Strategic Planning Sessionpmg-assets.s3-website-eu-west-1.amazonaws.com/170822_1st_Quar… · Q1...
Transcript of Strategic Planning Sessionpmg-assets.s3-website-eu-west-1.amazonaws.com/170822_1st_Quar… · Q1...
DEPARTMENT OF WOMEN
1st QUARTER PERFORMANCE INFORMATION
2017/18
PRESENTATION TO PORTFOLIO COMMITTEE
22 AUGUST 2017
PRESENTATION OUTLINE
PART A
Strategic Focus and General Information
PART B
Quarter 1st Departmental Performance Information 2017/18
PART C
Human Resource
PART D
Financial Information
PART E
MPAT Performance Report 2017/18
Conclusion
2
3
STRATEGIC FOCUS : SONA , NDP, MTSF , SDGs
Against the Mandate to champion the advancement of women’s socio-economic
empowerment and the promotion of gender equality; the Vision of a society that
realises the socio-economic empowerment of women and the advancement of
gender equality; and the Mission to accelerate socio-economic transformation
for women empowerment and the advancement of gender equality, and in
response to 2017 SONA, the MTSF (the implementation plan of the NDP), the
department has aligned its planned programmes to MTSF outcomes 2, 3, 4, 5,
6, 7, 10, 13 and 14 in support the NDP objectives of an inclusive and equitable
growth path that puts women, children and other vulnerable groups at the centre
of government`s medium-term goals, and promotes the advance of economic
transformation, education and skills development for these groups through a
range of measures.
This is done through analysis, monitoring and intervention design of policy and
programme implementation and through public participation and outreach
programmes; and making available knowledge on and promoting an evidence-
based approach to women’s empowerment and gender equality; and raising
awareness of and conducting public participation/outreach initiatives to enhance
the empowerment of women and the promotion of gender equality
4
STRATEGIC FOCUS OF DOW
The strategic focus of the Department concentrates on paying special attention to
eradication of inequalities and related intolerances in our country by strengthening
and supporting initiatives on:
Addressing the financial and economic exclusion of women, gender
mainstreaming and ensuring the financial inclusion of women in the economy,
and monitoring and evaluation of placing empowerment of women in centre of
plans and implementation of the Nine Point Plan, and the impact of the Nine
Point Plan; (Outcomes 4, 5, 6, 7, 10)
Addressing discrimination against women in social participation and the impact of
social protection and care policy and programmes (Outcomes 2, 13 and 14)
Addressing the scourge of violence against women and children, awareness
raising and monitoring of gender based violence including social cohesion and
nation building initiatives and the impact of crime prevention and law enforcement
strategy and programmes. (Outcomes 3 and 14)
Engaging with StatsSA in relation to the monitoring of the indicators against SDG
5, and encouraging gender disaggregated reporting against all SDGs.
5
ORGANISATION & BUDGET PROG STRUCTURE Department’s Organisational Design is structured into
4 components reporting directly to Accounting Officer
ODG, Ministry staff, Communication and Internal Audit
3 Divisions reporting directly to the Accounting Officer –
Strategic Management,
Corporate Management
Financial Management;
2 Branches reporting directly to the Accounting Officer –
Social Transformation and Economic Empowerment;
Policy Stakeholder Coordination and Knowledge Management.
Budget Programme Structure is structured into three programmes:
1. Administration;
2. Social Transformation and Economic Empowerment; and
3. Policy, Stakeholder and Knowledge Management
2017/08/17 DRAFT - V4
6
overall Performance Information for Q1 2017/18
Figure below provides a graphic of overall performance of DoW in relation to set
Quarter 1 targets outlined in the 2017/18 Annual Performance Plan. Out of 32 targets
planned, 13 (41%) targets were achieved, while 19 (59%) were not achieved.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
Total Targets Achieved Not Achieved
32 (100%)
13 (41%)
19 (59%) Total Targets
Achieved
Not Achieved
DoW Overall Performance for Q1 2017/18
7
Financial Performance for Q1 2017/18
The figure below illustrate that the Department in the 1st quarter had projected
expenditure of R 53 119 million out of the appropriation of R 206 163 million for the
year 2017/18 and that the actual expenditure amounted to R 45 919 million,
therefore the department has spent 22.3% of its budget as at 30 June 2017, with
the deviation of under spending amounting to R 7 200 million.
Programme
Appropriation
Projected
Expenditure at
30 June 2017
Actual
Expenditure
30 June 2017
Variance
Actual vs.
Projected
% Spent
R`000 R`000 R`000 R`000 %
Administration 83 029 23 038 18 400 4 638 22.2
Social Transformation and
Economic Empowerment 94 936 24 250 21 389 2 861 22.5
Policy, Stakeholder and
Knowledge Management 28 198 5 831 6 130 -299 21.7
Total 206 163 53 119 45 919 7 200 22.3
Department`s Financial Performance for the 1st Quarter 2017/18
8
PART B: PERFORMANCE INFORMATION
Q1 PERFORMANCE INFORMATION
2017/08/17
9
Programme 1: Performance Information for Q1
Figure below provides a graphic of overall performance of Programme 1 in
relation to set Quarter 1 targets outlined in the 2017/18 Annual Performance
Plan. Out of 14 targets planned, 6 (43%) targets were achieved, while 8 (57%)
were not achieved.
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Total Targets Achieved Not Achieved
14 (100%)
6 (43%)
8 (57%) Total Targets
Achieved
Not Achieved
Programme 1 Performance for Q1 2017/18
10
Programme 1: Financial Performance for Q1
The table below illustrates that out of the total planned budget projection of R 23 038 million for the 1st quarter of the year 2017/18, the actual expenditure was R 18 395 million, with under spending expenditure of R 4 643 million. Therefore,
Programme 1 has spent 22% of its budget as of 30 June 2017.
Financial Performance Programme 1
Sub-Programme
Appropriation
Projected
Expenditure at
30 June 2017
Actual
Expenditure
30 June 2017
Variance
Actual vs.
Projected
% Spent
R`000 R`000 R`000 R`000 %
Ministry 17 764 5 003 4 910 93 27.6
Departmental Management 17 323 4 256 4 153 103 24.0
Corporate Management 19 113 5 378 4 074 1 304 21.3
Financial Management 13 059 4 459 3 421 1 038 26.2
Office Accommodation 15 770 3 942 1 842 2 100 11.7
Total 83 029 23 038 18 395 4 643 22
11
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Departmental Management Percentage of risks in the DoW annual risk profile that have reduced in risk rating
90% of high
rated risks in
the DOW risk
profile
reduced in risk rating
Report on
implementatio
n and impact
of risk
mitigation
plans on the
high rated
risks in the
DoW risk profile
The risk integrated register has
been developed and considered
by the Risk Mitigation Committee
and will be finalised in Q2 to
enable the risk assessment and
mitigation to be implemented.
Not Achieved
The risk identification and
assessments were delayed
by the finalisation of the
operational plan and the
presentation to Exco was
done which required further
refinement prior to
presentation to the Audit
and Risk Committee.
The outstanding
processes are
currently being
finalised to ensure that
a report on the
implementation of risk
management is
produced in Q2
Risk report
DoW strategic and Annual Performance Plans
Annual review
of Strategic
Plan and APP
prescribed by
the relevant
planning
frameworks conducted
Zero Draft of
APP 2018-19
developed for
budgeting purposes
- Zero Draft APP and project
plan developed
- Reporting AR Template was
sent to the managers
- Met with programmes on AR
-Draft AR discussed at EXCO
and submitted to DG for approval
-Draft AR submitted to AGSA, NT
and DPME as required
-Submitted for Minister`s noting
Achieved No Deviation N/A Zero Draft
APP and
Project plan
12
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Departmental Management Quarterly
performance
review
conducted
4 Quarterly
performance
review
conducted
4th quarter
2016/17
performance
report
developed and
submitted to
National
Treasury
Q4 Report submitted to
DPME and NT
Achieved No Deviation N/A Q4 Report and
email to NT and
DPME
Improved
department
al MPAT
scores
Compliance
with all MPAT
required
standards
Status report
on the MPAT
Improvement
Plan produced
Status Report on the MPAT
Improvement Plan develop
and approved by the
Director-General
Achieved No Deviation N/A MPAT Q4
Report
13
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of
progress made for
Q1
Perform
ance
Status
Reason for
Deviation
Interventions /
corrective actions
to be taken
Verification Source
Sub-programme: Departmental Management Percentage
of audits
completed
against
Internal
Audit
Coverage
Plan
Annual
Internal Audit
plan for
2017/2018
implemented
Rolling three-
year strategic
internal audit
plan for
2017/2019 and
the annual
internal plan for
2017/2018
approved by the
Audit and Risk
Committee
Rolling three-year
strategic internal audit
plan for 2017/2019 and
the annual internal plan
for 2017/2018 are still
being developed.
However, the ARC has
approved an interim
Internal Audit plan for
the first quarter of
2017/18 financial year.
Not Achieved
Risk
Assessment
Report/Register
for 2017/18
was still in
process of
being finalised.
Rolling three-year
strategic internal
audit plan for
2017/2019 and the
annual internal plan
for 2017/2018 will
be finalised and
presented to EXCO
and ARC for
approval in the
second quarter of
the financial year.
-Interim Internal Audit
Plan
-Internal Audit Charter
-ARC Charter
-Fourth Quarter
Performance Information
Report
-Annual Financial
Statements Report
-Annual Performance
Information (2016/17)
-Follow-Up Audit Report
-Financial Interest
Disclosure
14
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of
progress made for
Q1
Perform
ance
Status
Reason for
Deviation
Interventions /
corrective actions
to be taken
Verification Source
Sub-programme: Departmental Management 25% of internal
audit projects in
the annual plan
completed and
audit reports
issued
All internal audit
projects for the first
quarter (25%) of the
financial year are
finalised. The
following internal
audit reports were
finalised
-Fourth Quarter
Performance
Information (2016/17)
-Annual Financial
Statements (2016/17)
-Annual Performance
Information (2016/17)
-Audit Follow-Up
Financial Interest
Disclosure
Achieved No Deviation N/A N/A
15
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of
progress made for
Q1
Perform
ance
Status
Reason for
Deviation
Interventions /
corrective actions
to be taken
Verification Source
Sub-programme: Departmental Management Percentage
of internal
audit
recommendat
ions
implemented
95% of
internal audit
recommendati
ons
implemented
95% of internal
audit
recommendati
ons made in
the previous
Quarter
implemented
All audit finding on
Performance information
audit and the Interim
Financial Statement
Review were implemented.
51% of AGSA audit
findings of 2015/16
financial year end were
implemented.
Not
Achieved Internal Audit
focused on
recommendations
of AGSA.
Follow-up audits will
cover both internal audit
and AGSA
recommendations and
will be performed on a
monthly basis.
Follow-up audit Report
16
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of
progress made
for Q1
Performa
nce
Status
Reason for Deviation
Interventions
/ corrective
actions to be
taken
Verification Source
Sub-programme: Financial Management % of invoices
paid within
30 days
100%
payment of all
valid invoices
within 30 days
100% payment
of all valid
invoices paid
within 30 days
63% paid within
30 days, 37% not
paid within 30
days.
Not
Achieved The deviation is due to the Vodacom
invoices which relates to 2015/16
financial year. The account
reconciliation had to be performed for
the whole financial year in order to verify
the validity of the invoices.
Monthly creditor’s
reconciliation will be
performed.
Instruction note 34 of
April, May and June
2017
Percentage
expenditure
in relation to
budget
allocated
Maintain a
less than 2%
under
spending in
expenditure
against budget
allocation
Maintain a less
than 2% under
spending
against
spending plan
Actual under
spending for
Quarter 1 is 4 %
(Actual 22% vs
Projected 26%
spending)
Not
Achieved Under spending can be attributed to: (i)
Vacancies in the process of being filled
(posts are Special Adviser and CFO –
EA will advise when to fill); (ii) Office
accommodation invoice (DPW) for June
only paid in July 2017; (iii) Consultation
and Symposiums planned not done due
to the reprioritising of Sanitary Dignity
and to be provided with re-scheduled
dates to be done in Quarter 2.
Monthly Budget
Committee
meetings to monitor
budget and
spending.
IYM as at 30 June
2017
Percentage
of external
audit
recommendat
ions
implemented
95%% of
external audit
findings
cleared
95% of
external audit
findings
implemented
Actual of 57 % of
audit findings
recommendations
implemented, 43
% in progress
Not
Achieved Ineffective action steps (not addressing
the root causes); Inadequate monitoring
(Quarterly).
Action plans
reworked to address
root causes;
Monthly monitoring
introduced.
Audit Monitoring Tool
17
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual Target
2017/18
Q1 Target as
per APP
Description of
progress made
for Q1
Performan
ce Status
Reason for Deviation
Interventions /
corrective
actions to be
taken
Verification
Source
Sub-programme: Corporate Management Percentage
Vacancy Rate
Maintain a vacancy
rate of less than
10% annually
<10% Achieved, vacancy
rate as on 30 June
2017 = 4.7%
Achieved No Deviation N/A Establishment report
for June 2017
Percentage
of
disciplinary
cases
finalised
within 90
days from
date
disciplinary
case being
initiated
100% of all disciplinary
cases resolved within
90 days of the cases
being initiated
100% of all
disciplinary
cases resolved
within 90 days
One Disciplinary
hearing in
progress
Two investigations
in progress
Not Achieved Delays attributed to disciplinary
hearing processes
Disciplinary hearings
are scheduled
every month, next
hearing date is in
August 2017, to
facilitate finalisation
Labour relations
database
% of
achievement
of ICT
systems
availability
Average of 95%
systems
availability measured
by quarterly reports as
generated by the
system achieved
95% ICT
system`s
Availability
achieved
95% availability of
ICT systems
Achieved No Deviation N/A SLA Reports for
April, May and June
2017
18
Programme 1: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual Target
2017/18
Q1 Target
as per APP
Description of progress made
for Q1
Performan
ce Status
Reason for
Deviation
Interventions
/ corrective
actions to be
taken
Verification
Source
Sub-programme: Corporate Management Implementati
on of DoW
Business
Systems
Implementati
on Plan
Implementation of
Year 1 of the
Business Systems
Implementation
plan
Progress
Report on
delivery
against the
quarterly
targets of the
Year 1
Business
Systems
implementatio
n Plan
Initiated R&D on M&E and Stakeholder
Participatory Management System
(Events Management solution)
Management Service commenced
Five Years Business systems
Implementation Plan reviewed and
aligned to aligned to ICT Strategic Plan
Commencement of acquisition of Data
and Information Backup
Chaired the Bid Evaluation Committee of
the Physical Security Tender
Conducted audit on old equipment for
disposal
Management Implementation and
Configuration Services
Not Achieved Focus was on
stabilization of the
network infrastructure
post its reconfiguration.
This was critical to
inform the technical
requirements.
Acquisition and
execution of the
service will be
done in July.
Envisaged
Operationalizatio
n in August
Funding of the
Capital needs
especially those
related to Audit
Findings
Draft Business
Implementatio
n Plan
19
Programme 2: Performance Information for Q1
Figure below provides a graphic of overall performance of Programme 2 in relation
to set Quarter 1 targets outlined in the 2017/18 Annual Performance Plan. Out of
10 targets planned, 3 (30%) targets were achieved, while 7 (70%) were not
achieved.
0
1
2
3
4
5
6
7
8
9
10
Total Targets Achieved Not Achieved
10 (100%)
3 (30%)
7 (70%)
Total Targets
Achieved
Not Achieved
Programme 2 Performance Information for Q1
20
Programme 2: Financial Performance for Q1
The table below illustrates that out of the total planned budget projections of
R 24 250 million for the 1st quarter of the year 2017/18, the actual expenditure
was R 21 387 million with an under expenditure of R 2 863 million. Therefore,
Programme 2 has spent 23% of its budget as of 30 June 2017.
Financial Performance Programme 2
Sub-Programme
Appropriation
Projected
Expenditure at
30 June 2017
Actual
Expenditure
30 June 2017
Variance
Actual vs.
Projected
% Spent
R`000 R`000 R`000 R`000 %
Management: Social
Transformation and Economic
Empowerment 5 102 909 487 422 9.5
Social Empowerment and
Transformation 4 576 1 460 513 947 11.2
Governance Transformation, Justice and Security 3 920 1 424 393 1 031 10.0
Economic Empowerment and Participation 3 072 889 428 461 13.9
Commission for Gender Equality 78 266 19 568 19 568 - 25.0
Total 94 936 24 250 21 387 2 863 23
21
Programme 2: Quarter 1 Performance 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-Programme: Social Empowerment and Transformation Policy
Framework
for sanitary
dignity
developed
Policy
Framework for
provision of
sanitary
dignity to
indigent girls
and women
developed and
implementatio
n initiated
Draft
Framework on
provision of
sanitary dignity
to indigent girls
and women
approved by the minister
The draft policy was presented to SPCHD DG Cluster on 21 June 2017
Achieved
N/A
N/A
Draft policy
framework
Outcome of
consultations
integrated into
draft
framework on
provision of
sanitary dignity
to indigent girls and women
Comments have been integrated
and further comments will
emerge from the consultative Indaba to take place in July 2017
Achieved N/A
N/A
Draft policy
amendments
Link: MTSF Outcomes 1, 2, 8 and 13
22
Programme 2: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-Programme: Social Empowerment and Participation Report on the
analysis of
progress and
impact on
empowermen
t of women of
each
component
of Nine Point
Plan
Analysis of
progress and
impact on
empowerment
of women of
each
component of
Nine Point Plan
Toolkit for
analysis of
reporting on
M&E of
Presidential
Directive
developed.
The focus areas to analyse the
mainstreaming of women
throughout the nine point plan
has been submitted to the
Executive Authority (EA) and it
came back with comments that are being attended to.
Achieved N/A N/A Submission to
EA’s approval
on the 4 focus
areas to
analyse and
measure the
mainstreaming
of women in the
9 Point Plan.
Report on
economic
empowerment
of women in
the Nine Point
Plan in quarter 4
Internal and external consultations on economic empowerment of women in the Nine Point Plan done in quarter 4 however further consultation still ongoing in Q1.
Not Achieved This work is linked to the
approval of the 4 focus
areas to analyse and
measure the
mainstreaming of women
in the 9 Point Plan.
However, STEE produced
a technical analysis
document on the 9 Point
Plan to serve as a guide
discussion document at
the Operational Planning
Retreat session held on
the 13 &14 May 2017.
Finalise Analysis
Report on economic
empowerment of
women in the Nine
Point Plan .
Quarterly report
23
Programme 2: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-Programme: Social Empowerment and Participation Women’s
financial
inclusion
framework
developed
Framework on
Women’s
financial
inclusion developed
Draft women’s
financial
inclusion
framework
developed and
approved by
Minister
A discussion document has been
developed but this must undergo
processes to make it into an
official framework.
Not Achieved Discussion document on
financial inclusion to be
further consulted. Financial
Inclusion to focus on
Access to Development
Finance and Enterprise
Development opportunities
for Women.
-Focus areas had to be
identified first before
consultation.
This work is Inter-
linked to GRB.
Engaged the
Minister’s Advisor on
the process to follow
which was advised the
process initiated with
academia and GRB
experts would similarly
address this indicator
Discussion
paper to be
converted into a
framework that
focuses on
access by
Women on
development
Finance from
IDC, PIC &
NEF.
Consultations
report with
external
stakeholders
on draft
women’s
financial
inclusion
framework
developed
Draft quarterly report on
stakeholders on women’s
financial inclusion framework
Not Achieved
24
Programme 2: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Governance Transformation, Justice and Security Interventions
on framework
for GFP’s
Recommendat
ions on a new
accountability
mechanism for
HOD’s and
functions,
competencies,
and location of
GFP’s
managed with
DPSA and monitored
Consultations
with Ministers
on the draft GFP
framework held
Letter from DoW Minister to
DPSA Minister sent requesting meeting.
Not Achieved Minister awaiting
confirmation for a
meeting request with
her DPSA
counterpart to discuss
and agree on the
implementation plan for
GFPs with regards to
their appropriate
location, accountability
and reporting lines
The Executive
Authority has written
to her counterpart
(new Minister) at
DPSA to request
meeting to brief her on
GFP progress made.
Cabinet
memorandum
25
Programme 2: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Governance Transformation, Justice and Security Gender
Responsive
Budgeting
(GRB)
framework
developed
GRB framework developed and finalised
Expert
consultations on
GRB concept
held
Initiated meeting with academia and GRB experts.
Not Achieved Consultation and
Symposiums planned not
done due to the
reprioritising of Sanitary
Dignity and to be provided
with re-scheduled dates to
be done in Quarter 2.
Delivery planned for
Quarter 2 of 2017/18
Concept
Document /
Business Case
Draft GRB
framework
developed and
approved by the
Minister.
Not Achieved
26
Programme 2: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Governance Transformation, Justice and Security Interventions
to enhance
prevention
and
elimination of
violence
against
women and
children
Cabinet
consideration
of the report
on the
outcome of
National Dialogues
Analysis report
on preliminary
findings of
National
Dialogues on
violence against
women and
children held in
previous quarter
National Dialogues Pilot Report
on Limpopo Province produced
Not Achieved Submission on National
Dialogues was
disapproved.
Social Mapping report
to be produced in the
quarter 2
Report on
National
Dialogues
27
Programme 3: Performance Information for Q1
Figure below provides a graphic of overall performance of Programme 3 in
relation to set Quarter 1 targets outlined in the 2017/18 Annual Performance
Plan. Out of 8 targets planned, 4 (50%) targets were achieved, while 4 (50%)
were not achieved.
0
1
2
3
4
5
6
7
8
Total Targets Achieved Not Achieved
8 (100%)
4 (50%) 4 (50%) Total Targets
Achieved
Not Achieved
Programme 3 Performance for Q1 2017/18
28
Programme 3: Financial Performance for Q1
The table below illustrates that out of the total planned budget projections of
R 5 831 million for the 1st quarter of the year 2017/18, the actual expenditure was
R 6 106 million, with over spending expenditure of R 275 thousands. Therefore,
Programme 3 has spent 22% of its budget as of 30 June 2017.
Financial Performance Programme 3
Sub-Programme
Appropriation
Projected
Expenditure at
30 June 2017
Actual
Expenditure
30 June 2017
Variance
Actual vs.
Projected
% Spent
R`000 R`000 R`000 R`000 %
Management: Policy,
Stakeholder and
Knowledge Management 2 638 644 1 212 -568 45.9
Research and Policy
Analysis 4 385 1 131 1 016 115 23.1
Information and
Knowledge Management 1 061 262 101 161 9.5
Stakeholder Coordination
and Outreach 16 244 2 741 2 799 -58 17.2
Monitoring and Evaluation 3 870 1 053 1 002 51 25.9
Total 28 198 5 831 6 106 -275 22
29
Programme 3: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Research and Policy Analysis Number of
reports
on progress
made on
women’s
empowerment
in the
Economic
Departments
Report on
socio-
economic
empowerment
of women
through
government
economic
incentive
schemes
First draft
report on
socio-
economic
empowerment
of women
through
government
economic
incentive
schemes
developed and
approved by
the Minister
In Operational Plan Retreat
Session held on 13-14 May 2017,
Exco decided to commission this
work to external expertise. Draft
Report (in a from of ToR) was
approved as per Exco decision
during the quarter 1 performance
review on 10 July 2017
Achieved No Deviation N/A TORS
Approved
30
Programme 3: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Information and Knowledge Management (Communications) Improved
communicati
on on
women’s
empowermen
t and gender
equality
through
various
information,
knowledge
and media
platforms
Quarterly
reports on
gender
communicatio
n and
information
made
available on
DoW media
platforms
Report on
gender
communication
and information
resources
loaded onto
repositories on
internet, intranet
and used in
communication
The report on gender communication
and information resources was not
done as planned.
Not achieved The report on gender
communication and
information resources was
not done as planned due to
human resource capacity
constraints.
The Director
Communication was
appointed in June and
the report will be
produced from
quarter 2.
None
31
Programme 3: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for
Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Stakeholder Coordination and Outreach Number of
public
participation /
outreach
initiatives on
women’
empowerment,
including girls
and young
women
10 public
participation /
outreach
Initiatives on
women’s
empowerment
conducted
(Outcome 14
Programme)
3 public
participation
outreach
initiatives on
socio-
economic
empowerment
including
young women
Imbizo in Soshanguve on 21 April
2017
Take A Girl Child to Work on 25
May 2017
# Not In My Name-#365 for No
Violence Against Women and
Children Campaign on 26 May
2017
Achieved N/A N/A Imbizo (submission,
letters, Agenda,
Attendance Register
& Report)
Take a girl child(
Submission, letters,
Agenda, Attendance
Register & Report )
#Not in My name
(Agenda, photos &
Letter to procure
banners for DoW)
32
Programme 3: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Stakeholder Coordination and Outreach 365 Days
Campaign for
No Violence
Against
Women and
Children rolled
out
4 Community
mobilisation
initiatives
conducted on
socio-economic
issues affecting
women such as
gender based
violence , social
cohesion, nation
building and
other related
intolerance per
year
(Outcome 14
Programme)
National
dialogues at
Provincial level
on violence
against women
and children
held
Preparation for Mpumalanga
dialogues: drafted business plan,
project charts, stakeholders
mapping and letters to Premiers
of Mpumalanga and Northern Cape
Not Achieved The National Dialogues
preparatory work was not
finalised by the end of the
quarter.
The dialogues to be
reported under quarter
2 following the
finalisation of
preparatory work.
33
Programme 3: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Stakeholder Coordination and Outreach Number of
international
engagements
at multi-lateral
forums on
women’s
affairs and
gender
Participation in
SADC, AU,
Commonwealth
and UN
women’s affairs
and gender
meetings as
invited
1 participation
report on
international
multilateral
forum i.e. UN,
SADC,
Commonwealth,
AU
The report on South African’s
participation at the Commission
on the Status of Women
approved
Achieved No Deviation N/A CSW report
34
Programme 3: Quarter 1 Targets 2017/18
2017/08/17
Performanc
e Indicator
Annual
Target
2017/18
Q1 Target as
per APP
Description of progress
made for Q1
Performanc
e Status
Reason for Deviation
Interventions /
corrective actions
to be taken
Verification
Source
Sub-programme: Stakeholder Coordination and Outreach Number of
reports
on
implementa
tion of
government
commitmen
ts on
internationa
l
instruments
4 Country
Reports for
international
Multi-lateral
Forums
Commission
on the Status
of Women
Report
(annually)
The report on Commission on the
Status of Women annual
programme for 2017/18 included in the approved report
Achieved N/A N/A CSW Report
35
Programme 3: Quarter 1 Targets 2017/18
2017/08/17
Performance
Indicator
Annual
Target
2017/18
Q1
Target as
per APP
Description of
progress made for
Q1
Performanc
e Status
Reason for Deviation
Interventions / corrective
actions to be taken
Verification
Source
Sub-programme: Monitoring and Evaluation Number of
Monitoring
Reports on Nine
Point Plan
4 quarterly
Monitoring
Reports on
progress
against Nine
Point Plan
Performanc
e
Monitoring
report on
Nine Point
Plan
1st Draft Concept
document on performance
monitoring the
implementation of the 9PP
was developed and
submitted the Accounting
Officer and returned
extensive comments.
Not Achieved A decision was taken during
the operational retreat session
(13-14 May 2017) that only 5
areas should be concentrated
on and M&E to determine how
they will provide support to
STEE and RPA and other
sections with regard to Nine
Point Plan. M&E to go back
and draft a concept document
that will state how the unit will
be supporting.
Met and engage with STEE and
RPA on how we will deal with
Nine Point Plan
The report on monitoring the
implementation of the Nine Point
Plan will be developed in the 2nd
quarter
A meeting will be arranged during
the 2nd quarter with STEE and
RPA for further planning
alignment on institutions to
monitor and areas of focus on
Nine Point Plan
2nd Draft
Concept for Nine
Point Plan
1st Draft Concept
for Nine Point
Plan
-Minutes of
planning nine
point plan areas
Number of
Monitoring
Reports on
Outcome 14
4 quarterly
Monitoring
Reports on
progress
against
Outcome 14
Performanc
e
Monitoring
report on
Outcome
14
1st Draft Concept
document on performance
monitoring the
implementation of the
Outcome 14 developed,
discussed with DDG and
to be routed for approval.
Not Achieved
Still to develop a project plan to
align our work and focus areas
as per the decision of the
meeting.
To arrange meeting with
Stakeholder Coordination and
Outreach on integrated planning
on Outcome 14 in quarter 2.
To re-convene before end of
July to finalise the project plan on
Outcome 14.
-1st Draft Concept
document for
Outcome 14
-Minutes to align
the work on
Outcome 14
36
PROGRESS WITH IMPLEMENTING OUTSTANDING TARGETS
FOR 2016/17 FINANCIAL YEAR
2017/08/17 DRAFT - V4
37
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17 DRAFT - V4
PROGRAMME 1
The tables progress of 2 targets not achieved for Programme 1 in the 2016/17 targets
PROGRAMME 1
Not Achieved 2016/17 Targets Progress to date
100% payment of all valid invoices
within 30 days
The register for the control and management of invoice
tracking has been revised and improved; Invoices with
queries are followed up to ensure compliance as far as
possible; and consequence management has been
implemented to managers who were found to have
contributed towards the delay in finalisation of the report..
100% of all disciplinary cases
resolved within 90 days of the cases
being initiated
The Department is working closely with the DPSA and
OPSC to address the matter.
Fixed-term contractor appointed from 2017/01/03 to
provide technical support for the labour cases.
38
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 2
The tables progress of 10 targets not achieved for Programme 2 in the 2016/17 targets
PROGRAMME 2
Not Achieved 2016/17 Targets Progress to date
Intervention mechanisms for women’s social
participation and empowerment engendered
(focused on women’s care responsibilities:
concept document on childcare as support
developed)
Erratum was issued to replace the target.
Intervention mechanisms for women’s social
participation and empowerment engendered
(focus on unpaid care work: concept document
on improved recognition of women’s
productive contribution to household and
community care work developed)
Erratum was issued to replace the target.
39
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 2
The tables progress of 10 targets not achieved for Programme 2 in the 2016/17 targets
PROGRAMME 2
Not Achieved 2016/17 Targets Progress to date
Establishment of interdepartmental task team;
preparation of project plan; consultation with
external stakeholders in Sanitary Dignity Indaba
The National Sanitary Dignity Indaba was
held in the 1st quarter 2017/18
Report on Interventions to ensure economic
empowerment of women in the Nine-Point Plan
Report to be finalised in Q2 of 2017/18
financial year.
Discussion paper on Women’s Financial
Inclusion
This work is Inter-linked to GRB. Engaged
the Minister’s Advisor on the process to follow
which was advised the process initiated with
academia and GRB experts would similarly
address this indicator
40
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 2
The tables progress of 10 targets not achieved for Programme 2 in the 2016/17 targets
PROGRAMME 2
Not Achieved 2016/17 Targets Progress to date
Framework on strategy for gender
mainstreaming and GFPs
The Executive Authority has written to her counterpart
(new Minister) at DPSA to request meeting to brief her
on GFP progress made.
GRB framework developed Business Case developed and development of GRB
framework was put on hold pending phase three
(Meeting with GRB experts) of the conceptualisation
process, for finalisation in Q2 2017/18 financial year.
Discussion paper on prevention
strategy for the IPOA on VAWC
The work done on the two indicators is being
incorporated in the IPOA during 2017/18 FY within the
new target (Concept document on dialogues towards a
national prevention strategy for the IPoA on VAWC
approved)
Concept document on dialogues
towards a national prevention strategy
for the IPoA on VAWC approved
41
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 2
The tables progress of 10 targets not achieved for Programme 2 in the 2016/17 targets
PROGRAMME 2
Not Achieved 2016/17 Targets Progress to date
Analysis report of best practices on
integrated services for survivors of
sexual offences as part of monitoring
the impact of the Sexual Offences Act
The target will be finalised upon completion of the
National Dialogues to continue in Q2 2017/18
financial year in outstanding Provinces.
42
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 3
The tables progress of 11 targets not achieved for Programme 3 in the 2016/17 targets
PROGRAMME 3
Not Achieved 2016/17 Targets Progress to date
Research analytical report on land
reform and Agri-Parks programmes
developed
The performance indicator and target of these three
targets for 3rd and 4th quarter were discontinued and
replaced with one annual target to cover the
thematic areas of the nine point plan. Five-Year research strategy on women’s
socio-economic empowerment and
gender equality in relation to the Nine-
Point Plan developed and implemented
Two gender policy papers on benefits to
women of government incentive
schemes in land reform and Agri-Parks
programmes as related to the Nine-Point
Plan developed
43
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 3
The tables progress of 11 targets not achieved for Programme 3 in the 2016/17 targets
PROGRAMME 3
Not Achieved 2016/17 Targets Progress to date
Two desktop research and analytical
reports on social impact of the nine point
plan on women`s socio-economic
empowerment and gender equality
developed
The original target was discontinued and replaced
following the midterm review of targets. The 2 desk top
research reports were based on an assessment of the
Cabinet progress reports on the implementation of the
ESEID cluster outcomes. Within the time period it was
challenging to produce a baseline report with detailed
analysis
Phase one of IKM strategy implemented
(audits on IKM) related to the Nine- Point
Plan conducted
The structural changes will be addressed in the HR
Plan amendments and budget programme structure in
2017/18 financial year.
Three reports on the domestication of
international commitments (SDGs, SADC,
AU, and UN)
Erratum was issued to replace the target.
44
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 3
The tables progress of 11 targets not achieved for Programme 3 in the 2016/17 targets
PROGRAMME 3
Not Achieved 2016/17 Targets Progress to date
M&E system developed The readiness assessment tool has been developed
and the Theory of Change and Logic Model on how
to improve M&E system in the department has been
conducted and the M&E Framework will be submitted
at the end of quarter 2
Reported cases by nature of gender
based violence analysed by justice
cluster
The targets will be finalised upon completion of the
National Dialogues to continue in 2017/18 financial
year
Two reports on the analysis of strategic
planning documents of the economic
cluster departments developed
This was discontinued to concentrate on the
monitoring of the implementation of the 9 point plan
45
PROGRESS WITH IMPLEMENTING OUTSTANDING
TARGETS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 3
The tables progress of 11 targets not achieved for Programme 3 in the 2016/17 targets
PROGRAMME 3
Not Achieved 2016/17 Targets Progress to date
Two impact assessment reports on
progress made on women’s economic
empowerment in the economic cluster
departments
The impact assessment is long term and could not be
covered during one Financial Year. This was
discontinued due to the amount of work required to
conduct the impact assessment.
Women empowerment M&E frameworks
approved and implemented
The Development of the Framework will be finalised
in quarter 2
46
KEY ACHIEVEMENTS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 1
The tables progress of 12 targets achieved out of 14 planned for Programme 1 in the 2016/17 targets
PROGRAMME 1
Achieved 2016/17 Targets
Annual risk assessment/ review conducted
3-year rolling strategic risk management plan produced
Annual risk implementation plan produced
3-year rolling strategic internal audit plan produced and submitted to the Audit Committee
for approval by 30 June 2016
Quarterly audit implementation reports approved by Executive Authority
The Department developed the 2017/18 APP with an annexure to changes in the Strategic
Plan 2015-2020
47
KEY ACHIEVEMENTS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 1
The tables progress of 12 targets achieved out of 14 planned for Programme 1 in the 2016/17 targets
PROGRAMME 1
Achieved 2016/17 Targets
Quarterly performance review as prescribed by the relevant planning were conducted
Departmental MPAT scores improved
2015/16 unqualified audit opinion attained.
Vacancy rate as on 31 March 2017 was 5.7% of funded posts which is less than planned 10%
annually
95% No network downtime experienced
85% of ICT business applications developed on annual basis
48
KEY ACHIEVEMENTS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 2
The tables progress of zero target achieved out of 10 planned for Programme 2 in the 2016/17 targets
PROGRAMME 2
Achieved 2016/17 Targets
None
49
KEY ACHIEVEMENTS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 3
The tables progress of 2 targets achieved out of 14 planned for Programme 3 in the 2016/17 targets
PROGRAMME 3
Achieved 2016/17 Targets
Four outreach initiatives on women (including young women) for the empowerment of
women and the promotion of human rights conducted per annum:
1.intergenerational dialogue ;
2. National Women’s Day: 09 August 2016;
3. 16 Days of activism campaigns and national dialogues; and
4. International Women’s Day: 08 March 2017.
50
KEY ACHIEVEMENTS FOR 2016/17 FINANCIAL YEAR
2017/08/17
PROGRAMME 3
The tables progress of 2 targets achieved out of 14 planned for Programme 3 in the 2016/17 targets
PROGRAMME 3
Achieved 2016/17 Targets
Nine community mobilization initiatives conducted on socio-economic issues affecting
women such as gender-based violence, social cohesion, nation building and other related
intolerances per year: -Community mobilization on social cohesion and moral regeneration
within the context of Africa Month: -11 May 2016-Take a girl child to work: 26 May 2016; -
Northern Cape Youth Summit: 9-11 June 2016; -International Mandela Day: 21 July 2016 including
local businesses; -National Prayer Day: 4 August 2016; -Youth consultation with Queenstown
district of the Methodist Church: 2 October 2016; -Report on the pilot dialogue for Mpumalanga: 21
February 2017; -Limpopo Youth development and career expo : 19 November 2016; - Her story
behind bars programme 60th Anniversary of women’s march builds up programme: 29 July 2016;
- Orlando East and Sedebeng report on Department of Woman engagement with the elderly on
socio-economic issues including gender based violence: 28 October 2016 and 10 November 2016.
51
PART C: HUMAN RESOURCE
52
HUMAN RESOURCE MATTERS: Q1 – 2017/18
2017/08/17
Vacancy rate 4.7%; 4 funded posts.
Progress with filling of vacancies
• Chief Financial Officer (CFO): held in abeyance subject to implementation of internal control systems.
• DDG STEE: selection finalised – to be filled in Q2. • CD Social: selection finalised – to be filled in Q2. • CD: Governance: selection finalised – to be filled in Q2.
Challenges experienced if any
None, despite delays in security clearances.
Number of resignation 1
Reasons for resignations Resignation.
Number of suspensions 1
Nature and duration for suspensions
Dereliction of duty and gross negligence; suspended since 05 September 2016.
By when these matters will be resolved
Hearing in process.
53
PART D: FINANCIAL INFORMATION
54
Department`s Financial Performance for the 1st Quarter 2017/18
2017/08/17
Programme
Appropriation
Projected
Expenditure
at 30 June
2017
Actual
Expenditure
30 June 2017
Variance
Actual vs.
Projected
% Spent
Actual vs.
Budget
R`000 R`000 R`000 R`000 %
Administration 83 029 23 038 18 400 4 638 22.2
Social Transformation and
Economic Empowerment 94 936 24 250 21 389 2 861 22.5
Policy, Stakeholder and
Knowledge Management 28 198 5 831 6 130 -299 21.7
Total 206 163 53 119 45 919 7 200 22.3
55
Programme 1: Financial Performance Q1
2017/08/17
Sub-Programme
Appropriation
Projected
Expenditure
at 30 June
2017
Actual
Expenditure
30 June
2017
Variance
Actual vs.
Projected
% Spent
Actual vs.
Budget
R`000 R`000 R`000 R`000 %
Ministry 17 764 5 003 4 910 93 27.6
Departmental Management 17 323 4 256 4 153 103 24.0
Corporate Management 19 113 5 378 4 074 1 304 21.3
Financial Management 13 059 4 459 3 421 1 038 26.2
Office Accommodation 15 770 3 942 1 842 2 100 11.7
Total 83 029 23 038 18 400 4 638 22.2
56
Programme 2: Financial Performance Q1
2017/08/17
Sub-Programme
Appropriation
Projected
Expenditure at
30 June 2017
Actual
Expenditure
30 June 2017
Variance
Actual vs.
Projected
% Spent
Actual
vs.
Budget
R`000 R`000 R`000 R`000 %
Management: Social
Transformation and
Economic Empowerment 5 102 909 487 422 9.5
Social Empowerment and
Transformation 4 576 1 460 513 947 11.2
Governance Transformation, Justice and Security 3 920 1 424 393 1 031 10.0
Economic Empowerment and Participation 3 072 889 428 461 13.9
Commission for Gender Equality 78 266 19 568 19 568 - 25.0
Total 94 936 24 250 21 389 2 861 22.5
57
2017/08/17
Programme 3: Financial Performance Q1
Sub-Programme
Appropriation
Projected
Expenditure
at 30 June
2017
Actual
Expenditure
30 June 2017
Variance
Actual vs.
Projected
% Spent
Actual vs.
Budget
R`000 R`000 R`000 R`000 %
Management: Policy,
Stakeholder and
Knowledge Management 2 638 644 1 212 -568 45.9
Research and Policy
Analysis 4 385 1 131 1 016 115 23.1
Information and
Knowledge Management 1 061 262 101 161 9.5
Stakeholder Coordination
and Outreach 16 244 2 741 2 799 -58 17.2
Monitoring and Evaluation 3 870 1 053 1 002 51 25.9
Total 28 198 5 831 6 130 -299 21.7
58
EXPENDITURE REPORT ECONOMIC CLASSIFICATION
Economic Classification
Appropriation Exp. as at 30 June
2017
%
Spent
Actual
vs.
Budget
Balance
R`000 R`000 % R`000
Compensation of Employees 71 899 17 316 24.1 54 583
Goods and Services 52 181 8 780 16.8 43 401
Transfers and Subsidies 78 267 19 593 25.0 58 674
Capital Payments 3 816 230 6.0 3 586
Payments for financial assets - - - -
Total 206 163 45 919 22.3 160 244
59
DEPARTMENTAL FINANCIAL OVERVIEW
The Appropriation for 2017/18 is R206, 2 million and the actual expenditure
as at 30 June 2017 amounts to R45, 9 million, which translates to 22.3% of
the Appropriation for the Department.
The spending is as follows:
Compensation of Employees: The under spending of R659 thousand against projection is due to vacancies in the
Department.
3 Vacancies will be filled by 1 September 2017
Transfers and Subsidies: All transfers to CGE were done during the 2017/18
financial year. Savings from Compensation of Employees will be moved to
Transfers and Subsidies to cater for Leave Gratuities paid.
60
DEPARTMENTAL FINANCIAL OVERVIEW
Capital Expenditure:
The budget on capital assets is R3, 8 million with actual expenditure of R230 thousand. Under spending against projection of R2 million is due to:
The expired RT56 contract, the Department is awaiting a new contract from
National Treasury before procurement of motor vehicle. PA System Intercom will no longer be procured, the building is leased and
contract is ending 2021. Funds will be utilised to procure office cabinets. Procurement of Anti-Virus Management Software commenced during mid June
2017 and execution of service will be concluded in July 2017.
61
PROGRAMME FINANCIAL OVERVIEW
Programme 1: Administration
The Programme has spent R18, 4 million which is 22% of the Programme’s 2017/2018
appropriation of R83 million. The variance between projected expenditure of R23 million and actual expenditure is R4, 6 million. The under spending is due to:
Invoice of office accommodation amounting to R 914 thousand for June 2017 was
received on 06 July 2017 and paid on 11 July 2017. Audit fees for Auditor General SA The expired RT56 contract, the Department is awaiting a new contract from
National Treasury before procurement of motor vehicle. PA System Intercom will no longer be procured, the building is leased and contract
is ending 2021. Funds will be utilised to procure office cabinets. Procurement of Anti-Virus Management Software commenced during mid June
2017 and execution of service will be concluded in July 2017.
62
PROGRAMME FINANCIAL OVERVIEW
Programme 2: Social, Political and Economic Participation and
Empowerment The net budget, excluding CGE transfer of R78, 3 million, is R16, 7 million for Programme
2. The actual expenditure is R1, 8 million which translates to 11% of the net budget. The variance between projected spending of R4, 7 million and actual expenditure is R 2, 9 million. The under spending is due to:
Vacancies within the Programme. The Sanitary Dignity Indaba, Gender Responsive Budgeting Symposium and
consultations of Gender Based Violence against women & sexual offences with other Departments which are part of National Dialogues that are planned to take place during 2nd quarter of 2017/18.
63
PROGRAMME FINANCIAL OVERVIEW
Programme 3: Policy Stakeholder Coordination and Knowledge
Management
The Programme has spent R6, 1 million which translates to 22% of the Programme’s
appropriation of R28, 2 million. The overspending against projection is due to the following:
Official that was transferred from Programme 1 to Programme 3. Procurement of carry bags for gifts of projects, Take a girl child to work. Invoice for Sanitary Dignity Packs that were procured in March 2017 and paid in
April 2017. Payment of invoice for printing of CEDAW (Convention on the Elimination of all
form of Discrimination against Women) report in 2016/17 and only received in the current financial year
64
FINANCIAL ACCOUNTING
Suspense Accounts:
Suspense and control accounts are cleared on an on-going basis and
reconciliations are performed monthly. The Department is awaiting the
conversion from BAS version 4 March 2017 balances into BAS version 5 which
will be done by National Treasury in August 2017.
Fruitless & Wasteful Expenditure: (means expenditure which was made in vain
and would have been avoided had reasonable care been exercised)
There is no Fruitless and Wasteful expenditure reported for the period ending 30
June 2017.
Irregular Expenditure: (means expenditure, other than unauthorised expenditure,
incurred in contravention of or that is not in accordance with a requirement of any
applicable legislation)
There are two (2) irregular expenditure transaction reported as at 30 June 2017
amounting to R432 thousand.
65
FINANCIAL ACCOUNTING
Deviations:
No cases of Deviations were reported for the 1st quarter 2017/18.
Payment within 30 Days:
A total of 1372 invoices were received in as at 30 June 2017 of which 593
was paid outside translating to 57% payments within 30 days.
April 2017 – 226 invoices: 100% compliance
May 2017 – 818 invoices: 27% compliance, 593 paid outside of 30
days.
June 2017 – 328 invoices: 100% compliance
66
MAJOR EVENTS – 2017/18
There was no major events during quarter 1.
2017/08/17
67
INTERNATIONAL TRIPS – QUARTER 1
2017/08/17
68
AGSA Annual Audit for 2015/16 Financial year
2017/08/17
AGSA Annual Audit for 2015/16 financial year
Area reviewed Total Findings
Resolved (Management assertions)
Verified & confirmed by IA
Unresolved
% Resolved
Financial Management 54 22 25 29 46%
Human Resource Management
13 13 9 4 69%
Strategic Management (Performance Information)
8 5 5 3 63%
Information Communication Technology
4 1 1 3 25%
Internal Audit 1 1 1 0 100%
Sub-Total 80 42 41 39 51%
69
Implementation status AGSA finding as at 31 March 2017
2017/08/17
70
2015/16 Audit action plans
2017/08/17
2015/16 AUDIT ACTION PLANS / AUDIT MONITORING TOOL
CHALLENGES IDENTIFIED IMPROVEMENTS IMPLEMENTED
• Internal Audit work done on Audit Action Plans
• Total of 80 findings • Total number of findings
resolved 42 (51%) • Total number of findings
unresolved 38 (49%)
• Real root causes of audit findings not identified
• Action plans not developed to address real root causes
• Action plans not specific • Timelines not assigned to
specific audit action plans • Timelines not specific • Specific responsibilities not
assigned to action plans • Quarterly reporting and
monitoring instead of monthly
• Audit Action Plans revised to include DoW identified real root causes
• Action steps specific and detailed
• Timelines specific and assigned to all action steps listed in the plan
• Specific responsible persons assigned to action steps
• Monthly reporting of progress by all responsible divisions and monthly reporting to all stakeholders
71
FINANCIAL MISCONDUCT • No cases of financial misconduct were reported during
the third quarter of 2016/17 financial year.
2017/08/17
72
PART E: MPAT PERFORMANCE REPORT 2017/18
2017/08/17
Background
73
• The Management Performance Assessment Tool (MPAT) is an annual departmental assessment which measures management practices in Strategic Management; Governance and Accountability; Human Resources and Financial Management.
• It is an evidence-based tool which assesses a variety of standards aimed at improving performance and service delivery in the Public Service.
• Within the four KPAs there are now a total of 37 standards which are based on existing policies and regulations.
• The department has improved its monitoring and compliance with MPAT in that it complied with the submission date of 30 September 2016.
2017/08/17
KPA 1: Strategic management
74
2017/08/17
2016 Final
Scores Progress
KPA 1 (Strategic Management)
1.1 Strategic Planning
1.1.1 Strategic Plans
(2015/2020)
3
• In the tabled APP 2017/18 Annexure A there are refinements made in the
strategic plan 2015-2020 under organizational environment and strategic
objectives
• Approved/signed-off 2015-2020 Strategic Plan.
• Strategic Plan 2015-2020 on page 23 to 24 shows the link with the MTSF
• Technical indicator description reflected as part D in the strategic plan 2015-
2020 starting on page 42-56.
1.1.2 Annual Performance
Plans
2 • Approved 2017/18 Annual Performance Plan
• Targets are carried through from the Strategic Plan to the 2017/18 Annual
Performance Plan with minor refinements in the strategic objectives
• Operational Plan 2017/18 developed to be used as tool for the implementation
of APP 2017/18
• Errata was done in the APP 2016/17 under programme 2 and 3 and
presented before the Portfolio Committee
KPA 1: Strategic management
75
2017/08/17
2016 Final Scores Progress
KPA 1 (Strategic Management)
1.3. Monitoring and Evaluation
1.3.1 Integration of monitoring and
evaluation in performance and strategic
management
3
• Signed-off M&E or Performance Management Information Policy /
Framework in place
• Signed-off Comprehensive quarterly performance reports by
Internal Audit or DG as per DPME quarterly reporting guide for
- Quarter 4 of 2015/16
- Quarter 1, 2, 3 and 4 of 2016/17.
• Signed-off reports by Internal audit
- Quarterly performance Report discussed at EXCO
1.3.2 Evaluation 2 • A draft concept document has been developed
• Programme 3: Sub-programme: M&E engaging DPME for
assistance with the development of a multi-year evaluation
1.3.3 Planning of Implementation
1
• Directorate: Planning and Reporting is monitoring the
implementation of programmes` planned targets as per Strategic
Plan and APP through the quarterly performance monitoring and
analytical reports
KPA 2: Governance and accountability
76
2017/08/17
2016 Final
Scores Progress
KPA 2 (Governance and Accountability)
2.1 Service delivery improvement
2. 1.1 Service delivery improvement mechanisms
2.5
• Service Delivery charter and SDIP developed and submitted to
DPSA
• Annual Report on SDIP developed as part of DoW annual
performance report
2. 2. Management Structures
2.2.1 Functionality of management structures
3 • Terms of Reference for management structures approved by the
Director-General
• Management meeting are taking place as per schedule
• Decision register is developed for each meeting and updated with
progress
• Management meeting focuses on strategic objectives and
priorities
2.3 Accountability
2. 3.2 Assessment of accountability mechanisms
(Audit Committee)
3
• Audit and Risk Committee Charter for 2017/18 was presented
approved by the ARC in the ARC meeting held on the 10 May
2017
• Annual schedule of ARC meeting has been developed and
adopted by the ARC in the ARC meeting held on the 10 May
2017
• ARC evaluation questionnaires were developed and adopted by
the ARC in the ARC meeting held on the 10 May 2017
KPA 3 (Human Resource Management)
KPA 2: Governance and Accountability
77
2017/08/17
2016 Final
Scores
Progress
KPA 2 (Governance and Accountability)
2.4 Ethics
2. 4.1 Assessment of policies and systems to ensure
professional ethics
3
• All SMS members complied with the PSC deadline of submission
i.e 31 May
2.4.2 Prevention of Fraud and Corruption 1 • Fraud Prevention Strategy and implementation plan has been
updated and presented to the Ethics Management Committee 0n
7 June 2017
2.5 Internal Audit
2. 5.1 Assessment of internal audit arrangements
2
• Audit and Risk Committee Charter for 2017/18 was presented
approved by the ARC in the ARC meeting held on the 10 May
2017
2.6 Risk Management
2. 6.1 Assessment of risk management arrangements
2 • The Department has a Risk Mitigation Committee in place that
plays an oversight on the mitigation of risks within the
department; this Committee is chaired by the Chief Director
Strategic Management, who then reports to the Audit and Risk
Committee that plays an overall oversight on risk management KPA 3 (Human Resource Management)
KPA 2: Governance and Accountability
78
2017/08/17
2016 Final Scores Progress
KPA 2 (Governance and Accountability)
2.8 ICT
2. 8.1 Corporate governance of ICT
1 • ICT Strategic Plan approved in March 2016
• ICT Implementation Plan approved and included in approved
ICT Strategic Plan
• ICT Operational Plan of 2016-17 included in Departmental
Operational Plan of 2016-17
• ICT Security Policy approved in March 2017
• ICT Security Policy implemented
• Corporate Governance of ICT Policy implemented
2.10 Promotion of Access to Information
(PAIA)
2.10.1 Promotion of Access to Information
2.5 • The English version the PAIA manual has been published in the
Department’s website on 18 February 2016
• Deputy information officer appointed
• Department has a section 14 manual in all eleven official
languages
• -Section 32 report submitted to the SAHRC on time
2.11 Promotion of Administrative Justice
Act (PAJA)
2.11.1 Promotion of Admin Justice
1 • No progress can be reported in this regard due to the lack of
clarity and understanding on how the department can ensure
compliance with PAJA
• A request for training on PAJA submitted to the HRD unit
KPA 3 (Human Resource Management)
KPA 3: Human resource management
79
2017/08/17
2016 Final
Scores Progress
KPA 3 (Human Resource Management)
3.1 Human Resource Strategy
and Planning
3.1.1 Human Resource Planning
2
• In process of conceptualising HR planning for 2018 MTEF; Executive Authority
has endorsed a concept revision; direction still required repriotisation of core posts
for additional funding
3.1.2 Organisational Design and
Implementation
4 • Approved organisational structure currently under review for 2018 MTEF. Project
plan being developed for Organisational Development process
• Approved structure currently under review to accommodate increased 2018 MTEF
CoE allocation
3.1.3 Human Resources
Development Planning,
Implementation and Reporting
2.5
• HRDIP approved by DG was submitted to DPSA on 31 May 2017
• HRD Monitoring tool was approved by DG and submitted to DPSA by the 31 May
2017
• Training budget was set aside, CFO confirmation of budget available.
• Letter to inform DPSA on the non-compliance with implementation of Internship
programme approved by DG and submitted to DPSA before March 2017
3.2 Human Resource Practices
and Administration
3.2.2 Application of recruitment and
retention practices
2
• Approved Recruitment policy.
• All employees exiting the Department are requested to complete exit interview
questionnaires.
• Approved exit interview questionnaire template aligned with MPSA Directive
• All newly appointed SMS employees met minimum entry requirements
KPA 3: Human resource management
80
2017/08/17
2016 Final Scores Progress
KPA 3 (Human Resource Management)
3.2.4 Management of Diversity 2 • Draft Job Access Strategic Framework developed
3.2.5 Management of Employee
Health and Wellness (EHW)
2.5
• Employee Health and Wellness policies developed and being
implemented
3.2.6 Delegations in terms PSA 2 • Approved HR delegations are in line with the PSA and PSR.
• Approved HR Delegations
2.2 Management of Performance
3.3.1 Implementation of Level 1‐12
Performance Management System
2.5
• Policy available
• 99.9% submitted by 31 May 2017 with the exception of one who
is on maternity leave
KPA 3: Human resource management
81
2017/08/17
2016 Final Scores Progress
KPA 3 (Human Resource Management)
3.3.2 Implementation of SMS
Performance Management System
(excluding HODs)
2 • 99.9% submitted by 31 May 2017
• 2016/17 mid term assessments were concluded and captured
on Persal
•
3.3.3 Implementation of Performance
Management System for HOD
2.5 • DG concluded Performance Agreement and was captured
before 31 March 2017
• DG PA was submitted to DPME and OPSC before end of May
2017
3.4 Employee Relations
3.4.2 Management of disciplinary
cases
2 • 1 case finalized,1 pending
KPA 4: Financial management
82
2017/08/17
2016 Final Scores Progress
KPA 4 (Financial Management)
4.1 Supply Chain Management
4.1.1 Demand Management
2 • Procurement plan submitted to National Treasury
• Demand management plan is in place
• Department reviews reports on procurement plan
• Demand management plan includes a sourcing strategy
4.1.2 Acquisition Management 4 • Department makes use of CSD
• Bid committees appointed and functional
4.1.3 Logistics management 1 • Department does not have a logistics management unit
4.1.4 Asset management 2 • Department has an SCM and Asset Management Policy
4.1 Expenditure Management
4.2.1 Management of cash flow and
expenditure vs. budget
2 • Department has a cash flow projection
• Departmental Cash-flow projections have submitted to National
Treasury in time
• IYM report has been reported on time to treasury
• Management regularly reviews expenditure vs planned budget
and take actions to prevent under/over expenditure
4.2.2 Payment of suppliers 2 • Not all invoices were paid within 30 days
• Invalid invoices are investigated and reported on instruction note
34
KPA 4: Financial management
83
2017/08/17
2016 Final Scores Progress
KPA 4 (Financial Management)
4.2.3 Management of unauthorised,
irregular, fruitless, and wasteful
expenditure
2 • Unauthorized, irregular ,fruitless and wasteful
expenditure is reported on a monthly basis
4.2.4 Payroll certification 2 • Pay sheet certification process is in place and is
implemented on a monthly basis
4.2.5 Delegation in terms of PFMA 4 • Department has financial management delegations of
power in place and is in terms of PFMA Act
• Delegations from Accounting Officer to all relevant
performers levels are appropriate for all levels
Departments overview on MPAT
84
• MPAT is monitored on a quarterly basis and the progress is presented at MANCO meeting.
• Where the department is experiencing challenges, possible solution have been proposed and are being implemented.
2017/08/17
CONCLUSION
• The Departmental Operational Plans was submitted to the Accounting Officer on 23 June 2017 and extensive engagement took place with the CD SM on the quality of the operational plans and how to make them effective in improving delivery through addressing forward planning and process management.
• Exco at the end of April expressed concern on the approach to performance, and agreed that the Strategic plan and the APP are in place, and that the next weakness to address was the operational planning processes and quality.
• The Department has held an operational planning working session to address the inadequate quality of the operational plans that were submitted to the Accounting Officer and were referred back.
• The Department now has an approved operational plan that enables managers and Heads of Divisions and of Branches to manage performance on a weekly and monthly basis, and to ensure that the time management of work is significantly improved.
• The Department’s Exco has endorsed a firm approach to consequence management for non-delivery and non-compliance
2017/08/17 85
Last Page
2017/08/17 86