Student Health Center
Student Health CenterJacob Brambley - AE (structural option)
Location : University Park, PA
Size: 64,000 SF 5 stories
Use: Offices, pharmacy, exam rooms
Architecture: Brick facade accented with stone bands; large curtain wall
Structure: Steel w/ slab on deck floor
Student Health Center(Current Building)
Lateral Force Resisting System
Student Health Center(Current Building)
ABCDEFG2
Examine the design effects of changing overall building structure including cost and schedule analysis
Use computer programs to aid in design of building components
Design shading system to remedy current problems
GoalsRedesign of the SHCAdd extra floor w/o increasing building height by decreasing floor thicknessRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestions
Redesign of the SHC8 Slab
Typical design strip in x-direction:(11) - tendons
Typical design strip in y-direction:(14) tendons
Redesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsPT Floor System:Redesign of the SHCRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestions
PT Floor System:Redesign of the SHCProblem Areas- Openings > 4 ft- Along cantileverRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestions
Redesign of the SHCRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsColumns:- Sizes based off first level, worst case (1065 k)- 18 x 18 throughout
Redesign of the SHC- Placement (Open Plan)- Strength and Drift ConsiderationsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsShear Walls:
Redesign of the SHCRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsShear Walls:
Redesign of the SHCRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsShear Walls:
Redesign of the SHCBuilding weight from 8,222 kips to 11,392 kipsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsFoundation:
Redesign of the SHCRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsFoundation:
Changed to 4-pile pile caps instead of 3Cost / Schedule ImpactsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsCost Comparison:
Cost / Schedule ImpactsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsCost Comparison:Didnt take into account:Contractors AvailableAdditional Floor WorkAdditional PilesMechanical/Electrical UsageCost / Schedule ImpactsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsSchedule Comparison:
Steel Structure: 177 daysConc. Structure: 234 daysDidnt take into account:Lead TimeAdditional Floor WorkAdditional PilesConnectionsCost / Schedule ImpactsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestions
CM Conclusion:Concrete structure costs lessSteel structure is a quicker buildMore analysis is neededShading SystemsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsProblems with current fabric shadesArchitectural ImpactsPossible energy savingsTwo systems studied:LouversLight Shelves
Shading SystemsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsLouvers:
Fit in with nearby architectureEconomicalEasily InstalledShading SystemsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestions
Louvers:10 ft ceiling30 projection
Shading SystemsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsLight Shelves:Energy Savings Better atmosphereEnergy Savings :
Shading SystemsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsLight Shelves:# of light bulbs in corridor = 100KWh used per year = 9,344Electricity Cost (@ $0.10 per KWh) = $934.40Savings with light shelves = $150Shading SystemsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsConclusion:Dual System
Thesis ConclusionsRedesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestionsNew concrete building appears to work well and be more cost effective than steelDownside in scheduleHave to look into program that needs space
Learned the ins and outs of two computer programs
Shading systems viable to reduce need for fabric shading
Questions?I would like to thank the following people for their assistance with this thesis project:
My family and friends for their encouragement;OPP for answering my many questions;AE faculty for continued help throughout;Outside consultants for clarification;Fellow AE students
Redesign of Student Health CenterPost-tensioned floor systemConcrete columnsShear wallsFoundationsCost/Schedule impactsShading SystemsQuestions