Structural Assessment
& Fit for Safe Service
Mine Safety Summit 2016 | Saskatoon, SK | February 11, 2016
Micky Multani
MI Superintendent, Mosaic Esterhazy Operations
-
7/26/2019 Structural RBI Program for Mining
2/9
STATIONARY MI PROGRAM OV
ASSET RISK MANAGEMENTASSET CRITICALITY FOR SAFETY / ENVIRONMENTAL / OPERATIONAL RE
ENGINEERED INSPECTIONSKNOW THE CONDITION OF OUR ASSETS
NON CONFORMANCE REVIEWFIT FOR SERVICE (FFS) EVALUATION
CORRECTIVE ACTION TRACKINGENSURE CRITICAL REPAIRS ARE COMPLETED
SITE RISK REGISTERRISK MITIGATION PLANNING & 5YR PROJECT PRIORITIZATION
-
7/26/2019 Structural RBI Program for Mining
3/9
WHY WE CARE ABOUT OUR STRUCTURA
PROTECTION OF OUR EMPLOYEES
PROTECTION OF OUR ENVIRONMENT
PROTECTION OF OUR FACILITIES
HOW WE CARE ABOUT OUR STRUCTURA
KNOW THE CONDITION OF OUR STRUCTURAL ASSETS
KEEP STRUCTURAL ASSETS FIT FOR SAFE CONTINUED SERVICE (FFS)
TRACK REPAIRS OF OUR STRUCTURAL ASSETS
STRUCTURAL INTEGRITY IN POTAS
-
7/26/2019 Structural RBI Program for Mining
4/9
STRUCTURAL INTEGRITY PRO
4
STEP 1: INSPECTION PLANS FOR ASSET
Fracture Critical / Primary / Secondary Components
STEP 2: ENGINEERED INSPECTIONSCondition Ranking 1 6
Mandatory Repair of 5-6 Critical/Primary Members
Triggers Non Conformance Management Review
Priority List of Sustaining Repairs
STEP 3: FIT FOR SAFE SERVICE/SAHShort Term Repair Plans
Long Term Repair Plans
Safe for Continued Operation under Structural Eng. Guidanc
-
7/26/2019 Structural RBI Program for Mining
5/9
Raw Ore Storage Building at K2
Part of 2014 S
Inspections
Large A frame
Construction
Arche
Beam
Constructed in
Structural Inspection Success
-
7/26/2019 Structural RBI Program for Mining
6/9
STRUCTURAL INTEGRITY PRO
6
STEP 1: INSPECTION PLANNING
Complete visual inspection and core sampling of glulam memb
STEP 2: ENGINEERED INSPECTIONSBuilding found to be under-designed for current loads per NBC
Glulam arches and beams had mechanical damage, missing la
STEP 3: FIT FOR SAFE SERVICE/SAH
Short Term Repair Plans:
Dailywalk down, wind speed 65km/hr limit, monthly plugged ch
Notify equipment operators to use caution near the glulams
Long Term Repair Plan: (Completed August 2015)
New steel beams c/w deflector plates installed
Safe for Continued Operation under Structural Eng. Guidance
-
7/26/2019 Structural RBI Program for Mining
7/9
7
BEFORE REPAIRSJULY 2014
-
7/26/2019 Structural RBI Program for Mining
8/9
8
AFTER REPAIRSAUGUST 2015
-
7/26/2019 Structural RBI Program for Mining
9/9
Questions?