STREET - City of Napa
Transcript of STREET - City of Napa
City of Napa Standard Plans January 2022
- 27 -
STANDARD PLANS
STORMWATER QUALITY
City of Napa Standard Plans January 2022
- 28 -
INTENTIONALLY LEFT BLANK
VARIES
6"
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2
OF THE BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS,SEE CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SIE). SEE CITY STD.SWQ-120.
4. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB, WALL, ANDSIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICALENGINEERS AND APPROVED BY PUBLIC WORKS DEPARTMENT.
5. IF CHECK DAMS ARE NEEDED, SEE CONCRETE CHECK DAM CITY STD. SWQ-131.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST-CONSTRUCTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST-CONSTRUCTION MANUAL -PLANT MATRIX APPENDIX F.
9. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL - PLANT MATRIXAPPENDIX F.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
CONSTRUCTION NOTES1. SCARIFY SUBGRADE BEFORE INSTALLING
BIORETENTION AREA AGGREGATE AND BSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLY WETTING.IF WETTING, ALLOW TO DRY OVERNIGHTBEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTION AREADURING RAIN OR UNDER WET CONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
CURB INLET PER CITY STD.SWQ-120, GUTTER INLET ELEV. (GIE)
CURB AND GUTTERPER CITY STD. SWQ-110
MAINTAIN 6" BENCHNATIVE SOIL FOR
SUPPORT OF ADJACENTSIDEWALK/ROAD
(TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
OVERFLOW STRUCTURE ELEV. (OE)
4" MIN. EXPOSED WALL HEIGHT
SIDEWALK DRAINAGENOTCH 1" BELOWSIDEWALK, SLOPED TOFACILITY, SIDEWALK INLETELEV. (SIE)
DEEP CURB PERCITY STD. SWQ-111
CALTRANS CLASS 2PERMEABLE 12" MIN. DEPTH
PER PROJECT REQUIREMENTS
SIDEWALKSTREET
FINISHED ELEVATION (FE)
PLACE BSM IN 6" LIFTSPER NOTES
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
SIDEWALK PER CITYSTANDARDS
MULCH LAYER
BIORETENTIONSOIL MEDIA
(BSM)18" MIN
EXISTINGSUBGRADE
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
06/2018STREET BIORETENTION FACILITY(FLAT/PLANTER, NO ON-STREET PARKING, SIDEWALK, WITHOUT UNDERDRAIN) NONE
TCW
SWQ-100
JBLLFM
6" MIN.PONDING DEPTH
VARIES
EXISTINGSUBGRADE
6"
OVERFLOW STRUCTURE ELEV. (OE)
4" MIN. EXPOSED WALL HEIGHT
SIDEWALK DRAINAGE NOTCH1" BELOW SIDEWALK, SLOPEDTO FACILITY, SIDEWALK INLETELEV. (SIE)
DEEP CURB PER CITY STD.SWQ-111
SIDEWALK
STREET
FINISHED ELEVATION (FE)
PLACE BSM IN 6" LIFTS PERNOTES
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE.
SIDEWALK PER CITYSTANDARDS
18" M
IN
CURB INLET WITH GRATE PER CITY STD.SWQ-123, GUTTER INLET ELEV. (GIE)
CURB AND GUTTERPER CITY STD. SWQ-110
30 ML LINER MAY BEREQUIRED AT STREET
AGGREGATE 12" MIN. DEPTHPER PROJECT REQUIREMENTS
MULCH LAYER(OPTIONAL)
BIORETENTIONSOIL MEDIA
(BSM)
WIDTH PER CITYREQUIREMENTS
6" MIN.PONDING DEPTH
MAINTAIN 6" BENCH NATIVESOIL FOR SUPPORT OF
ADJACENT SIDEWALK/ROAD(TYP.)
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2
OF THE BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS,SEE CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SIE). SEE CITY STD.SWQ-120.
4. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB, WALL, ANDSIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICALENGINEERS AND APPROVED BY PUBLIC WORKS DEPARTMENT.
5. IF CHECK DAMS ARE NEEDED, SEE CONCRETE CHECK DAM CITY STD. SWQ-131.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST-CONSTRUCTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST-CONSTRUCTION MANUAL -PLANT MATRIX APPENDIX F.
9. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL - PLANT MATRIXAPPENDIX F.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
CONSTRUCTION NOTES1. SCARIFY SUBGRADE BEFORE INSTALLING
BIORETENTION AREA AGGREGATE AND BSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLY WETTING.IF WETTING, ALLOW TO DRY OVERNIGHTBEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTION AREADURING RAIN OR UNDER WET CONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
STREET BIORETENTION FACILITY(FLAT/PLANTER, ON-STREET PARKING, SIDEWALK, WITHOUT UNDERDRAIN)
TCW
SWQ-101
JBL06/2018NONE
LFM
24"
CONSTRUCTION NOTESDESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 &
4.2 OF BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOWBYPASS, PER CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITYSTD. SWQ-121 AND SWQ-122.
4. MAX. LONGITUDINAL SLOPE 6% WITH CHECK DAMS. SEE CITY STD. SWQ-130,SWQ-131.
5. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB ANDSIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICALENGINEERS AND APPROVED BY PUBLIC WORKS DEPARTMENT.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3PERMEABLE WITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADEDAGGREGATE. (VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAAPOST-CONSTRUCTION MANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST-CONSTRUCTION MANUALAPPENDIX F - PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL APPENDIX F -PLANT MATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
VARIES
BOTTOM WIDTH MIN.
MAINTAIN 6" BENCH NATIVESOIL FOR SUPPORT OF
ADJACENT SIDEWALK/ROAD(TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
18" M
IN
DO NOT USE FILTERFABRIC BETWEEN BSMAND AGGREGATE.
SIDEWALK ELEVATION (SE)
PLACE BSM IN 6" LIFTS,PER NOTES
SIDEWALKSTREET
OVERFLOWSTRUCTURE ELEV.(OE)
CURB INLET PER CITY STD.SWQ-121 AND SWQ-122, GUTTER
INLET ELEV. (GIE)
1. SCARIFY SUBGRADE BEFORE INSTALLINGBIORETENTION AREA AGGREGATE AND BSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLY WETTING.IF WETTING, ALLOW TO DRY OVERNIGHTBEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTION AREADURING RAIN OR UNDER WET CONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
EDGE CONDITION WILLVARY FOR NEW/RETROFIT,PER CITY STD SWQ-111,SWQ-112, AND SWQ-113
6"
3:1 MAX. W. SHELF
6" MIN.PONDING
CURB AND GUTTER PERCITY STD. SWQ-110
FINISHED ELEVATION (FE)
MULCH LAYER
CALTRANS CLASS 2 PERMEABLE 12" MIN.DEPTH PER PROJECT REQUIREMENTS
4:1 MAX. NO SHELF
12"
2% SHELF(TYP.)
EXISTINGSUBGRADE
BIORETENTIONSOIL MEDIA
(BSM)
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
STREET BIORETENTION FACILITY(SLOPED SIDED, NO ON-STREET PARKING, SIDEWALK, WITHOUT UNDERDRAIN)
TCW
SWQ-102
JBL06/2018NONE
LFM
SIDEWALKSTREET
CONSTRUCTION NOTES
24"
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2
OF THE BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS,CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITY STD.SWQ-121.
4. MAX. LONGITUDINAL SLOPE 6% WITH CHECK DAMS. SEE CITY STD. SWQ-130 ANDSWQ-131.
5. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB ANDSIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICALENGINEERS AND APPROVED BY PUBLIC WORKS DEPARTMENT.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST-CONSTRUCTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST-CONSTRUCTION MANUALAPPENDIX F - PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL APPENDIX F - PLANTMATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
VARIES
BOTTOM WIDTH MIN.
MAINTAIN 6" BENCH NATIVESOIL FOR SUPPORT OF
ADJACENT SIDEWALK/ROAD(TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
DO NOT USE FILTERFABRIC BETWEEN BSMAND AGGREGATE.
CALTRANS CLASS 2PERMEABLE 12" MIN. DEPTHPER PROJECT REQUIREMENTS
SIDEWALK ELEVATION(SE)
PLACE BSM IN 6" LIFTS,PER NOTES
OVERFLOWSTRUCTURE ELEV.(OE)
CURB INLETCITY STD. SWQ-121,
GUTTER INLET ELEV. (GIE)
1. SCARIFY SUBGRADE BEFORE INSTALLINGBIORETENTION AREA AGGREGATE ANDBSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, ALLOW TO DRYOVERNIGHT BEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTIONAREA DURING RAIN OR UNDER WETCONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
EDGE CONDITION WILLVARY FOR NEW/RETROFIT,CITY STD. SWQ-111,SWQ-112 AND SWQ-113
18" MIN6"
6" MIN.PONDING
CURB AND GUTTERCITY STD. SWQ-110
FINISHED ELEVATION (FE)
MULCH LAYER
12"
2% SHELF(TYP.)
3:1 MAX. W. SHELF
4:1 MAX. NO SHELF
BIORETENTIONSOIL MEDIA
(BSM)
EXISTINGSUBGRADE
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
STREET BIORETENTION FACILITY(SLOPED SIDED, WITH ON-STREET PARKING, SIDEWALK, WITHOUT UNDERDRAIN)
TCW
SWQ-103
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
EXISTINGSUBGRADE
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 &
4.2 OF THE BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS,CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITY STD.SWQ-120.
4. EDGE CONDITION WILL VARY FOR PARKING LOT PROJECTS. SEE PARKING LOT EDGEOPTIONS DETAILS SWQ-114. CURB AND FLUSH EDGE DETAILS MAY BE MODIFIED FORPROJECT BY CIVIL AND GEOTECHNICAL ENGINEERS AND APPROVED BY PUBLICWORKS DEPARTMENT.
5. IF CHECK DAMS ARE NEEDED, SEE CONCRETE CHECK DAM DETAIL SWQ-131.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST-CONSTRUCTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST-CONSTRUCTION MANUALAPPENDIX F-PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL APPENDIX F-PLANTMATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS-AVOIDDECORATIVE USE.
CONSTRUCTION NOTES1. SCARIFY SUBGRADE BEFORE
INSTALLING BIORETENTION AREAAGGREGATE AND BSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHSTO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
3. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, ALLOW TO DRYOVERNIGHT BEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTIONAREA DURING RAIN OR UNDER WETCONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
PARKING LOTPARKING LOT
FINISHED ELEVATION (FE)
PLACE BSM IN 6" LIFTSPER NOTES
DO NOT USE FILTER FABRIC
18" M
IN
CURB INLET CITY STD.SWQ-120, GUTTER INLET
ELEV. (GIE)
MAINTAIN 6" BENCH NATIVESOIL FOR SUPPORT OFADJACENT CURB/PAVING(TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
CALTRANS CLASS 2 PERMEABLE 12"MIN. DEPTH PER PROJECT
REQUIREMENTS
MULCH LAYER
BIORETENTIONSOIL MEDIA
(BSM)
6" 6"
FLUSH CURBSURFACE ELEVATION(SE)
PARKING EDGE WILL VARYFOR NEW/RETROFIT, CITY STD.SWQ-114
CURB AND GUTTER PERCITY STD. SWQ-110
OVERFLOWSTRUCTURE ELEV. (OE)
6" MIN.PONDING DEPTH
VARIES
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
PARKING LOT BIORETENTION FACILITY(FLAT/PLANTER, WITHOUT UNDERDRAIN)
TCW
SWQ-104
JBL06/2018NONE
LFM
PARKING LOTPARKING LOT
CONSTRUCTION NOTES
24"
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2 OF THE
BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS, PER CITYSTD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITY STD. SWQ-121.
4. MAX. LONGITUDINAL SLOPE 6% WITH CHECK DAMS. SEE CITY STD. SWQ-130 AND SWQ-131.
5. EDGE CONDITION WILL VARY FOR PARKING LOT PROJECTS. SEE PARKING LOT EDGE OPTIONSDETAILS, SWQ-114. CURB AND FLUSH EDGE DETAILS MAY BE MODIFIED FOR PROJECT BY CIVILAND GEOTECHNICAL ENGINEERS AND APPROVED BY PUBLIC WORKS DEPARTMENT.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLE WITH ANOVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE. (VERIFY WITH CITY OFNAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST-CONSTRUCTION MANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST-CONSTRUCTION MANUAL APPENDIXF-PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL APPENDIX F-PLANT MATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
VARIES
BOTTOM WIDTH MIN.
EXISTINGSUBGRADE
1. SCARIFY SUBGRADE BEFOREINSTALLING BIORETENTION AREAAGGREGATE AND BSM.
2. FACILITY EXCAVATION TO ALLOWFOR SPECIFIED SOIL AND MULCHDEPTHS TO ACHIEVE FINISHEDELEVATIONS ON CIVIL PLANS.
3. COMPACT EACH 6" LIFT OF BSMWITH LANDSCAPE ROLLER OR BYLIGHTLY WETTING. IF WETTING,ALLOW TO DRY OVERNIGHT BEFOREPLANTING.
4. DO NOT WORK WITHINBIORETENTION AREA DURING RAINOR UNDER WET CONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
18" MINBIORETENTION
SOIL MEDIA(BSM)
6"
6" MIN.PONDING
DEPTH
6"
MAINTAIN 6" BENCH NATIVE SOILFOR SUPPORT OF ADJACENT
CURB/PAVING (TYPICAL)
30 ML LINER MAYBE REQUIRED
(TYPICAL)
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLE 12"MIN. DEPTH PER PROJECTREQUIREMENTS
CURB INLET CITY STD.SWQ-121, GUTTER INLET
ELEV. (GIE)PARKING EDGE WILL VARYFOR NEW/RETROFIT, CITY STD.SWQ-114
CURB AND GUTTERDETAIL SWQ-110
FINISHEDELEVATION(FE)
MULCHLAYER
PLACE BSM IN 6" LIFTS,PER NOTES
FLUSH CURB SURFACEELEVATION (SE)
3:1 MAX. (TYPICAL)OVERFLOWSTRUCTURE ELEV.(OE)
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
PARKING LOT BIORETENTION FACILITY(SLOPED SIDED, WITHOUT UNDERDRAIN)
TCW
SWQ-105
JBL06/2018NONE
LFM
CONSTRUCTION NOTESDESIGN NOTES1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW
MAY BE REQUIRED FOR LONGER PLANTER WALL SPANS.STEEL REINFORCEMENT OR ADDITIONAL CONCRETECHECK DAMS MAY BE NEEDED FOR STABILITY.
2. EDGE CONDITION WILL VARY FOR NEW AND RETROFITPROJECTS. CURB, GUTTER, AND WALL DETAILS MAY BEMODIFIED BY CIVIL AND GEOTECHNICAL ENGINEERS ANDAPPROVED BY PUBLIC WORKS DEPARTMENT. NOTE THAT24" GUTTER PROVIDES GREATER CURB STABILITY, BUT MAYNOT MATCH CITY OF NAPA GUTTER STANDARDS.
3. CONCRETE AND EXPANSION JOINTS SHALL MEET THEREQUIREMENTS OF THE MUNICIPALITY.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
6"
R = 3 4"
DOWELS PER MUNICIPALSTANDARD
1.5"
BIORETENTIONAREA
AGGREGATE BASE PER MUNICIPALSTANDARD
24"
MIN. 24"
R = 3 4" TYP.
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
CURB AND GUTTERTCW
SWQ-110
JBL06/2018NONE
LFM
6"
1/2" DIAMETER SMOOTH DOWEL,24" LONG AT ALL EXPANSION JOINTS,PER CITY OF NAPA STANDARDS
CONSTRUCTION NOTESDESIGN NOTES1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW MAY BE
REQUIRED FOR LONGER SWALE EDGE SPANS. STEELREINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BENEEDED FOR STABILITY.
2. WHEN SIDEWALK DRAINS TO PLANTER, PROVIDE 4" - 6" WIDE NOTCHOPENINGS, 1" BELOW SIDEWALK, SLOPED TO FACILITY, PERBIORETENTION PLANTER DETAILS. SPACE OPENINGS TO CONVEYFLOWS. PROVIDE MINIMUM 2" COVER BETWEEN DRAINAGE NOTCHOPENING AND DOWELS.
3. CONCRETE AND EXPANSION JOINTS SHALL MEET THE REQUIREMENTSOF THE CITY OF NAPA.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
1.5"
MIN. 24"
6"
STORMWATERFACILITY
R = 3 4" R = 3 4" TYP.
6" STREET/4" SIDEWALK
STREET/SIDEWALK/PARKING
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
DEEP CURBTCW
SWQ-111
JBL06/2018NONE
LFM
6"
SIDEWALK SECTION PERCITY STD. S-4.
CONSTRUCTION NOTESDESIGN NOTES1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW
MAY BE REQUIRED FOR LONGER FACILITY EDGE SPANS.STEEL REINFORCEMENT OR ADDITIONAL CONCRETECHECK DAMS MAY BE NEEDED FOR STABILITY.
3. FINISHED ELEVATION REVEAL - WHERE SIDEWALK CONVEYSSHEET FLOW TO FACILITY, A 1"-2" REVEAL SHOULD BEMAINTAINED BETWEEN SIDEWALK AND FACILITY FINISHEDGRADE TO AVOID MULCH OR PLANT BUILDUP FROMBLOCKING FLOWS.
4. CONCRETE AND EXPANSION JOINTS SHALL MEET THEREQUIREMENTS OF THE CITY OF NAPA.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
PROVIDE 2% SHELF ATPEDESTRIAN INTERFACE
1"-2"
MIN. 12"
STORMWATERFACILITY
FINISHED ELEVATION REVEAL, SEEDESIGN NOTE
1/2" DIAMETER SMOOTH DOWEL, 24"LONG AT ALL EXPANSION JOINTS
SIDEWALK
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
THICKENED EDGE SIDEWALKTCW
SWQ-112
JBL
8"
06/2018NONE
LFM
6"
1/2" DIAMETER SMOOTH DOWEL, 24"LONG AT ALL EXPANSION JOINTS
CONSTRUCTION NOTESDESIGN NOTES1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW
MAY BE REQUIRED FOR LONGER FACILITY EDGE SPANS.STEEL REINFORCEMENT OR ADDITIONAL CONCRETECHECK DAMS MAY BE NEEDED FOR STABILITY.
2. EDGE CONDITION WILL VARY FOR PROJECTS. CURBDETAILS MAY BE MODIFIED BY CIVIL AND GEOTECHNICALENGINEERS AND APPROVED BY PUBLIC WORKSDEPARTMENT.
3. CONCRETE AND EXPANSION JOINTS SHALL MEET THEREQUIREMENTS OF THE CITY OF NAPA.
4. FINISHED ELEVATION REVEAL AT SIDEWALK - WHERESIDEWALK CONVEYS SHEET FLOW TO FACILITY, A 1"-2"REVEAL SHOULD BE MAINTAINED BETWEEN SIDEWALK ANDFACILITY FINISHED GRADE TO AVOID MULCH OR PLANTBUILDUP FROM BLOCKING FLOWS AND REDUCE DROP ATPEDESTRIAN INTERFACE.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
SIDEWALK/PARKING SECTION PERMUNICIPAL STANDARDS (MAY BEUSED WITH EXISTING SURFACE)
PROVIDE 2% SHELF ATPEDESTRIAN INTERFACE
MIN. 12"
FINISHED ELEVATION REVEAL,SEE DESIGN NOTE
STORMWATERFACILITY
SIDEWALK/PARKING
MIN
. 8"
1"-2"
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
FLUSH CURB AT SIDEWALKTCW
SWQ-113
JBL06/2018NONE
LFM
DESIGN NOTES1. WHEEL STOPS MAY BE USED ON NON-FLUSH DESIGNS TO
KEEP CARS FROM OVERHANGING BIORETENTION FACILITY.
2. VEHICLE OVERHANG CAN BE USED TO REDUCEIMPERVIOUS PAVEMENT AREA.
3. WHERE VEHICLE OVERHANG IS UTILIZED SELECT LOWGROWING PLANTS THAT WILL TOLERATE SHADING.
PARKING LOT
STORMWATERFACILITY
DEEP CURB
DEEP CURBDETAIL SWQ-111
STORMWATERFACILITY
PARKING LOT
CURB AND GUTTER
CURB AND GUTTERDETAIL SWQ-110
PARKING LOT
STORMWATERFACILITY
FLUSH EDGE/WHEEL STOPS
FLUSH CURBDETAIL
SWQ-113
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
PARKING LOT EDGE OPTIONSTCW
SWQ-114
JBL06/2018NONE
LFM
STRE
ET
4'-6"AA
STREET 1'-6"
12"
CUR
BC
URB
6"
1'-6"
2'-6"
6"
6"
8"
DESIGN NOTES1. FOR USE WITH STORMWATER FACILITIES WITH FLAT
BOTTOMS.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE, OE, GIE, IE).SEE CITY STD. SWQ-100.
3. CURB AND WALL DETAILS MAY BE MODIFIED BY CIVIL ANDGEOTECHNICAL ENGINEERS AND APPROVED BY PUBLICWORKS DEPARTMENT.
4. CURB HEIGHT MAY BE REDUCED TO 4-INCHES WHEREADJACENT TO A SIDEWALK. SEE CITY STD. SWQ-110 ANDSWQ-111.
CONSTRUCTION NOTES1. AFTER CONSTRUCTION PLACE SAND BAGS AT
GUTTER OPENINGS TO KEEP STORM FLOWS FROMENTERING FACILITY UNTIL VEGETATION ISESTABLISHED.
PLAN VIEW
PERSPECTIVE VIEW
SECTION A-A
6"
R=6"
6"
DEPRESS GUTTER 2" ATOPENING, GUTTER INLET
ELEVATION (GIE)
CURB AND GUTTER,CITY STD. SWQ-110
FINISHEDELEVATION (FE)
DEPRESS GUTTER 2" AT OPENING,GUTTER INLET ELEVATION (GIE)
4" THICK CONCRETESPLASH PAD
DEPRESS GUTTER 2"AT OPENING
4" THICK CONCRETESPLASH PAD AT FACILITY
FINISHED ELEVATION
R = 3 4"TYP.
1'-6"
1'-6"
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
CURB CUT INLET FOR PLANTERSTCW
SWQ-120
JBL06/2018NONE
LFM
6"6"
8"
1'-6"
1 : 2
BIORETENTION DESIGN NOTES1. FOR USE WITH STORMWATER FACILITIES WITH
SIDE SLOPES.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE, OE,GIE, IE). SEE CITY STD SWQ-100.
3. CURB AND WALL DETAILS MAY BE MODIFIED BYCIVIL AND GEOTECHNICAL ENGINEERS ANDAPPROVED BY PUBLIC WORKS DEPARTMENT.
4. WHERE INLET FLOW VELOCITY IS HIGH, EXTENDCOBBLE INTO FACILITY, BUT AVOID EXCESSIVEUSE.
5. CURB HEIGHT MAY BE REDUCED TO 4-INCHESWHERE ADJACENT TO A SIDEWALK. SEE CITYSTD. SWQ-110 AND SWQ-111.
SECTION A-A
PERSPECTIVE VIEW
PLAN VIEW
CURB RETURN
CURB RETURN
CONSTRUCTION NOTES1. AFTER CONSTRUCTION, PLACE SAND BAGS
AT GUTTER OPENINGS TO KEEP STORMFLOWS FROM ENTERING FACILITY UNTILVEGETATION IS ESTABLISHED.
STRE
ET
4'-6"AA 1'-6"
12"
CUR
BC
URB
1"
1'-6"
R=6"
STREET
DEPRESS GUTTER 2"AT OPENING
1'-6"
8"
4"
PLACE 6" DEEP 3"-6" ROUNDED,WASHED, COBBLE ATCONCRETE INLET, SEE DESIGNNOTES
2'-0"
COBBLEENERGYDISSIPATION
DEPRESS GUTTER 2" ATOPENING, GUTTERINLET ELEVATION (GIE)
DEPRESS GUTTER 2"AT OPENING, GUTTER
INLET ELEVATION(GIE)
CURB AND GUTTER,CITY STD. SWQ-110
FINISHED ELEVATION (FE)
STORMWATERFACILITY
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
CURB CUT INLET FOR SIDE SLOPES(RAIN GARDEN OR SWALE)
TCW
SWQ-121
JBL06/2018NONE
LFM
2" 2"
18" MIN
BIORETENTION DESIGN NOTES1. FOR USE WITH STORMWATER FACILITIES WITH
SLOPED SIDES OR FLAT BOTTOMS.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE,OE, GIE, IE). SEE CITY STD SWQ-100 ANDSWQ-101.
3. DROP FROM INLET TO AGGREGATE PADWILL BE GREATER FOR PLANTERS.
3. CURB AND WALL DETAILS MAY BE MODIFIEDBY CIVIL AND GEOTECHNICAL ENGINEERSAND APPROVED BY PUBLIC WORKSDEPARTMENT.
4. WHERE INLET FLOW VELOCITY IS HIGH,EXTEND COBBLE INTO FACILITY, BUT AVOIDEXCESSIVE USE.
CONSTRUCTION NOTES1. AFTER CONSTRUCTION PLACE SAND BAGS
AT GUTTER OPENINGS TO KEEP STORMFLOWS FROM ENTERING FACILITY UNTILVEGETATION IS ESTABLISHED.
PLAN VIEW
SECTION A-A
4'-6"
6"
1'-6"
12"
2'-6"
1'-6"
STRE
ET
AA
CUR
BC
URB
6" DEPTH OF 3" - 6"ROUNDED, WASHEDCOBBLE
MIN. 2" DROP TO COBBLE
NOSE DOWN CURBOVER 6" (TYP.)
6"
GUTTER BEYOND
MIN. DROPTO COBBLE
MIN.
STORMWATERFACILITY
DEPRESS GUTTER 2"AT OPENING, GUTTERINLET ELEVATION(GIE)
DEPRESS GUTTER 2"AT OPENING, GUTTER
INLET ELEVATION(GIE)
CURB AND GUTTER,CITY STD. SWQ-110
FINISHEDELEVATION (FE)
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
CURB CUT INLET(WITH GRAVEL ENERGY DISSIPATION)
TCW
SWQ-122
JBL06/2018NONE
LFM
AA
STREET
6"
1" SHELF
18" GAP
DEPTH PERMANUFACTURER
STORMWATERFACILITY
B
B
INLET CURB
VARIES
0"
2%
VARIES
2%
STORMWATER FACILITYFLAT BOTTOM OR
SLOPE SIDED
GUT
TER
CUR
B
PLAN VIEW
SECTION B-B
BIORETENTION DESIGN NOTES1. FOR USE WITH STORMWATER FACILITIES WITH SLOPED SIDES OR FLAT BOTTOMS.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE, OE, GIE, IPE). SEE CITY STD. SWQ-100AND SWQ-101.
3. REFER TO CITY OF NAPA STANDARD DRAWINGS AND MATCH GUTTER PAN OFADJACENT CURB AND GUTTER.
4. IF SLOPED SIDES, WHERE INLET FLOW VELOCITY IS HIGH, EXTEND COBBLE INTOFACILITY, BUT AVOID EXCESSIVE USE.
5. BASE MATERIAL FOR CURB, GUTTER, AND SIDEWALK PER CITY OF NAPASTANDARDS.
SECTION A-A
CONSTRUCTION NOTES1. AFTER CONSTRUCTION PLACE SAND BAGS
AT GUTTER OPENINGS TO KEEP STORMFLOWS FROM ENTERING FACILITY UNTILVEGETATION IS ESTABLISHED.
12" T
YP. PL
AN
TER
WA
LL
24"
2"
GRATE AND FRAME
DEPRESS GUTTER 2"AT OPENING (GIE)
ADA COMPLIANTMANUFACTURED STEELGRATE AND FRAME
6" DEPTH OF 3" - 6"ROUNDED, WASHEDCOBBLE SPLASH PAD
BEVEL PLANTER WALL TOTOP OF INLET
INLET CHANNELWALLS
GRATE/FRAMEWIDTH PER PLAN
BOLT GRATEIN PLACE
SEE GRATE ANDFRAME DETAIL
WALL PER FACILITYDESIGN
OVERFLOW ELEV. PERFACILITY DESIGN (GOE)
GRATE
1/4" BOLTS,FLUSH
THREAD BOLTINTO FRAME PERMANUFACTURER
TOP OF GRATE= TOP OF CURB
FRAME
MATCH EXIST.CURB/GUTTER
EXPANSIONJOIN EACHSIDE (TYP.)
GUTTERFLOW LINE
COBBLE SPLASH PAD
DEPRESSGUTTER
2", (GIE)
INLET PANELEVATION (IPE)
DEPRESSGUTTER 2", (GIE) INLET PAN
ELEVATION (IPE)
CURB AND GUTTER,CITY STD. SWQ-110
SIDEWALK/GRATE
FINISHEDELEVATION (FE)
SIDEWALK ORPARKINGEGRESS
FLOW
INLET CURB
CUR
B
GUT
TER
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
INLET WITH GRATETCW
SWQ-123
JBL06/2018NONE
LFM
AA
STREET
6"
B
VARIES
2%
VARIES
2%
STORMWATER FACILITYFLAT BOTTOM OR
SLOPE SIDED
CUR
BPLAN VIEW
BIORETENTION DESIGN NOTES1. FOR USE WITH STORMWATER FACILITIES WITH SLOPED SIDES OR FLAT BOTTOMS.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE, OE, GIE, IPE). SEE CITY STD. SWQ-100AND SWQ-101.
3. REFER TO CITY OF NAPA STANDARD DRAWINGS AND MATCH GUTTER PAN OFADJACENT CURB AND GUTTER.
4. IF SLOPED SIDES, WHERE INLET FLOW VELOCITY IS HIGH, EXTEND COBBLE INTOFACILITY, BUT AVOID EXCESSIVE USE.
5. BASE MATERIAL FOR CURB, GUTTER, AND SIDEWALK PER CITY OF NAPA STANDARDS.
SECTION A-A
CONSTRUCTION NOTES1. AFTER CONSTRUCTION PLACE GRAVEL
BAGS AT GUTTER OPENINGS TO KEEPSTORM FLOWS FROM ENTERING FACILITYUNTIL VEGETATION IS ESTABLISHED.
2. GALVANIZED STEEL TO BE 1/4" THICK.
3. ALL CONCRETE SHALL BE CLASS "A" (6SACK PER CUBIC YARD).
4. GALVANIZED STEEL BOX TO BE DESIGNEDPER CITY STD. D-5B.
12" T
YP. PL
AN
TER
WA
LL
24"
2"
DEPRESS GUTTER 2"AT OPENING (GIE)
6" DEPTH OF 3" - 6" ROUNDED,WASHED COBBLE SPLASH PADPER CITY STD. SWQ-122
WALL PER FACILITY DESIGN
COBBLE SPLASH PAD
CURB CUT INLET FOR PLANTERS,CITY STD. SWQ-120
INLET PANELEVATION (IPE)
INLET PANELEVATION (IPE)
CURB AND GUTTER, CITY STD.SWQ-110
FINISHED ELEVATION (FE)
SIDEWALK ORPARKINGEGRESS
CUR
B
GUT
TER
STORMWATERFACILITY
ENCLOSEDSTEEL BOX
FLOW
4"
FLOWLINE OF BOXSET AT FLOWLINE OF GUTTER
10 GAGE WIRE MESH (4"x4"),WIDTH OF BOX + 24",CENTERED OVER BOX.
SIDEWALK PERCITY STD. S-4
6" MIN
2'
SECTION B-B
B
GUT
TER
F/C
2 - #4 BARS 24" LONG
18"x3" ENCLOSEDSTEEL BOX
2" MINIMUM
4" PCC
GALVANIZED STEEL BOXMINIMUM 1' 6" WIDE
3" MIN
CURB HEIGHT PERCITY STD. S-2
SUBGRADE COMPACTEDTO 95%
CLASS 2 AB
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
INLET WITH UNDER SIDEWALK DRAIN(COMMERCIAL)
TCW
SWQ-123A
JBL06/2018NONE
LFM
A
A
2" MIN
FLOW
SPECIFY
SPECIFY
SECTION A-A
BIORETENTION DESIGN NOTES1. FOR USE WITH STORMWATER FACILITIES WITH SLOPED
SIDES.
2. BEST SUITED FOR FACILITIES WITH < OF <= THAN 2%LONGITUDINAL SLOPE.
3. PROVIDE ELEVATIONS AND STATIONING AND/ORDIMENSIONING FOR CHECK DAMS.
4. SPACE CHECK DAMS TO MAXIMIZE PONDING ACROSSENTIRE CELL.
5. ENSURE THAT CHECK DAM ELEVATIONS DO NOT CAUSESTORMWATER TO OVERFLOW TO SIDEWALK.
CONSTRUCTION NOTES1. DO NOT WORK DURING RAIN OR UNDER WET
CONDITIONS.
2. KEEP ALL HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
CURB AND GUTTER PERBIORETENTION WITH
SIDESLOPE DETAIL4" -6" WASHED
COBBLE
TOP OF CHECK DAM
SLOPE 2:1
4" - 6" WASHEDCOBBLE
SLOPE 2:1
BSM
2" MIN
BIORETENTION SOIL MEDIA (BSM)
STREET SIDEWALK
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
GRAVEL CHECK DAMTCW
SWQ-130
JBL06/2018NONE
LFM
6"
BSM 18" MINBSM
6"
EXISTING SUBGRADEOR ROCK STORAGE
3" (TYP.)
3" (TYP.)
3" 3"
3" (TYP.)
CURB AND GUTTER ORPLANTER WALL
BIORETENTION DESIGN NOTES1. FOR USE WITH BIORETENTION PLANTERS OR SLOPED SIDED
SWALES/RAIN GARDENS.
2. FOR CHECK DAMS LONGER THAN 12' SPECIFY REBAROVERLAP LENGTH.
3. SPACE CHECK DAMS TO MAXIMIZE PONDING ACROSSCELLS.
4. PROVIDE ELEVATIONS AND STATIONING AND/ORDIMENSIONING FOR CHECK DAMS.
5. ENSURE THAT CHECK DAM ELEVATIONS DO NOT CAUSESTORMWATER TO OVERFLOW TO SIDEWALK.
6. SHOW PLANTER WALL EMBEDDED IN EXISTING SUBGRADEOR DRAINROCK.
CONSTRUCTION NOTES1. EMBED #3 REBAR 3" INTO CURB AND PLANTER
WALL.
2. DO NOT WORK DURING RAIN OR UNDER WETCONDITIONS.
3. KEEP ALL HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
SEE CONSTRUCTIONNOTE 2
PLANTER WALL
LAP SPLICE #3 REBAR TOEMBEDDED REBAR, OVERLAP 12"(SEE DESIGN NOTE 2)
TOP OF SIDEWALKTOP OF PLANTER WALL
#3 REBAR
6" OF 3"-6" ROUNDED,WASHED COBBLE
EXISTING SUBGRADEOR ROCK STORAGE
FLOW2" FREEBOARD
SIDEWALK
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
CONCRETE CHECK DAMTCW
SWQ-131
JBL06/2018NONE
LFM
24"
24 3 4"
9"
BEEHIVE GRATE
1778"
24"x4" REVERSIBLE MANHOLE FRAME
10"
DESIGN NOTES1. PROVIDE GRATE OVERFLOW ELEVATION ON PLANS.
2. TO INCORPORATE FLEXIBILITY INTO DESIGN OVERFLOWELEVATION OR CORRECT ELEVATION OF AN EXISTINGSTRUCTURE, INSTALL OVERFLOW COLLAR, PER CITY STD.SWQ-141.
CONSTRUCTION NOTES1. DO NOT ADJUST OVERFLOW GRATE ELEVATION,
CONSTRUCT AS SHOWN ON PLANS.
MANHOLE RING AND BEEHIVE GRATEMH25BH BY OLYMPIC FOUNDRY OR
APPROVED EQUAL
1934"
19"
1778"
19"253
8"
3"12"
34"
PONDING DEPTH
WIRE ROPE BEEHIVE GRATE, SEE BELOW
MANHOLE FRAME, SEE BELOW
EPOXY MANHOLE FRAME TOSTD. REINF. CONC. PIPE CLASS III
SPECIFY GRATE OVERFLOW ELEVATION TOACHIEVE DESIGN PONDING DEPTH (GOE)
ADJACENT STORMWATERFACILITY PLANTING SURFACE
#4 REBAR U-BOLT
STD. REINF. CONC. PIPE CLASS III
SLOPE TO DRAIN
PRECAST OR POURED INPLACE 6" MIN. DEPTH
GROUT PIPE AT BASE
3000 PSI COMMERCIALGRADE CONCRETE
GROUT AT CONNECTION
CONNECT TO APPROVEDDISCHARGED POINT
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
OVERFLOW STRUCTUREW/ BEEHIVE GRATE
TCW
SWQ-140
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
DESIGN NOTES1. MAY BE USED IN CONJUNCTION WITH
OVERFLOW STRUCTURES TO ALLOW FOR FIELDADJUSTMENT OF OVERFLOW ELEVATION, OR ASRETROFIT TO CORRECT EXISTING STRUCTURETHAT DOES NOT ALLOW PONDING TO OCCUR.
2. PROVIDE COLLAR OVERFLOW ELEVATION (COE)ON PLANS.
CONSTRUCTION NOTES1. CENTER COLLAR ON OVERFLOW GRATE.
SPECIFY COLLAR OVERFLOWELEVATION TO ACHIEVE DESIGN
PONDING DEPTH (COE)
ADJACENT STORMWATERFACILITY PLANTING SURFACE 2"-5"
MIN. 10"
30" OR 36" DIA. STEEL OR RIGIDPLASTIC PIPE COLLAR, OR DIA. ASNEEDED TO SURROUND EXISTINGOVERFLOW STRUCTURE FORRETROFITS
BACKFILL WITH CALTRANS CLASS 2OR 3 PERMEABLE
PONDING DEPTH VARIES
OVERFLOW STRUCTURE
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
OVERFLOW STRUCTURE COLLARTCW
SWQ-141
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
HDPE OR PVC 30 MIL LINER
1/8" MIN ALUMINUM FLAT BAR, 2" WIDTH
2" x 1/4" HIT ANCHOR 12"O.C.
TRIM LINER TO TOP EDGE OF FLAT BAR. SILICONESEAL TOP EDGE OF FLAT BAR. TOP OF LINER TO BE3" BELOW SOIL LEVEL.
DEPTH OF LINER PER CIVIL/GEOTECHNICAL ENGINEER
STORMWATERFACILITY
ADJACENTCURB ORPLANTER
WALL
CHECKED BY:APPROVED BY:DRAWING NO.
PUBLIC WORKS DEPARTMENT
IMPERMEABLE LAYERTCW
SWQ-150
JBL
CITY OF NAPADRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
CHECKED BY:APPROVED BY:DRAWING NO.
PUBLIC WORKS DEPARTMENT
BIORETENTION FACILITY PLANT MATRIX(KEY)
TCW
SWQ-160
JBL
CITY OF NAPADRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
BIORETENTION FACILITY PLANT MATRIXTCW
SWQ-161A
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
BIORETENTION FACILITY PLANT MATRIXTCW
SWQ-161B
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
PLANTING INUNDATION ZONESTCW
SWQ-162
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
VARIES
18" MIN
EXISTINGSUBGRADE
6"
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 &
4.2 OF THE BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS,CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE,OE, GIE, SIE). SEE CITY STD.SWQ-120.
4. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB, WALL, ANDSIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICALENGINEERS AND APPROVED BY THE PUBLIC WORKS DEPARTMENT.
5. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITHSWEEP BEND.
6. IF CHECK DAMS ARE NEEDED, SEE CONCRETE CHECK DAM PER CITY STD. SWQ-131.
7. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
8. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST-CONSTRUCTIONMANUAL.
9. PLANT SELECTION PER BASMAA POST-CONSTRUCTION MANUAL APPENDIX F - PLANTMATRIX.
10. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL APPENDIX F -PLANT MATRIX.
11. LOCATE ENERGY DISSIPATION COBBLE PADS AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
CONSTRUCTION NOTES1. SCARIFY SUBGRADE BEFORE INSTALLING
BIORETENTION AREA AGGREGATE ANDBSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. INSTALL UNDERDRAIN WITH HOLESFACING DOWN. UNDERDRAINDISCHARGE ELEVATION SHALL BE NEARTOP OF AGGREGATE LAYER.UNDERDRAIN SLOPE MAY BE FLAT.
4. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, LET DRYOVERNIGHT BEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTIONAREA DURING RAIN OR UNDER WETCONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
CURB INLET PER CITY STD.SWQ-120, GUTTER INLET ELEV.
(GIE)CURB AND GUTTER
PER CITY STD.SWQ-110
MAINTAIN 6" BENCH NATIVE SOILFOR SUPPORT OF ADJACENT
SIDEWALK/ROAD (TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
OVERFLOWSTRUCTURE ELEV.(OE)
4" MIN. EXPOSED WALL HEIGHT
SIDEWALK DRAINAGE NOTCH 1"LOWER THAN SIDEWALK, SLOPEDTO FACILITY, SIDEWALK INLETELEV. (SIE)
DEEP CURB PERCITY STD. SWQ-111
UNDERDRAIN, MIN. 4" DIA. PVC SDR 35PERFORATED PIPE, SEE CONSTRUCTION NOTE
SIDEWALK
FINISHEDELEVATION(FE)
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
STREET
12" MIN
6" MIN.PONDING DEPTH
BIORETENTIONSOIL MEDIA
(BSM)
12" DEPTH CALTRANSCLASS 2 PERMEABLE
PLACE BSM IN 6" LIFTS, PER NOTES
SIDEWALK PER CITYOF NAPA STANDARDS
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
STREET BIORETENTION FACILITY(FLAT/PLANTER, NO ON-STREET PARKING, SIDEWALK, WITH UNDERDRAIN)
TCW
SWQ-200
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
EXISTINGSUBGRADE
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2
OF THE BASMAA POST-CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS,CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SIE). SEE CITY STD.SWQ-120.
4. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB, WALL, ANDSIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICALENGINEERS.
5. IF CHECK DAMS ARE NEEDED, SEE CONCRETE CHECK DAM PER CITY STD. SWQ-131.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST-CONSTRUCTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST-CONSTRUCTION MANUALAPPENDIX F-PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST-CONSTRUCTION MANUAL APPENDIX F-PLANTMATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS-AVOIDDECORATIVE USE.
CONSTRUCTION NOTES1. SCARIFY SUBGRADE BEFORE
INSTALLING BIORETENTION AREAAGGREGATE AND BSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHSTO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
3. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, ALLOW TO DRYOVERNIGHT BEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTIONAREA DURING RAIN OR UNDER WETCONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
SIDEWALK
STREET
BIORETENTIONSOIL MEDIA
(BSM) 18" M
IN
6"
12" MIN
VARIES
6" MIN.PONDING DEPTH
WIDTH PER CITY OF NAPAREQUIREMENTS
OVERFLOWSTRUCTURE ELEV. (OE) 4" MIN. EXPOSED WALL HEIGHT
FINISHEDELEVATION (FE)
MAINTAIN 6" BENCH NATIVE SOILFOR SUPPORT OF ADJACENT
SIDEWALK/ROAD (TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
12" MIN CALTRANS CLASS 2PERMEABLE BASE PER PROJECT
REQUIREMENTS
PLACE BSM IN 6" LIFTSPER NOTES
UNDERDRAIN, MIN. 4" DIA. PVC SDR 35PERFORATED PIPE, SEE CONSTRUCTION NOTE
DO NOT USE FILTER FABRIC
DEEP CURB PER CITY STD.SWQ-111
SIDEWALK PER CITY OFNAPA STANDARDS
SIDEWALK DRAINAGE NOTCH1" BELOW SIDEWALK, SLOPEDTO FACILITY, SIDEWALK INLETELEV. (SIE)
MULCH LAYER(OPTIONAL)
CURB INLET WITH GRATE PER CITY STD.SWQ-123, GUTTER INLET ELEV. (GIE)
CURB AND GUTTER PERCITY STD. SWQ-110
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
STREET BIORETENTION FACILITY(FLAT/PLANTER, WITH ON-STREET PARKING, SIDEWALK, WITH UNDERDRAIN)
TCW
SWQ-201
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
CONSTRUCTION NOTES
24"
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2 OF
THE BASMAA POST CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS, CITYSTD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITY STD.SWQ-121 AND SWQ-122.
4. MAX. LONGITUDINAL SLOPE 6% WITH CHECK DAMS. SEE CITY STD. SWQ-130 AND SWQ-131.
5. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB AND SIDEWALKDETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICAL ENGINEERS ANDAPPROVED BY PUBLIC WORKS DEPARTMENT.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLE WITHAN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE. (VERIFY WITHCITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST CONSTRCUTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST CONSTRUCTION MANUALAPPENDIX F PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST CONSTRUCTION MANUAL APPENDIX F PLANTMATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
BOTTOM WIDTH MIN.
MAINTAIN 6" BENCH NATIVESOIL FOR SUPPORT OF
ADJACENT SIDEWALK/ROAD(TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
EXISTINGSUBGRADE
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
SIDEWALK ELEVATION(SE)
PLACE BSM IN 6" LIFTS,PER NOTES
SIDEWALKSTREET
OVERFLOW STRUCTURE ELEV. (OE)CURB INLET PER CITY STD. SWQ-121 ANDSWQ-122, GUTTER INLET ELEV. (GIE)
1. SCARIFY SUBGRADE BEFORE INSTALLINGBIORETENTION AREA AGGREGATE ANDBSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
3. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, ALLOW TO DRYOVERNIGHT BEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTIONAREA DURING RAIN OR UNDER WETCONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
EDGE CONDITION WILL VARYFOR NEW/RETROFIT, PER CITYSTD. SWQ-111, SWQ-112 ANDSWQ-113
BIORETENTIONSOIL MEDIA
(BSM)
6"
6" MIN.PONDING
CURB AND GUTTER PERCITY STD. SWQ-110
FINISHEDELEVATION
(FE)
MULCH LAYER
12"
CALTRANS CLASS 2 PERMEABLE 12"MIN.DEPTH PER PROJECT REQUIREMENTS
3:1 MAX. W. SHELF4:1 MAX. NO SHELF
VARIES
12" MIN
18" M
IN
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
STREET BIORETENTION FACILITY(SLOPED SIDED, NO ON-STREET PARKING, SIDEWALK, WITH UNDERDRAIN)
TCW
SWQ-202
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
CONSTRUCTION NOTES
12"
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 &
4.2 OF THE BASMAA POST CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT AN OVERFLOWBYPASS, CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITY STD.SWQ-121.
4. MAX. LONGITUDINAL SLOPE 6% WITH CHECK DAMS. SEE CITY STD. SWQ-130 ANDSWQ-131.
5. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB ANDSIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND GEOTECHNICALENGINEERS AND APPROVED BY PUBLIC WORKS DEPARTMENT.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST CONSTRCUTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST CONSTRUCTION MANUALAPPENDIX F PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST CONSTRUCTION MANUAL APPENDIX F PLANTMATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
VARIES
MAINTAIN 6" BENCH NATIVESOIL FOR SUPPORT OFADJACENT SIDEWALK/ROAD(TYPICAL)EXISTING
SUBGRADEDO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
SIDEWALK ELEVATION (SE)
SIDEWALK
OVERFLOWSTRUCTUREELEV. (OE)
CURB INLET SEE CITY STD.SWQ-121 GUTTER INLET ELEV.
(GIE)
1. SCARIFY SUBGRADE BEFORE INSTALLINGBIORETENTION AREA AGGREGATE ANDBSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. INSTALL UNDERDRAIN WITH HOLES FACINGDOWN. UNDERDRAIN DISCHARGEELEVATION SHALL BE NEAR TOP OFAGGREGATE LAYER. UNDERDRAIN SLOPEMAY BE FLAT.
4. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, LET DRY OVERNIGHTBEFORE PLANTING.
4. DO NOT WORK WITHIN BIORETENTION AREADURING RAIN OR UNDER WET CONDITIONS.
5. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
EDGE CONDITION WILLVARY FOR NEW/RETROFIT,CITY STD. SWQ-111,SWQ-112 AND SWQ-113
6"
UNDERDRAIN, MIN. 4" DIA.PVC SDR 35 PERFORATED PIPE,
SEE CONSTRUCTION NOTE
12" DEPTH CALTRANSCLASS 2 PERMEABLE
24" MIN.BOTTOM WIDTH
6" MIN.PONDING
3:1 MAX.W/ SHELF
FINISHED ELEVATION (FE)
30 ML LINER MAY BEREQUIRED AT STREET
PLACE BSM IN 6" LIFTS,PER NOTES
STREET
12" MIN
MULCH LAYER (OPTIONAL)
18" M
IN
2% SHELF(TYP.)
6"
4:1 MAX.NOSHELF
BIORETENTIONSOIL MEDIA
(BSM)
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
STREET BIORETENTION FACILITY(SLOPED SIDED, WITH ON-STREET PARKING, SIDEWALK, WITH UNDERDRAIN)
TCW
SWQ-203
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
EXISTINGSUBGRADE
BIORETENTION DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2
OF THE BASMAA POST CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS,CITY STD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITY STD.SWQ-120.
4. EDGE CONDITION WILL VARY FOR PARKING LOT PROJECTS. SEE PARKING LOT EDGEOPTIONS DETAIL SWQ-114. CURB AND FLUSH EDGE DETAILS MAY BE MODIFIED FORPROJECT BY CIVIL AND GEOTECHNICAL ENGINEERS AND APPROVED BY PUBLICWORKS DEPARTMENT.
5. IF CHECK DAMS ARE NEEDED, SEE CONCRETE CHECK DAM PER CITY STD. SWQ-131.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLEWITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE.(VERIFY WITH CITY OF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST CONSTRUCTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST CONSTRUCTION MANUALAPPENDIX F PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST CONSTRUCTION MANUAL APPENDIX F PLANTMATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
CONSTRUCTION NOTES1. SCARIFY SUBGRADE BEFORE INSTALLING
BIORETENTION AREA AGGREGATE ANDBSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. INSTALL UNDERDRAIN WITH HOLESFACING DOWN. UNDERDRAINDISCHARGE ELEVATION SHALL BE NEARTOP OF AGGREGATE LAYER. UNDERDRAINSLOPE MAY BE FLAT.
4. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, ALLOW TO DRYOVERNIGHT BEFORE PLANTING.
5. DO NOT WORK WITHIN BIORETENTIONAREA DURING RAIN OR UNDER WETCONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
PARKING LOTPARKING LOT
PLACE BSM IN 6"LIFTS PER NOTES
6" MIN.PONDING DEPTH
DO NOT USE FILTERFABRIC
18" M
IN
CURB INLET PER CITY STD. SWQ-120,GUTTER INLET ELEV. (GIE)
MAINTAIN 6" BENCH NATIVESOIL FOR SUPPORT OFADJACENT CURB/PAVING(TYPICAL)
30 ML LINER MAY BEREQUIRED AT STREET
CALTRANS CLASS 2PERMEABLE 12" DEPTH PER
PROJECT REQUIREMENTS
MULCH LAYER
BIORETENTIONSOIL MEDIA
(BSM)
6" 6" FLUSH CURB SURFACEELEVATION (SE)
PARKING EDGE WILL VARY FORNEW/RETROFIT, CITY STD.SWQ-114
12" MIN
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE, SEECONSTRUCTION NOTE
FINISHED ELEVATION (FE)CURB AND GUTTER PER
CITY STD. SWQ-110
OVERFLOWSTRUCTURE ELEV. (OE)
VARIES
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
PARKING LOT BIORETENTION FACILITY(FLAT/PLANTER, WITH UNDERDRAIN)
TCW
SWQ-204
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
PARKING LOTPARKING LOT
CONSTRUCTION NOTES
24"
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE PROVIDED IN BIORETENTION FACILITY FIGURE 4.1 & 4.2 OF
THE BASMAA POST CONSTRUCTION MANUAL.
2. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS, CITYSTD. SWQ-140.
3. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SE). SEE CITY STD.SWQ-121.
4. MAX. LONGITUDINAL SLOPE 6% WITH CHECK DAMS. SEE CITY STD. SWQ-130 AND SWQ-131.
5. EDGE CONDITION WILL VARY FOR PARKING LOT PROJECTS. SEE PARKING LOT EDGE OPTIONSDETAIL SWQ-114. CURB AND FLUSH EDGE DETAILS MAY BE MODIFIED FOR PROJECT BY CIVILAND GEOTECHNICAL ENGINEERS AND APPROVED BY PUBLIC WORKS DEPARTMENT.
6. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLE WITH ANOVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN-GRADED AGGREGATE. (VERIFY WITH CITYOF NAPA CONSTRUCTION DIVISION)
7. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BASMAA POST CONSTRUCTIONMANUAL.
8. PLANTING DESIGN AND IRRIGATION PER BASMAA POST CONSTRUCTION MANUAL APPENDIXF PLANT MATRIX.
9. MULCH (OPTIONAL) PER BASMAA POST CONSTRUCTION MANUAL APPENDIX F PLANT MATRIX.
10. LOCATE ENERGY DISSIPATION COBBLE ONLY AS SPECIFIED IN INLET DETAILS - AVOIDDECORATIVE USE.
VARIES
BOTTOM WIDTH MIN.
MAINTAIN 6" BENCH NATIVE SOILFOR SUPPORT OF ADJACENT
CURB/PAVING (TYPICAL)
30 ML LINER MAYBE REQUIRED
(TYPICAL)
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLE12" DEPTH PER PROJECTREQUIREMENTS
PLACE BSM IN 6" LIFTS, PER NOTES
1. SCARIFY SUBGRADE BEFORE INSTALLINGBIORETENTION AREA AGGREGATE ANDBSM.
2. FACILITY EXCAVATION TO ALLOW FORSPECIFIED SOIL AND MULCH DEPTHS TOACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
3. INSTALL UNDERDRAIN WITH HOLESFACING DOWN. UNDERDRAINDISCHARGE ELEVATION SHALL BE NEARTOP OF AGGREGATE LAYER.UNDERDRAIN SLOPE MAY BE FLAT.
4. COMPACT EACH 6" LIFT OF BSM WITHLANDSCAPE ROLLER OR BY LIGHTLYWETTING. IF WETTING, ALLOW TO DRYOVERNIGHT BEFORE PLANTING.
5. DO NOT WORK WITHIN BIORETENTIONAREA DURING RAIN OR UNDER WETCONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
BIORETENTIONSOIL MEDIA
(BSM)
6"
6" MIN.PONDING
DEPTH
CURB AND GUTTERCITY STD. SWQ-110
FINISHEDELEVATION(FE)
MULCHLAYER
18" M
IN12" MIN
UNDERDRAIN, MIN. 4" DIA. PVC SDR 35PERFORATED PIPE, SEE CONSTRUCTION NOTE
CURB INLET PER CITY STD.SWQ-121, GUTTER INLET
ELEV. (GIE)
EXISTINGSUBGRADE
3:1 MAX. (TYPICAL)OVERFLOWSTRUCTURE ELEV.(OE)
PARKING EDGE WILL VARYFOR NEW/RETROFIT, CITYSTD. SWQ-114
FLUSH CURB SURFACEELEVATION (SE)
6"
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
PARKING LOT BIORETENTION FACILITY(SLOPED SIDED, WITH UNDERDRAIN)
TCW
SWQ-205
JBLDRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
CHECKED BY:APPROVED BY:DRAWING NO.
CITY OF NAPA PUBLIC WORKS DEPARTMENT
NO DUMPING DRAINS TO RIVER CURBMARKER
TCW
SWQ-206
JBL
Ø4.00"
MANHOLE COVERS WITH "NO DUMPING - DRAINS TO RIVER" SIGNAGE MAY SUBSTITUTE ADDITIONAL MARKINGS. STORMDRAIN COVERS SHALLBE FROM OLDCASTLE PRECAST MODEL: CIN-COVER.
EACH STORM DRAIN WITHIN THE CITY LIMITS NEEDS TO BE MARKED WITH A “NO DUMPING - DRAINS TO RIVER” MARKER. CONTRACTOR IS TOPURCHASE THESE MARKERS FROM THE PUBLIC WORKS DEPARTMENT LOCATED AT 1600 FIRST STREET.
CAST IRON COVERA
'NO DUMPING' MARKERB
24"
A
B
NO DUMPINGMARKER B
ANO DUMPING CASTIRON COVER
DRAWN BY:APPROVAL DATE:SCALE:REVISED DATE:
06/2018NONE
LFM
08/2021