ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A NEW ECONOMIC CITY IN PUNIAB, PAKISTAN EXPRESSION OF INTEREST Feasibility Studies and Master Planning for The Development of a New Economic City in Punjab, Pakistan December 2017 THE URBAN UNIT t 'l'nD s.dor Phnrirr& rlrnrrfflar k,rk- l nir It,r.) l-d. ,l Public Sr.tor Comprny. Urban Sector Planning and Management Services UNit PW. LTD. Government of the Punjab XAMT AG oAtt 0.rtl Suae4 gl,- - 12- 577 n.ri.rl g^ n.ri.* ll Ul^^.. a lppro!!d Expression of Interest 2017 ,[Y

Transcript of Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... ·...

Page 1: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

ld€

EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

EXPRESSION OF INTEREST

Feasibility Studies and Master Planning

forThe Development of a New Economic City in

Punjab, Pakistan

December 2017

THE URBAN UNITt

'l'nD s.dor Phnrirr& rlrnrrfflar k,rk- l nir It,r.) l-d.

,l Public Sr.tor Comprny.

Urban Sector Planning and Management ServicesUNit PW. LTD.

Government of the Punjab

XAMT AG oAtt

0.rtl Suae4 gl,- - 12-577n.ri.rl g^n.ri.* ll Ul^^.. alppro!!d

Expression of Interest 2017

,[Y

Page 2: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBIUTY STUOIES AND MASTER PL,'NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNJAE, PAKISIAN

DISCLAIMER

l. The inlormation contained in this Expression of Interest (EOI) document or subsequentlyprovided to Bidder(s), whether verbally or in written form by or on behalf of the Urban SectorPlanning and Management Services Unit (USPMU) Pvt. Ltd, or any of their employees oradvisors, shall be subject to the terms and conditions set out in this EOI documenr and any otherterms and conditions subject to which such information is provided.

2. This EOI document does not purpon to contain all the information each Bidder may require.This EOI document may not be appropriate for all persons, and it is not possiblc for the UrbanSector Planning and Management Services Unit (USPMU) Pvt. Ltd, their employecs or advisorsto considcr thc investment objcctives, financial situation and particular needs of each Bidder whoreads or uses this EOI document. Certain Bidders may have better knowlcdge of the proposcdProject than others may. Each Bidder should conduct its own investigations and analysis andshould chcck the accuracy, reliability and completeness of the information in this EOI documentand obtain indcpendent advice from appropriate sources. Urban Sector planning and ManagementServices Unit (USPMU) Pvt. Ltd, its Representatives, their employees and advisors make norepresentation or warranty and shall incur no liability under any law, statute, rules or regulationsas to the accuracy, reliability or completeness of the EOI document.

3. USPMU may, in thcir absolute discretion, but without being undcr any obligation to do so,update, amend, add to any or all of the provisions or supplement the information of this EOIdocument or cancel the present Invitation and call for fresh Invitations. Such changes would beintimated to all Bidders using this EOI Document.

4. USPMU reserves thc right to reject any or all of Expression of Interests (EOIS) submitted inresponse to this Eol Invitation at any stage without assigning any reasons whatsoever beforeacceptance of any proposal. USPMU also reseryes the right to hold or withdraw from or cancelthc process at any stage up to the final pre-qualification / shortlisting.

5. Neither USPMU nor their employees or representative will have any liability in case of non-receipt of any correspondence from them to the bidders due to the postal delays.

6. Mere submission of this EOI or Pre-qualification or issue of RFP does not vest any right in theBidder for being sclccted for the project.

Exprcssion of hktest 2017 I

Page 3: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

Pakistan" in ------------------, -------- and

EOI_ FEASISILITY STUDIES AND MASIER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY IN

PUN]AS, PAKISfAN

EXPRESSION OF INTEREST

Schedule of Pre-qualification Process

This EOI is issued to the Bidder in response to the advertisement on Expression of Interest-"Feasibility Studies and Master Planning for Development of a New Economic Ciry in Punjab,

dated t 4-12-2017

lnvitation for Prequalifi cation December, 14, 2017

Last date for receipt ofqueries January 05,2018,5:00 pmContact Person:Dr. Nasir Javed, ChiefExecutive OfficerThe Urban Unit, 503-Shaheen Complex,Egerton Road, Lahore, Pakistan.Phone: +92 42-99205316-22F ax: +92 42-99205323Email: ceo.urbanunit(@gmail.com

Last date for submission of EOIs in response tothis EOI

January 15, 2018, at 1l:00 am at the The UrbanUnit, 503-Shaheen Complex, Egerton Road,Lahore, Pakistan.Phone: +92 42-99205316-22F ax: +92 42-99205323

Date and time of Opening of EOIs in response

to this EOIJanuary 15, 2018, at 1 I :30 am (Tentative time)at the Committee Room, The Urban Unit, 503-Shaheen Complex, Egerton Road, Lahorc,Pakistan.

Shortlisting of Firms/JV/Consortium lanuary 29,2018, at I I :00 am (Tentative) at

the Committee Room, the Urban Unit, 503-

Shaheen Complex, Egerton Road, Lahore,Pakistan.Results shall be announced

Issuance of Request for Proposal (RFP)documents

January, 30, 2018, (Tentative) at theCommittee Room, The Urban Unit, 503-Shaheen Complex, Egerton Road, Lahore,Pakistan.

Submission of Tcchnical & Financial Proposals February, 28, 2018, at I I :00 am at theThe Urban Unit, 503-Shaheen Complex,Egerton Road, Lahore, Pakistan.Phone: +92 42-99205316-22Fax: +92 42-99205323

Award of Contract March, 20, 2018 (Tcntative)

Expression of lnterest 2017

NOTICE INVITING EXPRESSION OF INTEREST

Page 4: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIAILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUN]AB, PAKISTAN

. NOTICE INVITING EXPRESSION OF INTEREST

FEASIBILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OFA NEW ECONOMIC CITY IN PUNJAB. PAKISTAN

Punjab is facing alarming threats of urbanization, however, the phenomenon is being consideredpositively and in response, the Govemment of the Punjab is envisaging to tap the potential ofurbanization in the province. When the Motorway (M2) Corridor linking Islamabad and Lahorewas planned, it was aspired to have some l1 new industrial towns along its length. However, thisidea could not be matured due to various reasons. Now the GoPb aims to initiate the developmentopportunities along the Motorway corridor. Furthermore, the post-development context of China-Pakistan Economic Corridor (CPEC) enhances the potential of developing new towns thatcapitalize economic development in the province. In this context, there exists a dire need toinvestigatc properly proposed/selected site in the province of Punjab where the GoPb can initiateurban-industrial development that can bring economic and physical advantages to other locations.

The Planning and Development Department, Govemment of the Punjab, Pakistan has thereforeassigned The Urban Sector Planning and Management Unit (The Urban Unit) to act as the ProjectManagement Unit for the "Feasibility Studies and Master Planning for Development of a NewEconomic City in Punjab, Pakistan".

The "Feasibility Studies and Master Planning for Development of a New Economic City inPunjab, Pakistan" will need to have regional focus and include short to long-term action andfinancing plans. Intemational consulting firms having expertise in this regard are being invited tosubmit Expressions of Interest for the same.

chir Javed,ve Officer

Urban Sector Planning & Management Services Unit Pvt. Ltd.Contact: Ph: +92 42-99205316-22 F ax: +92 42-99205323

Email: [email protected], website: www.urbanunit.gov.pk

EDr.

Expression of lntercsl 2017 111

Urban Sector Planning and Management Services Unit (USPMU) Pvt.Ltd.

Page 5: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILITY STUDIES AND MASTER Pl.,'NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITYIN PUNJAB, PAKISTAN

Table of Contents

SCHEDULE OF PRE-QUALIFICATION PROCESS..........

ACRONYMS & ABBREVIATIONS

SE,CTION I: INSTRUCTIONS TO BIDDER.SCoPE oF APPLICATIONELIGIBLE BIDDERS

CHANGES rN CoNSoRTTUM CoMposrrroN.......

III

2

2

2

3

3

3

3

3

444

4445

5

6

6

6

6

6

6

6'7

7

1,7

78

8

9

9

9999

B.C.D.E.

F.G.H.I.J.

K.L.MN.o.P.

a.R.

S.

T.U.

wx.Y.Z.

NUMBER oF EOIS.EOI PREpARATIoN Cosr....................EXAMINATToN oF EOI.........................RIGHT To ACCEPT oR REJECT ALL APPLICATIoNSCoNTENTS or EOI ......................CLARIFICATIoNS ......AMENDMENT OF EOI

SECTION 2: TERMS OF REFERENCEPROJECT INTRODUCTION,..,.....,.BACKGROUND INFORMATION .....scoPE oF woRK.................PART-A : DETAILED FEASIBILITY...............

LANcuAGE.........CURRENCY.........VAr tDrry oF EOls.....................FoRMAT AND SIGNING oF EOI AppLIcATIoN ....................SEALTNG AND MARKTNG oF EOI AppLrcATroNS................EOI APPLICATIoN DUE DATE..,....,..,.LATr EOI A PPLtCATroNS,.....MoDIFICATIoNS/ SUBSTITUTIoN/ WITHDRAwAL oF EOISEVALUATToN oF AppllcATroN - DUE DATE.......................EVAI,I]ATIoN oF F-C)I _ CRITER]A

EVALUATIoN oF EOI . SUPPoRTING DoCUMENTS.EVALUATIoN oF EOI . RIGHT To REJECT...............

CoNFIDEN f tALtrYTESTs oF RESPoNSIVENESS..,.............

CLARIFtcATIoNS ..

QUALIFICATION AND NOTIFICATION

.. 1 Tourism Potential Assessment...........

..2 Housing Demand Assessment....

..3 Commercial Space Demand Assessment..........................

..4 Business qnd Industrial Demand Assessment ..........

..5 Formulalion of Strategic Framework Development Guide|ines...............PART-B MASTER PLANN tNG.........

l. Vision/ormulation....................2. Land Use Policy and Land Suitability Analysis......3. Master Plqn Development ........4. Determining Financial and Economic Feasibility Based on Master Plan5. City's Economic Development 9trateqies...............6. Proposalsfor City's Governance Mode|...............7. Strategic Environmentql Assessment of NEC Deve\opment......................8. Land use and Development Contol Guidelines......9. Sectoral P lan J... .. ... .. . .. .... ... .. ... ...

101l11

11

12t31920202022

Page 6: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASTER PLANNIN6 FOR DEVELOPMENT OF A NEW ECONOMIC CITY

IN PUNJAB, PAKISTAN

10. Formulation ofCity Development Model, Projects Structuring and Strategy forlmplementalion.... ..................221 l. Monitoring and Evaluation Fremework..............................,..,.......................... 23

BSHoRTLISTING..........ELIGIBILITY..............

................24

.,.,,,,,,.,...., 25

,...,,.,..,,.... 25C. EvALUATroNCRrrERrA.......

POWER OF ATTORNEY 28

APPT],NDIX I B 29

FORMAT FOR POWER OF ATTORNEY FOR LEAD MEMBER OF CONSORTIUM . 29

POWER OF ATTORNEY 29

NOW THIS POWER OF ATTORNEY WITNESSETH THAT 29

INFORMATION RELATED TO EXPERIENCE 32

FORM 1 32

FORMAT FOR ESTABLISHING FINANCIAL CAPABILITYFTNANCTAL CApABILITy oF SINcLE ENTRy ..................................LETTER oF INTENT To FoRM A CoNSORTIUM ...............................

363638

APPENDIX 7..... ............................ 39GUIDELINES FOR PROVIDING INFORMATION RELATED TO FINANCIAL.......... 39CAPABILITY ..... ...................... 39FORMAT FOR ANTI-COLLUSION CERTIFICATE 41

APPENDIX 98 43FORMAT FOR PROJECT UNDERTAKING ....... ............43

Page 7: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

I

EOI- FEASIBIUTY SfUDIES AND MASrER P,.r'.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNJAB, PAKISTAN

ACRONYMS & ABBRI,VIATIONS

CA

DG

EOI

GoPb

HUD&PHE

P&DD

USPMU

MOU

PMU

POA

RIP

TMA

Cash Accrual

District Government

Expressions of Interest

Government of the Punjab

Housing, Urban Development & Public Health Engineering

Planning and Development Department

Urban Sector Planning and Management Services Unit

Memorandum of Understanding

Project Management Unit

Power of Attorney

Request for Proposal

Tehsil Municipal Administration

Expres;ion of lnturesl 2017 1

Page 8: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILIIY SIUDIES AND MASrER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNJAB, PAKISTAN

SECTION I: INSTRUCTIONS TO BIDDER

A. Scope of Applicationl. Urban Sector Planning and Management Services Unit (USPMU) Pvt. Ltd.

wishes to receive EOIs for Qualification to shortlist experienced and capablefirms / companies for the RFP stage.

2. Shortlisted Bidders would be subsequently invited to submit the proposal inrespect of the "Feasibility Studies and Master Planning for Development of a

New Economic City in Punjab, Pakistan".

B. Eligible Bidders1. May be a single company or a group of maximum 4 companies (hereinafter

referred to as Consortium), coming together to prepare the Feasibility Studies andMaster Planning for Development ofa New Economic Ciq/ in Punjab, Pakistan.The term Bidder used hereinafter would therefore apply to a single entity and/ora Consortium orjoint venture.

The Bidder should submit a Power of Attomey as per the format enclosed atAppendix 1A, authorizing the signatory of the EOI Application to commit theBidder.

2

EOIS submitted, in response to the EOI, by a Consortium should comply with thefollowing additional requirements:

Number of members in a consortium would be limited to maximum of 4;The EOIs should contain the information required for each member of theConsortium;An individual Bidder cannot at the same time be member of a Consortiumapplying for this Project. Further, a member of a particular Consortiumcannot be member of any other Consortium applying for this Project; anundertaking towards this end needs to be submitted by all members;Members of the Consortium shall nominate one member (InternationalFirm) as the Lead Member. The nomination shall be supported by a Powerof Attorney as per the format enclosed at Appendix lB;Members of the Consortium shall enter into a Memorandum ofUnderstanding (MOU) as per the format enclosed at Appendix 10 and dulynotarized for the purpose of making the EOI Application and submitting a

Proposal, The MOU shall. inter alia:i. Convey the intent to enter into the Contract Agreements and

subsequently carry out all the responsibilities specified in the ContractAgreement, in case the assignment is awarded to the Bidder; and

ii. Clearly outline the proposed roles and responsibilities ofeach memberin case ofConsortium at each stage.

4. Notwithstanding anything stated elsewhere in this document, the Client shallhave the right to seek updated information from the Bidder to ensure theircontinued eligibility. Bidder(s) shall provide evidence of their continuedeligibility in a manner that is satisfactory to the Client. Bidder may bedisqualified if it is determined by the Client, at any stage of the process, that the

l

a

b

c

d

e

2Expression of Intercst 2017

Page 9: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT Of A NEW ECONOMIC CITY INPUNJAE, PAKISTAN

Bidder will be unable to fulfil the requirements of the Project or fails to continueto satisfo the Eligibility Criteria. Supplementary information or documentationsmay be sought from Bidders at any time and must so be provided within a

reasonable time frame as stipulated by the Client.

5. A firm which has been barred or disqualified either by any department/agenciesof the Govemment of Pakistan /Punjab or Govemment departments/agencies oftheir respective country, in case of International bidder(s) would not be eligibleto submit an EOI Application, either individually or as member of a Consortium.Bidder to submit an affidavit to this effect.

D. Number of EOIsEach Bidder shall submit only one (l) EOI Application in response to this EOI. AnyBidder, which submits or participates in more than one EOI Application will be

disqualified and will also cause the disqualification of the Consortiums of which it is a

member as the case may be.

E. EOI Preparation Cost

The Bidder shall be responsible for all of the costs associated with the preparation of itsEOI and its participation in the pre-qualification process. The Client will not be

responsible or in any way liable for such costs, regardless oi the conduct or outcome ofthe pre-qualifi cation process.

F. Examination of EOI1. lt would be deemed that by submitting the EOI, Bidder has:

a. Made a complete and careful examination of the EOI; andb. Received all relevant information requested from the Client.

The Client shall not be liable for any mistake or elror on the part of the Bidder inrespect of the above.

G. Right to Accept or Reject all Applicationsl. Notwithstanding anything contained in this EOI, the Client reservcs the right to

accept or reject all EOI and to annul the pre-qualification process and reject allEOIs / proposals, at any time without any liability or any obligation for suchacceptance, rejection or annulment, with assigning reasons.

The Client reserves the right to reject any EOI Application if:a. At any time, a material misrepresentation is made or uncovered, orb. The Bidder does not respond promptly and thoroughly to requests for

supplemental information required ior the evaluation of the EOI.

2

Exprcssion of Interesl 2017

C. Changes in Consortium CompositionAfter shortlisting, change in the composition of the Consortium (except lead member)will bc subject to approval of the Client but applications to change the consortium shouldreach the Client at least l0 days before the last date for submission of RIP. Conditionsfor such approval will be provided in the RFP document.

2.

3

Page 10: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASrER Pl/,NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

Such misrepresentation / improper response would lead to the disqualification ofthe Bidder. If the Bidder is a Consortium, thcn the entire Consortium would bedisqualified / rejected.

H. Contents of EOIThe EOI Document comprises the contents as given in the Table of Contents and wouldadditionally include any Addenda issued in accordance with the provisions of thisDocument.

I. Clarificationslnterested parties may address their queries relating to the EOI to the Office of the UrbanUnit. The queries should reach the above latest by January 05,2018, 5:00 pm, Ph: +92

12-99205316-22, Fax: +92 42-99205323; Email: [email protected]. The UrbanUnit would endeavor to respond to the queries. The responses will be sent by faxl email.

J, Amendment ofEOIl. At any time prior to the deadline for submission of EOI Application, the Client

may, for any reason, whether at its own initiative or in response to clarificationsrequested by any Bidder, modiry the EOI Document by the issuance of an

Addendum.2. Any Addendum thus issued will be sent in writing to all those who have sent

queries to the EOI Document, and shall also be uploaded on

www.urbanunit.gov.pk

K. Language

The EOI and all related correspondence and documents should be written in the Englishlanguage. Supporting documents and printed literature fumished by Bidder with the

EOIs; Application may be in any other language provided that they are accompanied byappropriate translations of the pertinent passages in the English language duly certifiedappropriately. Supporting materials, which are not translated into English, shall not be

considered. For the purpose of interpretation and evaluation of the EOl, the Englishlanguagc translation shall prevail.

L. CurrencyThe cunency for the purpose of the EOIs; Application shall be the Pak Rupee (PKR). Theconversion to Pak Rupees shall be clearly indicated in the Appendix 5. In all such cases,

the original figures in the relevant foreign currency and the PKR equivalent thereof must

be given. The exchange rate(s) applied shall be clearly stated. The conversion to PAKRupees shall be based on 0lUS$:105.5 PKR. The Client reserves the right to use anyother suitable exchange rate for the purposes ofuniform evaluation for all Bidders.

M. Validity of EOIsEOIs shall remain valid for a period not less than 90 days from the EOI Application Due

Date. The Client reserves the right to reject any EOI Application, which does not meetthis requirement.

3

4Exptession of lnteresl 2017

Page 11: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILIrY STUDIES AND MASTER PI,,.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

N. Format and Signing of EOI Applicationl. The Bidder would provide all the information as per this EOI. The Clicnt would

evaluate only those EOIs that are received in the required format and arecomplete in all respects.

2. The Bidder shall prepare one original of the documents comprising the EOIApplication and clearly marked 'ORIGINAL". In addition, the Biddcr shall maketwo copies of the EOI Application, clearly marked 'COPY'. In the event of anydiscrepancy between the original and the copies, the original shall prevail.

3. The EOI Application and its copies shall be typed or written in indelible ink andeach page shall be initialled and stamped by the Bidder. All the alterations,omissions, additions, or any other amendments made to the EOI Applicationshall be initialled by the person(s) signing the EOI Application.

O. Sealing and Marking of EOI Applicationsl. The Bidder shall seal the original and copy duly marking the envelopes as

'ORIGINAL' and "TWO COPIES". The envelopes shall then be sealed in anouter envelope super scribing 'EOI for "Feasibility Studies and Master Planningfor Development of a New Economic City in Punjab, Pakistan" and also thename(s) ofbidder / consortium.

2. Each EOI (original and copy) shall contain:a. Power of Attorney (POA) for the signing authority as per the format

enclosed at Appendix lA. Alternatively, at EOI stage, authorization letterissued by the CEO or suitably authorized person would suffice subject tothe power of attomey being submitted before the RFP submission deadline;

b. Power of Attomey for the Lead mcmbcr of the conso ium as per theformat enclosed at Appendix lB, in case of Consortium;

c. Bidder details (Appendix 2);d. EOI's Application in the prescribed format (Appendix 3) along with

supporting documents;e. Completed Format for Experience as in Appendix 4, along with supporting

documents;f. Completed Format for Financial Capability as in Appendix 5, 6 & 7, along

with supporting documents;g. A consortium applying at EOI stage, if unable to submit POA for lead

member nomination, MOU, Board resolutions, etc., may submit the Letterof intent signed by all Consortium members Io form a Consortiumincluding nomination of a lead member and to ensure submission of relateddocuments including (b) above and the MOU (k below), elc. before signingofcontract agreement, if selected. (Appendix 6);

h. Format ofAnti collusion certificate as in Appendix 8;i. Format of Assignment Undertaking as in Appendix 9,A.;j, In case of a Consortium, an undertaking from each member of Consortium

certifying that it is an exclusive member of that particular consortiumalone, and not a member of any other consortium nor an independentBidder, bidding for this Project and has submitted only one (l) EOIApplication in response to this EOI (Appendix 9 B).

k. MOU in case of a Consortium (Appendix l0); andl. Documentary evidence, if applicable, relating to experience of group

companies/associates.3. The envelope shall be addressed to:

5Expression of lnterest 2017

Page 12: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI. FEASIBILITY STUDIES AND MASTER PI/,NNING FOR OEVELOPMENT OF A NEW ECONOMIC CI|Y INPUNIAB, PAKISTAN

Dr. Nasir Javed,Chief Executive OfficerUrban Sector Planning & Management Services Unit (The Urban Unit)Office No. 3, 5th Floor, Shaheen Complex,Edgerton Road, Lahore, Pakistan

4. If the envelope is not sealed and marked as instructed above, the Client assumes

no responsibility for the misplacement or premanrre opening of the contents ofthe EOI Application submitted.

P. EOI Application Due Date

EOI Applications should be submitted before I l:00 am PST on the EOI Application Due

Date mentioned in thc Schedule of Pre-Qualification Process, at the address provided

above in the manner and iorm as detailed in this EOl. EOI Applications submitted byeither facsimile transmission, telex or e-mail will not be considered for evaluation and

shortlisting. However, the Client resewes the right to extend the EOI Application Due

Date and Time, at any time prior to opening of EOIs in resPonse to this EOl. ln such

cases the EOI applications received prior to such extension shall not be opened. Further,

if the EOI document is materially modified long/during such extended period, the EOI

application received prior to extension shall be retumed to the bidders and appropriate

time shall be allowed for resubmission of the EOI applications.

Q. Late EOI ApplicationsEOI Applications received after the Due Date shall NOT be considered.

R. Modi{ications/ Substitution/ Withdrawal of EOIs

The Bidder may modi!, substitute or withdraw its EOIs after submission, provided that

written notice of the modification, substirution or withdrawal is received by the Clientbefore the EOI's Due Date and time. No EOI shall be modified or substituted orwithdrawn by the Bidder after the EOI Due Date and time.

T. Evaluation of EOI - CriteriaThe Client would subsequently examine and evaluate EOIs in Accordance with the

criteria set out in Section 3.

U. Evaluation of EOI - Supporting Documents

The Client reserves the right to call for supporting documentation to vedry the data

provided by Bidder, at any time during the pre-qualification process. The Bidder in such

cases would need to provide the requested clarification / documents promptly and withinthe stipulated time failing which the Bidder is liable to be disqualified at any stage of the

shortlisting process.

V. Evaluation of EOI - Right to Reject

The Client resewes the right to reject any EOI Application il

6Exprersion of Intercsl 2017

S, Evaluation of Application - Due Date

The Client would open the APplications on the opening due date mentioned in the

Schedule of Pre-qualification Process, for the purpose ofevaluation

Page 13: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASTER PLr'.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

At any time, a material misrepresentation is made or uncovered: orThe Bidder does not respond promptly and thoroughly to requests forsupplemental information required for the evaluation of the EOL

W, ConfidentialityInformation rclating to the examination, clarification, evaluation, and recommendationfor the shorrlisted Bidders shall not be disclosed to any person not officially concemedwith the process. The Client will treat all information submitted as part of EOIApplication in confidence and would require all those who have access to such materialto teat the same in confidence. The Client will nol divulge any such information unless itis ordered to do so by higher authority that has the power under law to require itsdisclosure.

X. Tests of responsiveness

Prior to evaluation of EOIs, the Client will determine whether each EOt Application isresponsive to the requirements of the EOL An EOI Application shall be consideredrcsponsive if the EOI Application:

Is received by the Due Date including any extension thereof;Is accompanied by the letter of intent ( Appendix 6), if applicable, (ro form aconsortium and submission of MOU duly supported by Board resolution andcharter documents before the RFP submission deadline); andContains information required as per Appendix 3,4,5, 6 and 7.

The Client reserves the right to reject any EOI Application which is non-responsive andno request for alteration, modification, substitution or withdrawal shall be entertained bythe Client in respect of such EOI Applications.

Y, ClarificationsTo facilitate evaluation of EOIS, the Client may at its solc discretion, seek clarificationsin writing from any Bidder regarding its EOI.

Z. Qualification and NotificationAfter Ihe evaluation of EOIs, the Client would announce a list of shortlisted Bidders whomcet the Qualification Criteria. At the same time, the Client would notifo other Biddersthat their EOI Applications have been unsuccessful. The shortlisted Bidders would thenbe requested by the Client to submit a detailed Proposal in the form and manner to be setout in the RFP Document.

SECTIO\. 2: TERMS OF REFERENCE

I

2

I

2

3

1Exprcssion of lntercst 2017

Page 14: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILIrY S|UDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY IN

PUNIAB, PAKISTAN

PROJECT INTRODUCTIONThe New City project was initiated and being funded by the Government of Punjab (GoPb),

Pakistan. The Urban Sector Policy and Management Services Unit (USPMU), Pakistan(commonly known as "The Punjab Urban Unit" website (www.urbanunit.gov.pk) is a public

sector corporate consulting concern having a diverse strcngth in sectors like urban planning,

architecture, urban design, GIS/RS, environment, institutional development, and capacity

building. For this particular project, the GoPb mandates the Urban Unit to act as a Project

Management Unit (PMU) to assist and provide supervision for all consultancy services arising indue course of studies required New City viz-a-viz. pre-feasibility, feasibility, detailed master

planning, institutional design, engineering design and development phases for this new cityproject.

BACKGROUND INFORMATION

The increased urbanization has overburdened the existing cities specifically in the province ofPunjab. Yct urbanization offers various opportunities for the economic growth. Realising the

stated facts, the Govemment of Punjab has initiated for development of a new urban industrial

agglomeration on world class standards in Punjab. Initially a site was selected for the

development of a new city along the Motorway (M2) corridor near Lillah interchange located 210

Km from Lahore. Motorway M2 is a 370 km long 6 lane inter-city highway connecting Pakistan's

national capital Islamabad with Lahore and was planned in early 1990's with a vision to develop

some eleven new industrial towns on it but none has been materialized till today. The proposed

city would have the largest industrial cluster [zone] in the country with high-end supportive urban

infrastructure and to house around 2 million inhabitants and offering them diverse work'live-

leisurc opportunities.

Howcver, during the course of projcct planning and deliberations, it was decided by the

Government of the Punjab to not only specifically look at one sitc on the M2 but also det€rmine

the potential of orher competitive sites as well on which a New City could be developed. For this,

initially a Prefeasibility for New City was carried out by an intemational consulting firm with an

objective to prioritize the potential sites for the development of othel new towns within Punjab.

The Prefeasibility Study has been completed in the month of March 2017. The prefeasibility

covercd Baseline Market and Demand Analysis; Identifiing optimal Sites (site comparison);

Proposed implementation, Financial Model, and Expected Impacts in the form of a consolidated

Prefeasibility Report. A further Assessment and Calibration study is underway to review and re-

assess the results arrived at in the first study. This study and subsequent finalization of site is

expected to be completed by the end ofDecember 2017. The tentative size of area ofNEC may

be around 400 Km'. In view thereof, the Govemment ofPunjab intends to hire two leading firms

(Onc lntemational and onc National level) under separate contracls with different assignments.

However, both the firms shall be conducting Feasibility Studies and Master Planning related

assignments in close liaison, for a coherent and integrated planning, as per their scope that has

been advertised and published separately. The Intemational firm shall be responsible for few parts

of Feasibility studies and complete Master Planning of the proposed city. All the lnternational

firms, with experience in conducting Feasibilities & Master Planning for development of the new

Cities and integrated SEZs in developing and emerging countries, are invitcd to bid under this

Exprcssion of Interest-

8Expression of Interesl 2017

Page 15: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASrER PI,,.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

SCOPE OF WORKFor Intemational firm (the Consultants), the scope of work is to undertake Feasibility studies andMaster planning; however, for the detailed Feasibility, the Consultants shall be executing selectedparts only. Nevertheless, the Consultants shall be using studies and results to be produced by alocal firm aftcr rcview and acceptance. The Client shall award sequential work orders for eachpart subject to the timely submission and subsequent approval of the submitted work of thepreceding phase. Furthermore, the Consultants may have requisite stakeholder's consultation andfocused group discussions as per requirement of the tasks to be carried out in each part. Whereever required consultant shall base his work on new datrinformation to develop a secondopinion.

PART-A: DETAILED FEASIBILITY

..1 Tourism Potential Assessment

The consultants shall perform an analysis to determine the existing tourism potential of theProject Area. Further, the consultants shall evaluate the potential impact of this proposed citywhich is likely to attract local, national and regional tourism in to the proposed city and areasaround.

..2 Housing Demand Assessment

The consultants shall determine the projected (for project development period) and anticipatedhousing demand for the NEC by using quantitative information supported by qualitative data.This demand analysis shall be done preferably at punjab level by conducting primary levelresearch in major urban areas of the province and as well as projecting from where and how muchthe ncw population shall be setting in the NEC. The Consultant shall apply best practices inassessment of housing needs for the proposed city This assessmenl will help ascertaining demandslots in different types of housing and further to guide allocation of lands for housing in NECmaster plan.

..3 Commercial Space Demand Assessment

The Consultants shall determine the fuh.re commercial space/area demand based on studiesconducted by them in existing urban centers, CPEC, and surrounding area economic andcommercial dynamics. This will give a feed for master planning in next phase whethercommcrcial space allocated in existing urban centers is sufficient or not and shall help determinecommercial zoning guidelines for the NEC project. Funher, it can be used a measure of the futureland required to accommodate long-term retail commercial demand (projected to the year 2040).

--4 Business and Industrial Demand Assessment

The Consultants shall perform a comprehensive business and industrial demand analysis coveringthe following aspects:

I. Map local potential markets of agriculture especially crops, fruits and vegetables,mineral resources to be used as raw materials for potential industry and businesses tobe established

9Exprcssion ol Intercst 2017

Page 16: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILIrY STUDIES AND MASTER P,.,.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUN]AB, PAKISTAN

II Analyze current market trends in terms of market demand and supply, price-scheduling, mechanisms, market determinant factors, supply chains and govemmentmarket regulatory and control mechanisms

Identify potential industrial sectors, based on pragmatic and empirical based

rationale, which can be promoted in the NEC in particular based on its comparative

advantages

tII

IV Analyze the Chinese firms global relocations and potential ofNEC to attract and host

after diversion in context ofpost CPEC scenario

Analyze possible potential risks and challenges the NEC may face in markel during

development, post industrialization and suggest possible mitigation measures

Analyze to determine the future industrial demand by type and nature of industry to

be established in the proposed Industrial area ofthe NECvI.

..5 Formulation of Strategic Framework Development Guidelines

Following the completion ofthe preceding tasks, the Consultants will draft the following strategic

framework guidelines which will serve as guiding principle for development of City Master Plan

and City Development Model in next phase of the study:

i. Develop an advance version of "Vision Scenarios" for the development ofthe Project

Area and, if appropriate, neighboring area(s) and which shall be tested and

consolidated through a consultative process in Master Planning, phase

ii. Recommend development strategies, rationale, key indicators for spatial division,drivers of economic activity, and implementation milestones based on the

selected/preferred vision

iii. Develop strategic guidelines to identiry key development types that the site identified

to support and house on the basis ofengineering assessments

iv. Basis for allocation of land uses and zones for different city components with

envisaged zoning and time horizon (5, 10, 15, 20 years)

v. Developing planning, standards for development of city master plan based on

international best practices for new city developments and local cultural, socio-

economic and environmental structure

vi. Developing a criterion to lead and guide for sustainable development envisioned to

occur on the basis of environmental and socio-economic assessments linked to

intemational agreements/agendas (SDGs, Habitat III, etc.)

vii. Initial identification of mechanisms, tools and resources, both existing and new, to

execute the proposed develoPment

viii. Broader indicative strategies to facilitate Land acquisition, disposition and

development sequencing and transactional structuring altematives

Expression of Intercsl 2017 l0

Page 17: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

lx

\

Broader strategies and land use standards to develop zoning and further translation tohousing, commercial, businesses and tourism diversity to match city vision and

community aspirations

Strategies guiding through the development and operation of industrial mix and

typology

Strategies to guide the govemance model and institutional development on the basis

of initial in-practice context

. The consultants are required to hold meetings with all public sectordepartments, stakeholders, general public, academia and businesscommunity to have their voice on "How do they want this NEC to be" andshare the outputs ofthe planning in seminars as well as public hearing.

. Conduction Focus Group Discussions (FGD), seminars and open forums todevelop a shared city's Planning and Development Vision

The consultant will document the inputs provided by all stakehotders in the finalversion of the plan. Public hearing is a necessary part of this excrcise to ensuregeneral public participation in the plan making. The Consultants shall devclop a

City Vision Statemenl and align project objective accordingly.

Land Use Policy and Land Suitability AnalysisThe Consultants are expected to perform the following sub-tracks under thc LandUse and Suitability Analysis including legislation/legal (planning) framework forimplementation to produce enabling environment for foreign direct investments:

i. Rcview current land use policy, regulations and governance associated withthe land management and land use planning and its relationship with theProject Area.

ii. Review ofall prevalent building regulations and rules in Punjab to ascertaintheir applicability for NEC with respect to setbacks, FARs, distances,building heights, permitted uses, permitted foundation depths and proximity,etc.

iii. The consultant shall also be responsible for proposing new policies orinstruments-for example, planning act-which are needed to implement NECeffectively.

xl

I

Expression of lnterest 2017 ll

PART.B MASTER PLANNING

Vision formulationTo ensure that plan making becomes a collaborative and inclusive process, theConsultants shall conduct public outreach meetings to introduce the project intent,its developmental focus along with the components to seek their aspirations andguidance on the identification of goals/vision, objectives, issues, conccms,opportunities, etc. Therefore, the consultant should have stakeholder engagementteam to run these meetings, not only during the vision but also during the otherimportant phascs of the project.

.,

Page 18: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASIER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

vi

lv.

vlll

Assessmenl of baseline conceptual plan prepared earlier, expected landrequirements for different zones, density propositions, approximation ofcxpected floor space for residential, commcrcial, office, industrial andparkland etc. as prescribed in strategic guidelines developed earlier parts.Complete prioritizing of lands requiring protection or prcservation and makerecommendation as to appropriate land use designation and zoning.Identification of key sites with outstanding "vistas and view" assessmentand recommendations for appropriate policy to preserve and improve thesefeatures along the waterfront, hillside views and other proposed corridors ofscenic beauty.The consultants shall perform land suitability analysis for NEC byemploying GIS's land use modelling tool Decision Support System (DSS).Input parameter for DSS will be defincd and fetchcd from all theassessments done during previous assignments, consultation with the Client& Stakeholders.Land Suitability Analysis will be carries out to determine the location andallocation of pertinent land use zoncs to be place in the project site area

based on strategic directions developed in earlier parts.The results of all the physical and engineering assessments shall be fed intoDSS model to run and decide on pertinent locations. This analysis will helpdefine and develop different alternate zoning options further to developdetailed city master plan.

vl1.

tx

J Master Plan Development

Based on site reconnaissance and base mapping, initial information and surveys,detailed land suitability analysis, and while considering the concept alreadypreparc by the Urban Unit, the Consultants shall submit three board conceptualMaster Plans for proposed development. The consultants shall analyze, updateand prepare a conceptual land use plan with the following details:. Generalized land use distribution. Plan phasing (both in spatial and temporal dimensions). Major Circulation Pattern, Mass transit routes, Arterial System, Transit Nodes

and proposal for efficient accessibility to the City and within the city for each

of housing, industry/work and leisure components

The concept plan should demonstrate the division of city into various zones andrelevant land usage in a manner that is respectful and complementing to sitetopography, climate, landscape, environmental conditions and new urbanismpractices but at the same time produces cost effective layout for development ofcity utilities and infrastructure services. Main themc is to work for feasibility of asustainable land use plan that remains unique and attractive for all times to come.The Plan should necessarily consider following aspects for inclusion other thatwhich the Consultants shall identifu additionally:

Diverse residential zones based on poly-centric city planning modelCommercial hubs

Exptession of Inlercst 2017 12

Page 19: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY SrUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC C'TY IN

PUMAA, PAKISTAN

. Transit Corridors and Road Network (Circulation Pattern and TransportInfrastructure such as Mass Transit Corridors (elevated, at grade and sub-

surface), Nodes, Feeders, and terminals, Railways, walkways, beltways).. Self-sustained Industrial Park with workforce housing options. City level spaces and places

' Specialized Zones. Water bodies, lagoon, lakes, channels, etc.

' Neighborhoods. CBDs and other nuclei commercial centers. Town Park. Social Infrastructure locations and proposals. Urban design and landscape proposal etc.. Airport and airport zone. Railway stations. Riverine park and golfcourses. Dry Port and Freight Zone. Mix of Housing. Mixed use development. River-front and lagoon/water-front housing development along with flood

protection buffers and dykes. Health and Education Zones. Media and IT zones. Peri-urban and agdculture area. Conservation Zones. Leisure and cultural zones. River Eco-conservation ZoneThe Consultants shall develop a schematic plan of NEC, including a

programmatic framework of design, development & interventions and prioritizingthe project components as the locations of interest for initiations. This frameworkshall also identi$, the different line agencies/ departments that are to collaborateon the specific components. The detailed layout plan should have sufficientdetails about number, sizes, volumes, bulks & category ofvarious land use types,lots, sizes/dimensions for sites reserved for necessary social infrastructure such as

parks, community buildings, educational & health facilities, mosques andgraveyards etc.

4

The consultants shall also develop and present master plan visualization by usingVirh.ral Reality Modelling tools like City Engine etc.

Determining Financial and Economic Feasibility Based on Master Plan

4.1- Financial Analysis and Feasibility Assessment

The financial analysis will be bascd on the City Master Plan and derived space

standards and volumetric analysis done for the infrastructure development, cost

Exprcssion of Interesl 2017 l3

Page 20: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNJAE, PAKISTAN

i. Development Cost AssumptionsThe Consultants will develop cost assumptions by developing preliminarydevelopment strategies and applying defensible unit, or other, cost estimates toquantified development programs allocated and discounted on an annual basisover the projected life ofthe project. Note: At this point in the Financial Analysis,it is assumed that the Project Developer will be responsible for all costs, and theClient is not responsible for any costs of Development. However, the Consultantsshould develop scenarios if:

i. The government builds enabling/catalytic infrastructure as its owncost and later the private sector investment and development starts;

ii. If the government only regulates the overall development and theprivate sector only complies with the development and investment;and

iii. If the public-private partnership mode is activated and developmentand investment goes on incremental basis as per the private sectordemand;

iv. Assumptions for selecting a best suitable/feasible model for landsupply/acquisition

v. Assumptions for setting up suitable types of industrial developmentfor this city based on raw material, marketability, human and capitalresources availability, land suitability and availability, environmentalcosts ofproduction processes like Carbon Credits

vi. Development of a comprehensive business case for city (inclusiveof housing, leisure, industry, business and other urban services)

vii. The Consultants to assess development cost for1. Overall city development2. Catalytic development projects

All the assumptions used in the financial analysis along with basis shall be

elaborated. The Consultants shall also develop matrix of project risks includingmarket risk, financial risk, developmental risk, and other project externalities andsuggested mitigation measures. The Consultants shall undertake necessarysensitivity analysis for various scenarios including most probable and mostpessimistic scenarios.The cost assumptions shall include rough order of magnitude cost estimates forthe following categories, at the minimum:

a. Pre development costsi. Gcncral and Administrativeii. Planningiii. Designiv. Approvals (e.g. Zontng)

b. On-site Infrastructure Costs, Phased

Expressioh of Ihterest 2017 14

assumptions over planning, design, execution and operation phase. The analysiswill be split into two components: Stage 1 and Build-Out, Thc Financial Analysiswill include the following:

Page 21: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

i. Land Costsii. Site preparationiii. Remediationiv. Flood protectionv. Roadvi. Parksvii. Waterviii. Sanitary sewerix. Storm sewerx. Taxationxi. Other

c. Off-site infrastructure costs, phased

i. Cas, hydro, telephoneii. Water system upgradesiii. Sewer system upgradesiv. Flood protection upgradesv. Road/intersectionupgradesvi. Development ofElectricity generation and supply systemsvii. Development of IT & telecommunication systemsviii. Other

d. Residential Development Costsi. By building, neighborhood or other reasonable unit of measure when

considering scale of the developmentii. Land costs

iii. Site preparationiv. Consultancy costsv. Parkingvi. Building permits fees and other leviesvii. General and Administrativeviii. Marketing and Sales

ix. Holding and operatinge. Commercial Development Costs, by building, neighborhood or other

reasonable unit of measure when considering scale ofthe developmenti. Land Costsii. Site preparationiii. Infrastructue Costiv. Consultancy costv. Parkingvi. Building permit fees and other leviesvii. General and Administrativeviii. Marketing and sales

ix. Tenant Inducementsx. Holding and Operating Financingxi. Interest and fees

ii. RevenueAssumptions

Expression of Inlerest 2017 l5

Page 22: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY IN

PUNIAB, PAKISTAN

The Consultants will develop revenue and cost recovery assumptions for allaspects of the Project Development Plan. Notwithstanding the currentfragmentation of land ownership, it is important to understand the potentialdevelopment revenues of the entire Project Area lands, individually and inaggregate, as though there were one master developer undertaking the entireproject. In this regard, it will be necessary to develop and document justifiableassumptions and project revenue and cost recovery estimates for the following:. Sales revenue relating to the vertical development of all residential

buildings. Such projections are to follow the market study conclusions and a

phasing plan reflecting defensible absorption assumptions;. Sales revenues relating to the vertical development of all commercial

buildings assuming defined lease and market rates. Such projections are to followthe market study conclusions and a phasing plan reflecting defensible absorption

assumptions;. Potential grants or subsidies from senior levels of govemment or other

sources; and. Potential sale of unneeded development rights, easements or access to

private parties

iii. Financial Modelling

The cost and revenue assumptions, streams and projections developed accordingto the foregoing must be incorporated into financial models. Four models are

required in total - two scenarios for each of two Stages. (Stage I & Build-out).The first scenario is to consist of the Consultant's best estimate of the truefinancial potential of the Project Development Plan. This is to be augmented by apessimistic scenario that reflects a "slow start" compared to the plan. A "slowstart" is dehned as slower than anticipated absorption of residential and

commercial units due to adverse market conditions.Each Model will, at a minimum, be created with Microsoft Excel. Concise notes

to explain variables, inputs and results will be provided; reflect the entireprojected life of the project with revenues and costs allocated in annual

increments; be sufficiently detailed so as to independently portray a reasonable

understanding of the City Development Plan, timing/phasing of individualelements/projects and key assumptions used; be intemally consistent with respect

to key assumptions used within the same scenarios' be robustly dynamic whereby

numerous key assumptions can be changed with immediate effect on results.

Examples of such required flexibility would include, but not be limited to:. Revenues and costs per square foot;. Adding, amending or deleting items in infrastructure cost summaries;. Costs estimated as a percentage ofrevenues (e.g. sales commissions);. Timing of specific buildings, infrastructure or other plan elements;. Project and structured financing terms;. Cap rates; and

Exprcssion of lnteresl 2017 16

Page 23: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILIrY STUDIES AND MASTER PIr'.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY NPUNIAB, PAKISTAN

Etc.

The Financial model should reflect the financial Indicators: Payback period, IRR,NPV, Profitability Ratio, CBR etc. Provide annual and cumulative cash flows thatsummarize inflows, outflows and net cash flow; provide the application ofpotentially complex financing assumptions at the vertical and horizontal projectlevels; provide a meaningful integration of development statistics with financialprojections; provide residual land values associated with all residential andcommercial vertical projects - and compare such values to current marketcomparable; and provide report and a meaningful one-page summary of findingsand results.iv. FinancialViabilityAssessmentBased on the Financial Models, the Consultants shall summarize and discuss thefinancial viability and risks associated with the Baseline Conceptual Plan. Thisopinion shall form the basis of the consultants' recommendation to the Client tofurther carry on the project appraisal. The consultants shall also calculating rate ofretum under the various revenue assumptions and financing scenarios besidesconducting break-even and sensitivity analysis; identifying potential sources andmethods of funding various costs including short and long-term; preparing thehnancing plan and developing the commercial package.For building and operating a municipal service e.g. transport orte lccommunication, perform tasks of:. Investigating market rates, a survey of residential demand, Engineering study

to get the cost of building transport station / building telecom network,analysis of other costs ofproviding and operating the service.

. Identi& which operational model could work e.g. retail network, wholesale

network, hybrid network i.e. who would be the provider of service and itsimplications. This would determine discounts on market rates (if any) and

market penetration rates.. Identi& the best model that would generate sufficient revenues to make bond

payments.. Quantiff any risks involved.. Mention financing e.g. bond financing, or revenue bonds or other means of

appropriate financing. Identifz with interest rates and the spread as the best

possible option/s. Financing requirement for the cost of creating wholesale or retail business.. Identi& through market survey the households willing to pay for a municipal

service if offered at Iower prices. Would there be a profit motive?. How can the city rctire its debt?. Identi& the ability ofa facility to sustain operations with direct income.. Perform Cash flow and Proforma analysis:

. Consruction cost esl.imates

Expression of Interest 2017 17

Page 24: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILITY STUDIES AND MASTER PI,ANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISTAN

. Revenue estimates

. Operating cost estimates, Identification of any financial gaps that would require ongoing public

investment. Financing options

Recommend capital-financing structure for any recommended new facilities.

In particular, this structue should represent opportunities for potentialpartnerships. Consultant should research and provide for discovery process ofpotential partners.

Recommend operational structure for the facility including options formanagement arrangements. Recommend a management structure that has

been successful in comparable facilities based on specific conditions of the

NEC development coordinated with identified market opporhrnities.

Financial Feasibility (cost in PKR) of:

Cash Flow Analysis, Capital Structure and Partnerships, Management and

Operations Structure

Use industry standards for potential businesses and provision of services for(construction costs, franchise requirements, revenue sharing arrangements,

etc.)

Establish estimates of capital costs, operating costs and revenues for provision

of the above in the NEC which could be subject to change. Include revenue

sharing assumptions over a (Mention the number of years of the NEC

development completion and final phase, 25 is an example here) 25-year

period that assumes a partnership scenario

A complete business case and detailed costing analysis will need to be

undertaken by the City and / or a second party prior to selecting preferred

options for new facilities.

Under proposed capital costs mention e.g. the cost of constructing a new

building given its purpose, whether equipment will be rented or purchased and

therefore is included as part of the fixtures, fumishing and equipment, interest

rates, etc.

Include estimated cost of land based on per sq. ft.

The proportion ofcapital costs which can be covered by development charges

will depend on growth-related needs and the amount that the City can allocate

to a new facility. There may be other opportunities for the municipality to

reduce its financing requirements (e.g. fundraising and donations).

Operating costs estimates:

Salaries and staff benefits;

Concession supplies;

Marketing;

Expressioh of Interest 2017 l8

Page 25: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNJAE, PAKISTAN

Repairs/maintenance;

Capital reserve contributions (% assumption of the total facility capital costs);

utilities;Insurance, and

Other/ miscellaneous

If the city cannot raise all of the required money to construct the facilitythrough its municipal reserves, development charge revenue, grants,

fundraising, partnerships or other sources, it will need to borrow money. Inwhich case, give hypothetical funding scenarios.

Determine the expected return on investment (ROI) under various funding

scenarios.

Funding scenarios:

Potential sources of development funding

Estimates of year I of operations excluding debt financing: revenues,

operating costs, profit deficit.

Estimates including debt financing: year I of operations' profit/deficit,anticipated 25-year business/building/service provision Retum on Investment(RoI) (NPV).

Estimate Current annual operating cost, and annual debt scrvicing

For the said service provision or business, the city could generate estimated

profit/loss (net present value).

What is the most financially feasible option?

How much the city can incur approximate deficit. In year one and over a 25

year period, providing it is able to finance the facility largely through itsmunicipal reseryes, development charge revenue and grants and/or private

partnership contributions.

If the City is able to obtain enough public and /or private sector funding tocover halfofthe construction costs, identiff the net cost i.e. deficit in the case.

4.2 Economic Analysis and Feasibility AssessmentEconomic benefits shall be discounted over plan period on the basis of MasterPlan space indicators and expected driven economic activity from these spatialparameters. Economic rate of return analysis that accounts for financial and non-financial spill-overs (e.g. increased activity from employment generation, etc.),ensuring the devclopment of a robust business model for the NEC as well as

different financing options

City's Economic Development StrategiesBased on the previous market assessment and proposed land use activities,recommendations will be developed to guide the development of a specializedmarketing plan focusing on industrial, commercial, residential and otheropportunistic uses. The Consultants are expected to:

5

Expression of Interest 2017 19

Page 26: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASTER PI,,.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAE, PAKISTAN

1. Identifr effective local gmssroots institutional arangements for land tenureand long term management of land use, land disposal the local naturalresource base and development projects;

2. Identifu potential income generating opportunities and projects (such as

initiatives to raise income for local residents within the project Area).

Specific outcomes of this task could include:. Market positioning of the proposed NEC. Select group ofgeneral targets. Initial strategic action outline

Proposals for City's Governance ModelThe Consultants shall also develop and suggest an Urban Govemance andInstitutional Model for this development considering some best practice models ofthe region and developed world. This shall also include comparative analysis ofdilferent in-practicc and proposed options such as an indeplndent city ;ouncilmodcl, current in practice local government system and / or developmentauthority vis-d-vis. Selection of the best suited model shall be made aftersubsequent deliberation by the Govemment and line departments

Strategic Environmental Assessment of NEC DevelopmentThe primary purpose of carrying out SEA is to havc a coherent overview of a setof devclopment proposals made by NEC master plan that may possibly haveeffects on the same area or same environment capital both in short and long run.SEA of NEC Master Plan shall be carried out:

A- To assess how well environmental considerations are integrated intothe plan,

B- To carry out sustainability appraisal of the policy and plan made forlarge scale complex developments,

C- To provide recommendations for environmental optimization andpossible modifications to the NEC Master to minimize environmentalnegatives; and

D- To provide a monitoring and mitigation plan for minor adversities andsubsequcnt environmcntal monitoring during master planimplementation phases.

SEA, at this stage, will primarily be benefiting from the data collected andanalysed in earlier parts and findings, recommendations of pre-planenvironmental assessments-

8. Land use and Development Control GuidelinesThc Consultants will provide the tand use and development standards andguidelines needed to guide and support devclopment withi; the project area as tosupplement effectivc plan translation and enforcement. NEC shall have its own

Expression of Interest 2017 20

6.

7.

Page 27: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILI|Y STUDIES AND MASTER PLANNING FOR DEVELOPMEN| OF A NEW ECONOMIC CITY IN

PUNIAB, PAKISTAN

regulations/guidelines and recommendations in this regard are solicited. Work

performed in this phase of the project will consist of following products:

A- Land Use GuidelinesMaster plan prepared for the city will establish land use

distribution, development and transportation policy for the whol

immediate environs. This master plan, to be produced in di

placement and

e of NEC and itsgital format and

supported by an accompanying memorandum, will address the following:. 'iand

uie guidelines for the proposed development at block-level within the

Study Area;. Recommended access and circulation to support development on block level;

. Identification of natural features and environmental constraints located;

. Requirements for various social infrastructure for the City and Industrial Park;

. Recommendations for access/infiastructure improvements to advance future

economic develoPment;. Special site/area./zone development considerations

B- Dcsi Standards and Guidelines

TheConsultantsshalldevisedraftDesignStandardsandGuidelinesforeachLanduse Zone of the study area. These Design Standards and Guidelines considering

,t',utl ,"t general and detailed guidelinei and restrictions to- be followed by the

deueloperis;/locator(s) on each block/lot parcel of the study area' The Design

Staodaids attd Guidelines shall provide details such as, but not limited to:

a. Zore, Neighbourhood and District level plans

b. Floor Area Ratios (FAR) and Gross Floor Area (GFA) and other bulk/volume

control tools for each development type;

c. Building heights, easements, setback controls and other development

standards such as building coverage, building line, basement line' etc';

d. Transport system plan which shall include parking requirements' vehicular

access, signage, loading and unloading requirements, pedestrian system and

other components of transport system;

e. Infrastructure and utilities plan which shall include water' electricity'

telecommunications, district cooling, sewage, sewerage treatment facilities'

surface water drainage system, piped gas system, d'rainage system' etc'

f. Green (landscape) and open space plan;

g. Landmarks, Vistas, skylines and other aspects'

h. Green Building Standards and LEED certifications/conformity

i. Smart City Management Protocols

C- Urban Deslgn Guidelincs

The consultants shall draft the detailed urban Design Guidelines considering the

following:u. dria.nn.s to be applied in the arrangement, function and appearance of

urban space conceming

2tExpressiori of Intercst 2017

Page 28: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILITY STUDIES AND MASIER P|.r'NN'NG FOR DEVELOPMENT OF A NEW ECONOMIC CITY IN

PUNIAB, PAKISTAN

b. Treatment for conservation of natural landscape, development pattem, and

regional character

c. Visual impact assessment

d. Signage, way-finding and street address system

e. Urban form and character

f. Treatment of major plan boundaries, districts, focal points, connections

(e.g. greenways), and viewpoints oflands

g. Redevelopment plan / conservation of cultural districts, ifany.

h. Transition between land uses and arterial roadways, transportation, rail

lines and utility corridors within and surrounding the plan area. This includes

separation distances between land uses and that of healy industrial development

to ensure minimal conflict between transportation networks and traffic flows

servicing each use.

i. Smart city development prospects

9. Sectoral Plans

Based upon the studies, analysis and assessment, the Consultants shall develop

the following Sectoral Plans to supplement Master Plan implementation:

a. Land use development and management plan

b. Environmental management plan in-line with SEA recommendations

c. Social sector (health, education, security etc.) plan

d. Transportation sector Plan

e. Water resouces and management plan

f. Waste management Plang. Governance and institutional framework

h. Nature and heritage conservation plan

i. Industrial management and cleaner production plan

j. Capital improvement Plan (CIP)

k. Energy sourcing, conservation management plan

l. Disaster management Plan

m. Tourism and leisure areas management plan

n. lnfrastructure development plan

o. Eco-system conservation and management plan

p. City Streetscape and land-scape plan

10. Formulation of City Development Model, Projects Structuring and Strategy

for ImplementationThe Consultants will be required to preparc City's Devclopmcnt Model in-line

with master plan. This implementation framework including Institutional

development/strengthening guidelines, Legal and Regulatory guidelines and

Financing guidelines including the following:

Expression of Interest 2017 22

Page 29: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY SfUDIES AND MASTER PI,,NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAS, PAKISTAN

l. A responsive institutional arrangement, organizational structure and

collaboration to enable the development ofNEC to effectively take place and

implement the strategies with clear demarcation of roles, rights andresponsibilities of public sector, private sector, civil society, academia andgeneral public.

2. A 5 years (Wave-l) rolling financing plan and financing options as derivedfrom financial and economic assessment, including public-private partnership(including but not limited ro BOT, BOOT, DBOT, joint ventures, grants, co-financing etc.). It should include short, medium and long-term projects foreach sector, prioritization of infrastructure development projects as guided inMaster Plan in each sector, detailed costing ofprioritized projects for next fiveyears, funds availability and implementation framework, roles andresponsibilities.

The consultants shall detail out the implementation Plan that should prioritizeprojects and to further recommend an Incremental Implementation Plan for 5,10, I 5 and 20 year horizon, including:. Items ofpriority and urgency. Identifications and options for implementation of Wave- l CatalyticDevelopment Projects. Full costing projections - capital and operating. Timeline altematives (including cash-flow projections for implementation)Institutional Arrangements

Following, completion of the preceding tasks, the Consultants witl meet withthe Client and the Stakeholders identified for this project to review theConsultant's preliminary conclusions and recommendations including thciollowing:(v) Recommended clear and workable way-forward for infrastructuredevelopment, financing rational, key drivers of economic activity,development quality standards and implementation milestones and phases;(vi) Identification of financial tools and resources, both existing and new, toexecute the proposed development strategies;(vii) Identihcation and prioritization ofpotential anchor land uses and tenantsthat can serve as catalysts for economic development in the Projcct Area andmore broadly.

Monitoring and Evaluation FrameworkA monitoring and Evaluation Framework needs to be dovetailed into thepreparation process of Master Plan since its inception. Therefore, the Consultantswill be required to develop a detailed M&E plan for this plan to detail M&Eprocesses for visioning, strategic framework development, master planformulation and implementation stages. Monitoring and evaluation framework

ll.

Exprcssion of lnteresl 2017 73

Page 30: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILI|Y STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAK'STAN

shall include a spatial platform (dashboard) to assist decision makers inmonitoring, feedback, follow-up etc.

SECTION 3: CRITERIA FOR EVALUATION

A. Shortlisting

The Bidder/consortium shall be pre-qualified using criteria given below on the basis oftheir:

Technical Experience; andFinancial capability in terms of:a. Tum over

I2

Expression of lnterest 2017 24

Page 31: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI_ FEASIBILIrY STUD'ES AND MASTER PI,A.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY IN

PUNIAB, PAKISTAN

On each of these parameters, the Bidder would be required to meet the evaluation criteriaBidders meeting all the criteria will only be qualified for issuance of request for proposal.

B. Eligibility

The presence of the following items has to be checked before Bidders are evaluated forshortlisting:

Registration Certificate (name of relevant professional institutions, e.g. PEC incase ofPakistan) along with latest renewal letter;Copy of Registration with Securities & Exchange Commission or Registrar ofFirms; / Relevant registration Authority (in case of intemational bidder)Copy of Registration with Income Tax Department (FBR), Pakistan (may be

relaxed in case of Foreign Frim);List of permanent professional staff along with C.Vs of relevant core staffshowing projecrwise experience with exact time duration for each project(Appendix 4);List of similar works completed during last l0 years and similar works in hand,indicating total cost of such works and cost of projects received against those

works along with date of start and completion or expected date of completion(Appendix 4);A certificate / affidavit that Bidder is not blacklisted by any Govemment /Autonomous Body;Audited statements of accounts for thc last 3 years (Appendix 5)/any otherrelevant documentRegistration with Punjab Rcvenue Authority (may be relaxed in case of foreignhrm)Any other relevant information

C. Evaluation Criteria

Once all Bidders that have not submitted the required items or those that are non-compliant to the terms laid out in the EOI'S Instructions to Bidders are removed from thelist, remaining Bidders would be evaluated according to the following criteria:

Tahl! l: (iileria fot Sho listing of Request firt Prcq uoliliculiot,

2

3

4

5

6

,7

8

9

GeneralI

QualiSingCriteria

l.l Existence as a legal Entity (Legal Incorporation orEstablishmcnt and Registration) in country of origin

QualifuingCriteria

t.2 Not blacklisted by World Bank or any National / Internationalagency/authority

QualiQingCriteria

1.3 Local JV Partner of Intemational Firm must be registered as

Legal Entity (Lcgal Incorporation or Establishmcnt and

Expression of lnterest 2017 25

Sr. No. Criteria Marks

Page 32: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY STUDIES AND MASTER PI,,.NNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY INPUNIAB, PAKISfAN

Registration with Securities & Exchange Commission ofPakistan)

1.4 Local JV Partner of International Firrn must be registered withPakistan Engineering Council in relevant category undercoIIes onding PEC Consultancy Codcs

Quali$,ingCriteria

I 5 The lead member of the consortium must secure 507o ofthetechnical marks.

QualiftingCritcria

t.6 Single entity bidder and all members ofthe consortium, ifapplicable, should be Profit-Making concerns for the last 3

years

QualifuingCriteria

| .'7 lntemational Firms should have demonstrated abilify tomobilize global resources as best fit for the Project (at leastfive resources will be examined for global project expcricncc)

Quali$.,ingCriteria

1.8 Firms should be able to demonstrate the existence ofa globaland regional footprint in terms ofregional (permanent) andproject offices (at Ieast have one office in either South Asia,Middle East or China)

QualifuingCriteria

2 Technical criteria 80%

2.t Experience and standing in similar two projects (10+10) inscope and scale as Lead Firm (in case of JV/Consortium) inlast l0 years for feasibility studies of Industrial AreaDevelopment, City Development & Urban Planning, Market &Economic viability

20

d We ak s im i lar i ty/re levance of Proj ect 33%

b Medium s im ilarity/re I evance of Proj ect 66%

c C omp I ete s im il arity/rel evance of P roj ect

Professional capability of the Bidder such as availability ofqualified and experienced technical professionals. Min 7 years'experience with advanced degrees (PhD-full marks andMaster's degree-80% marks) to include:

55

Urbqn Economist 6

h Sustqinability Expeft (with Smqrt City Experience) J

Financial, Risk & Investment Anqlyst 5

lndustrial Economist 5

Core Engineering team (Geologist, Hydrologist,Geotech)

9

Urban Planner J

Urbon Infrastructure Design Experl

h GIS expert J

Legal Expert (with Industrial Zone Dev. Experience)

Public Private Partnership Expert 5

2.3 Other relevant documents such as ISO certification 5

3 Financial criteria 200/o

Expressiott of Interest 2017 26

t 00%

2.2

c

d

I J

I 5

Page 33: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEASIBILITY SIIJDIES AND MASTER P|.r'NNING FOR DEVELOPMENT OF A NEW ECONOMIC CIW IN

PUNIAB, PAKISTAN

Note:Total Marks-----------------------1 00

Qualifr ing Marks------------------65

3.1 Minimum Average Annual Turnover for last three financialyears

20

a 05- 10 Million USD t0

b I 1-20 Million USD 15

Above 20 Million USD

4 Special Conditions for a Consortium

4.1 In case the Bidder is a Consortium, tumover would be taken as

an arithmetic sum of tumover of each member of the

Consortium, calculated in the ratio oftheir stake in the

consortium. The Consortium would be required to meet the

threshold cdteria on the basis of aggregate figures subject toprovisions of this Clause.

QualiS,ingCriteria

27

c 20

Exprcssion of Inkrest 2017

Page 34: Studies and for - Punjab, Pakistaneproc.punjab.gov.pk/BiddingDocuments/50484955/4950/... · 2017-12-07 · ld€ EOI- FEASIBILIIY STUDIES AND MASTER PLANNING FOR DEVELOPMENI OF A

EOI- FEAS'BILIrY STUDIES AND MASTER PLANNING FOR DEVELOPMENT OF A NEW ECONOMIC CITY IN

PUNIAB, PAKISTAN

Due to hle upload size restriction on PPRA website, the complete document

(including Appendix) could not be uploaded here. Complete document can

be accessed from the Urban Unit website using the following link:

http ://www.urbanunit.gov.pk/uU/Procurements

Erpression of Intercst 2017