Strathprints Institutional Repository - CORE · IEC 61660 mathematical model The traditional...
Transcript of Strathprints Institutional Repository - CORE · IEC 61660 mathematical model The traditional...
Strathprints Institutional Repository
Emhemed, Abdullah and Burt, Graeme (2015) LVDC - redefining
electricity : enabling an LVDC last mile distribution network. In: IEC-BIS
International Conference on Low Voltage Direct Current, 2015-10-26 -
2015-10-28, Hotel The Ashok. ,
This version is available at http://strathprints.strath.ac.uk/57549/
Strathprints is designed to allow users to access the research output of the University of
Strathclyde. Unless otherwise explicitly stated on the manuscript, Copyright © and Moral Rights
for the papers on this site are retained by the individual authors and/or other copyright owners.
Please check the manuscript for details of any other licences that may have been applied. You
may not engage in further distribution of the material for any profitmaking activities or any
commercial gain. You may freely distribute both the url (http://strathprints.strath.ac.uk/) and the
content of this paper for research or private study, educational, or not-for-profit purposes without
prior permission or charge.
Any correspondence concerning this service should be sent to Strathprints administrator:
Bureau of Indian Standards
LVDC-Redefining Electricity First International Conference on Low Voltage Direct Current
New Delhi, India,
26 & 27 October 2015
InternationalElectrotechnicalCommission
Enabling an LVDC last mile
distribution networkDr Abdullah Emhemed
Prof Graeme Burt
University of Strathclyde
Department of Electronic and Electrical Engineering
Technology and Innovation Centre
Tel: +44 141 4447274
Glasgow-United Kingdom
Overview
1. Issues with an existing LVAC last mile network
2. Moving to an LVDC last mile: motivations
3. Moving to an LVDC last mile: challenges
4. Protection challenges
5. Protection solution
6. Conclusions
NOP
11/0.4kV
MV
Su
pp
ly
http://corrupteddevelopment.com/
1. Issues with existing LVAC last mile
Operates at 60
-70% of their
limits with
losses 3%
Under pressure
to host more
renewables
Benefit the
least from
load diversity
Under pressure to
host more heat and
transport demand
Become a bottleneck to connect
further EV and heat pumps, power
flow could reach up to 130%-150%
in future UK system
Distribution
networks are
aging
Requires AC-DC conversion
for supplying DC loads and
hosting renewable
2. LVDC last mile: motivation
Load
Existing MV network
11kV/0.4kV
Load
variable speed ac source
Unipolaror bipolar
cable connections
Addressing the technical constraints
(enhanced voltage profile, limited impact
of the inductance, no skin effect, etc.)
Reduced losses and increased power capacity
Supporting better controls,
and easier to connect multiple
sources
flexibility in operation offers more flexible
market mechanism with better
stimulation of customers control demands
No phase balance and
synchronisation issues
Better control of peak demands
Potential benefits for DSOs
Suitable and powerful ICT platform
for integrating various smart grid
functionalities
Reduced fault level and allow the
use of lower current ratings and
smaller footprint
Release additional generation and
demand headroom, and defers
reinforcement
Selected projects of DC in distribution
ScottishPower £15m ANGLE に DC project
KEPCO aims to replace a number of existing AC rural MV distribution networks supplying light loads by LVDC networks to save up to 5% of the total operating cost
Real rural LVDC network as a part of Finnish national Smart Grids research programme
Potential benefits for DSOs
2. LVDC last mile: motivation
P. Muutinen Wデ ;ノく さE┝ヮWヴキWミIWゲ from use of an LVDC system in public
electricity SキゲデヴキH┌デキラミざ CIRED ヲヰヱン
2. LVDC last mile: motivation
Load
Existing MV network
11kV/0.4kV
Load
variable speed ac source
Unipolaror bipolar
cable connections
Reduced energy waste and losses by
reducing AC-DC conversion stages
More suitable for devices
generate and consume DC
(80% of todays load are DC)
Power converter interfaces are
more mature and their
associated costs are declining
Better control of energy leads to
better market services and consumers
cost savings
Potential benefits for end-users
IET LVDC Code of Practice
Section 4: Recognised standards of d.c. power distribution over
telecommunications cabling
Section 5: Proprietary d.c. power distribution over
telecommunications cabling
Section 6: Proprietary d.c. power distribution over proprietary cabling
Section 7: Proprietary d.c. power distribution over conventional single
phase a.c. power supply cabling
Section 8: Proprietary d.c. power distribution over conventional 3-
phase a.c. power supply cabling
2. LVDC last mile: motivation
If we are designing the first last mile today,
would be an AC or DC?
3. LVDC last mile: challenges
Very limited experience
Huge investment in AC
Interaction with existing AC grid
Lack of standards (topology, voltages, cable connections, etc.)
international systematic approach on LVDC not yet provided
LVDC benefits versus the cost
Existing LV protection is too simple and not capable of enabling the potential benefits afforded by LVDC last mile networks
4. Protection challenges
Characterisation of DC faults
DC protection for safety challenge
The requirement for high speed DC protection
Detecting and locating DC faults challenge
Protection against DC voltage disturbances
DC faults interruption challenge
Protection is top priority of any electrical distribution system
Does DC protection require more caution?
Characterisation of DC faults
0 0.002 0.004 0.006 0.008 0.01 0.0120
0.5
1
1.5
2
2.5
3
3.5x 10
4
Time (s)
Fau
lt c
urr
ent
(A)
Simulated fault current
Calculated fault current by IEC61660
Main DC bus
Rm Lm
Rca
Vg
Rsm Lsm LreRre
Common DC feeder
Isc
LfeRfe
Rb Lb
Battery
Vb
Capacitor Vca
Rca_l Lca_l
Rb_l Lb_l
Rm_l Lm_l
Vm
DC Motor
Ef
Rf Lf
XeqReq
Line
Smoothing reactor
IEC 61660 mathematical model
The traditional methods used for DC
fault calculations:
Static mathematical model
mathematical model implemented in
some ANSI/IEEE guidelines
IEC 61660-1 dynamic mathematical
model
ଵ ݐ ൌ ଵ Τష ഓభଵ Τష ഓభ Ͳ ݐ ݐଶ ݐ ൌ ͳ െ ூೖ షഓమ ூೖ ݐ ݐ
Q: Is IEC 61660 suitable for characterising
LVDC short circuit currents under all possible
system configurations?
DC protection for safety challenge
0V30V200V 120V400V 60V1500V
Band I (ELVDC)Band II (LVDC)
Comparable safety
margin as for AC for
direct contact
(IEC60479) can be
provided in 2-wire &
3-wire systems
Dangerous and could kill
in case of direct contact
For <30V and in
normal dry
conditions for <60V,
basic protection is
not required for SELV
and PELV systems
Comparable safety margin
can be provided only with
3-wire system with
grounded middle point
ゅTエW IEC ヲンEっWGヲ ┘ラヴニゲエラヮが さDC SキゲデヴキH┌デキラミ ゲ┞ゲデWマ ;ミS IラミゲWケ┌WミIWゲ aラヴ RCDゲざ
Protection for safety : RCDs are not widely and commercially available for DC
Protection for equipment: detecting, locating, and interrupting DC faults are challenging
How does DC influence the existing earthing systems?
L+
L-
PE
L+
L-
PE
0(N)
TN-S d.c. system
2-wire
system
3-wire
system
TN-C d.c. system
L+
L-PE
PEN
L+
L-
PE
L+
L-
0(N)
L+
L-
PE
TN-C-S d.c. system
L+
L-
PE
L-
PE
0(N)
L+
L-
PE
0(N)
L+
L-
PE
L+
TT d.c. system IT d.c. system
3-wire DC systems can have lower touch voltages
DC protection for safety challenge
The requirement for high speed
4.8 5 5.2 5.4 5.6 5.8-1
0
1
2
3
4
Time (sec)D
C c
urren
t (k
A)
Fault3 (at 1km) Fault4 (at 2km)
Fault1(at 0km)
Fault2 (at 0.5km)
4.995 5 5.005 5.01 5.015 5.02 5.025-1
0
1
2
3
4
Time (sec)
DC
cu
rren
t (
kA
)
Fault1(at 0km)Fault2 (at 0.5km)
Fault3 (at 1km)
Fault4 (at 2km)
Transient DC
fault current
Steady state DC
fault current
2 - level
VSC
F2 F3
F4
0.75kV LVDC last mile
Load1
Load2
NOP
RMU
11/0.4 kV 4.5% 500kVA
11kV AC system
1km
2km
F1
CB1
CB2
Power electronics poor short circuit capability
DC current circulates in the converter and other
sensitive equipment
Protection systems need to be very fast to
- prevent a high transient and steady state DC currents from
damaging equipment
- prevent the main converters from losing control and unnecessary
tripping; and
- reduce the impact of post-fault power quality and stability
Detecting and locating DC faults
challenge
The natural small DC line impedances can lead to more
complexity for locating DC faults
Resistive faults hard to detect
Solutions
Using differential protection (time
synchronisation issue)
Using signal processing techniques-based
protection such as Travelling waves and Active
Impedance Estimation (AIE)
0 200 400 600 800 1000 1200
-100
-50
0
50
100
150
200
Time (micro sec)
Cu
rren
t (A
)
5 6 7 8 9 10 11 12
0
0.5
1
1.5
Time (sec)
DC
Vo
lta
ge (
kV
) Post-fsult4 DC voltage
Post-fault1 DC voltage
Post-fault2 DC voltage
Post-fault3 DC voltage
Protection against DC voltage
disturbances
Fast propagation of voltage disturbance
Sensitivity of AC/DC and DC/DC to voltage drops
Rapid DC voltage drop
Overvoltage on the DC side
caused by a line-to-earth fault on the AC side
Caused by the loss of the supply DC
neutral/earth of a bipolar DC system
Post-fault transient overvoltage due the
release of substantial energy stored in the
inductor ((ଵଶ ଶ) due slow protectionܫܮ
Voltage surge protection or fast protection that reduces the fault duration and
magnitude are required
DC faults interruption challenge
DC arcs are more aggressive than AC
DC fault without zero crossing do not provide a
natural low point to extinguish the fault arc
More complex techniques such as increased arc
length and arc splitters are required
Mechanical breakers complied with IEC 60947-2
- LVAC Moulded Case CBs and Miniature CBs (magnetic
trip units to be adjusted for DC)
- DC CBs equipped with permanent magnetic
- DC CBs equipped with electronic trip units
- Lower DC current and voltage ratings compared to
equivalent AC due to the higher risk of fire in DC
DC solid state breakers
- 900 times faster than LVDC mechanical breaker
- On-state losses issueshttp://www.electronicproducts.com
Using different converter topologies
DC hybrid breakers????
- Full bridge DC/DC chopper
- full-bridge Modular Multi-level Converters
DC faults interruption challenge
Protection
functions
Relays C IED1 IED2 IED3 IED4
Current directions 1 0 0 0 0
Trip function - - - -
Blocking reverse current -
Reclosing function - - - - -
Protection
functions
Relays C IED1 IED2 IED3 IED4
Current directions 1 1 0 0 0
Trip function - - - -
Blocking reverse current -
Reclosing function - - - -
dc-dc48-12V
ac-dc
ACCB
F1
F2
LVDC last mile
AC grid
AC/DCSSCB
F3C
SSCB
SSCB
SSCB
dc-dcICT links
Elect links
Smart DC home
Communication-assisted
Fault detection and locations are based on DC current
directions and magnitudes, and DC voltages
Using multiple IEDs
Using solid state circuit breakers for interrupting DC faults
Features
Multi-function DC protection for enabling an LVDC last
mile
5. Protection solution
LVDC testing facilities
DC
Po
wer
So
urc
e
Lo
ad1
SSCB1
SSCB2 SSCB4
SSCB3
Loa
d2
LR2 2
L LR2 2
L
LR L
LR L
LR2 2
L LR2 2
L
IED4
IED3
IED2
IED1
V V
VV
V
IED5
SSCB5
Communication link
2I
2V
3I
3V
1I
1V
1C
1F
3C
2C4I
4V
3F
5I
5V2F
Feeder1
Feeder2
PCC
LVDC experiment circuit schematic
Validating the concept
Validating the concept
Start
The SSCB remains
open
Reclosing function is
performed and loads are
energised
The fault is
temporary
End
Measure I (mag and
dir) & Vdc at each IED
The fault is located at the PCC, the
AACB is tripped and all downstream
µgenrators are tripped
The end user is faulted and its
local SSCB directly operates
The fault is on the main feeder, and its IED trips
the associated SSCB, and remotely trips all the
µgenrators connected to the feeder
The IED feeder with
(+) current direction
takes the lead
I & V within the
nominal limits
The converter
IED current
direction is (+)
and the feeder
IED is (-)
Any of the
customers IEDs
has a current
with (+) direction
YES NO
YES
YES
NO
NO YES
NO
Deployment of the Algorithm
using LabVIEW
Loads
Mimic LVDC
cablesCRIO: hardware-
software interface
Actual experiment setup
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700
-100
-50
0
50
100
150
200
Time (s)
Cur
rent
(A
)
The supply (grid) DCfault contributionwith protection
The supply (grid) DC faultcontribution without protection
The DC fault contributions fromfeeder 1 and 2 without protection
The DC fault contributions fromfeeder 1 and 2 with protection
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700-5
0
5
10
15
20
25
Time (s)
DC
vol
tage
s (V
)V1 at IED1
V2 at IED2
V4 at IED4
V5 at IED5
V3 at IED3
DC
Pow
er
Sourc
e
Loa
d1
SSCB1
SSCB2 SSCB4
SSCB3
Loa
d2
LR2 2
L LR2 2
L
LR L
LR L
LR2 2
L LR2 2
L
IED4
IED3
IED2
IED1
V V
VV
V
IED5
SSCB5
Communication link
2I
2V
3I
3V
1I
1V
1C
1F
3C
2C4I
4V
3F
5I
5V2F
Feeder1
Feeder2
PCC
Experimental results
100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 10000
50
100
150
200
250
300
350
400
Time (s)
Cur
rent
(A
)
Fault current for F3 fault
Fault current for F2 fault
Fault current for F1 fault
6. Conclusions
LVDC distribution systems have the potential to bring benefits
to future electricity grids
Replacing or energising an existing part of AC circuits using DC
is still at very early stages and limited by practical technical
solutions and lack of standards
The fund to LVDC projects is still limited to national levels
Protection and safety one of the major concerns
The developed fast acting DC protection has demonstrated
more resilient performance for future LVDC networks
Thank you & Q