored by PMB in co-ordination with local People's Committees.

Page 10: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

l'rans~nission and distribution 11 project - Credit 4107-Vh' EMDP

Iluc Trong 220kV Substation and connection line -- p-p.--

An independent monitoring agency will bc entrusted with extcrnal rnonitoring tasks of RP and ElMDP implementation. The selection of this agency will be submitted to the approval of PMB and WB. The selected independent external monitoring agency shall be contracted by the PMB right after RPIEMDP approval and shall begin supervision and rnonitoring activities from the beginning of the implementation phase.

0.10 COST AND FINANCING PLAN

Total cost of project is (including contingency - 20%) 22.800.000.

1. INTRODUCTION

1.1 The project

Duc Trong 220kV substation project is proposed to be built to strengthen capacity 1 lOkV supplying power for Lam Dong province in the next project stage, especially the north of the province (zone 1) including: Dalat city and Duc Trong, Don Duong, Lac Duong, Lam Ha and Dam Rong districts. The duty of Duc Trong 220kV substation is to receive power 220kV from Da Nhim hydroelectric power plant and 5001200kV Di Linh station through the line 220kV Da Nhim - Di Linh - Bao Loc transmission line and provide 1 lOkV power to the additional charge of the north of Lam Dong Province.

Duc Trong 220kV substation and its connection lines include these components:

+ Duc Trong 22011 10kV substation has the capacity of 2xl25h4VA. The first stage will set up 1 x 125MVA. Duc Trong 220kV substation is scl~eduled to build at Chi Rong A hamlet, Phu Hoi commune, Duc Trong district, Lam Dong province.

+ Construction and installation of connecting line

- The 220kV connection line (two routes) with the 1,100m length starts from tower of the substation's gate to T115 - TI 16 tower of the Da Nhim - Di Linh 220kV existing transmission line and goes across the area of Phu Hoi commune.

- The 1 lOKV connection line (two routes) with the 6,000m length starts from tower of the Duc Trong substation's gate to No.3 tower of the Da Nhim - Duc Trongl 1 OkV existing transmission line and goes across Lien Nghia township and a part of Phu Hoi commune.

In the project area, there are many ethnic minorities such as the C:huru and K'Ho mainly living at Chi Rong A hamlet, Phu Hoi commune, the Tho and the Chinese scattering in Ward 2, 12, Lien Nghia township. Implementing the project components, there will be impacted on local people because land acquisition required for tower foundations and tree chopping in ROW. However, the project does not cause permanently affected houses; .therefore, involuntary resettlement is not required.

(Pls. see Appendix 1 for Map ofproject areas).

Page 11: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution 11 project - Credit 41 07-VN EMDP

Duc Trong 23-OkV Substation and connection line --

1.2 Ethnic Minority Development Plan

As mentioned above, implementing the project components, local people will be affected because land acquisition is required for the tower foundations, substation, road into the substation and tree chopping in ROW. Although there is special try in design, proposed construction measures and construction schedule to reduce adverse impacts on the local communities, particularly the ethnic minority, some adverse impact on land acquisition would be unavoidable. These adverse impacts to individuals are not significant: most of land is temporarily affected, while some agricultural land of ethnic minority households could be permanently revoked for tower foundations and substation.

The EMDP is developed to ensure that the project subcomponents would not cause any traditional culturally specific impact on the affected EM13 and the nature of impacts does not result in community-wide socio-economic effects. The EMDP also ensures that the development process foster full respect for dignity, human rights and cultural uniqueness of the EMS and the,y will not suffer adverse effects during the development process and that they will receive culturally compatible social and economic benefits.

The plans are not only for DPs who are directly affected by land acquisition but also for the EMS who are living in the affected project areas. As mentions in RP, this EMDP is developed based on the results of consultatior~ with and participation of affected EMPs and their local authorities.

1.2.1 Policy framework for ethnic minority

The TD2 project has prepared an Policy Framework and guidelinesjbr EMDP. The guidelines seek to ensure that ethnic minorities are well informed, consulted and mobilized to participate in the sub-projects to be supported by Transmission and Distribution I1 Project. Their participation can protect them from any potential adverse impacts of sub-projects to be financed blyr the TD2 Project. This ElMDP is prepared based on this guidelines.

(Pls. see Appendix 2 for Policy Framework and guidelines for EMDP - TD2 project).

1.2.2 Ethnic minorities in Vietnam

In Vietnam, the indigenous people, particularly the ethnic minority people are commonly among the poorest groups and have limited benefits from social development. They are vulnerable to the appearance of possible physical impacts by their land occupation for the infrastructure project or social impacts due to the changes of favorable place living acquaintance.

The WB's policies are to identify the possible impacts, analyze the customs, cultures and behaviors to find out the best appropriate plan to act and help those affected people. In the process it is necessary to study the policy and legal framework to integrate in the implementation schedule. Org, ranization

Page 12: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

l'ransmission and distribution 11 project - Credit 41 07-VY E41I)P

Duc Trong 220kV Substation and connection line --PA-

- - P- --- - -.

needs to build to precede the plan, monitor and supervise in order to contribute to the improvement of indigenous people life conditions.

For this subproject, considering the institutional arrangements by EVN (all institutions which will be involved in RP preparation and implementation will be responsible for preparing and implementing Ethnic Minority Development Plan). Therefore, a lot of information on consultation and participation of EM in EMDP, institutional arrangements, complaint and grievances and monitoring are described the RP report of this project. The resettlement and compensation policy for EMDPs is the same for other RP. In the EMDP, only the special policies and programs are figured out based on the consultation and feedback from EM and local authorities in the project affected areas.

The plan mainly aims at providing information on ethnic group in the project areas and having development plan in compliance with WB's policy OP 4.10 (previous as OD 4.20), ensuring the following:

(a) Respect characteristics of customs, habits and cultural tradition o f . the ethnic group;

(b) Avoid negative impacts on ethnic group during development progress; and

(c) Ethnic group will be entitled to socio-economic interests suitable to their cultural tradition.

2. SOCIO-ECONOMIC STATUS OF ETHNIC lMINOKITY IN THE PROJECT AREA 2.1 Ethnic minority in the project area

Ethnic minorities in the project area are Chu Ru, Tho, K'Ho, anti Chinese people who are living intermix with Kinh people in Duc Trong district, Lam Dong province.

Chu Ru Ethnic Minority

Chu Ru EM is one of the communities whose language stems from the Malayo - Polynesian. The population of Chu Ru EM is quite small; they mainly live in Lam Dong, Ninh Thuan and Binh Thuan province.

In Lam Dong province, Chu Ru EM has about 13,000 people who are living in Tutra commune (Don Duong district), Phu Hoi and Loan communes (Duc Trong district) and some parts of hamlets of Di Linh district.

Like other EM in Lam Dong province, Chu Ru EM does not have their own script. Nowadays, many Chu Ru people, especially the teenagers, can speak and write Vietnamese very well.

Chu Ru people have begun their rice cultivation for many years. Cultivation is the main production activities. Besides wet rice cultivation, Chu R.u people plant corn, sweet potato and vegetables in their own land.

Land is owned by the whole village and each member has the right to hunt and fish in the area of hislher village; however, tenure land belongs to each family.

Page 13: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution 11 project - Credit 41 07-Vh EClDP

Duc Trong 220kV Substation and connection line -. - - -. . . - . . - -

Yet, all the selling and buying activities must have the agreement of the village's leader.

Chu Ru families follow the matriarchy, which is proved by the role of wives and uncles (mother's younger brothers) in families. The right of inheritance belongs to the daughter in families. A great family often includes three or four generations who live in a long house on stilts. Uncles have the right to make important decisions such as inheritance division, marriage, and land exchange.

In the Chu Ru matriarchal society, only marriage between people i,n different families is accepted. Couples will live in the bridegroom's house and children will follow their mothers' surnames. After marriage, couples will cultivate on the land which their parents give to them.

In the project area, there are 13 Chu Ru households (64 people) living in Chi Rong hamlet, Phu Hoi commune, Duc Trong district.

Tlzo Ethnic Minority

Tho people have other names such as: Keo, Mon.. . Tho language belongs to the Viet - Muong system. These people mainly live at the west of Nghe An. Its population is about 5 1,000 people.

Tho people mainly till fields, plant rice and flax. Besides, these people have experiences in hunting and fishing. In the past, job of Tho people was also the weave fabric, but because of the cultivation condition and exchanges with Kinh people, weave fabric was faded.

In villages, that Tho people help each other and have the close rela-tionship is the long-standing lifestyle. According to the old customs, all land, mountains and forests, rivers and mountains are public property; each person has the right to control when helshe is cultivating, to exploit when heishe is a member of the village.

Tho people are used to live on houses on stilts, but their houses on stilts do not have specific characteristics. Nowadays, Tho people's houses in many places have been changed into the Kinh-style house.

It is difficult to realize the character of ethnic people. Their costumes are the same as the Kinh costumes in the countryside in previous centuries; in some areas, women wear the Thai skirts. In Tho area, it is familiar for women to wear white square cloth; and mourning hed- band is white long cloth.

In the project area, the connecting line 1 lOkV has the impact on 18 Tho households (88 people) living in Lien Nghia township, Duc Trong district.

K'lio Ethnic Minority

K'Ho people are over 92,190, and language's one belongs to Mon - Kho Me system (South - Asia family). These people mainly had been lived at Tay Nguyen for very long time before migrated to Lam Dong. Some: specific production tools are yoas (chop down tree), ploughs, rakes and Kors (level the field) etc . . .

Page 14: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Trans~iiission and distribution I1 prqiect - Credit 3 107-VN EMDP Duc Trong 220liV Substation and connection line -- ---

Except for some households cultivate wet rice, most till the fields with nomadic existence in cycle. They live in long house stilts with cottage roofs cottage wall inclining outside and having a stair in front. Most ol' activities including eat and drink, relax, and entertain are around a ilame.

Traditional clothes of K' Ho women are long indigo blue skirt winded. They wear a thin blanket in cold days. K' Ho girls practice weave when they were young. In order to use these products as betrothal gifts to bridegroorn's family when they are adult.

"Bo~" is a rural commune inclined matriarchy clan commune. "Kuang bon" heads bon. A volunteer union orgnization of many bons was taken shape in densely populated areas, and the head of union is "iM' drong". K' Ho still exist 2 family types: large family and small family. However, the large families are gradually dissolving and the small families are gradually disseminated, especially populous and rich areas. K' Ho organization is matriarchy, the women are active in marriage. After wedding ceremony, the husbands live in his wife house, their children take mother surename, . . . The youith marries fairy soon (men from 18 to 20 years of age; women from 16 to 1'7 years of age), so that is one of primary reasons make birth rate faily high (on an average, the per woman birth is about 5 to 6 children).

K' Ho people believe that everything are decided by Supernatural Being. In their ideas, one side is Yang (God) supporting them and other side is Cha (devils) who make many bad things to them. So in all of cases (growing rices, wedding ceremony, ...), they always make ceremonial to implore. They believe that the Gods like eat and drink so much, but depending on importance of ceremony, they sacrifice raw buffaloes, pigs, or chickens together with alcohol.

Among rituals of K' Ho people, the one which concerned tilling the fields are the most important.

Chinese Etlzn ic Minority

The percentage of Chinese people in Vietnam is 1.13% Vietnamese population and is ranked in the fourth position. In Lam Dong province, Chinese people are over 12,000. Most of Chinese people in Lam Dong are those who migrate from Quang Ninh in 1955 - 1975. Those people are a part of Chinese people who did farming in Quang Ninh and later set up their house in Lam Dong.

Outstanding characteristics of Chinese people are to unite closely, help each other in ethnic community, local areas and families. They do their best to preserve and maintain their own cultural character and tradition.

Houses of Chinese people often have two categories: tree-compartment houses, two-lean-to houses and two-wing houses.

Chinese society has the severe class gap and follows the strict patriarchy. Working people has the high spirit of close unity which has been ;preserved quite completely.

Page 15: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'Transmission and distribution I1 project - Credit 3107-VS EbIDP Duc Trong 220kV Substation and connection line .- --

Worship ancestors and ghosts arc appreciated. Together with the: previous opinions of living beings and specific characters in every locality, group of people, they are affected by the opinions of Taoism, Buddhism, and Confucianism.. . Ethnic minority people live alternatively; although they have different languages, their lifestyles are similar.

In the project area, 14 Chinese households (68 people) living in Lien Nghia township, Duc Trong district are affected.

2.2 Socio-economic condition of ethnic minority in the project area

From 22/07/2007 to 30/07/2007, PECC3 carried out a socio--economic survey in project area. Survey results are as follows:

- Average family size

o Male:

o Female: 48.24 %

- Age groups:

o 1 - 17 yrs:

o 18 - 60 yrs:

o Above 60 years:

- Heads ofHH

o Male:

o Female:

- Education

o University1 College1 Vocation 8.33 %

o High school: 14.90 %

o Primary and secondary school: 74.24 %

o Read and write 3.96 %

o Illiterates 1.55 %

- Occupation

o Farming and wage-earner 50.00 %

o Small business 2.60 %

o Small scale industry 1.40 %

o Unstable occupation 2.00 %

o Others (housewife,

the elderly, children, etc.) 44.00 %

Page 16: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transm~ssion and distribution I1 project - Credit 31 07-VK ELIIIP [ ILIC TI .OII~ 23-0hV Substation and connection line - - - .- -- - - - - - - -

- Income (average income): 1,35 1,050 VSDII-IFIImonth

- 1:acilities

o DPs use power: 9 8.4%

o DPs use water supply system: Nil

o DPs use well-water: 100%

o DPs have telephones: 39.124%

o DPs have TVs: 86.53%

o DPs have refrigerators 19.:33%

o DPs have motor bikes: 96.50%

o DPs have bicycles: 99.64%

- Average expenses: 1,046,3 10 VND/HH/month. Including:

Regular expenses:

o Food/foodstuff 42.52%

o Electricity 3.10%

o Water 0%

o Renting house 0%

o Clothing

o Health

o Education

o Travel/communication

o Tax

o Other facilities/services

Irregular expenses:

o Festivities

o Mourning

o Furniture

o House repairs

o Vehicle repairs

o Others

19.72% flotlsing condition

Page 17: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution 11 project - Credit 4107-VN EYIDP Duc Trong 220kV Substation and connection line -- -.A -- -- --

~Most houses are of cat.4 and cat.tempora~y orlcs with woodcn vvall, tile or corrugated steel sheet.

Almost ELM DPs are farmers. Their cultivation is mainly ricc planting mixed with small scale live-stock breeding. So, DPs' income is mainly from cultivation and livestock raising (86.45%), only 13.55% ol- DPs have income from small scale industry, small business and others.

2.2.1 Education:

+ Developing classes and schools: All ELMS' schools are public, and ELM students do not to attend night class.

+ Compulsory education: Duc Trong district has succeeded in c~ompulsory education in primary school with the right age at 14/14 communes, towns and in secondary school at 13/14 communes.

+ EM students' support: 18,430 primary and secondary students have borrowed textbooks (a set of textbooks/student)(l2,661 primary students and 5,779 secondary students) to support their study.

2.2.2. Health care:

Districts and townships have 1 general hospital each and all c;ommunes covered by the project have 1 healthcare station each.

The commune's health care services usually taking care of minor illness or maternity deliveries. The district hospital can take care of more serious illness or minor operations.

However, such health services are suffering from poor facilities or lack of equipment.

As regard more serious cases, the patients will be transferred to the provincial hospitals.

2.2.3. Culture:

Cultural, festival, sporting activities also develop.

Leaders of communes have used many poverty alleviation methods to reduce poverty fast by many projects such as borrowing capital and changing the structures of crop plants and domestic animals.

2.3 Land use actuality of the ethnic minority in the project area

From 22 July to 30 July 2007, PECC3 had had a survey for land acquisition of EMMH and result follows:

Table 2-1: land acquisition.

Page 18: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution i l project - Credit 4 107-VN EMDP

Duc Trong 720kV Substation and connectio~l line -- - -. . - pppp

2 j Crops land 22,733 24,399 147,132 1

Total 22,733 37,936 60,669 1

Table 2-2: Affected land of ethnic minorities.

3 4

2.3.1 Chu Ru EM

Duc Trong 220kV substation has mainly affected Chu Ru EM people in Phu Hoi commune. Main job of these EMHH is farming procluction (to plant coffee, rice, corn, vegetables, flowers, etc.)

Garden land Other land

Land for rice and crops occupies a large proportion of Chu Ru EM land use system in the project area; land for crops occupies 86.46%, land for rice occupies 7.12%, garden land occupies 6.39% of the whole land

Cultivated land is affected:

1,990

8.571

- Garden land 520 m2

8.57 1

- Rice land 715 m2

- Crops land 15,001 m2

The total culturing affected land: 16,236 m2

Water for cultivation is from wells.

Ethnic farmers use machines for production and local existing bio- fertilizer for plantings.

The garden land is used by the EM for many purposes: planting of long- term trees (eucalyptus, pear, mango, etc.) mixed up with short-term crops (sugar cane, vegetables, etc.) and raising livestock, poultry.

All farmers are supported by the provincial andlor district Agricultural Extension in introducing new seedlings, new fertilizers and application of new farming methods etc.

Page 19: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution I I project - Credit 4 107-Vh EYIDP

Duc Trong 220kV Substation and connectioll line - - - - -- -- - -- - --A

2.3.2 Tho EM

In the project area, 'Tho EM people scatter in Lien Nghia township, Duc Trong district and live on farming production. Land for crops occupies a large proportion of Tho EM land use system in the project area; land for crops occupies 50%, land for rice occupies 10.29%, garden land occupies 24.5 1% of the whole land.

Cultivated land is affected:

- Residential land

- Crops land 6,120 m2

- Rice land

- Garden land

The total culturing affected land : 12,240 m2

Like other EM in the project area, cultivation is the main job of Tho EM. Cultivation has applied many mechanization methods. Water for irrigation is 30-40m underground water

Duc Trong 220kV substation has mainly affected K' Ho EM people in Phu Hoi commune. Main job of these EMHH is farming procluction (to plant coffee, rice, corn, vegetables, flowers, etc.)

Land for rice and crops occupies a large proportion of K' Ho ELM land use system in the project area; land for crops occupies 86.46%, land for rice occupies 7.12%, garden land occupies 6.39% of the whole land

Cultivated land is affected:

- Garden land 1,020 m2

- Rice land 1,001 m2

- Crops land 20,323 m2

The total culturing affected land: 22,344 m2

Water for cultivation is from wells.

Ethnic farmers use machines for production and local existing bio- fertilizer for plantings.

The garden land is used by the EM for many purposes: planting of long- term trees (eucalyptus, pear, mango, etc.) mixed up with short-term crops (sugar cane, vegetables, etc.) and raising livestock, poultry.

All farmers are supported by the provincial and/or district Agricultural Extension in introducing new seedlings, new fertilizers and app:lication of new farming methods etc.

Page 20: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission and distribution I1 project - Credit 41 07-Vh EYI[)P

Duc Trong 220kV Substatioti and connection line - - - .

2.3.4 Chinese EM

Chinese EM people who live in Lien Nghia town have the same habits and customs with Kinh people. Those who are affected by Duc 'rrong 220kV substation project live on farming production. Because of high topography, water for irrigation is underground water.

Cultivated land is affected:

- Residential land

- Crops land

- Rice land

- Garden land 450 m2

The total cultivated land affected : 9,849 m2

In the project area, EM use cultivated land for crops and irrigate by underground water.

3. LEGAL FRAMEWORK

This plan is developed based on policy OP 4.10 of the World Bank on indigenous people (previous as OD 4.20) and policies for ELM of'GOV.

A policy framework and guidelines for EMDP has been prepared for TD2 project to ensure that ethnic minorities are well informed, consulted and mobilized to participate in the sub-projects to be supported by the TD2 project.

3.1 The OP 4.10 on indigenous people of the World Bank

According to OP 4.10: "The Bank's broad objective towards indigenous people, as for all the people in its member countries, is to ensure that the development process fosters full respect for their dignity, human rights, and cultural unique. Particularly, the objective at the center of this directive is to ensure that indigenous people do not suffer adverse effects during the development process, particularly from Bank-financed projects, and that they receive culturally compatible social and economic benefits.", and

"The Bank's policy is that the strategy for addressing the issues pertaining to indigenous people must be based on the informed participation of the indigenous people themselves. Thus, identifying local preferences through direct consultation, incorporation of indigenous knowledge into project approaches, and appropriate early use of experienced specialists are core activities for any project that affects indigenous people and their rights to natural and economic resources."

Page 21: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Trans~nission and distribution I 1 project - Credit 4107-Vh' EYIDP Iluc Trong 220kV Substation and connection line -- - ~

3.2 Vietnam Law

In Vietnam, the Government has always devoted much altention to ethnicities in Vietnam. In 1955, right after liberation froin France. Vietnam issued one of the first legal documents on ethnicities, Decree 299-SL, dated April 29, 1955. Article 6 ofthis Decree declared:

"Ethnicities are free in the development of their langzlage and jetters, are free in preservation or improvement of usages and ctlstoms, are free in religion choice and are assisted by the Government (of Vietnam) in all side political, economic, czilttiral and social development. "

Since then, many policies for development for ethnicities in Vietnam have been issued.

The equality of every ethnic person living in Vietnam has been clearly stated at the highest legal level - in the constitution of 1992. Its article 5 declares that:

The Socialist Republic of Vietnam is an united nation with many nationalities. The State implements an equality and united policy and supports spiritually all nationalities and prohibits race di~crimi~vation and separation. Each nationality has the right to use its own language and ways of living to preserve their characteristics and to improive its own good traditional and cultural customs. The State carries out a policy to develop thoroughly and gradually improve the quality of life of ethnic minorities in Vietnam physically and spiritually.

Recently, The GOV has established programs such as 327, 135 and the like for sake of speeding up the tempo of development for ethnic groups in mountain areas. Many social policies have been issued to benefit these groups. Therefore, ethnic minorities in Vietnam have enjoyed better legal and political status than in the past. They have received many benefits as a result of government policies. They have received preferential treatment in college admission processes. Cooking oil, kerosene, and iodized salt have been provided to them at heavily subsidized rates. The government, foreign donor agencies, and many NGOs have been organized numerous development and special assistance programs that are target to ethnic minorities. Very large sums of money have been invested with the intention of helping the upland in general and ethnic minorities in particular to "catch up" with lowland areas.

Since 1968, the GOV has promulgated resettlement policy -for ethnic groups, reducing migration trends of the ethnic people. One of the most important policies on relation with ethnic groups is the Government Guidance No.5251TTG on 2/11/1993 regarding in detail on implementation guiding of development in high land areas and ethnic areas with the main following points:

- Develop infrastructure especially transportation road system and fresh water supplying

Page 22: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

~l'ransmission and distributioli TI pt-qjcct - Credit 3107-VS EPIDP Duc Trong 220kV Substation and connection line .- -

- Step by step overcome thc lack of food.

- Consolidate of education system; adjust education program basing on characteristic of provinccs; crcate favor conditions and support the isregular education program and develop internal economic force.

Page 23: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Trans~nission and distribution 11 project - Credit 4 107-Vh Ebl t lP

Duc 'Trong 730kV Substation and connection litic ---- - - -. . . --

4. PROJECT 1Ml)ACT ON ETIISIC MISOKITY

4.1 Impacts on ENI

4.1.1 Chu Ru EIM

The project will affect Chu Ru EM people in Chi Rong hamlet, Phu Hoi commune, Duc Trong district, Lam Dong province.

There are 06 Chu Ru EM households (28 people) affected, in which:

Number of EM DPs affected by 03 HHs permanent land acquisition

15 persons

Number of EM DPs temporarily 03 HHs affected

13 persons

Number of EM DPs affected by 0 HH house/structure

0 person

Number of EM DPs required to be 0 relocated

Number of EM DPs affected on 0 business

Impacts on sensitive areas and other 0 areas

The total Chu Ru EM affected land is 16,236 m2, in which permanent acquired land for building stations and pole stations is 9,741 m2. The percentage of permanent land for acquisition is about 60% of the total land of households affected.

4.1.2 Chinese EM

The project will affect Chinese EM people in Lien Nghia town, Duc Trong commune where the connecting line 1 lOkV goes through.

There are 14 Chinese EM households (68 people) affected, in which:

Number of EM DPs affected by 01 household permanent land acquisition

Page 24: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission a n d distr-ibution 11 ~ro j ec t - Credit 4107-VS EYIIII' Duc - Trong 770kV Substatiotl and connection line -. .. . . - -- - - - -- - - - - . -.

05 persons

Number of EIM DPs temporarily 13 households affected

63 persons

= Number of EM DPs affected by 0 household house/structure

0 person

Number of ELM DPs required to be 0 relocated

Number of EM DPs affected on 0 business

Impacts on sensitive areas and other 0 areas

The area of Chinese EM producing land which is affected by the project is 9,849 m2. Amount of permanent affected land occupies low percent of total affected land (< 1 %).

4.1.3 Tho ELM

The project will affect 18 Tho EM households in Lien Nghia township, Duc Trong district where the connecting line 1 10kV goes through.

There are 18 Tho EM households (88 people) affected, in which::

Number of EM DPs affected by 02 households permanent land acquisition

10 persons

Number of EM DPs temporarily 16 households affected

86 persons

Number of EM DPs affected by 0 household house/structure

0 person

Number of EM DPs required to be 0 relocated

Page 25: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

T~.ansmission and distribution I 1 project - Credit 4107-VN EblDP

Duc Trong 270kV Substation and connection linc --- pp --

Number of ELM DPs affected on 0 business

Impacts on sensitive areas and other 0 areas

The area of Tho EM producing land which is affected by the project is 12,240 m2. There are two HHs which are permanently acquired; permanent acquired land is 32 m2, which accounts for 0.26% of the total affected land of Tho EM households.

In general, cultivated land of EM DPs acquired for pole foundations and stations is 22,733 m2, which occupies 37.47% of their cultivated land which they own.

There is no ethnic communal house, cultural site or any sensitive place affected in this project because HHs in the project area have been broadly popularized the information and minimizing methods as in 7.2.

EM people in the project area has the right for continuing their access to and use the customary and traditional land and other natural resources.

(Please see Appendix 3 for preliminary screening of ethnic minorities.)

The project will affect K' Ho EM people in Chi Rong hamlet, Phu Hoi commune, Duc Trong district, Lam Dong province.

There are 07 K' Ho ELM households (28 people) affected, in which:

Number of ELM DPs affected by 04 HHs permanent land acquisition

19 persons

Number of ELM DPs temporarily 03 HHs affected

17 persons

Number of ELM DPs affected by 0 HH house/structure

0 person

Number of EM DPs required to be 0 relocated

Number of EM DPs affected on 0 business

Page 26: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

l'ransnlission and distribution 11 project - Credit 4 107-Vh EMDP

Duc Trong 220kV Substation and connection line - . . - -. - - -. --

Impacts on sensitive areas and other 0 areas

The total K' Ho EM affected land is 22,344 m2, in which permanent acquired land for building stations and pole stations is 12,990 m2. The percentage of permanent land for acquisition is about 58% of the total land of households affected.

Table 4.1 Number of EM DPs in the project area by impact categories

Categories

1. EM DP has long-term trees, crops which are affected by the project.

1 2. EMUP has land in ROW and is affected during construction period

1. EM DP has houseslstructures in ROW

2. ELM DPs have houseslstructures, which are partially damaged, and the damaged portion will not affect the safety or using purpose of the entire house or structure (the dismantled areas are I 20% of total areas), and the lost houselstructure portion could be rebuilt in adjacent areas already owned by the DP.

5. EM DP has houses1 structures, which are partially or totally damaged or cut, and the damaged portion will affect the safety or using purpose of the entire houses or structures (the dismantled areas are more than 20% of total areas or even less than 20% of total area, but the remaining area can not be used or inconvenient for using); so houses/structures should be totally relocated and rebuilt in the remaining adjacent area owned by DP.

Nil

Nil

6. EM DP has houses1structures which are partially or totally damaged, and the damaged portion will affect to the safety or using purpose of the entire houselstructure, so the houses1structures need to be totally removed and rebuild. But DP does not have sufficient spare residential land for the reconstruction of a house of equal dimensions as the Iiouse lost. The threshold of sufficient residential land is at 100 m2 for rural areas.

, Nil

I 1 7. EM DP has land which will be acquired permanently for the project: 1 a) Acquired cultivated land area is more than 20% of total cultivated land DPs' holdings.

b) Acquired cultivated land area is less than 20% of total cultivated land I DPs' holdings.

Page 27: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Transmission mid distributio~l I 1 project - Credit 41 07-Vs E.ClD1'

Duc l'song 210kV Substation and connection linc - - - - -- -- -. - -- - ---- - - - - - ---

- . - - . -. -- - - - . . - - - - - - - - - - . - - . . -. . -. - -- - - - - . - - - - . - - -

'l'lie remaining residential-garden landlspccitic use land area is less than I00 m' (in rural areas)

7- d) .lqlic remaining residential-garden land is inorc than 100m2 (in rural 1 Nil areas) r -- -

Table 4-2: Total EM DPs by impact categories - locality distribution

I 8. EM DP impacted permanently or temporarily on business or other ' services.

4.2. Impacts on land use system

Nil

4.2.1. Impact on land acquisition of the project

Temporary land acquisition:

There are 45 EM households (220 people) with temporarily affected land in ROW and during construction period. The temporarily acquired areas are:

- Rice land : 2,976m2

- Crops land : 24,399 m2

- Garden land : 1,990 m2

- Other land : 8,571 m2

Permanent land acquisition:

There are 14 EIM households (49 people) with permanently acquired land for towerlpole foundations and stations. Total acquired area is 2,2,733 m2. The acquired area is about 7.01% of total area of their land. holdings (average productive land hoiding of EM DPs is around 7,210 rn2). There is one EM DP affected more than 20% of totai agricultural land their holdings.

Page 28: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Trans~nission and distribution 11 project - Credit 41 07-VS DLIC T r o n ~ 720kV Substation and connection line

4.2.2 Impacts on land use system

Since the impact on land accluisition is almost 7.01% of' productive land holding of the EM DPs. The land use system ofthe ELM DPs in the pro-ject area is farming production, mainly planting vegetables.

When the project in progress, land acquisition for pole foundations does not change the land use system.

4.3 Impacts on houses and structures

In the project area, there is no ELM houses/stmctures affected.

4.4 Impacts on farming system

4.4.1 Impacts on trees and crops

There are 45 EMHH will be impacted on crops and trees.

List of affected crops and trees is shown:

Page 29: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'I'D2 projcct - Credit 4 107-VN EXIDI' DLIC 'I rong 220kV Substation and connection line - - - - - - -- - - --

Table 4.3: List of 1111s with trees and crops affected

I I K' Xip Phu IJoi commune, Duc Trong, L. Dong 4 8,597 1,232 836 ~ l- 2068 24-1

12 Kalen Ju Nwng Sang Phu I-Ioi commune, Duc Trong, L. Dong 4 10,000 7,631 - 7,631 1 - 1 - --

13 LuHangChi Ward 12, Lien Nghia, Duc Trong, L. Dong 5 14 Lu Hivu Minh Ward 12, Lien Nghia, Duc Trong, L. Dong 7 2,178 - 15 Lu Hivu ~ a u -- - Ward 12, Lien Nghia, Duc Trong, L. Dong 5 2,288 - 16 La V5n Phung Ward 12, Lien Nghia, Duc Trong, L. Dong 6 1,705 120 I7 L a V a n ~ n g Ward 12, Lien Nghia, Duc Trong, L. Dong 6 2,255 330 --

18 L o van ~ d n g Ward 12, Lien Nghia, Duc Trong, L. D o n 5 1,484 - 270

19 Lgc chung San Ward 12, Lien Nghia, Duc Trong, L. Dong 3 1,606 - 690 -

LUG ~ i o n g ~hrn Ward 12, Lien Nghia, Duc Trong, L. Dong 5 16,000 - Ward 12, Lien Nghia, Duc Trong, L. Dong 5 856 210

Rice ofland

-

-

- 176 - - - - -

Total landhol ding 1111

24,494

2,474

764 11,312

1,122

21,973

7,540

3,627

5,770

6,208

~ i & n g T ~ C Phun 2 Jw Nvng ~ 6 p

Communcltown

Ward 12, Lien Nghia, Duc Trong, L. Dong

Phu I-Ioi commune, Duc Trong, L. Dong Phu Hoi commune, Duc Trong, L. Dong Phu Hoi commune, Duc Trong, L. Dong Phu Hoi commune, Duc Trong, I,. Dong Phu Iloi commune, Duc Trong, L. Dong

Phu Hoi commune, Duc Trong, L. Dong Phu Hoi commune, Duc Trong, L. Dong Phu Hoi commune, Duc Trong, L. Dong

Phu Hoi commune, Duc Trong, L. Dong

3

4

5 6

7 8

9 -

Affected Crops Garden land land

1,323 - 1 -

572

484 484

3,872 572

Persons per HH

6

4 3 6 3 6

5 6 5 4

K' Bai K' Binh K ' P ~ A ~ . K' . Puk K' Sih K' Teon K' The

15,549

1,232

836 1,100

660 10 K' TUU

396 - -

-

,- 572 5 5 4 9

1232

836 I100

660

5 1 1

171 1 16 23 1 19 --' I I ---1

Page 30: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

.I'D2 project - Credit 41 07-VN EMDP Duc 'rrong 220kV Substation and conncction line - - - .- -- - - - --

25 Sy Mu6ng 26 am^ Civu - .- pp

Commune/town

Ward 12, Lien Nghia, Duc Trong, L. Dong /ward 2, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong Phu Hoi commune, Duc Tro~ig, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 2, Lien Nghia, Duc Trong, L. Dong Ward 12, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 12, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong

29

30 31

Si&nh ~ 6 c h

38 Vy Thj Kham -

39 -. Vy thj kim They . - . -

30 Vy Thien Khai 1 . - - - - - - -.

41 Vy Van Hwp --

'43 Vy Van Minh

T ~ I Van Nam Tinh Chieu Sang Tinh m i D ~ U

Ward 12, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 12, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 12, Lie11 Nghia, Duc Trong, L. Dong

Ward 12, Lien Nghia, Duc Trong, L. Dong Ward 2, Lien Nghia, Duc Trong, L. Dong Phu IIoi communc, Duc Trong, L. Dong

43 - - --

Persons per HH

5 6

5 5

5 3 3 7 5 5

.. VyVPet - -.

4 6 4 6 4 5 4 6 6 4 5 4 5 5

220

Ya Thang L- [ -- l ~ o t a l -

Total landhol ding IIII 21,975 4,598

25,735

4,270

4,090

187 2,763

11,935

5,200

5,212

4,029

5,208

3,998

4,323

4,991

4,991

3,240

1,765

2,535

2,335 43,950

13,935 1,197 6,135

324,480

Hicc ofland

- - - - -

- - - - - -

- - - - - 810 - - - - - 308

2,976

Crops land

1,410

308

510

165

150

960

330

330

Gardcn land

450 450 1,410 -

1

-

510

--

300

330 300

300

1,200

1,200

660

330 450

390

2,816

47,132

- - . -

660

810 4 6

300 17

-

1,990

330

300

300

1,200

1,200

1

6

8

4 24 -1 24 I

6,711

390 3,124

60,669 1 I 1

33

51 I

Page 31: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

-I'D2 Prqject - Credit 4 107-VS LJbIDf' [IIIC T r o n ~ 22011 lOkV Substation -- - - - - - - - - - - -- .. --

4.4.2 Impacts on farming land

Considering the impacts on land accluisition and impacts on crops and trees, as described above, the farming system of the EMDPs in the project area is not affected.

Page 32: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2 Prqjcct - Credit 4107-VN EYIDP

Duc Troli~ 32011 IOkV Substation -- -. -- - - -. . -. . - -. -. - -. . - - .- - - - - - -

5. PEOP1,E'S YAKTICIPATIOS

During the pro-ject preparation (along with RP preparation), Management Hoard and consulting companies have held many community meetings at the commune level in the project area with the participation olf DPs and representatives of Commune People's Committees, authorities and non- governmental organisations (Women's union, youth organisation, farmers' union, fatherland front, veterans' organisation, etc.) In these meetings, project related issues i.e. investment financial resources, project objectives, project components, compensation policy, allowances, etc. are explained by consulting institutions.

Table 5-1 Public Consultation

1 Consultation outcomes Consultation method

Detailed activities

Newspaper Notification

Public Notice

I Name of newspaper I I

Date(s) of notice

Location of notice

Date(s) of notice

Public announcemenv

Time(s) announcement

Newsletter questionnaire

I

30 days (2310712007 - 23/08/2007)

All related communes

I

Not implemented

I Date(s) sent Not implemented received

No feedbacks

n/a

I Number sent 1 Main issues /

I Area of distribution I I raised I Feedback sought (Yes I No)

/ From 2310712007 1 Meeting / Discussed issues: 1 l 2710712007

minutes I - Definition of eligibility I attached (YesMo): I - Resettlement 1 yes , compensation principles

I and I I I I I 1 - Compensation policy

- Entitlement

, - Recordled feedbacks I I I 1 Public meeting Venue(s) held People's 1 Attendees - Representation of

1 1 committee of Commune I

People's - --

Page 33: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2 Project - Credit 41 07-VS EMDP

Duc Trong 23011 1 0kV S~~bs tn t i on -. - - - - -- - ~

- -. . - T- -~ -- ~.

i I !

1 Consultation ' 1 Detailed activities 1 method I

I I Consultation outcomc!s

I i 1 related communes 1

Invitees Commune 1 People's committee

1 - Women's union I I 1 - Farmer's union 1

Veteran's

Affected 1 Institution

Committee

I - DPs

' Agenda attached (YesNo)

Public announcement after the EMDP approved

Yes

Location

of announce- ment

I I

Offices of related PPCs, DPCs, CPCs

Forms of announ- cement

Vietnam Development Information Center of World Bank (VDIC), 63 Ly Thai To street, Ha Noi city

World Bank Office in Washington

shou)

RP reports will be attached at related PC and publicly announced to people.

RP reports (English version) will be submitted to VDIC and publicly

, announce to related institutions.

RP reports (English version) will be submitted to World Bank Office in Washington (WB info shop)

Date held (pro- posed)

The proposed layouts of T/L routes are also displayed in the meetings along with discussions and consultation with the local authorities and

0912008 (proposed)

0912008 (proposed)

0912008 (proposed)

1

Page 34: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Pro-ject - Credit 4 107-VN EMDP TILIC T'rong 22011 10kV Substation

. -- -- - - - -.

local people on possible impacts caused by thc project, project site selection, alignment of routes etc. so as the proposed selected line route is the least impact option.

In the comn~unity meetings, DPs' queries on RP related issues i.e. entitlements, compensation, etc. are explained by PIMB and DPs' opinions were recorded.

The opinions of EM DPs and local government in the project area:

- The process of building stations and implementing the T/L must have the participation of DPs.

- DPs want to know the project's schedule; so that they car1 clear the ground on their own.

- DPs expect to receive satisfactory compensation for their damaged properties and they also want to be provided the information about the compensation unit prices for their temporarily damaged crops.

- Compensation for the damaged land in ROW is due to TIL limited utility.

- If land is acquired, compensation and relocation (if yes) should be in progress, but land in Lien Nghia township is used up.

Minutes of community meetings must have the signature of representatives of district compensation and relocation, Provincial People's Committee, MB and DPs.

All of the feedbacks of DP are integrated in W and EiMDP of this project.

6. INSTITUTIONAL ARRANGEMENT

The details of institutional arrangement are described in Chapter 2 of the W report of this project.

To implement this EMDP smoothly, PMB will:

- Assigning adequate number of staff for EMDP implementation.

- Contracting with skillful experts for ElMDP implementation.

- Setting up offices at the site for advantageous implementation.

- Periodically monitoring the EMDP implementation.

- Transparency in implementation through information campaign.

- Ensuring that ELM leaders (elders and those who prestigious on publicity) are represented in local EMDP committees.

Page 35: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

.I'll? Project - Credit 4 107-VN EXII1P

Duc Trans 7-2011 10kV Substation -- -. .- -- - -- --

Table 3: Detailed discription of activities and responsibility of related institutions

.- -- -- - -. -- - - - - - I 1

1 Proposed Assistance I

Action Responsible institution

1. Utilization of small credit from BARD

All necessary action such as setting up training program/schedule, printing necessary documentation and implementing training

Provincial andlor district BARDS

I 1 program. I I 2. Electric Safety 1. Establishment of

training program/ schedule, in close cooperation with communes' relevant authorities and technical assistances

2. Fixing the training time schedule at communes

PMB

Communes' People's committees

PMB

Town, c:ommunes' People's committe:es

Technical assistance

3. Printing of necessary documentation, pamphlets

PMB

4. Implementing the training programs

I PMB

Technical assistance in close cooperation with the Communes' People's Committees.

Page 36: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2. Project - Credit 4 107-VS 1 3 1 DP Duc Trong 22011 l OkV Substation -- -. - -- - . . .-

7. IlEVEI,OPME?r:T ACTIVIrI'IES

The plans are not only for EM DPs who are directly affected by land acquisition but also for the E,Ms who are living in the project affected areas. As mentions in RP, this EMDP is developed based on the results of consultation with and participation of ELM and their local authorities.

Special resettlement provisions for ethnic minorities to ensure consideration of impacted ethnic people's views on various issues and to represent their legal rights.

In indigenous people, the role of the village elders, mostly, and most respect one is really .the heart of their ideology playing .the vital role in public consultation. Hence they were invited to meetings for getting information on the project and R.P and EMDP.

Community meetings including representatives of EIM DPs and village and commune authorities (EM leaders (elders), and representatives of EM DPs) and women's union. PMB and consulting institution made the presentation on the locations of the project, proposed policy and requested participants assess for the adverse impacts, propose for mitigation measures and propose for development programs.

Through consultation with and participation of local authorities and EM in the project affected areas, local authorities and ELM gave the feedback on the potential of adverse impacts by the project as below:

- Potential of electric shock;

- Accident in the construction period;

- Disturbance by the construction and construction workers to villages;

- Implementing street may have impacts on people and trees at. two sides of streets

All of these feedbacks are integrated in this EMDP and environmental mitigation measures (EMP report).

7.1 For ethnic minority in affected area

The following programs are proposed by EIM and local authorities for all EM people who are living in the project affected areas.

- Information (on projects, project implementation schedule, project impacts etc.) disclosure/dissemination.

- Compensation for assets lost (according to DP).

- Training for electric safety:

To propagandize the regulation electric safety measures and guidance for giving first aid in case of electric shock. The leaflet will be disseminated to all families in the project areas.

Training on electric safety and first aid for electric shock in each commune for local people and students in primary and secondary

Page 37: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD? Project - Credit 4 107-VS EhIDP

t>uc Trong 22011 I OkV Substation - -- - -- -- . .- - - - -

schools.

- Training on applying, use and management of loan and assi.st DPs to access loan from BARD (to be organized by the provincial and/or district BARD).

- Special agriculture extension training courses for female-headed households who are farmers (to be organized by the district and/or commune Agricultural Extensions andlor Farmer's Union:; in close cooperation with the district and/or commune Women Unions).

- Construction period: various mitigation measures

7.2 Mitigation measures

Potential of ne~ative impacts:

Permanent land acquisition for building stations ;and pole foundations; temporary land for ROW in construction period; temporary impacts on long-term trees and crops.

Local sanitation and local food/foodstuff prices may go up due to the concentration of many workers in construction period.

Noise and dust are due to transportation and construction activities.

Mitigation measures:

The measures to minimize impacts includes of (i) technical measure; (ii) encouraging ELM in the project affected areas to participate in preparing and implementing EMDP; and (iii) close consultation with local authorities and all relevant institutions.

Information from .the SIA and meetings with the ethnic minority communities will be used in preparing the design, construction schedule and construction measures for the project and the estimated cost of required work. These will include:

a. Recommendations for changing line alignments, locations, construction measures and construction schedule for the project to accommodate needs and preferences of ethnic minority.

Public consultation has already undertaken during the design stage for the line route, locations of support poles with consideration to preferences of the EM community in the project area.

The construction schedule has been considered to avoid crops. Although the requirement for construction is 12 months, it is considered to increase workers working two shifts; therefore, construction can begin right after the end of crop harvest ,and finish before the beginning of the next crop.

However, temporary crop damages will be compensated by market prices.

b. Sensitive areas, cultural and historical monuments must be considered during the design and construction stage: sensitive areas

Page 38: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

.I'D?- Project - Credit 4107-VS E\lt)P Due 1-rong 32011 10kV Substation - - -- - --- - ppppp.

have been well considered during the preliminary construction stage. FIowever, sensitive areas are far from the project area

c. Develop a program for communication, information and education by the commune for the ethnic minority community in the zone of influence on electric safety, potential health and social problems.

Special training programs for EM communities in affected areas have been envisaged i.e.

Training on agricultural extension program for EM ho~~seholds in the project area.

Training on electric safety to local people and students in the project area.

Training on utilization of small credit from BARD.

d. Land acquisition and compensation: where there is land accluisition in ethnic minorities, the project will ensure that their rights will not be violated and that they will be compensated for the use of any part of their land in a manner that culturally acceptable to them. The compensation will follow the resettlement policy for DPs under the project. Ethnic minority leaders will assist with consultation of affected households and with compensation activities

Compensation for land shall be at replacement cost as defined in RP. However, it is noticeable that all ELM DPs should have land owner certificate of total land owning.

There is always participation of representatives of EM DPs together with ELM development council.

The EM people enjoy similar compensation administrative and grievance redressal structures and monitoring procedures ;as defined in RP.

Results of mitigation measures:

There is no E M DPs required to be relocated due to impacts on their houses/structures.

There is no communal house, cultural areas, and sensitive areas of EM DPs in the project area due to careful consultation and mitigation measures as mentioned above.

7.3. Technical identification of development assistance

Through its regular development program, PPC will provide assistance to the ethnic minorities living in the project areas, such as priority for those living near the affected areas in getting employment i n project construction and maintenance. Priority for accessing to credit:; OF Bank for Agricultural and Rural Development in medium and long terms. Assistance for agricultural development such as land reclamation. If the

Page 39: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

1'112 Project - Crcdit 3 107-VX EYI DP I111c Trorlg 22011 10kV Substation - . . . - - - - -- . -. - .- -

areas overlap with others World Bank linanced projects, ethnic minority areas will be targeted wherever possible.

'/iw in ing

The project will provide training for many EM people in the affected areas on electric safety. It will also include ethnic minority leaders in training sessions on SIA, resettlement, and participatory monitoring for EMDP implementation.

Gender assistance

Special consultation and training for women, especially female-headed households (such as credit, agricultural extension, fertilizer use, etc.)

List of the proposed development assistance and schedule:

1 Proposed Assistance 1 Responsible Group 1 Schedule

2. Electricity safety

1. Utilization of small credit EM households in the project from BARD 1 area

1 day at commune level

Villagers and students in the project area

1 day at commune level

Page 40: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD'2 Prqject - Credit 4 107-VS EUIDP I>nc 7'ro1ig 730/1 l0kV Substation -. - - - -- - __._.-.___P--~.--

The EMDP implementation program will be carried out in parallol with the RP implcrnentation program.

The details of implementation arrangement are described in Chapter 8 of the RP report of this project.

The responsibility on each program is as follows:

Page 41: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2 Psojcct - Credit 4 107-VN EhlDP Iluc I rong 220kV substation and connection line

- - - .- - -- . -- - - -. - -

l'ablc I: Implementation arrangement

Program I Responsible agency I Action requiredl Schedule

Information disclosure/ dissemination

- Interest matrixes were sent to provincialldistrictlcommune by PMB and PECC3 in the RP preparation period. 1

PMB, districtlcomn~une - Information disclosure on the project, implementation 1

Compensation and resettlement

PC and CRC

PMB, People's Committee of communes and CRC

schedule, project impacts, etc. werc be carried out by PMB and PECC3 in cominunity meetings i

1 Action 1 I

I Just after contracting capital-borrowing convention of WB, PMB ' will select and contract a qualified agency for independent external monitoring. I Action 2 I CRC carrying out the DMS and inventoiy of affected assets (on the , basis of the surveys for this RPEMDP) together with the independent monitoring and other related agencies cairy out the evaluation for the applicable unit costs in RP and propose to PPC Sor 1

amendment of the applicable unit prices in RP, if it is necessary, 1 ensure that EMDP is coinpensated at replacement costs at the time of RPIEMDP implementation. I

i I Aiticle 9 of decree i97iCP states iiiat the prices of ia~id f o ~ 1

calculation of compensation is the prices of land with present 1 purposes at the time the Government have the decision of acquiring 1

Page 42: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'I'L)? Project - Crcdit 4107-VN Duc 'I ronE 330kV substation and connection line

Program Responsible agency I

Action required/ Schedule 1 --I

land. If there is no compensation with the price of land, it will be change in usage

1 I

Action 3

Right after the coi~lpletion of DMS and inventory survey, CRC will inspect and define the official number of EM DPs, impacted

I properties and total compensation amount for EM DPs.

Action 4 I I I

CRC will officially announce the policy, schedule of the RP to 1 3 4 ~ DPs at public meetings including issues related to conipcnsa~ion, resettlement and land clearance.

Action 5 I 1 I

Compensation payment for houses and assistance delivery to EM I

DPs with affected houses, and then compensation payment for EM ~ DPs with other affected properties. I

I EM DPs that permanently impacted more than 20% of total productive land or incomes will be entitled to rehabilitation

'

assistance. They will be assisted for the training or technical assistance for agriculture/husbandry or non-land based program. 1

i

700,000VND/person/main worker is given for training or I regulation/technical consultant and 800,00OVND/trainee as the I allowance &ring the training period (total: !,500,00O\rND/pzrso;?) , Proposal for training or technical consultant program is prepared by 1

1 PMB or PECC 3 in the phase of RPEMDP implementation. , Proposals will be developed based on consulting with local 1

Page 43: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

.I'D2 Project - Crcdit 4 107-VN I'iLfDP Duc '1 rong 220kV substation and conncction line . . - -

Program -. .

Rcsponsiblc agcncy 1

Action rcquircdl Schedule I - - -- -- .- - -1

authorities and EMDPs. The proposal includes the ability of having 1 careers after training. The proposal will bc submitted to UNDP. 1

I (However, there is one household with more than 20% of their total I productive land or incomes perinanently affected in this project. Actually, their permanently affected productive land is minor, from 0.3 1 to 8.5 1% of their total productive land.)

Action 6 I

During the project implementation, PMB and lndepcndcnt External ; Monitoring Agency will supervise/monitor all activities of 1 RPIEMDP implementation and rchabilitation programs. I

Note: the EMDP implementation will be in parallel with the 1 implementation of RP. Please see the proposcd RP implen~entation I schedule (A1-t.7.4 of Chapter 7 of RP report).

I

I Subsidize to DP who permanently lost their productive land (more than 20% 0 f landholding) 500,000VND for fertilizer to improve iand.

' District PC and CRC

If the lost land is more than 20% of total using land and thc / remaining cannot meet the demand of producing, the project will acquired the total area of land and DPs will be conlpensated by "land 1 for land" with the same productivity which I':M DPs will be satisfied. I

I However, if EM DPs want to receive cash instead of land, replacing- I

I expensc compcnsation will be applied. i i I I

for I 2'2 1 : ~ ~ l e o i c n l that District PC and CRC i In this period, RPEMDP preparation ibr real land acquisition I

cannot complete. However, the minute of officially

Page 44: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 45: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Program I Responsible agency

Support EM DPS to 1 PMB, BARD, local get long-term loan with the amount money of 3 to 5 million VND (may apply for all EM Dl's with low incomes)

- Special training for female-headed

authorities and elders in villages

PMB and related ~rovince/district

Action required/ Schedule

authorities discuss and then PMB will submit to UNDP to consider and give thcir opinions.

1. PMB, cominune/district PC, province/district BARD.

2. PMB prepare questionnaires, communes prepare to hold meetings with EM, explain the program, the procedure for getting loan and interest, repayment . . . right after the beginning RP ii~~pleinent 1

i

3. Dispense the questionnaire to EMS, collect the answers and I prepare the list of EMS who wants to get loan from BARDS in the I first meeting with EMS: not later than 3 months when the ~ announcement of project implementation deliver. I

4. MB, commune BARD hold community meetings to adjust thcsc activities, about 15 days after the first meeting. I

5. Anothcr meeting held by MB, and commune, town ollicially 1 announces the list of EM people who are able to get loan liom 1 BARD and support them to get the loan. They will get the loan I from BARD without mortgage 1 inonth after the first inceting. i

6. MB, commune, town will announce to EMS the times and vcnucs i where they can get the loan 1 month aftcr the first meeting. ~

I

7. Consult them about how they use the loan. MB, province and / district Department of Agriculture and rural devclopincnt will be i

i~ charge of this actior? 1 mor?th after the first ~nec!ing. I I

Officers of commune PC, Women's unions and officcrs of Women's / I

unions hold meetings with villagers to discuss the topic, tiincs and . -A ;

Page 46: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'I'D2 Project - Credit 4 107-VN EMDI' Duc 'I'rong 220kV substation and connection line - - - - -- -- --- - - -- --

I No 1 Program I Responsible agency I Action requiredl Schedule

households about agriculturc and husbandry cxpansion and fertilizer use.

- 'Training about husbandry and agriculture expansion.

agriculture expansion agency; authorities in cooperation with districtlprovince Women's unions.

venues for training.

Based on the EM women's proposals in meetings, PMB and local agriculture expansion prepare to propose training.

During the RP implementation

1 1 Construction times ( Design consultants, 1 To be scheduled for the construction of the project. 1 I will be implemented after harvesting crops (rcasonable construction scheduling)

Regulations of PMB and Construction con~panies about traf-fic safety, workers

PMB, construction companies

Directors of construction companies, PMB, commune authorities, Independent monitoring agency

Supervised by supervisors of PMB and communes, towns.

PMB and CRC clearly announce to EM this mitigation rncasure in 1 meetings in the phase of RP implementation I

One article for this issue in the construction contract between PMB and construction companies.

PMB reviews regulations for the safety in construction and for their workers.

Commune authorities inform EM of this regulation in thc meetings with EM and DP in the phase of RP and EMLIP

L 1 .-

implementation. I 1

Page 47: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

.fI12 Projcct - Crcdit 4 107-VN EMDP Duc - 'l'rong 220kV substation and connection line

-- - -- - -- -

NO / Program Responsible agency / Action required, Schedule

6.2

6.3

I'leasc see the proposed RP implementation schedule (Art.7.4 of Chaptcr 7 of RP report).

S ignallwarning boards at dangerous places

6.4

Minilnise impacts on construction

Construction companies, PMB, Commune authorities, monitoring agency

Transparently1 closely monitoring lMDP tation.

PMB, constiuction companies, independent commune monitoring agency

One article for this issue in the construction contract between PMU and construction companies.

Supervised by local authorities and checked by Independent monitoring agency.

One article for this issue in the construction contract between PMB and construction companies. I Supervised by local authorities and checked by Indcpendem monitoring agency. I 1

PMB , construction companies, CRC,

Independent monitoring

1

I

Through information dissemination, infoilnation distribution, I

meetings held by relevant institutions. and / Monitoring the RP/FMDP implementation by PMB.

Page 48: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD3 Project - Credit 4107-VS EYIDP DLIC 'Trong 7301.rV s~lbstation arid connectiorl line - . A- - - - - -- - .-

Identify the process of each action. -- - - - -- -

7--- - - r- 1 Action Schcdulc

- -- I- - - - - - -- r- 1 1. Setting up training 1 program/schedule, in close j cooperation with related authorities

and technical consultant. ' 2. Adjusting the training schedule at communes.

leaflets.. . 3. Printing necessary document,

10 days (before the project implementation)

10 days (before the project implementation)

implementation) 3 days (before the project

4. Training program implementation

1 town + commune x 1 day

(as soon as the project implements)

Page 49: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD? Project - Credit 41 07-VN EbIDP Duc Trong 220kV substation and connection line - - - - - -

The implementation of RPEMDP shall be constantly supervised and monitored by PMB in co-ordination with local People's Committees.

An independent monitoring agency will be entrusted with external monitoring tasks of RP and ElMDP implementation. The selection of this agency will be submitted to the approval of PMB and WB.

The selected independent external monitoring agency shall be contracted by the PMB right after RPfEMDP approval and shall begin supervision and monitoring activities from the beginning of the implementation phase.

The detailed supervision and monitoring are described in Art. 7.7.

Describe the indicators to be monitored, institution(s) responsible for monitoring, requirement for monitoring reports.

Indicators

- Inventory forms and assessment of compensation (randomly checked);

- Payment of compensation to EM DPs in comparison to the level of compensation specified in the RP report of this project;

- Public information and consultation;

- Procedures for response to appeals;

- Provision of assistance and rehabilitation allowances;

- Provision of training to ELM DPs, and

- The schedule of resettlement implementation.

Compensation payment

- Payment to be made to all DPs sufficiently ahead of land acquisition;

- Adequacy of the method for valuation of - and compensation for - land and other assets;

- Adequacy of payment to replace the affected assets, including compensation for temporary damages and losses.

Linkage of RP and construction

The RP activities, with the exception of DP training, should be completed at least one month before the beginning of the construction and stringing.

Provision of training to DPs

Restoration of economic activities.

DPs should be monitored for the restoration of income earning capacity.

Standard ofliving.

- The level of satisfaction of DPs with various aspects of the RP implementation;

Page 50: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2 Project - Credit 4 \ 07-VS EMDP Duc Trong 220hV substation and connection line

.- - -- - -- - . -- - - - -

- 'l'he responsiveness in dealing with appeals.

Throughout the implementation process, the DPs' standard of living will be observed and compared to the situation before the RP implementation. Potential problems in the restoration of standard of living will be identified and reported.

The forecast schedule of 3 ELM communities in the project area is as follows:

Activities

1. Screening

2. Conduct SIA

3. Discuss findings of SIA with community

4. Preparation of Action Plan

5. Discussion with local authorities, engineer about mitigation measures

6. Visit one month after construction work

7. Visit one month after construction work

8. Visit six months after construction work

Monitoring schedule

1 week

1 week

1 week

1 week

1 week

1 week

1 week

6 months

Internal monitoring

External monitoring

External monitoring

External monitoring

External monitoring

Internal monitoring

Internal monitoring

External monitoring

Internal monitoring

External monitoring

Lf completed

BY commencement o f RPIEMDP implementation

BY commencement of RP/EMDP implementation

Page 51: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD? Project - Credit 4107-VS EbIDP Duc Trong 21(11;V substation and connection litic -- - - - - PA- -- -

10. COST AND FIKANCIXG PLAK

The detail costs of trainings will be prepared in each proposal later.

To save costs, combination between meetings and trainings will be organized by PMB and all relevant institutions for RP and EMDP.

Costs for mitigation measures will be included in the construction contracts.

Loan will be from BARD.

Estimated cost for some special prograrns/actions of EMDP is fronn EVN

Table 5: Estimated cost for special programs of EMDP

Unit: VND

No. Item Details

1 1 Credit program One (or '/2 day) training course to 1 1 be organized provincial district BARD Or 1 3,000,000 1

will be held at the Lien Nghia 10,000,000 township, 1 I

2

1 (PMB, consultant)

Training on electric safety for villagers and students

One day (or ?4 day)training course to be organized in the project area

It is proposed that such course

3

Contingency (20%) 1 3,1-1 I

Total

1 Total 1 22,800,000 1

Meetings, pamphlets, etc.

19,000,000 1 For credit program

For electric safety

Page 52: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'TD7 I'roject - Credit 4 107-VN EbIDP Iluc 'I'rong 220kV substation and connection line - -- - _ -- - - . . .

I. Map of project areas with EM people

V, 2. Policy framework and guidelines for EMDP a 0 - TD2 project

m-

w I= 3. Social impact assessment

4. Inventory of EM DPs Q a 5. Minutes of community meetings

Page 53: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'I'D7 Project - Credit 4107-VS EbIDP Duc .I'rong 22OliV substation and connection line . - -- - . . -. - -. . . - - -- -- -- -. . -- - - -. -- - . . . . . - . - - -- -- .. .- - - -. - - - - - - - - -. -

Appendix I

Map of project areas with EM people

Page 54: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 55: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2 Project - Credit 4 107-VN EMDP Duc Trong 220kV substation and connection ~ line

Appendix 2 Policy Framework and guidelines for EMDP - TD2 project

Page 56: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

'I'D2 Project - Credit 4 1 07-VS EMDP Duc rrong 220kV substat~on and connection line .- . - - - -- -- . - - --- -

i Policy Frantework crird giiidelittes I

for Etltnic Minority Development Plan (entdp) -- 2 Introduction

1. EVN is undertaking a large transmission and distribution with World Bank. financing, the Second Transmission and Distribution project. Under this project, at the 500kV le:vel, about 540 km transmission lines and 1500 MVA of new transformers will be built to enable the evacuation of power from the planned major generation centers at 0 Mon in the South and at Quang Ninh in the north. Substation reinforcements will be made at 500 kV and 220 kV levels to meet increased demand in Ho Chi Minh city. Additional measures will also be taken to strengthen transmission system control, protection and reactive capability so as to improve the quality and stability of the bulk power system. At the 220 kV level, the Project consists of two GIs substation constructed in Southern Vietnam. At the 1 lOkV level, about 50 km of lines and 80 MVA to new transformer capacity will be built to improve network capacity, remove bottlenecks and meet growing demand from smaller load centers in Central Vietnam. Other subcomponents will be prepared later based on the proposed project implementation schedule.

2. In line with the World Bank's Operational Directive on Indigenous People (OD 4.20), this policy framework is developed to guide the preparation and implementation of Ethnic Minority Development Plans (ElMDPs) for sub-project areas where there are ethnic minority households.

Social and Economic informationi

3. Over the last 20 years, Vietnam has made considerable progress in achieving economic growth and in reducing poverty. Almost all Vietnamese have better lives today than they had in 1985. Most of this remarkable economic growth, however, took place in and around major urban centers. And despite all this very real progress, Vietnam remains a very poor country, with limited resources and a growing population. The national poverty rate is about 29 percent (Vietnam Household Living Standard Survey - VHLSS 2002) and the per capita annual GDP is only about US$430.

Status of Ethnic Minorities

4. Ethnic minorities in Vietnam have enjoyed better legal and political status than minority groups have in many other countries in the region, or around the world. They have received many benefits as a result of government policies. They have received preferential treatment in college admission processes. Cooking oil, kerosene, and iodized salt have been provided to them at heavily subsidized rates. The government, foreign donor agencies, and many NGOs have organized numerous development and special assistance ;programs that targeted ethnic minorities. Very large sums of money have been invested with the intention of helping the uplands in general and ethnic minorities in particular to "catch up" with lowland areas. And yet ethnic minorities in Vietnam are still severely disadvantaged.

I The information for the following two sections is taken from a social and economic assessment report commissioned by the World Bank for a poverty reduction project in northern Vietnam. The report, "Poverty Reduction in the Northern Mountain Region", July 2000, is written by Professor3eil Jamieson, a specialist in the ethnic minority peoples of Vietnam. Another reference is a previous report by Neil Ja~nieson and also comtnissioned by the World Bank titled "Ethnic Minorities in Vietnam", 1996.

Page 57: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2. Project - Credit 4 107-Vh' E3IDP Dilc Trong 7_70kV sl~bstation and connection line -- - _ . . . - .-

5. While many-probably most--ethnic minority households have better material standards of living today than they did ten or fifteen years ago, they are still not catching up with the rest of the country economically. Indeed, they are in many ways falling fi~rther behind. The poverty rate among the ethnic minorities fell marginally over the past 10 ycar period, from 86.2% in 1993 to 69.3% in 2002 (VHLSS). As predicted by the World Bank (VDR 2004 - Poverty), ethnic minorities are among the groups that will remain poor for longer. A forward-looking estimate of the poverty rate of Vietnam put it at 21% by 2010. Aro~lnd 37% of those living in poverty by then would be ethnic minority people, more than twice their share of the poor in 1993, and close to three times their share of the Vietnamese population.

6. There are many reasons for the poverty of ethnic minority groups in Vietnam. But lack of attention from the government and the Party is not one of them. Nor have they been ignored by the donor community or by NGOs. The peoples of the northern mountain region are struggling to adapt to severe stresses placed upon them from population pressure, resource depletion, and cultural dislocation resulting from decades of externally imposed change. Development of the region must concentrate on promoting the process of adaptive change, recognizing that it must be accomplished by the people themselves, and that they will inevitably have to devise many different ways of doing it.

Policy Framework

7. The main objective of the ethnic minority policy framework is to ensure that the development process fosters full respect for their dignity, human rights, cultural uniqueness and that ethnic minorities do not suffer adverse impacts during the development process and they will receive culturally-compatible social and economic benefits. The Bank's OD 4.20 on Indigenous Peoples indicates that the strategy for addressing the issues pertaining to indigenous peoples must be based on the informed participation of the indigenous people themselves. Thus, identifying local preferences through direct consultation, incorporation of indigenous knowledge into project approaches, and appropriate early use of experienced specialists are core activities for any project that affects indigenous peoples and their rights to natural and economic resources.

8. The State of Viet Nam has the policy of not discriminating against indigenous peoples as showed by the presence of Ethnic People Committee in the National Assembly. Article 94 in the Constitution states that the Ethnic People Committee has the right to submit proposals, plans or related issues of indigenous peoples to the Assembly, monitor, control the implementation of national policies, development programs on various areas such as, education, health care, etc. Article 5 of the Constitution also indicates that ethnic minority people could use their own languages to reserve its cultural distinctions. In the Government of Viet Nam, directly under the supervision of the Prime Minister is the Committee of Ethnic Minorities Affairs (CEMA which is equivalent to a minist try). Development programs are supervised by CEMA such as the poverty reduction Program 135 according to the degree No, 135/1998/QD-TTg of the Prime minister to promote the construction of small-scale infrastructure in poor ethnic minority villages.

9. According to the Government of Vietnam, ethnic minorities have the following characteristics:

- An intimate understanding and long stay in the territory, land or area of their ancestors closed attachment to the natural resources;

Page 58: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD:! Project - Credit 4 107-VN EIllDP

Duc Trong 220kV substation and connection line _. - . _ _ _ _

- Self-identification and recognized by neighboring members by their distinctive culture

- A language different from the national language - A long traditional social and institutional system

- A self-provided production system.

10. This policy framework will be applied to all of the sub-projects of TD2 where applicable.

Guidelines for Ethnic Minority Dcvclopmcnt Plan (EMPD)

11 . The guidelines seek to ensure that ethnic minorities are informed, consulted and mobilized to participate in the sub-projects to be supported by TD2 Project. Their participation can either provide them benefits with more certainty, or protect them from any potential adverse impacts of sub-projects to be financed by the Project. The main features of the EMDP will be a preliminary screening process, then a social impact assessment to determine the degree and nature of impact of each work under the sub-project, and an action plan will be developed if warranted. Consultations with and partici~ation of the minority population, their leaders and local government officials will be an integral part of the overall EMDP. The EMDP's consist of the following sections:

(a) preliminary screening (b) social impact assessment (c) mitigation measures (d) development assistance (e) project monitoring

Detail requirements for screening and social impact assessment are described in the annexes. The Project will provide a series of training to all implementers and local agencies preparing and implementing ElMDPs.

Screening

12. All communes which are candidates for sub-project will be visited (at the time of first consultation with communes) by a teams made up of Project Management Boards of Electricity of Viet Nam (EVN) or of the respective Power Company (PC) or project consultants. Prior to the visit, respective Project Management Boards (PMBs) will send a letters to the communes informing the commune leaders that they will be visited by the respective PMBs or project consultants which would like to discuss sub-project. The letter will request that the communes invited to the meeting have representatives of farmers and women associations, village leaders, and key staff of commune for discussion on the sub- project. If there are ethnic minorities in the commune, their leaders should be invited to the meeting as well. During the visit, the commune leaders and other participants will present their views with regards to the sub-project.

13. At this visit, the social scientists (social consultants) will undertake a screening for ethnic minority population with the help of ethnic minority leaders and local authorities. The screening will check for the following:

(a) names of ethnic groups in the commune (b) total number of ethnic minority groups in the commune

Page 59: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2 Project - Credit 4107-VS EMDP

Duc I'rong 270kV substat io~~ and connection line --.p--pp--p-.--..-- ~. . ~~ ~- . ~ .~- . . . .. ~

(c) percentage of ethnic minority of commune population

(d) number and percentage of ethnic minority houscliolds along the zone of influence of the proposed s~lb-Project.

14. If the results show that there are ethnic minority households in the zone of influence of the proposed sub-project, a social impact assessment will be planned for those areas.

Social Impact Assessment

15. The social impact assessment (SIA) will be undertaken by the social consultants. The SIA will gather relevant information on the following: demographic data; social, cultural and economic situation; and social, cultural and economic impacts - positive and negative.

16. Information will be gathered from separate group meetings: ethnic minority leaders; ethnic minority men; and ethnic minority women, especially those who live in the zone of influence of the proposed work under sub-project. Discussions wil.1 focus on sub-project impacts, positive and negative; and recommendations for design of sub-project. The social consultants will be responsible for anaIyzing the SIA, and for leading the development of an action plan with the ethnic minority leaders, project engineers and other sta.ff. If the SIA indicates that the potential imuact o f the urouosed strb-proiect will be sinnificantlv adverse or that the ethnic minoritv commtlni& reiects the proiect, the sub-Project will not be implemented in that localitv; no ftrrther action is needed in this case.

17. If the ethnic minority supports the sub-project implementation an EMDP will be developed.

Ethnic Minority Development Plan

18. The action plan wilI consists of a number of activities and will include mitigation measures of potentially negative impacts, modification of sub-project design, and development assistance. Where there is land acquisition in ethnic minority communities, the Project will ensure that their rights will not be violated and that they be compensated for the use of any part of their land in a manner that is culturally acceptable to them. The compensation will follow the Resettlement Policy Framework of the project. An Ethnic Minorities Development Plan will include:

baseline data; land tenure information; local participation; technical identification of development or mitigation activities; institutional arrangement; implementation schedule; monitoring and evaluation; and cost and financing plan.

Project Monitoring

19. Implementation of the EMDPs will be regularly supervised and monitorecl by PMBs of EVN or PCs in coordination with the respective Peoples' Committees and Cclmmittees for Ethnic Vlinorities and Mo~lntainous Areas at grass root level. The findings and

Page 60: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2. Project - Credit 4 107-VS E V D P I luc I'rong 220kV substation and connection line - - - - - - -. -- - A - -- -- -- -- - - - - -. - - - . . - - - - - - -- - - - - -- -- - -

rccommendations will be recorded in quarterly reports and to be furnished to the PblBs. Em'. K" and World Sank office in Viet Nam.

20. The independent agency or agencies which would be ~lsecl by the respective PMBs to . ~~nder take external monitoring and evaluation of the implementation of resettlement action plans for the Project will also be tasked with monitoring the resettlement activities for ethnic minority areas. While, the external monitoring agency will visit a sample of affected households for resettlement in each relevant province on an annual basis, it will also visit a sample of at least 10% of ethnic minority households in the project affected areas.

Schedule

2 1. The EMDP should have an implementation schedule that is coordinated with the sub- project implementation. Logically, social impact assessments and group meetings should be undertaken before sub-project designs are prepared. Compensation for land acquisition should be satisfactorily completed at least one month prior to start of civil work. Mon.itoring should take place at the recommended times during and after civil work.

Budget

22. The EMDP will include information on detailed cost of mitigation measures and other rehabilitation entitlements for ethnic minority in the affected areas. Sources of funding for the various activities and financing plans will be clearly specified in the cost tables.

23. The EMDPs will be prepared and submitted by PMBs to EVN or PCs and then the World Bank at the same time that respective PMBs submit the sub-project fea,sibility study, Resettlement Plan to EVN, PCs and the World Bank for review. If a PMB has many sub- projects with similar implementation schedule, an integrated EMDP report for all sub-projects will also be prepared and furnished to EVN, PCs and the World Bank for review..

Implcmen tation Arrangement

24. PMBs of EVN and PCs will be responsible for the EMDP while the 1oc:al authorities (People's Committees, Committees for Ethnic Minorities and Mountainous Areas, Resettlement Committees, Women Union and Land Departments etc. at different levels) will closely coordinate with PMBs for preparing and implementing EMDP. The project social consultant will be responsible for coordinating, planning and supervising EMDP. Consultants will also be responsible for training respective PMBs, social organizations to undertake the work of consultation, screening, social impact assessment, analyses, implerr~entation and monitoring.

Page 61: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD? Prqjcct - Credit 4 107-VN ELILIP LIuc 'l'rong 7301.rV s~~bstat ion and connection line

. . -- - - - - -. - .. -. . . . -- - -- -- - - -- - -- - - - - . .. . - .- - - - - - - - - -. - -. . - -. .-- . . - - -

Appendix 3

Social impact assessment

Page 62: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TL)? Project - Credit 4 107-VN EMDP

Duc Trong 230kV s~~bstation and connection line . ~

-p--.___. _ . -_ - - .. .~ _ _

Appendix 3: Social impact assessment

The socio-economic survey shows that:

A. Social cultural and economic situation of EM people

1. Percentage of ELM DPs below the poverty line 10,6%

2. Number of ELM girls attending elementary school 7

3. Number of EM boys attending elementary school 9

4. Number of EM girls attending secondary school 10

5. Number of EM boys attending secondary school 10

6. Number of EIM girls attending high school 3

7. Number of EM boys attending high school 4

8. Availability of water supply facility (wells) in the

community (Funded by Unicef)

9. Availability of electricity in the community

10. Economic information of ethnic minority community

Yes

Yes

a) Types of natural resources in the area:

1 ii. Lake, river

Natural resource i. Forest

1 iii. Mineral

Check 1 Natural resource 1 Check No iv. Aquaculture/fishing 1 No

b) Economic and livelihood systems: I

1 4. Off farm work

1. Sedentary agriculture

2. Shifting agriculture

1 3. Landless farm worker

1 4. Off farm work

Main activity

1 5. Govt. employees 1 1.50 1 6. Govt. employees

% EM HH

0

98.50 1 1. Sedentary agriculture

1 6. Business

0

0

I / 7. Business

Secondary activity

2. Shifting agriculture

3. Landless farm worker

7. Small scale industry 0

O/O of EIM

/ 8. Small scale industry

Note: the sedentary rrgt-icultlrre activity includes pltrnting pa~ia): cr.ops tmd fiuit-trees ~ t n d raising live-stock/paultr~v.

c) Tenure systems of main ethnic groups: briefly describe land ownership and tenure systems (e.g., communal ownership. private ownership. gender differences in ownership, etc.).

Page 63: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2. Project - Credit 4107-VS EYIDI'

Duc Trong 220kV substation and connection line . - . - -. .- - - -. . . . .. - - -- .- . - . . -~

The land ownership of 45 EM households is tho private ownership without gender differences in ownership. 85% of these DPs have got LURCs for their residential and productive lands

B. Social, cultural and economic impact

Views from tnen and women on:

1. Potential positive impacts

a) Potential employment during subproject construction, or increased access to employment once the subproject constructed

Yes

The contractor should employ the local labors where possible, particularly the unskilled labors.

b) Other positive impacts in socio-economic development:

Implementing this project will not only satisfy the ever increasing demand for infrastructure, small industries, handicraft, and aquaculture development but also improve the spiritual and material life of the commllnities in the remote areas.

2. Potential negative impacts

a) Electric safety

Yes

Electric shock while using the household electric appliances i.e. lights, shreddinglgrinding machines, and electric aeration machines (in aquaculture). . .

b) Physical and social problems related to subproject:

Yes

EM DPs expressed their concern regarding sanitation issues and local food/foodstuff prices may arise due to concentration of many workers in a certain period of construction.

c) Land acquisition for subproject construction

Yes

There are 11 ELM DPs with permanently acquired land for poleltower foundations. Total acquired area is 22,733 m2. The acquired area is insignificant in comparison with total area of their land holdings (average EM DPs productive land holding is around 1,475 m2). There is one EM DP affected more than 20 % of total agricultural land holdings.

EM DPs would like to be compensated for their acquired land at replacement cost.

Page 64: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TI)? Prqject - Credit 4 107-VN 'CbIDP Duc l'rong 720kV substation and connection line - .. -- -- ~~

~ - .. . -. . ~

d) Threats to cultural properties and resources, such as archaeological sites and historical monuments, sacred and ceremonial sites, graveyards, medicinal plants, etc., in zone of influence:

EM DPs expressed their satisfaction since such issues have been considered during the preliminary design stage and through thorough community consultation to minimize the negative impacts of the project and practically there is on impacts on such sensitive areas.

e) Other negative impacts:

The EM also expressed their concern about the possible social disturbance due to concentration of construction workers during the construction period.

C. Comments and petitions for the project:

From men:

- Compensation unit prices have to be announced for reference of local people.

- Proclaiming the project in the locality to local people give related information.

- Compensation policy has to obey stipulation of the government..

- Compensating and allowancing in satisfaction for DPs to rehabilitation.

- Compensation unit price for trees and crops is based on age groups trees and crops.

- Compensation unit prices close to market unit prices to mitigate impacts to local inhabitants.

- There are allowances for poor households of the commune.

- Clearing houses and structures in ROW of the line and assisting local people on power safety.

- Assisting cost of house/structure improvement and installing fireproof materials and lightning arrestors.

- Compensating for different value of land in ROW.

- Supporting for households with land in ROW

- Tower foundations of the line do not locate at houses of local people to minimize the losses.

- In the construction phase, the project needs to combine with local government and local people to minimize losses on trees, crops and harvest.

From women:

- Considering the construction period to avoid impact on cultivation and harvest of local inhabitants.

D. Others: No.

Page 65: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

TD2 Prqject - Credit 4107-VN DLIC 'rrang 320kV substation and connection line - - . - - - . - - . -. - --. - - - - --- -- - . -.- - -. . - -. . . - - . . . -. . . -. .- - - - - - . -

Appendix 4

Inventory of EM DPs

Page 66: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

Appendix Inventory of Project Displaced Persons

0

Name of household

Page 67: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 68: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

.1'112 Project - Credit 4107-VS EY111P 1h1c Trong 320kV substation and conncction line -- ----

Appendix 5

Minutes of community meetings

Page 69: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

H6m nay nghv & th811g .& nBrn 2007.

Tai \,Bn phbng UBND .... ..... &...LL

----4-- . .

.... : . I

I .F

I. Thanh phAn tham d$

I BISN E ? . ~ . N LAM ~ 1 %

( 4 1 * I . 11. Nai dung )

Sau khi nghe bai dien PECC3 trinh bhy, phd bign th6ng tin v6 dq iin va sg c6n thigt phHi ti& hAnh diQu tra mdc 89 Bnh h~16ng d& m6i tnfang, dgn d2n sinh kinh t6 clia dq sin Tram bie'n &p 220kV Diic Trong vh nhdnh re. Hai b6n dii uao ddi c6 cAc )i kis'n sau:

I PECC3 / ' Ngay bh: . F - bh :01 -

1. UBND hoan tohn nhii't tri vdi chb trudng cda YhB nu& v& viec xily dqng dcf 6n Tram biEn ;ip 220kV Dee Trong vA nhinh r i .

MS. 5 'A-MT-42

2 . UBND T:.E.~.& ..... : ~ . . dii tgo d i h ki$n dd doan khdo s8t hshn rhiinh nhiem vp Y-' d~fdc giao.

3. Khgo s6t chi tie't khu vgc d$ Bn:

Dai disn PECC3 1.A ciic cd quan chdc ngng cSa dia phUd3g k2't hqp cign hanh di6u tra, kh io s d t rnec do i n h h&ng mdi trutfng, diln sinh ~ i r . h t2- khu vgc dtl gn

Page 70: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

;y , j !-3n bh : 01 I .- B!SN BAN LAM V I ~ C 7

- ids: CIU-MT-42 1 1 PFCC3 ( ' . : q ~ y bh: I , I

? ki2h v 8 Dci~rlz sin' tiic d61z.q n16i trztlvrr d czin dzt n'n

. . T & ~ ~ hop i;h& iwng Anh h ~ A n g : . . *

- 6- ..................... ...................................... .................... " ............................ - ........................... ........-...........-.,.. m.. . . I..# ........... ̂..

j - > - b: - ' m 7 i . !

/ D b n v j i 3.; . , Hz!ng muc i 57-1' ,! . . .

I !

. ~ z G & . ! i - 1 . I . . . . . I I

I I . . ! . ' .' , . . j

! 1 I : . . . i ,! 4 . .A. E n CLI' !

. . . ' 1 ; . . I i 1 i ~ 6 & a ~ ~ ,A A;' 1 . i . , . .

i I ! I

- , . . . I

- . , i 2 / ~ > $ t ; t l r 3 n

. . . .

. .

. . .. I ' .

* . - . . . .

.. ' 7 Dien tich d a g tr6ng . .

I

) C.. CGng trinh kie-n t r l ic . 1 . . . . . . - i i i MA can * .

2 1 ~ i g n ~ &Ao / 3 Tnfang hoe ! . phbng

. . . 1 4 M 6 m i 1 cii . . I 5 / T r y n6 ] phbia - - a

I krn . . . . . , 6 1 D~r6ng gin0 than9 - I

. .

111. 9 hiean clia dja phlidng v& 6nh h&ng ~ 8 i trrlang, 'b6ithuifng:- . . . . t i idjnhcd Y& . . . . thi@t hai rang (ngu c6): . . . . .

. . -: . .

Page 71: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

- ... ...............-.................

... LA?. .... ...... .... ....

.... .... .....

..... . .

-. ... ... ... ...... .,,. ..,.

Dpi die11

Page 72: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 73: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 74: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there
Page 75: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

>

I).-\;<H S ~ C H HOP TH-Lh'I f i 5 CQSG D ~ X G D<i' TR+>I BIJ?S il? 330KV ~ f i i TROSG ~.i SH--L~H RE

xi: . TT . L~GR .nC911!G. . . . . . . . . . . . .

Page 76: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

D-LXI-1 S ~ C H BQP T H ~ I I I V : ~ COXG D ~ Y G .<?i T K ~ J I BIE5 -LP 230KV DOC TRQ3G ~-i S H ~ Y H Fd

3 - C

.. ... . . . . . . . . : k n . ~ k p ~ ..........., WES: r9d.q iwj ,

C . . - .C~LLImND XA. .................

I?;, A d' +. "?:.\ . . . C . . :.. ,,.. . . . . . . . ..,..'>. :.*am-, /// - - . . .. i . . . . : ' _

- : - . . I <.,; , .-: . - .- . .

. . : .'-.,

. . - ., 2: - ,:A' - .. ,.-.. ,!. . , I - . : . t . : ... . \. : :

- r. -, .. . . . t . . . . . ' . . . .-. . / -7 C

. , L . . . ..... i _ . ;< d. ;i .- /-

Page 77: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there

. . . .

; Stt

UBND fi.. ......;.. .,.. ... . . .

Page 78: SUB-PROJECT: Public Disclosure Authorized DUC TRONG 220KV ...€¦ · Duc Trong 220kV substation and its connection lines include these components: ... In the project area, there