RESOLUTION NO. 92-141 A RESOLUTION AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVER A CONTRACT WITH PIERCE GOODWIN ALEXANDER & LINVILLE FOR THE PRELIMINARY ARCHITECTURAL/ ENGINEERING DESIGN OF DOWNTOWN TRANSIT STREETS AND TRANSIT MALL; AND MAKING FINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT. WHEREAS, in July, METRO solici ted qualification statements and letters of interest from firms for the preliminary architectural/ engineering design of the Downtown Transi t Streets and Transi t Mall; and WHEREAS, the professional team headed by Pierce Goodwin Alexander & Linville is most qualified to do the work; NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE METROPOLITAN TRANSIT AUTHORITY THAT: Section 1. The General Manager be and he is hereby authorized and directed to negotiate, execute and deliver a contract with Pierce Goodwin Alexander & Linville for preliminary archi tec- tural/engineering design of the Downtown Transit Streets and Transit Mall at a cost not to exceed capital budget appropriations. passage. is effective immediately upon this 24th day of September, 1992 this 24th day of September, 1992 WfiiaIR F. Chairman

Transcript of STREETS AND TRANSIT MALL; AND MAKING … architectural/ engineering design of downtown transit ......

RESOLUTION NO. 92-141

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH PIERCE GOODWIN ALEXANDER & LINVILLE FOR THEPRELIMINARY ARCHITECTURAL/ ENGINEERING DESIGN OF DOWNTOWN TRANSITSTREETS AND TRANSIT MALL; AND MAKING FINDINGS AND PROVISIONSRELATIVE TO THE SUBJECT.

WHEREAS, in July, METRO solicited qualification statements and

letters of interest from firms for the preliminary architectural/

engineering design of the Downtown Transi t Streets and Transi t

Mall; and

WHEREAS, the professional team headed by Pierce Goodwin

Alexander & Linville is most qualified to do the work;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract with

Pierce Goodwin Alexander & Linville for preliminary architec-

tural/engineering design of the Downtown Transit Streets and

Transit Mall at a cost not to exceed capital budget appropriations.

passage.

is effective immediately upon

this 24th day of September, 1992this 24th day of September, 1992

~-~--WfiiaIR F. BUrge~Chairman

RESOLUTION NO. 92-142

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH BENCON MANAGEMENT & GENERAL CONTRACTING CORPORATIONFOR THE REPAIR OF POTHOLES ALONG MAJOR THOROUGHFARES, COLLECTORSTREETS AND BUS ROUTES; AND MAKING FINDINGS AND PROVISIONS RELATIVETO THE SUBJECT.

WHEREAS, the repair of potholes along major thoroughfares,

collector streets and bus routes has been designated a General

Mobility project; and

WHEREAS, METRO issued an invitation for bid for certain

pothole repairs; and

WHEREAS, Bencon Management & General Contracting Corporation

submitted the lowest responsive and responsible bid;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract wi th

Bencon Management & General Contracting Corporation for the repair

of potholes along designated thoroughfares, collector streets and

bus routes in an amount not to exceed $452,500.

Section 2. This resolution is effective immediately upon

Assistant Secretary

this 24th day of September, 1992this 24th day of September, 1992

RESOLUTION NO. 92-143

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH TEXAS STERLING CONSTRUCTION INC. FOR THERECONSTRUCTION OF FULTON STREET FROM DELANEY TO EVELYN; AND MAKINGFINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.

WHEREAS, METRO invited bids for the reconstruction of Fulton

Street from Delaney to Evelyn; and

WHEREAS, the firm of Texas Sterling Construction, Inc.

submitted the lowest responsive and responsible bid;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract wi th

Texas Sterling Construction, Inc. for the reconstruction of Fulton

Street from Delaney to Evelyn at a cost not to exceed $2,634,400.

Section 2.

passage.

ATTEST:

This resolution is effective immediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

RESOLUTION NO. 92-144

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH COBB, FENDLEY AND ASSOCIA~ES FOR ENGINEERING ANDELECTRONIC DATA STORAGE, RETRIEVAL, DRAFTING AND MAPPING SERVICES;AND MAKING FINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.

WHEREAS, METRO has accumulated considerable data for the

development of design of the Regional Bus Plan, transit streets and

METRO facilities; and

WHEREAS, it is necessary that the data be converted to a

format that will enhance data utilization and accessibility for the

various METRO departments; and

WHEREAS, conversion to an interactive graphics system for

engineering and electronic data storage, retrieval, drafting and

mapping services will enhance data accessibility and utilization;

and

WHEREAS, the qualifications of firms to provide the necessary

services have been reviewed; and

WHEREAS, the firm of Cobb, Fendley and Associates is most

qualified to do the work.

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract wi th

Cobb, Fendley and Associates for engineering and electronic data

RESOLUTION NO. 92-144 (Page 2)

storage, retrieval, drafting, mapping and related services on an

interactive graphic system for an amount not to exceed $225,000

Section 2.

passage.

ATTEST:

This resolution is effective immediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

~-----';"--~~'~:'''',~,;'I.'\.,\,.., ~~~.";-::~.,\JTf\,f,('\\\,~ F.BUrge-,~

,..r; f,l -"'"" .H W )~t l;~(;hairman;1'"

(Co"-

~ " ,j" "'- .'

.."\".

~t~~,<·{rf··.l()f;4,\~ '4/::'"\ -.'i. H. f~ \ ~f'('"

,"\"~\,,\.,\~~~~~,,, 'tJ

RESOLUTION NO. 92-145

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH BROWN & ROOT, INC. AND WITH KENNETH BALK ANDASSOCIATES, INC. FOR DESIGN OF THE NORTHWEST TRANSIT CENTER/INNERKATY CONNECTOR AND THE EASTEX HOV INTERCHANGE NEAR QUITMAN STREETRESPECTIVELY; AND MAKING FINDINGS AND PROVISIONS RELATIVE TO THESUBJECT.

WHEREAS, METRO has proposed construction of a Northwest

Transit Center/Inner Katy Connector and an Eastex HOV interchange

near Quitman Street; and

WHEREAS, METRO has reviewed the qualifications of firms for

architect/engineer services; and

WHEREAS, the firm of Brown & Root, Inc. is most qualified to

perform architect/engineer services for design of the Northwest

Transit Center/Inner Katy Connector; and

WHEREAS, the firm of Kenneth Balk and Associates, Inc. is most

qualified to perform architect/engineer services for design of the

Eastex HOV Interchange near Quitman Street;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract wi th

Brown & Root, Inc. for architect/engineer services for design of

the Northwest Transit Center/Inner Katy Connector in an amount not

to exceed $------

Section 2. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract wi'th

Kenneth Balk and Associates, Inc. for architect/engineer services

RESOLUTION NO. 92-145 (Page 2 )

for design of the Eastex HOV Interchange near Quitman Street in an

amount not to exceed $------

Section 3.

passage.

This resolution is effective immediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

RESOLUTION NO. 92-146

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH MENENDEZ-DONNELL AND ASSOCIATES FOR FURNISHING ANDINSTALLING A PARTS CLEANING FURNACE SYSTEM AT THE KASHMERE BUSOPERATING FACILITY; AND MAKING FINDINGS AND PROVISIONS RELATIVE TOTHE SUBJECT.

WHEREAS, METRO's current method of cleaning rebu~lt parts uses

a chemical process which often causes production delays and

environmental problems; and

WHEREAS, a new parts cleaning method has been developed which

complies with environmental regulations by using a high-temperature

furnace; and

WHEREAS, METRO invited bids to furnish and install a parts

cleaning furnace system at the Kashmere Bus Operating Facility; and

WHEREAS, the firm of Menendez-Donnell and Associates submitted

the lowest responsive and responsible bid;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract with

Menendez-Donnell and Associates to furnish and install a parts

cleaning furnace system at the Kashmere Bus Operating Facility at

a cost not to exceed $178,782.

RESOLUTION NO. 92-146 (Page 2)

Section 2.

passage.

ATTEST:

This resolution is effective inunediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

RESOLUTION NO. 92-147

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH D-III CONSTRUCTION, INC. FOR UPGRADE OF THE BUSWASHER, AND CONSTRUCTION OF A NEW SERVICE AND CLEAN OFFICE ANDSTORAGE BUILDING AT THE POLK BUS OPERATING FACILITY; AND MAKINGFINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.

WHEREAS, METRO invited bids for upgrade of the bus washer and

construction of a new service and clean office and storage building

at the Polk Bus Operating Facility; and

WHEREAS, D-III Construction, Inc. issued the lowest responsive

and responsible bid;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a contract with D-

III Construction, Inc. for upgrade of the bus washer and

construction of a new storage and clean office and storage building

at the Polk Bus Operating facility at a cost not to exceed

$485,111.

Section 2.

passage.

ATTEST:

This resolution is effective immediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

RESOLUTION NO. 92-148

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO EXERCISE OPTIONS FOR THEPURCHASE OF ADDITIONAL BUSES UNDER TWO EXISTING CONTRACTS WITHNEOPLAN, USA, INC.; AND MAKING FINDINGS AND PROVISIONS RELATIVE TOTHE SUBJECT.

WHEREAS, METRO entered into contracts with Neoplan USA, Inc.

for the purchase of forty-one suburban buses and thirty-six

articulated buses; and

WHEREAS, the contracts contain options for the purchase of

additional buses; and

WHEREAS, the acquisition of additional buses under the

existing contracts will provide METRO wi th lower costs per vehicle,

and avoid the extra costs for additional inventory and training;

and

WHEREAS, it is appropriate that METRO exercise the contract

options for the purchase of additional buses;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to exercise the option under contract number W20178C

with Neoplan USA, Inc. for the purchase of up to twenty additional

suburban buses at a unit cost of $351,584.

Section 2. The General Manager be and he is hereby authorized

and directed to exercise the option under contract number W20060C

with Neoplan USA, Inc. for the purchase of up to eighteen

additional articulated buses at a unit cost of $363,123.

RESOLUTION NO. 92-148 (Page 2)

Section 3. The General Manager is further authorized and

directed to request Letters of No Prejudice from the Federal

Transi t Administration for the additional buses purchased under the

contract options.

Section 4.

passage.

ATTEST:

This resolution is effective immediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

RESOLUTION NO. 92-149

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA MODIFICATION TO THE CONTRACT WITH FIRST CITY, TEXAS - HOUSTON FORBANKING SERVICES; AND MAKING FINDINGS AND PROVISIONS RELATIVE TOTHE SUBJECT.

WHEREAS, by way of Board Resolution 88-126, METRO entered into

contract with First City, Texas - Houston for banking services; and

WHEREAS, the contract contains an option to extend the period

of performance for three additional one-year periods; and

WHEREAS, it is in METRO's best interest to exercise the final

option for one additional year of service;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a modification to

the contract with First City, Texas - Houston for banking services

by extending the period of performance for one additional year and

increasing the maximum authorized expenditures under the contract

by $130,000.

Section 2.

passage.

ATTEST:

This resolution is effective immediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

RESOLUTION NO. 92-150

A RESOLUTION

AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA MODIFICATION TO THE CONTRACT WITH PAYDEN & RYGEL; AND MAKINGFINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.

WHEREAS, by way of Board Resolution 90-69, METRO entered into

a contract with Payden & Rygel to manage METRO's capital fund

account; and

WHEREAS, the contract contains an option to extend the period

of performance for two additional one-year periods; and

WHEREAS, Payden & Rygel has performed satisfactorily during

the initial contract term and during the first option period; and

WHEREAS, it is in METRO's best interest to exercise the final

option for additional services;

NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:

Section 1. The General Manager be and he is hereby authorized

and directed to negotiate, execute and deliver a modification to

the contract with Payden & Rygel for management of METRO's capital

fund account by extending -the period of performance for an

additional one-year period and increasing the maximum authorized

expenditures under the contract by $250,000.

RESOLUTION NO. 92-150 (Page 2)

Section 2.

passage.

ATTEST:

This resolution is effective immediately upon

PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992

I~·C.~Assistant Secretary

Chairman