  • NAl'IONAL POWER TRANSMISSION CORPORATION

    TRANSMISSION AND DISTRIBUTION II PROJECT - CREDIT 4107-VN

    IPP136 VOL. 5

    SUB-PROJECT: \ J- DUC TRONG 220KV SUBSTATION AN ONNECTION LIN* % * J Y Code: 4601 7 -

    JI \

    L /

    March, 2009.

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

  • NATIONAL POWER 'TRANSMISSION CORPORA1-ION

    SOUTHERN POWER PROJECT MANAGEMENT BOARD

    TRANSMISSION AND DISTRIBUTION II PROJECT - CREDIT 4107-VN

    SUB-PROJECT: 7 I CTY CP TU

    DUC TRONG 220KV SUBSTATION AND CONNECTION / LINES I 2 * Code: 4607 7

    ETHNIC MINORITY DEVELOPMENT PLAN (EMDP)

    Head of Environment and Computer Dept.: Duong Thi Thanh Truc k Member : Nguyen 'Thanh Long

    /

    HCM City, March, 2009 POWER ENGINEERING CONSIKTING

    JOINT STOCK COMPANY No.3

    GENERAL DIRECTOR

  • Transmission and distribution 11 project - Credit 4107-VN EkIDP Duc Trong 220kV Substation and connection line -- -- -. -. .

    TABLE OF CONTENT

    TABLE OF CONTENT

    0. EXECUTIVE SUMMARY

    0.2 SOCIO-ECOIVOMIC STATUS OF ETHNIC MINORITY IN THE PROJECTAREA

    0.3 LEGAL FRAMEWORK

    0.4 PROJECT IMPACT ON ETHNIC hIIiVORITY

    0.5 PEOPLE'S PARTICIPATION

    0.6 IIVSTITUTIONA L ARRANGEMENT

    0.7 DEVELOPMENT ACTIVITIES

    0.8 IhfPLEhfENT ARRANGEMENT

    0.9 MONITORING AIVD EVA LUA TION

    0.10 COST AND FINANCING PLAN

    1. INTRODUCTION

    1. I The project

    1.2 Ethnic Minority Development Plan 1.2.1 Policy framework for ethnic minority 1.2.2 Ethnic minorities in Vietnam

    2. SOCIO-ECONOMIC STATUS OF ETHNIC IMINORITY IN THE PROJECT AREA

    2. I ' Ethnic minority in the project area

    2.2 Socio-economic condition of ethnic minority in the project area 2.2.1 Education: 2.2.2. Health care: 2.2.3. Culture:

    2.3 Land use actuality of the ethnic minority in the project area 2.3.1 Chu Ru EM 2.3.2 Tho EM 2.3.3 K' Ho EM 2.3.4 Chinese EM

    3.1 The OP 4.10 on indigenous people of the World Bank

    3.2 Vietnam Law

    4. PROJECT IMPACT ON ETHNIC MINORITY

    4. I lmpacts on EM 4.1.1 ChuRuEM 4.1.2 Chinese EM 4.1.3 Tho EM 4.1.4 K ' H o E M

    4.2. Impacts on land use system 4.2.1. Impact on land acquisition of the project 4.2.2 Impacts on land use system

    4.3 Impacts on hozises and strzictzires

    4.4 Impacts on farming system 4.4.1 Impacts on trees and crops

  • Transmission and distribution I I project - Credit 41 07-VN Duc Trone 220kV Substation and connection line

    4.4.2 Impacts on farming land

    5. PEOPLE'S PARTICIPATION

    6. INSTITUTIONAL ARRANGEiMENT

    7. DEVELOPMENT ACTIVITIES

    7. I For ethnic minorify in affected area

    7.2 Mifigafion measzrres

    7.3. Technical idenf ification of developrnenf assisfance

    8. IMPLEMENT ARRANGEMENT

    Program

    Action 1

    Action 2

    Action 3

    Action 4

    Action 5

    Action 6

    9. MONITORING AND EVALUATION

    10. COST AND FINANCING PLAN

  • Transmission and distribution [ I project - Credit 4107-VN EMDP Duc Trong 220liV Substation and connection line --

    APPENDICES

    I . Map of the project areas with EM people

    2. Preliminary screening of ethnic minority

    ABBREVIATIONS

    BARD Bank for Agricultural and Rural Development

    CRC

    DMS

    DP

    EM

    EMP

    EMDP

    EVN

    GOV

    HH

    OP 4.10

    PC

    PECC 3

    PMB

    PPC

    ROW

    RP SIA

    T/L

    TD2

    VND

    WB

    ElMHH

    Compensation and Resettlement Committee

    Detailed measurement survey

    Displaced person

    Ethnic minority

    Environmental management plan

    Ethnic minority development plan

    Vietnam Electricity

    Government

    Household

    World Bank's operation policy 4.10

    People's Committee

    Power Engineering Consulting Joint Stock Company 3

    Project management board

    Provincial People's Committee

    Right of way

    Resettlement plan

    Social impact assessment

    Transmission line

    Transmission and Distribution I1 project Vietnam Dong

    World Bank

    Ethnic minority households

  • Transmission and distribution I1 project - Credit 41 07-VN EMDP Duc Trong 27-0kV Substation and connection line pp

    0. EXECUTIVE SUIMLVARY

    Duc Trong 220kV substation and its connection lines include these components: + Duc Trong 22011 lOkV substation has the capacity of 2xl251MVA with . + Construction and installation of connecting line: the 220kV connection line (two routes) with the 1,100m length and the 1 lOKV connection line (two routes) with the 6,000m length. In the project area, there are many ethnic minorities such as the Churu and K'Ho mainly living at Chi Rong A hamlet, Phu Hoi commune, the Tho and the Chinese scattering in Ward 2, 12, Lien Nghia township. Implementing the project components, there will be impacted on local people bec.ause land acquisition required for tower foundations and tree chopping in ROW. However, the project does not cause permanently affected houses; therefore, involuntary resettlement is not required.

    0.2 SOCIO-ECONOMIC STATUS OF ETHNIC MINORITY IN THE PROJECT AREA

    Ethnic minorities in the project area are Chu Ru, Tho, K'Ho, and Chinese people who are living intermix with Kinh people in Duc Trong district, Lam Dong province. Chu Ru EM is one of the communities whose language stems from the Malayo - Polynesian. The population of Chu Ru EM is quite small; they mainly live in Lam Dong, Ninh Thuan and Binh Thuan province. Tho language belongs to the Viet - Muong system. These people mainly live at the west of Nghe An. Its population is about 5 1,000 people. K'Ho people are over 92,190, and language's one belongs to Mon -- Kho Me system (Nam - A family). These people mainly lived long - standing at Tay Nguyen, then migrated to Lam Dong. Some specific production tools are yoas (chop down a tree), plough, rake and Kor (level the field). . . The percentage of Chinese people in Vietnam is 1.13% Vietnamese population and is ranked in the fourth position. In Lam Dong province, Chinese people are over 12,000. Most of Chinese people in Lam Dong are those who migrate from Quang Ninh in 1955 - 1975. Those people are a part of Chinese people who did farming in Quang Ninh and later set up their house in Lam Dong.

    0.3 LEGAL FRAMEWORK

    This plan is developed based on policy OP 4.10 of the World Bank on indigenous people (previous as OD 4.20) and policies for EM of GOV. A policy framework and guidelines for EMDP has been prepared for TD2 project to ensure that ethnic minorities are well informed, consulted and mobilized to participate in the sub-projects to be supported by the TD2 project.

    0.4 PROJECT IMPACT ON ETHNIC lMINORITY

    The project will affect Chu Ru EM people and K' Ho EM people in Chi Rong hamlet, Phu Hoi commune, Chinese EM people in Lien Nghia town, and Tho

  • 'Transmission and distribution I1 project -- Credit 4107-VS EMDP Duc Trong 130kV Substation and connection linc --

    EM people in Lien Nghia township, Duc Trong district, Lam Dong province. There are 13 Chu Ru EM households (64 people), 14 Chinese EM h.ouseholds (68 people), and 18 Tho ELM households (88 people) affected.

    0.5 PEOPLE'S PARTICIPATION

    During the project preparation (along with RP preparation), Management Board and consulting companies have held many community meetings at the commune level in the project area with the participation of DPs and representatives of Commune People's Committees, authorities and non- governmental organisations (Women's union, youth organisation, farmers' union, fatherland front, veterans7 organisation, etc.) In these meetings, project related issues i.e. investment financial resources, project objectives, project components, compensation policy, allowances, etc. are explained by consulting institutions.

    0.6 INSTITUTIONAL ARRANGEMENT

    To implement this EMDP smoothly, PMB will: - Assigning adequate number of staff for ElMDP implementation. - Contracting with skillful experts for EMDP implementation. - Setting up offices at the site for advantageous implementation. - Periodically monitoring the EMDP implementation. - Transparency in implementation through information campaign. - Ensuring that EM leaders (elders and those who prestigious on publicity) are

    represented in local EMDP committees.

    0.7 DEVELOPMENT ACTIVITIES

    The plans are not only for EM DPs who are directly affected by land acquisition but also for the EMS who are living in the project affected areas. As mentions in RP, this ElMDP is de