Strengthening Rural Credit Cooperatives Project I. General I. Project information: State Name: Gujarat Agency rcsponsible for preparing the procurement plan: NABARD 2. Bank's approval Date of the procurement Plan: May 24, 2007 3. Draft procurement plan dated Revision approved on 4. Date of General Procurement Notice: 5. Period covered by this procurement plan: 18 months (From 01 Apr 2009 to 30 Sep 2010) II. Goods and Works and Non-consulting services 1. Procurement Methods and Thresholds Category Method of Threshold (US $ Equivalent) Procurement Works NCB Above US $ 5000 Shoooin' Less than US S 5000 Goods ( .11 50 appl icable for I CB Above US $ 2 million non·intellectual services Lib (Wherever <lgreed and the services contracted by Bank) on the basis of perfonnanec NCB All contracts between US $ 100,000 of measurable physical and 2 million outputs) Shoppin. All contracts below US $ 100,000 DC Proorietary items and software 1 b) Prior Review Threshold Procurement Decisions to Prior Review by Bank as stated in Appendix I to the Guidelines for Proeun:ment: Procurement Method Prior Review Threshold Ae.e.reeate I. ICI3 All lea contr<lcts 2. NCR Above US $ 2 million 2. Pre+qualification: Not applicable 3. Reference to (if any) Project Operational/Procurement Manual: None 4. Any Other Special Procurement Arrangements: 5. Procurement Packages with Methods and Time Schedule Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Strengthening Rural Credit Cooperatives Project I....

Page 1: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Strengthening Rural Credit Cooperatives Project

I. General

I. Project information:

• State Name: Gujarat • Agency rcsponsible for preparing the procurement plan: NABARD

2. Bank's approval Date of the procurement Plan: May 24, 2007 3. Draft procurement plan dated Revision approved on 4. Date of General Procurement Notice: 5. Period covered by this procurement plan: 18 months (From 01 Apr 2009 to 30 Sep 2010)

II. Goods and Works and Non-consulting services

1. Procurement Methods and Thresholds

Category Method of Threshold (US $ Equivalent) Procurement

Works NCB Above US $ 5000 Shoooin' Less than US S 5000

Goods (.1150 appl icable for ICB Above US $ 2 million non·intellectual services Lib (Wherever <lgreed and the services contracted by Bank) on the basis of perfonnanec NCB All contracts between US $ 100,000 of measurable physical and 2 million outputs) Shoppin. All contracts below US $ 100,000

DC Proorietary items and software

1 b) Prior Review Threshold

Procurement Decisions subj~ct to Prior Review by Bank as stated in Appendix I to the Guidelines for Proeun:ment:

Procurement Method Prior Review Threshold Ae.e.reeate I. ICI3 All lea contr<lcts 2. NCR Above US $ 2 million

2. Pre+qualification: Not applicable

3. Reference to (if any) Project Operational/Procurement Manual: None

4. Any Other Special Procurement Arrangements:

5. Procurement Packages with Methods and Time Schedule

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb350881
Typewritten Text
55589
Page 2: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

III. Selection of Consultants

1 a) Selection Methods and Thresholds

Category Method of Procurement Threshold (US $ Equivalent) Consultant's Services Consultant's Services As per para 5.2 to 5.4 of (Individuals) the World Bank -

Guidelines Service Delivery Contractors As per para 3.21 of the

World Bank Guidelines Shon list of consultants for services estimated to cost less than US $ 500,000 may be composed entirely of national consultants.

1 b) Prior Review Threshold

Consultancy Services: All contracts above US $ 200,000

2. Any other Special Selection Arrangements:

3. Reference to (if any) Project Operational! Procurement Manual:

4. Consultancy Assignments with Selection Methods and Time Schedule:

IV. Implementing Agency Capacity Building Activities with Time Schedule

Page 3: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Annexure t Procurement Schedule for Goods - GUJARAT

.... I o.-...np<iooI Pro<c ..... S<~ p....,,,r.- Q1o ••• To •• 1 T ... ' S<, .. h,'i • • ~ '''' Prrp AWro Pubef "'. Opc-.~ S.b ... '" ,-"~1I1 ".., _.,

i~ ...... i"' • • ~ u'i ........ 'r.p ~ "rbid ..al or I "B _ .,- 0( ... '" "" ., " C .... lr I

,

M . ...... Sli« " ... Ioorit~ , C~, ., I FK ..... IFK & "i ... ~ .. • .. 01. "" _ir ... ,n

••• C~, cs i. 001·0 ' ""'" • _ .. "" ,,~ ,- ..... Sill_i.

\1( .. , _ tlSaRot-QI ."" ... .. .. •• '" ., • .... , ,_.

" WO lI~DB . .. 'ard _ .. "'

Purchase of l"CB 6·' sue" 7176 JJO.S60 8.612 Apprai April N, OJ " 30 30 07 Jllh N, N. 01 " Comp"'''' ••• .' ~, 2010 I' r;" May l'rio< May M a) 2010 for I'rior "r;" '" A"g Ilanlware , 2010 I"C\';'" 20 10 2010 T""hnica r~' i~ , 201 0 2010

~\i • I Bids: • r~vi ,. 2 1 Jul~

I " 20 10 co.-

Finanei. I Bids

*** Proc:u~m",nt will be mad", in 6-7 packages Ii Pnx .. ~menl" ill he done., .he Sia le Jew l. SU C i. tuh f"S il ". I.uSlreI .. ilh procur .. ., ,,n l. SLlC .. ill delermin .. the no. a nd 10u.;(HI or PACS rC'qllirinl Ha rd .. -a~ prior 10 proc ..... m. nl. 'ii' Amollnl ..... r1o.ed (l ui II Rs.6G.OOO pC'< PACS

,.- '''% Co •• , ., 014-11 •• .., ... ~, 0 ., ~,

~" (""_or

• .. ·u ," ...,,,.1 , Oblil -- • • io. , 30 30 ~)V "0' 2010 2013

Page 4: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

,.

,

Annexure 1 (Conld ... ) Procurement Schedule for Goods - GUJARAT

""'.~ Qun' Sl »t~ Intlalt ,~, P~p"f Al'Pro hb of "', Sub of APfI of I .. ~t O .. .,np'''''' Pn>cu •• S<h. d ... .. , i~' To •• 1 T~' ,~, oflf ll ~ .'.1 of 1F8 in . r OIH'~i SEll RER _r

... n. .w A .. thDrit~, r .. ,imal. £.<'i .al _r '" sub ' oc. IF8& ......... bid "' I. Bk ..."iIi< M .. ~od Sliu , N Sp<cs .0 Bk n,.n l ~ r . l"'n 'oc or r" • • ion

C.,., CM' &~ dO)( b)" & bids ." _r lib . 10 '" 'oc. W, UND8 . ... ·ard _r ( I~~. mul

f>r;nl;n~ of :-leo , sLie 8100 11.569 • 151380 Actual " " 01 Aug ~o II Nov • " " '10 " RegiSlers sel o f Jul} Prior ~OOg Prior 2008 NO' Prior Prior "" 26 '008 rev,c ",vie '008 rcV IC rene 2008 reg,st w " " " '" roc

8100 PACS

* The cost includes cost o f advert isement inv iting tenders. However, act ual expenditure incurred was Rs.116,20,534.00. 1# Bid documents were not sold

' MUt .. ," Coo, _r d. her Compl • • i ~, coot , , on of

Sic"; ." tom p' Contr1O.' -, . .. ·or ", ." , Obli~1io lIO,i< • ,

NA 24 26.\ 13) Mar 2009 '009

Page 5: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Strengthening Rural Credit Cooperatives Project I. General

I. Project information:

• State Name: Haryana • Agency responsible for preparing the procurement plan: NABARD

2. Bank's approval Oule of the procurement Plan: May 24, 2007 3. I>raft procurement plan dated Revision approved on 4. Date of General Procurement Notice: S. Period covered by this procurement plan: 18 months (From 01 Apr 2009 to 30 Scp 2010)

II. Goods and Works and Non-consulting services

l.a. Procurement Methods and Thresholds

Category Method of Procurement Threshold (US $ Equivalent) Works ICB

NCB Shopping Less than US $ 5000 De/F oree Account

Goods (also applicable for non· ICB Above US $ 2 million intellectual services and the Lib (Wherever agreed by services contracted on the basis Bank) of perfonnance of measurable NCB All contracts between US $ 1·2 physical outputs) million

Above US S 500,000 in ease of Consultants

Shopping All contracts below US $ Imillion DC Proprietary items and soflware

I. b. Prior Review Threshold

Procurement Decisions subject to Prior Review by Bank as stated in Appendix I to the Guidelines lor Procurement:

Procurement Method Prior Review Threshold Aggregate I. ICB All ICB contracts 2. NCB Above US $ 2 million 3. Shopping Above US $ I million 4. Din:ct Contracting 5. Commercial Practices

2. Pre·qualification: Not applicable

3. Reference to (if any) Project Operational/Procurement Manual: one

~. Any Other Special Procurement Arrangements:

Page 6: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

5. Procurement Packages with Methods and Time Schedule III. Selection of Consultants

1 a) Selection Methods and Thresholds

Category Method of Procurement Threshold (US $ Equivaleot) Consultant' s Services Consultant's Services As per para 5.2 to 5.4 of (Individuals) the World Bank -

Guidelines Service Delivery Contractors As per para 3.21 of the

World Bank Gu idelines

1 b) Prior Review Threshold

Consultancy Services: All contracts above US $ 200.000

2. Any other Special Selection Arrangements:

3. Reference to (if any) Project Operational! Procurement Manual:

4. Consultancy Assignments with Selection Methods and Time Schedule:

IV. Implementing Agency Capacity Building Activities with Time Schedule

2

Page 7: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

3

Page 8: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

N.

,

,

Annexure I Procurement Schedule for Goods - Haryana

J> ..... . .. Qun t St .!:~ I ntiat~ '"' " " I' M Appro r.b of ~" S.bof '" ,.~ I .. " . Description Prot .... '".~ mtll' it)' Totol Total '"' "rt ~-S ,. ..at of t rs i. "f bid ~. i ". ., ., Cant .,

m~n' " I. t ..... Uh.,..it utin,.,. Est in,a, ., & oub 'M. U'B& :00; . ..... - ., '0 Bk ,,. .otiroe ~,

~"' Me thod Sik. , • M Sp . .. to Bk _., ,. ~~, 00 ,,, .,ion Sit:ni ~,

c~ eM' & bid dot b, •• bid!. . " ., ., ....... (lb. ln (S in -. '" Ui'o" VD ' lOud , ""> -, "' ... , ""tie

(I Sm Rs. , >0>

Purchase of t-IC B H Sl.ICI' 586 35.160 '" Apprai Jul ~ Under "'~ No 05 05 08 '0 "0 " Compu'Cf .. @ ~, 2<"" rev,c 0" Prior No,' No, De, Prior Prior "'" Hardware w '009 ",,·i., 2009 ,- """ rn-ie revie '00 w w w 9

1'urchas. of Shoppi , SLiC , 3,700 " Actua l "", Under '". N, L9 Uplo " No No NA 06 ComplJler ., 2007 rev,e 2008 Prior F,b 28 ,'Ul! Prior Prior Apo Software , re";e 2008 Feb 2008 «""i. revie '00

w w w 9

** Procurement w ill be made in 3-4 p a ckages NPro.:urement will be'done allhe SI8 ,. le,-el. S LiC in each PS i. enlru. led "ilh proru r. menl. S LiC " ' ill drluminr Ihe no. and loro tion o r I'ACS r.-quoting lIard .. -... prWr to pl"O<'uremut.

@ Amounl "orked oul.I R.../iO.OOO puPACS

4

"'" d.l iH Camp"" i

" on or eo mpl Cont...." .. , ".1

Obligat io

30 31 ,\lar ~lar 2013 2010

30 31 Mar Mar 2013 2010

Page 9: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Annexure J (Contd ... ) Procurement Schedule for Goods - Haryana

I P,"" .. .... Qta~n! S laR' In';." Pr.p r .... pof "'PI''''' Pub or '"', Soo bof APfI or '"'" I '"~ ,~

i"io I~.ript"'" Pr"",yr. S< htd mon ' ;I~ Tot • • Tota l I'r.p of lFO '" n lor W O i. ., O~"i RER '" of Con, ., d . l i .... Co .. pl • • i mUI ultl A,U I ...... i'y t:.limalt uli ... , ., & . ub ,~" IFR& ...... , b id ., to Il ~ ~o' i r... ....." conlr , on o f

M •• bod SIt« I , ~ Sp ... to Ok mon' '" P.~ ... .. "' ,,, "ion S~ni " .. <ompl Con,,.,..,

C,,' C,,' & bid do< b,- & bid. """ ., ., . .. ·u ", ""' (R •. l n CS i. ,~. W. l i "IlO • .. ·. rd , Obli!!!"'"

""'" '00(1) ",ont nolit I . tlS-N. , W,

3 !'rinting of Shopr ; , sue 23 152 3.567 71 "~(ual 1\:0" So May· ., 18 Jun lO " No ., " 26 26 Sept

Registe ... "g reglsi 2007 Prior '". Prior """ '". July I'rior I'rior Aog S,_ 200S H "r;& " rC"le 2008 rc,ie ""'. 2008 re" 'c c'. 200. ZOOS quotal; lakhs May " w w w ~, of 2008

,ouch

I

=f" I 586 I (lACS

5

Page 10: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

6

Page 11: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Strengthening Rural Credit Cooperatives Project I. General

I. Project information:

• State Name: Orissa • Agency responsible for preparing the procurement plan: NARARD

2. Bank's approvlll Date or the procurement Plan: May 24, 2007 3. Draft procurement plan dated Revision approved on 4. Date of General Procurement Notice: 5. Period covered by this procurement plan: 18 months (From 0 I Apr 2009 to 30 Sep 2010)

II. Goods and Works and Non-consulting services

I. Procurement Methods and Thresholds

Category Method of Threshold (US $ Equivalent) Procurement

Works NCB Above US S 5000 Shopping Less than US $ 5000

Goods (abo applicable lor ICB Above US $ 2 million non-intellectual services Lib (Wherever agreed and the services contracted bv Bank) on the basis of pcrlonnance NCB All contracts between US $ 100,000 of measurable physical and 2 million outputs) ShODDin" All contracts below US $ 100,000

DC Proorielarv items and software

I b) Prior Review Threshold

Procurement Decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines fo r Procurement:

Procurement Method Prior Review Threshold A •• re.ate I. lell All leB contracts 2. NCB Above US $ 2 million

2. Prc·<lualification: NO! applicable

3. Reference to (if any) Project Operational/Procurement Manual: None

4. Any Other Special Procurement Arrangements:

5. Procurement Packages with Methods and Time Schedule

Page 12: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Ill. Selection of Consultants

1 a) Selection Methods and Thresholds

Category Method of Procurement Threshold US $ Equivalent Consultant ' s Services Consultant ' s Services As per para 5.2 to 5.4 of (Individuals) the World Bank -

Guide lines Service Delivery Contractors As per para 3.21 of the

World Bank Guidelines Short list of consuhants for services estimated to cost less than US $ 500,000 may be composed entirely of national consultants.

1 b) Prior Review Threshold

Consultancy Services: All contracts above US S 200,000

2. Any other Special Selection Arrangements:

3. Reference to (if any) Project Operational I Procurement Manual:

4. Consultancy Assignments with Selection Methods and Time Schedule:

IV. Implementing Agency Capacity Building Activities with Time Schedule

2

Page 13: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

3

Page 14: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

'0

,

Annexure I Procurement Schedule for Goods - ORISSA

Oes<,;p'io~ Pr<>cut~ ,.., Procu~ Quan' To,.1 T ... ol SI.g,. 1",i.I,. Pt,.p " np Appro I'Mbt>f "'. Ol'<"ning 5Mbof A~ h . ... I ...... m. nl du lol .... n l iI)' !:",i",." [sl im.'''' Prop ., of bid "o r of IFS ioo of bid orb,d, SEK .. .. Conlr ..

.... dho<! Slic~ AUlho";I ~' , eM' 0' ,eo "",, IFK & :-0."" .. 10 Bk B!:R oOfir.., ,,' 'M' ... C~ (S iR 000', ) - • m.n l bid ,.~, ,,, ,'ion Sij(nin - , (Rs.ln (ISo-Rs.SO) '" bid

,.. d"" by •• 'W .. , ... ·.r

000., 'K. .. W. D '-DB ... ·.rd , .... n. " nOli.

• Purchase of NCB H S LiCIl 1726 163.560 3.271 Apprni April No 03 No 3<J 3! 07 July No :-':0 " 06 Compuler ... " ~, 2010 Prio l\1a} "rior "'aJ Ma)' 2010 for Prior Prio Ao, Ao, Hardware , 2010 J'<!\'IC ~OIO 201 0 Technica re',e , 20 10 2010

rc,i " I Bids; w ~,' i

ew 21 Jul)' ow 2010 for Fioancia I Bids

*** Procuremenl will be made in 3-4 packages II P"",unmenl ""iIl b. done a llh. SIa l. len" SLiC in uch PS is en'nn 'od ... it h p"",,,nm. ,,'. SLiC ,,'ill delu min. Ih. nO •• nd II)U lion of PACS .. qu iring IInd,,·a .. prio r II) procu ... mool. @ Amo untwork. ll o,, ' a ' Rs.60,OOOpu PACS

4

' 00 % C.rnp d. lin ".ion

ry ., ",ompl C_tr

'" ac.ual Obli~

• • ion

3<J 30 No,' No\' 20 10 1013

Page 15: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Annexure I (Conld .. . ) Procurement Schedule for Goods - Orissa

r""""r~ Qu .. , S'al:<' In l i. t~ f' r t'p f""P 01 App~ PMb "r ,.. S. bof A", '" I» ... ,.~ ",.% :000 ~r'>O r ...,.. ..... Sci,,,,, ", .... I iI>' Tooal T.,.", ,~, of lfO "" ,".1 of " "S in '" O~.i 8£1( IIElI '" Coal " delinr C_ . no u . . 1,,1 A u' ltori'~' (No.1)( ~:M'i "JI'" £5ri",. , '" " .. b ,~" U"B& N .... 5 "" ., 10 01< lIol ir ... n<O O'Oa lr , "",'io

M r thod 51"" C"io. .. r Rt;;,lt , " SJI<"f" I,,8k "UI b" r apt '" - m ,,' . riolo Sic,, ; ~. RO"'J>I ••

,, ~ol. t ;o. "' C~. C .... .5; bid d..,.. b~ • bid, . '" ., ., . ... r ... ("0 '" , .... , (11: ... 1 .. ,S in ,~. WIS U!'OIlR . .... d ,

~." -, - , on' nOl '" •• ns-.W ... • ""'. '" ~ I ioo , Printing Shoppi , SIX 76000 2615 54 Actual 22 N. 22 ~3) ~·o 23 Ma) " 03 ,. N. " " " . r ., ,,0 /I.'l a~ I'rior 2008 Prior 08 M3~ June I'rior I'ri ... r J ul~ Jul} "', Registers qU<)Ial io 200~ r~' i<- re,ie 08 08 rene re,ie 08 08 08

,, ' " " " " Repc:1l 70500 2373 4 7 Actual . . . " 26 " order Ma} Mo, A"

09 09 09 , sue t' 41 200 4404 88 Aelua' - do ~ Nu - du- N' o I June 02 00 N. :-11,1 " 28 31 Jan quo!mio I' riur !'rior 09 Jurk: June Prior Prior A,. A ug 20 10 n r .. -cd) rC I'i~ rcl"ic 09 ()9 revic re\ Ie 09 09

" w " " ...

5

Page 16: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category
Page 17: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Strengthening Rural Credit Cooperatives Project I. General

I. Project informatio n:

• State Name : Uttar Pradesh • Agt:ncy responsible for preparing tht: procurement plan: NA BARD

2. Sank's approval Date of the procurement Plan: May 24, 2007 3. Draft procurement plan dated Revision approved on 4. Date of General Procurement Notice: S. Period covered by this procurement plan: 18 months (From 01 Apr 2009 to 30 Sep 2010)

II. Goods and Works and Non-consulting services

La. Procurement Methods and Thresholds

Category Method of Threshold (US $ Equivalent) Procurement

Works NCB Above US $ 5000 Shopping Less than US $ 5000

Goods (also applicable for ICB Above US $ 2 million non-intellectual services Lib (Wherever agreed and the services contracted by Bank) on the basis of perfomlance NCB All contracts between US $ 100.000 of measurable physical and 2 million outputs) Shopping All contracts below US $ 100,000

DC Proprietary items and software

L b. Prior Review Threshold

Procurement Decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method Prior Review Threshold A22reeate I. ICB All le B contracts 2. NCR Above US $ 2 million

2. Pre-qualiticttlion: Not appl icable

3. Reference to (if any) Project Operational/Procurement Manual: None

4. Any Other Special Procurement Arrangements:

S. Procurement Packages with Methods and Time Schedule

Page 18: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

III. Selection of Consultants

I a) Selection Methods and Thresholds

Category Method of Procurement Threshold (US $ Equivalent) Consultant's Services Consultant's Services As per para 5.2 to 5.4 of (Individuals) the World Bank -

Guidelines Service Delivery Contractors As per para 3.21 of the

World Bank Guidelines Short list of consultan ts for services estimated to cost Icss than US $ 500,000 may be composed entirely of national consultants.

1 b) Prior Review Threshold

Consultancy Services: All contracts above US S 200,000

2. Any other Special Selection Arrangements:

3. Reference to (if any) Project Operational! Procurement Manual:

4. Consultancy Assignments with Selection Methods and Time Schedule:

IV. Implementing Agencv Capacity Building Activities wilh Time Schedule

2

Page 19: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

3

Page 20: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

i"io

,

Annexure 1 Procurement Schedule for Goods - Uttar Pradesh

o...dption P,,)Cur~ ,. .. P .... un Quant T"tal Toto ' Sl'~ Idli.t~ Pnp '"' ,\ ppro rubor Sa '~ Opto '" g, S .. bor A" I ... ~ I","~

mul d. '~J .. ~nt it)' £<t;mat~ £<t;matttl Prtp " of bid ' -a' of IHI in of bid Of bitk B£R ., ., Cont . " Mttl>od s/i.~ Aull>o,ily " C~, ., ,no doc" IF8 & N~''5 "" to 8k 8£1t n"lir.. ,,' '''a ID

••• C"" (S in 000'5) .... A "~At bid ropt. ,,, ahon Sign;" " (Rs. In tl Sc Rs..50) & bid . "b dO<" by . & ." ., , .... r d

""" -, " W. l:Nf)1:I .,,-a .d not i.~

.. ~nt "' Purchase of r-.:CB ~7 Sl.tCII 6742 404520 8.090 API''''' Apri l N. 03 :-';0 1<1 " 07 July N. :\0 " " Computer ••• " ~I 2010 Prio May Prior May _\la~ 2010 for Prior Prio ,\ ug All!, Hardware , 2010 !C"1e :?QIO ~01O Technica !C"le , 2010 2010

re,·' " I Bids; w ""vi ow 21 July ow

~OIO for Financia I Bid,

*** Procuremenl w ill he made in 6-7 p a ckages It Procuremenl .. ill ~ don. lI i Ih~ Sia lt I~"cl. sLie in each PS is t nlnSIed .. -;I h procuremenl. sLie " 'ill deler mine Ihe nO. and localion or rACS requiring .. an ... ·. re prior lu procur~menl. Iii' Amounl .. -ork~d oul .1 Rs.60.000 p<'r I'ACS

4

'00 Comp % I •• ion

doli,' " '" Con .. .,. ••• u.1 p'd~ Oblig,

. Iion

30 30 Nov ~ov

201 201) 0

Page 21: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Annexure 1 (Conld ... )

Procurement Schedule for Goods - Uttar Pradesh

,- l><st rip! ..... ' ron .... :.thtd rro .. r~ Quu! T o!. ' To ta l ~~ In" • •• ! P'.p p""p "r Appro p~bot S. I~ O p ... i Sabot .,,0< '"~ ,.~ ''''' C""'pl.-II

"'~ .. ~t.1 ...n' i '~ r..$.i", .'~ I;,. i . .. p"", of 11' 8 ~ .-.1 .. r It·8 i. -, -, 8 1:51: '" " CM' -, 6oIi ... ,,.. "r " .. hod SIi« A.u ~ori 'y " N of 6< ~ob 'M. If~& Sno, ,. m .. ~ ..... ir .. ~, -" , <-·U! ...... ,

••• C~, C~, S,....s , ' 0 8 1i. -, ~ P.p"r'f .. - ~ a .... s.g.i - , "';'1'1 .. , H •. lu IS _ .~ ...... b~ • ." ., ~ ... ar '" Obl ..... lI •

, ,,, ., 00II'0' ,,~. '" U:-'08 . .. 'orel " • (I $~ 1tJ..

_., ~.

y , , f'riming of DU(' R iSlers

;. ShahFohanp Shoppi J DLle 4557 Actual N. ~o 26.06.0 01.07. No N. 0 1.07. 0 1.0 r.;,n . .. -, I' rior Prior , OS Prior I'rior " 7.08 08 r,,"ie "", ie rt:'\'!C ",,-j..:: , , , ,

, "' ... 4 DUe 6803 01.01.0 09.01. 09.01. "'.0 ~1.03. , 9 '" '" 0.09 '" iii. t ",kno ... , Due 3825 01.12.0 13.02. 13.02. 13.0 15.0-'. , '" 09 2.09 09

w. Ela...-3ih 4 Due 06'&9 03. 10.0 . . . 2603. , W , Muzzafama 6 Due I "'" 29.08.0 13.09. 13.09. 13.0 19.1 1

P' , " 08 9.08 " and31. 08.08

" i. " ra1apgarh , Due 48' 29.08.0 17.09 17.09. 17.0 24.0-1. , 08 " 9.08 '" " ii. I' ilihlli t 3 '" 30.06.0 24.09 24.09. 24.0 24.10. , .. , 08 08 9.08 0' 20.07.0 ,

, iii Kanpur , DLle 1020 21.0.tO 11.06 11.06. 11.0 I J.(~. , 08 08 6.08 08 i~. Gorakhpur 0 11(' 982 24127.0 . . . 13.11 . , '.08 '" "'" 06J07.0

6.08 .. Azams:nh , Due 56' . 07.06. 27.06. 27.0 10.09.

0'" " 6.01\ 08 0~.O3 ," , ,,'" '" 02,03. 02.0 15.03.

09 3m w xi. Gniabad I

, 01.1(' ,,, 24,05,0 111.06. 18.06. 18.0 24,02. , 08 08 6.08 09

5

Page 22: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

'- (kocrip' io. P~.r. ,..~ ProcUH Qu.n, To' " Tn •• 1 s,.,. Intia •• '"' p,,,,, uf ApI'''' "ubor ,." O~~i Sub"f Ap., .. f I .. a< bs"o "'% CD mpldi ... n. -,- .. .. , il)- r ... ,im." u ti ... , P r.p ou ro '" ,.I .. f IFBio -, -, onl: "" -, e MU ., """'U .m of

" .. bod Sl ice ,\at hori',- , " -, & tub ,-- Irs &I :"I ..... '" '" t. II ~ ""'i lk ~, .... ,r , Con' '''.! ... CM' C_, ,~" , .. Bk mon' '" f'.~" ,- bid . ,-, . tio. Sign. -, co .. pl -" (Ih.ln lSi .. &I bid d<>< bl • ." -, ., . .. ·. r ," Ob lilt"lio

I ~IU~I OOO"s) ,-- WB U:-;OB . .. ·. nI , •

( 1S*1b. .... , .... 'i. "" ,

xiI. ~ 1Ci!nl1 I DUe I 1>18 · 19.06 19.06. 19.0 11.07. 08 08 6.08 08

xiii Etah , DLie 852 10_06.0 . . . 0601. , 09 , .. Bijoofe 5 Due 1295 · 11.07. 11.07. 11.0 05. II. 08 08 7.08 08

,",,' "'''ainpur; , Due 567 · 08.08. 08.08 08.0 27.08. 08 08 8.08 08 .. , l al ilpuri , Due 227 23.0S.0 01.10. 01.10. Ol. ! 18m

8 08 08 0_08 09 xvi fo,loradabad , Due ,,7 02.05.0 16.07. 18.08 18.0 11.12.

8 08 08 8.08 08 nl Barcilly , Du e 700 05106.0 l O.O:!. 20.01. 20.0 IS_~

2.09& 09 09 2.09 09 06109.0 9.08

'" Unnao 5 Du e ,,, 30,03.0 17.0-l. 17.0-l. 17.0 10.06 8 08 08 4.08 08 .. A8m I Due 1277 15.O-l.0 05.12. 05 . 12 05_1 31.03 8 08 08 2.08 09

X.~I :\1ahoba Due ><6 :!5,06.0 01.1 2. 0 1.12. 01.1 May 8 08 08 2.08 09

xxi Jhansi DUe 'OS · 01. 10. 01.1 0. 01.1 29.05 08 08 0.08 09

x.~ i Bahraich DLie -157 28.2.8 28.08 28.08. 28.0 25.11. 08 08 8.08 08

,.XI Firozabad Due m 27J19.0 06.01. 06.01. 06.0 IH16. 8 09 09 109 09

xx> liasti Du e 593 18 .11.0 25. 11 25 . 11. 25.1 08.05. 8 " 08 1.08 09

'" r.,'lirlllpur Due 1609 11 .06.0 0:.07. 02.07. 0 2.0 14.10. 8 08 08 7.08 08

~ ." Sah,anpur Due 842 28.06.0 I ~ . II 12.11 19.1 No, . 8 08 08 108 08

~~ , Silarur Du e '90 11.08.0 08.09. 12.09. 12.0 19,06 8 08 08 9.08 09

Totallncid~ rN.al "xp.(~ i z Adwnisement. '" Trans",," of printed "'giste,. etc) for alilhe abo~c oonl,acls

TOTAl. 235 1

6

Page 23: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

7

Page 24: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category
Page 25: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Strengthening Rural Credit Cooperatives Project

I. General

I. Project information:

• State Name: Uttarakhand • Agency responsible for preparing the procurement plan: NABARD

2. Bank's approval Date of the procurement Plan: May 24, 2007 3. Draft procurement plan dated Revision approved on 4. Date of General Procurement Notice: S. Period covered by this procurement plan: 18 months (From 0 I Oct 2007 to 31 March 2009)

II. Goods and Works and Non-consulting services

I.a. Procurement Methods and Thresholds

Category Method of Threshold (US $ Equivalent) Procurement

Works NCR Above US $ 5000 Shopping~ Less than US $ 5000

Goods (also applicable for leB Above US $ 2 million non-intel lectual services Lib (Wherever agreed and tht: services con tracted by Bank) on the basis of performance NCB All contracts between US $ 100,000 of measurable physical and 2 million outputs) Shopping All contracts below US $ 100,000

DC ProprietarY items and software

I. b. Prior Review Threshold

Procurement Decisions subject to Prior Review by Bank as stated in Appendix I to the Guidelines for Procurement:

Procurement Method Prior Review Threshold Aeereeate I. leB All ICB contracts 2. NCB Above US $ 2 million

2. Pre-qualification : Not applicable

3. Reference to (if any) Project OperationaVProeurement Manual: None

4. Any Other Special Procurement Arrangements:

S. Procurement Packages with Methods and Time Schedule

Page 26: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

III. Selection of Consultants

1 a) Selection Methods and Thresholds

Category Method of Procurement Threshold (US $ Equivalent) Consultant ' s Services Consultant ' s Services As per para 5.2 to 5.4 of (Individuals) the World Bank -

Guidelines Service Delivery Contractors As per para 3.21 of the

World Bank Guidelines Short list of consultants for services estimated to cost less than US $ 500,000 may be composed entirely of national consultants.

t b) Prior Review Threshold

Consultancy Services: All contracts above US $ 200,000

2. Any other Special Selection Arrangements:

3. Reference to (if any) Project Operational! Procurement Manual:

4. Consultancy Assignments with Selection Methods and Time Schedule:

IV. Implementing Agency Capacity Building Activities with Time Schedule

2

Page 27: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

3

Page 28: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

N.

Annexure 1 Procurement Schedu le for Goods - UUarakhand

[)ncrip'io~ I'"",u <~ "., I'r""o", Quo, TOlal T .... r S •• g~ ro.i.'~ '"' '"' ' \1'1'<0 Pu b or Salt Optn inlt S.bof A~ r .. u ~ r .. u~ "'''' mul du l~ - "' ;1)' r.l i m .'~ Es,i llultd I'np ., of bid "01 of , .. S;o of bid Of bid . '" ., .. ConI • '" ddi.'~

M.,hod ~k< Anl ho n ')' , eM' ., U'O ,~. ' .. 0& Nt .. ·s ,~ ... Ok OF. R notific ." ~ .. " ... e~. (S in too'S) "'" • m~n' bid I'apt. ,., alion Siltnin ... ~";'pI (R .. Io. (lS·R'·~l & bid ."b doc b) . & ." ., , . .. -ar ,,, ..... .... " \\'0 t.::-; lJlI • .. -.rd ,

"'~n ' .. notit , Purchase of ~CB 2·3 suc;; 729 -1 3,7.10 875 Appmi April No OJ No )0 " 07 July '0 No 02 16 )0 Com pUle!' ...

'"' ~. 201 0 Prio May Prior May ~la) 2010 for Prior Prio ,'ug A., N.,v

Hardwar~ , 201 0 rc"ie 2010 2010 Tech ni ca revie , 201 0 20 10 2010 r(,vi " I Bids; " revi .. 21 July <W

2010 for Finaneia I ll ids ... Procu reme nt will be made in 2-3 packages

1# t·rocu...,m~RI ",ill ht t10R~ at Ih ~ 5 .01. l~n1. 5 U C in u~h PS is enlr .. .sled "i,h procureme"t, S U C "'ill t1e' erm; ne the no. a nd loutioR or PACS r~quiring roll out & " a nl",-o rr prio r to p~ur~n'tal. (ii' Amounl "'orked uu' al Rs,60,000 p*r PACS

4

e_, I~. ion ., Con I< . <lna l ObIig II.ion

)0 Nov 20 13

Page 29: Strengthening Rural Credit Cooperatives Project I. Generaldocuments.worldbank.org/.../pdf/555890PROP0p071ct1PP0dated0Feb02010.pdf · 1. Procurement Methods and Thresholds Category

Annexure 1 (Conld ... ) Procurement Schedule for Goods - Uttarakhand

1'1'01''''-' (}va., Sl31:<' I ~ . ; • • ~ '"' p .... por A,,.. , .. bor S . .. s." 01 ,\f'fI or ,w_ I 'w. '"% " o.....:rip1ioa ,.""" .... Sr"~ on' iI) T",. I I Toul P.~p of l F8 ... n . .. f If8 in .f Opc-.i "" HOt of C_ •• •• f d.lin Co"' ...... ; I ...... , . .., A .. II.orif~ ...... i...... [s. i ... , ., & •• b .... IF8& '.n.. "" ". to 8" ... ,;r... H' -, 0 _,f

M~' ''''' Slit. " ~ ,..... '0 8" - ' ... ' "1"'''' ... '" f- .,"", Sfj!:.i. ~, no,' C..."nCl

C~, C_, '" bid ... ~ • , .. . ~ "' I • ..... ... ,,' IRo. I. IS . I .... W8 l ' 'I;1)8 . .. ·.nI I ~ 0 .. ..,.. . .. -, ... , _ ..

_Ij • I ' ~R .. " " , I'rin l'ng of Shoppi ,., sue Regist ~,4J7 89 ,\ppI3.; April N. April N. 31 1>la) J1 07 N, " " 02 IS J1

RcgiSiers '" ~f~ ~, 2010 I'rior 2010 "r;or 20 10 May Jul) Pri_ Prior Jul) A" M an; M Ul\:h 729 r~ .. ic .. :"ie 20 10 2010 rc' ,( r<:\1c ~OIO 2010 h 2(1 11