RESOLUTION NO. 92-141
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH PIERCE GOODWIN ALEXANDER & LINVILLE FOR THEPRELIMINARY ARCHITECTURAL/ ENGINEERING DESIGN OF DOWNTOWN TRANSITSTREETS AND TRANSIT MALL; AND MAKING FINDINGS AND PROVISIONSRELATIVE TO THE SUBJECT.
WHEREAS, in July, METRO solicited qualification statements and
letters of interest from firms for the preliminary architectural/
engineering design of the Downtown Transi t Streets and Transi t
Mall; and
WHEREAS, the professional team headed by Pierce Goodwin
Alexander & Linville is most qualified to do the work;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract with
Pierce Goodwin Alexander & Linville for preliminary architec-
tural/engineering design of the Downtown Transit Streets and
Transit Mall at a cost not to exceed capital budget appropriations.
passage.
is effective immediately upon
this 24th day of September, 1992this 24th day of September, 1992
~-~--WfiiaIR F. BUrge~Chairman
RESOLUTION NO. 92-142
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH BENCON MANAGEMENT & GENERAL CONTRACTING CORPORATIONFOR THE REPAIR OF POTHOLES ALONG MAJOR THOROUGHFARES, COLLECTORSTREETS AND BUS ROUTES; AND MAKING FINDINGS AND PROVISIONS RELATIVETO THE SUBJECT.
WHEREAS, the repair of potholes along major thoroughfares,
collector streets and bus routes has been designated a General
Mobility project; and
WHEREAS, METRO issued an invitation for bid for certain
pothole repairs; and
WHEREAS, Bencon Management & General Contracting Corporation
submitted the lowest responsive and responsible bid;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract wi th
Bencon Management & General Contracting Corporation for the repair
of potholes along designated thoroughfares, collector streets and
bus routes in an amount not to exceed $452,500.
Section 2. This resolution is effective immediately upon
Assistant Secretary
this 24th day of September, 1992this 24th day of September, 1992
RESOLUTION NO. 92-143
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH TEXAS STERLING CONSTRUCTION INC. FOR THERECONSTRUCTION OF FULTON STREET FROM DELANEY TO EVELYN; AND MAKINGFINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.
WHEREAS, METRO invited bids for the reconstruction of Fulton
Street from Delaney to Evelyn; and
WHEREAS, the firm of Texas Sterling Construction, Inc.
submitted the lowest responsive and responsible bid;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract wi th
Texas Sterling Construction, Inc. for the reconstruction of Fulton
Street from Delaney to Evelyn at a cost not to exceed $2,634,400.
Section 2.
passage.
ATTEST:
This resolution is effective immediately upon
PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992
RESOLUTION NO. 92-144
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH COBB, FENDLEY AND ASSOCIA~ES FOR ENGINEERING ANDELECTRONIC DATA STORAGE, RETRIEVAL, DRAFTING AND MAPPING SERVICES;AND MAKING FINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.
WHEREAS, METRO has accumulated considerable data for the
development of design of the Regional Bus Plan, transit streets and
METRO facilities; and
WHEREAS, it is necessary that the data be converted to a
format that will enhance data utilization and accessibility for the
various METRO departments; and
WHEREAS, conversion to an interactive graphics system for
engineering and electronic data storage, retrieval, drafting and
mapping services will enhance data accessibility and utilization;
and
WHEREAS, the qualifications of firms to provide the necessary
services have been reviewed; and
WHEREAS, the firm of Cobb, Fendley and Associates is most
qualified to do the work.
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract wi th
Cobb, Fendley and Associates for engineering and electronic data
RESOLUTION NO. 92-144 (Page 2)
storage, retrieval, drafting, mapping and related services on an
interactive graphic system for an amount not to exceed $225,000
Section 2.
passage.
ATTEST:
This resolution is effective immediately upon
PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992
~-----';"--~~'~:'''',~,;'I.'\.,\,.., ~~~.";-::~.,\JTf\,f,('\\\,~ F.BUrge-,~
,..r; f,l -"'"" .H W )~t l;~(;hairman;1'"
(Co"-
~ " ,j" "'- .'
.."\".
~t~~,<·{rf··.l()f;4,\~ '4/::'"\ -.'i. H. f~ \ ~f'('"
,"\"~\,,\.,\~~~~~,,, 'tJ
RESOLUTION NO. 92-145
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH BROWN & ROOT, INC. AND WITH KENNETH BALK ANDASSOCIATES, INC. FOR DESIGN OF THE NORTHWEST TRANSIT CENTER/INNERKATY CONNECTOR AND THE EASTEX HOV INTERCHANGE NEAR QUITMAN STREETRESPECTIVELY; AND MAKING FINDINGS AND PROVISIONS RELATIVE TO THESUBJECT.
WHEREAS, METRO has proposed construction of a Northwest
Transit Center/Inner Katy Connector and an Eastex HOV interchange
near Quitman Street; and
WHEREAS, METRO has reviewed the qualifications of firms for
architect/engineer services; and
WHEREAS, the firm of Brown & Root, Inc. is most qualified to
perform architect/engineer services for design of the Northwest
Transit Center/Inner Katy Connector; and
WHEREAS, the firm of Kenneth Balk and Associates, Inc. is most
qualified to perform architect/engineer services for design of the
Eastex HOV Interchange near Quitman Street;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract wi th
Brown & Root, Inc. for architect/engineer services for design of
the Northwest Transit Center/Inner Katy Connector in an amount not
to exceed $------
Section 2. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract wi'th
Kenneth Balk and Associates, Inc. for architect/engineer services
RESOLUTION NO. 92-145 (Page 2 )
for design of the Eastex HOV Interchange near Quitman Street in an
amount not to exceed $------
Section 3.
passage.
This resolution is effective immediately upon
PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992
RESOLUTION NO. 92-146
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH MENENDEZ-DONNELL AND ASSOCIATES FOR FURNISHING ANDINSTALLING A PARTS CLEANING FURNACE SYSTEM AT THE KASHMERE BUSOPERATING FACILITY; AND MAKING FINDINGS AND PROVISIONS RELATIVE TOTHE SUBJECT.
WHEREAS, METRO's current method of cleaning rebu~lt parts uses
a chemical process which often causes production delays and
environmental problems; and
WHEREAS, a new parts cleaning method has been developed which
complies with environmental regulations by using a high-temperature
furnace; and
WHEREAS, METRO invited bids to furnish and install a parts
cleaning furnace system at the Kashmere Bus Operating Facility; and
WHEREAS, the firm of Menendez-Donnell and Associates submitted
the lowest responsive and responsible bid;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract with
Menendez-Donnell and Associates to furnish and install a parts
cleaning furnace system at the Kashmere Bus Operating Facility at
a cost not to exceed $178,782.
RESOLUTION NO. 92-146 (Page 2)
Section 2.
passage.
ATTEST:
This resolution is effective inunediately upon
PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992
RESOLUTION NO. 92-147
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA CONTRACT WITH D-III CONSTRUCTION, INC. FOR UPGRADE OF THE BUSWASHER, AND CONSTRUCTION OF A NEW SERVICE AND CLEAN OFFICE ANDSTORAGE BUILDING AT THE POLK BUS OPERATING FACILITY; AND MAKINGFINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.
WHEREAS, METRO invited bids for upgrade of the bus washer and
construction of a new service and clean office and storage building
at the Polk Bus Operating Facility; and
WHEREAS, D-III Construction, Inc. issued the lowest responsive
and responsible bid;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a contract with D-
III Construction, Inc. for upgrade of the bus washer and
construction of a new storage and clean office and storage building
at the Polk Bus Operating facility at a cost not to exceed
$485,111.
Section 2.
passage.
ATTEST:
This resolution is effective immediately upon
PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992
RESOLUTION NO. 92-148
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO EXERCISE OPTIONS FOR THEPURCHASE OF ADDITIONAL BUSES UNDER TWO EXISTING CONTRACTS WITHNEOPLAN, USA, INC.; AND MAKING FINDINGS AND PROVISIONS RELATIVE TOTHE SUBJECT.
WHEREAS, METRO entered into contracts with Neoplan USA, Inc.
for the purchase of forty-one suburban buses and thirty-six
articulated buses; and
WHEREAS, the contracts contain options for the purchase of
additional buses; and
WHEREAS, the acquisition of additional buses under the
existing contracts will provide METRO wi th lower costs per vehicle,
and avoid the extra costs for additional inventory and training;
and
WHEREAS, it is appropriate that METRO exercise the contract
options for the purchase of additional buses;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to exercise the option under contract number W20178C
with Neoplan USA, Inc. for the purchase of up to twenty additional
suburban buses at a unit cost of $351,584.
Section 2. The General Manager be and he is hereby authorized
and directed to exercise the option under contract number W20060C
with Neoplan USA, Inc. for the purchase of up to eighteen
additional articulated buses at a unit cost of $363,123.
RESOLUTION NO. 92-148 (Page 2)
Section 3. The General Manager is further authorized and
directed to request Letters of No Prejudice from the Federal
Transi t Administration for the additional buses purchased under the
contract options.
Section 4.
passage.
ATTEST:
This resolution is effective immediately upon
PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992
RESOLUTION NO. 92-149
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA MODIFICATION TO THE CONTRACT WITH FIRST CITY, TEXAS - HOUSTON FORBANKING SERVICES; AND MAKING FINDINGS AND PROVISIONS RELATIVE TOTHE SUBJECT.
WHEREAS, by way of Board Resolution 88-126, METRO entered into
contract with First City, Texas - Houston for banking services; and
WHEREAS, the contract contains an option to extend the period
of performance for three additional one-year periods; and
WHEREAS, it is in METRO's best interest to exercise the final
option for one additional year of service;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a modification to
the contract with First City, Texas - Houston for banking services
by extending the period of performance for one additional year and
increasing the maximum authorized expenditures under the contract
by $130,000.
Section 2.
passage.
ATTEST:
This resolution is effective immediately upon
PASSED this 24th day of September, 1992APPROVED this 24th day of September, 1992
RESOLUTION NO. 92-150
A RESOLUTION
AUTHORIZING THE GENERAL MANAGER TO NEGOTIATE, EXECUTE AND DELIVERA MODIFICATION TO THE CONTRACT WITH PAYDEN & RYGEL; AND MAKINGFINDINGS AND PROVISIONS RELATIVE TO THE SUBJECT.
WHEREAS, by way of Board Resolution 90-69, METRO entered into
a contract with Payden & Rygel to manage METRO's capital fund
account; and
WHEREAS, the contract contains an option to extend the period
of performance for two additional one-year periods; and
WHEREAS, Payden & Rygel has performed satisfactorily during
the initial contract term and during the first option period; and
WHEREAS, it is in METRO's best interest to exercise the final
option for additional services;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THEMETROPOLITAN TRANSIT AUTHORITY THAT:
Section 1. The General Manager be and he is hereby authorized
and directed to negotiate, execute and deliver a modification to
the contract with Payden & Rygel for management of METRO's capital
fund account by extending -the period of performance for an
additional one-year period and increasing the maximum authorized
expenditures under the contract by $250,000.