STRATEGIC FLOOD RISK ASSESSMENT...

63
STRATEGIC FLOOD RISK ASSESSMENT (SFRA) OF THE DRAFT LISTOWEL MUNICIPAL DISTRICT LOCAL AREA PLAN 2019-2025 AND THE THIRD VARIATION OF THE LISTOWEL TOWN DEVELOPMENT PLAN 2009-2015 (as extended) Kerry County Council County Buildings Rathass Tralee Co. Kerry October 2019

Transcript of STRATEGIC FLOOD RISK ASSESSMENT...

Page 1: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

STRATEGIC FLOOD RISK ASSESSMENT (SFRA)

OF THE

DRAFT LISTOWEL MUNICIPAL DISTRICT

LOCAL AREA PLAN 2019-2025

AND THE

THIRD VARIATION OF THE LISTOWEL TOWN

DEVELOPMENT PLAN 2009-2015 (as extended)

Kerry County Council County Buildings

Rathass Tralee

Co. Kerry

October 2019

Page 2: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 2

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

SFRA Contents __________________________ 1.0 Introduction to the Strategic Flood Risk Assessment ............................... 3

1.1 Introduction .................................................................................................. 3 1.2 Scope and objectives .................................................................................. 3 1.3 Disclaimer .................................................................................................... 4 1.4 Reporting Structure ..................................................................................... 5 1.5 The Planning System and Flood Risk .......................................................... 5 1.6 Definition of Flood Risk ................................................................................ 6 1.7 Probability of Flooding ................................................................................. 7 1.8 Consequences of Flooding .......................................................................... 9 1.9 The Staged Approach .................................................................................. 9

2.0 Study Area ................................................................................................... 10

2.1 Introduction ................................................................................................ 10 2.2 Population and Household Growth ............................................................ 11 2.3 Environment and Heritage ......................................................................... 12 2.4 Infrastructure ............................................................................................. 13

3.0 Identifying Flood Risk in the Listowel Municipal District ........................ 14

3.1 Sources of Flooding ................................................................................... 14 3.2 Fluvial Flooding ......................................................................................... 14 3.3 Rivers in the Listowel Municipal District ..................................................... 15 3.4 Historical Flood Events .............................................................................. 15 3.5 Other Sources of Flooding ......................................................................... 16

4.0 Addressing Flood Risk in the Listowel Municipal District Local Area Plan ........................................................................................... 17

4.1 Introduction ................................................................................................ 17 4.2 Collation of Flood Risk Data ...................................................................... 17 4.3 Flood Risk within the Listowel Municipal District ........................................ 19 4.4 Flood Risk Management Strategy ............................................................. 21 4.5 The Approach to Zoning in Areas at Risk of flooding ................................. 22 4.6 Approach to Development in Areas at Risk of Flooding ............................ 61 4.7 Flood Risk and Development Management ............................................... 62

5.0 Managing Flood Risk in the Future ........................................................... 63

5.1 Achievement of the Local Area Plan .......................................................... 63 5.2 Monitoring and Review .............................................................................. 63

Page 3: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 3

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

1.0 Introduction to the Strategic Flood Risk Assessment

1.1 Introduction

Kerry County Council has prepared the Draft Listowel Municipal District Local Area Plan/Third Variation to the Listowel Town Development Plan 2009-2015 (as extended) in accordance with the requirements of the provisions of the Planning and Development Act 2000 (as amended), in conjunction with the Regional Planning Guidelines for the South West 2010 – 2022 and the Kerry County Development Plan 2015 – 2021. The Local Area Plan sets out the landuse framework for the development of the Listowel Municipal District. This Strategic Flood Risk Assessment (SFRA) of the Draft Listowel Municipal District Local Area Plan/Third Variation to the Listowel Town Development Plan 2009-2015 (as extended) has been prepared in accordance, in so far as practicable, with the requirements of “The Planning System and Flood Risk Management: Guidelines for Planning Authorities”, published in November 2009 by the DEHLG and the OPW, and having specific regard to the areas, within the settlements of this Municipal District, that have been identified as being at risk of flooding. Flooding is a natural process that can happen at any time in a wide variety of locations. Flooding has significant impacts on human activities; it can threaten people’s lives, their property and the environment. Assets at risk can include housing, transport and public service infrastructure, commercial, industrial and agricultural enterprises. The health, social, economic and environmental impacts of flooding can be significant and have a wide community impact. This SFRA also provides a strategic assessment of flood risk using existing information and data sources to inform strategic land-use planning decisions. As part of this, the Local Area Plan/Third Variation to the Listowel Town Development Plan 2009-2015 (as extended) and the SFRA provide guidance for the identification and zoning of development lands, so as to ensure that flood risk management forms an integral component of the plan formulation process. Guidance is also provided for project level assessment and sustainable flood risk management. Data likely to emerge from the Catchment Flood Risk Assessment and Management (CFRAM) and similar flood risk processes over the coming years will also inform future assessments and decision making. This SFRA has been integrated with the Strategic Environmental Assessment (SEA) process. As part of this a number of recommendations for SEA monitoring are provided within this SFRA.

1.2 Scope and objectives

This report sets out how the Flood Risk Assessment was undertaken, as well as how its findings were addressed and integrated into the Listowel Municipal District Draft Local Area Plan/Third Variation to the Listowel Town Development Plan 2009-2015 (as extended). The report should be read in conjunction with the Local Area Plan/Third Variation to the Listowel Town Development Plan 2009-2015 (as extended), and the associated maps.

Page 4: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 4

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

The primary purpose of the SFRA is to determine flood risk within a particular geographical area, in this instance, the Listowel Municipal District and to support spatial planning decisions in relation to the zoning of particular areas or lands for development. Under the Guidelines the objectives of an SFRA is to:

• To provide for an improved understanding of flood risk issues within the Local Area Plan and development management process, and to communicate this to a wide range of stakeholders;

• To consider existing flood defence infrastructure and the consequences of failure of that infrastructure and also identification of areas of natural floodplain to be safeguarded;

• To produce a suitably detailed flood risk assessment, drawing on and extending existing data and information, leading to a suite of flood risk policies and objectives and where appropriate maps that support the application of the sequential approach;

• To inform, where necessary, the application of the Justification Test;

• To conclude whether measures to deal with flood risks to the area proposed for development can satisfactorily reduce the risks to an acceptable level while not increasing flood risk elsewhere, and

• To produce guidance on mitigation measures on how surface water should be managed and appropriate criteria to be used in the review of the Local Area Plan site specific flood risk assessments.

It should be noted the SFRA is an ever-evolving document, which is to be reviewed and updated on a regular basis in the light of emerging information, flood data and an improved understanding of flood risk. This SFRA takes into account the latest flood risk information/data available from the OPW and national guidance available.

1.3 Disclaimer

This SFRA has been prepared in compliance with the Guidelines but the SFRA remains a living document and is based on the best available data at the time of preparation. It is subject to change based on more up to date and relevant flood risk information becoming available during the lifetime of the Listowel Municipal District Local Area Plan/Third Variation to the Listowel Town Development Plan 2009-2015 (as extended). Accordingly, all information in relation to flood risk is provided for general policy guidance and may be updated in respect of emerging new data and analysis. Owners/occupiers, developers and any other interested body are advised to take all reasonable measures to assess the flooding vulnerability or risk of lands in which they have or may have an interest prior to making planning or development decisions. The aim of this SFRA is to provide an appraisal of all sources of flooding within the Listowel Municipal District area and to set out a number of approaches in the plan making process to avoid, reduce and manage flood risk as part of a wider objective to ensure the protection of property, people and infrastructure. The SFRA does not contain advice for existing occupiers who currently live in areas at risk of flooding or those that may experience flooding.

Page 5: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 5

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

1.4 Reporting Structure

Section 2.0 of this report provides a brief introduction to the Listowel Municipal District, identifying the settlement hierarchy and the key population and household growth targets for the respective categories of settlement with the settlement hierarchy. Section 3.0 examines the main sources of flood risk within the Municipal District and recent flood events. Section 4.0 examines how the issue of managing flood risk was addressed in the review of the Local Area Plan and outlines the main provisions of the flood risk management strategy. Section 5.0 sets out what this assessment has achieved in terms of managing the adverse effects of flooding within the Listowel Municipal District. It also identifies how information on flood risk will be reviewed and monitored over the lifetime of the Local Area Plan.

1.5 The Planning System and Flood Risk

“The Planning System and Flood Risk Management: Guidelines for Planning Authorities”, published in November 2009, describe flooding as a natural process that can occur at any time and in a wide variety of locations. Flooding can often be beneficial and many habitats rely on periodic inundation. However, when flooding interacts with human development, it can threaten people, their property and the environment. Flooding may be from rivers, the sea, groundwater, sewers or overland flow caused by intense or prolonged periods of rainfall. Climate change and its impact in relation to frequency, pattern and severity of flooding is recognised as becoming more uncertain and more damaging. Understanding flood risk is a key step in managing the impacts of flooding. The Guidelines describe good flood risk practice in planning and development management and seek to integrate flood risk management into the planning process, thereby assisting in the delivery of sustainable development. Planning authorities are directed to have regard to the Guidelines in the preparation of Development Plans and Local Area Plans, and for development management purposes. For this to be achieved, flood risk must be assessed as early as possible in the planning process. Paragraph 1.6 of the guidelines states that the core objectives are to:

• Avoid inappropriate development in areas at risk of flooding;

• Avoid new developments increasing flood risk elsewhere, including that which may arise from surface run-off;

• Ensure effective management of residual risks for development permitted in floodplains;

• Avoid unnecessary restriction of national, regional or local economic and social growth;

• Improve the understanding of flood risk among relevant stakeholders; and,

Page 6: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 6

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

• Ensure that the requirements of EU and national law in relation to the natural environment and nature conservation are complied with at all stages of flood risk management".

The guidelines aim to facilitate “the transparent consideration of flood risk at all levels of the planning process, ensuring a consistency of approach throughout the country. The Guidelines work on a number of key principles, including:

• Adopting a staged and hierarchical approach to the assessment of flood risk;

• Adopting a sequential approach to the management of flood risk, based on the frequency of flooding (identified through Flood Zones) and the vulnerability of the proposed land use.

1.6 Definition of Flood Risk

In order to manage flood risk it is important to understand what the term “flood risk” implies and to define the components of flood risk in order to apply the principals of the DEHLG 2009 Guidelines 'The Planning System and Flood Risk Management'. Flood risk is generally accepted to be a combination of the likelihood of flooding and the potential consequences arising, and is normally expressed in terms of the following relationship: Flood Risk = Probability of Flooding x Consequences of Flooding It is assessed using the source – pathway – receptor model as illustrated in Figure 1.1 below. This is a standard environmental risk model common to many hazards and should be the starting point of any flood risk assessment. Figure 1.1 Source-Pathway-Receptor Model

Source: Planning System and Flood Risk Management (DEHLG 2009)

Principal sources of flooding are intense or prolonged rainfall or higher than normal sea levels while the most common pathways are rivers, drains, sewers, overland flow and river and coastal floodplains and their defence assets. Receptors can include people, their property and the environment. All three elements must be present for flood risk to arise. Mitigation measures, such as defences or flood

Page 7: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 7

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

resilient construction, have little or no effect on sources of flooding but they can block or impede pathways or remove receptors. Flood risk assessments require identification and assessment of all three components:

• The probability and magnitude of the source(s) (e.g. high river levels, sea levels and wave heights);

• The performance and response of pathways and barriers to pathways such as floodplain areas and flood defence systems, and

• The consequences to receptors such as people, properties and the environment. The planning process is primarily concerned with the location of receptors, taking appropriate account of potential sources and pathways that might put those receptors at risk.

1.7 Probability of Flooding

The likelihood of flooding is normally expressed as the percentage probability based on the average frequency measured or extrapolated from records over a large number of years. A 1% probability indicates the flood level that is expected to be reached on average once in 100 years, i.e. it has a 1% chance of occurring in any one year. Considered over the lifetime of development, such an apparently low-frequency or rare flood has a significant probability of occurring. For example:

• A 1% flood has a 22% (1 in 5) chance of occurring at least once in a 25-year period - the period of a typical residential mortgage;

• And a 53% (1 in 2) chance of occurring in a 75-year period - a typical human lifetime.

In the Department document 'Planning System and Flood Risk Management', the likelihood of a flood occurring is established through the identification of Flood Zones which indicate a high, moderate or low risk of flooding from fluvial or tidal sources, as defined in Table 1.1. It is important to note that the Flood Zones do not take other sources of flooding, such as groundwater or pluvial, into account, so an assessment of risk arising from such sources should also be made, where appropriate.

Page 8: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 8

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Table 1.1 Definitions of Flood Zones

Flood Zone Description

Zone A High probability of Flooding

More than 1% probability (1 in 100) for river flooding and more than 0.5% probability (1 in 200) for coastal flooding. Most types of development would be considered inappropriate in this zone.

Zone B Moderate probability of Flooding

0.1% to 1% probability (between 1 in 100 and 1 in 1000) for river flooding and 0.1% to 0.5% probability (between 1 in 200 and 1 in 1000) for coastal flooding. Highly vulnerable development, such as hospitals, residential care homes, Garda, fire and ambulance stations, dwelling houses and primary strategic transport and utilities infrastructure, would generally be considered inappropriate in this zone.

Zone C Low probability of Flooding

This zone defines areas with a low risk of flooding from rivers and the coast (i.e. less than 0.1% probability or less than 1 in 1000). Development in this zone is appropriate from a flooding perspective (subject to assessment of flood hazard from sources other than rivers and the coast).

Figure 1.2 Example of Flood Zone Mapping

Source: Planning System and Flood Risk Management (DEHLG 2009)

Page 9: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 9

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

1.8 Consequences of Flooding

Consequences of flooding depend on the hazards caused by flooding (depth of water, speed of flow, rate of onset, duration, wave-action effects, water quality) and the vulnerability of receptors (type of development, nature, e.g. age-structure, of the population, presence and reliability of mitigation measures etc). The DEHLG 2009 Guidelines 'The Planning System and Flood Risk Management' provides three vulnerability categories, based on the type of development, which are detailed in Table 3.1 of the Guidelines, and are summarised as:

• Highly vulnerable, including residential properties, essential infrastructure and emergency service facilities

• Less vulnerable, such as buildings used for retail and commercial and local transport infrastructure

• Water compatible, including amenity open space, outdoor recreation and associated essential infrastructure, such as changing rooms.

1.9 The Staged Approach

The Guidelines recommend a staged approach to be adopted to ensure that only such an appraisal or assessment as is needed for the purposes of decision making at the various plan levels is undertaken. The stages include: Stage 1: Flood risk Identification: To identify whether there may be any flooding or surface water management issues related to the area of the regional planning guidelines, development plans or local area plans (LAPs) or a proposed development site that may warrant further investigation at the appropriate lower level plan or planning application levels. If the Planning Authority considers that there is potential flood risk issue, then stage 2 shall be entered into. Stage 2: Initial flood risk assessment: To confirm sources of flooding that may affect a plan area or proposed development site, to appraise the adequacy of existing information and to scope the extent of the risk of flooding which may involve preparing indicative flood zone maps. Where hydraulic models exist, the potential impact of a development on flooding elsewhere and of the scope of possible mitigation measures can be assessed. In addition, the requirement of the detailed assessment should be scoped; and Stage 3: Detailed flood risk assessment: To assess flood risk issues in sufficient detail and to provide quantitative appraisal of potential flood risk to a proposed or existing development or land to be zoned, of its potential impact on flood risk elsewhere and of the effectiveness of any proposed mitigation measures. This staged approach is recommended for flood risk assessments at Regional, County and site-specific levels. Within this hierarchy of Regional, County and site-specific flood-risk assessments, a staged approach ensures that the level of information is appropriate to the scale and nature of the flood-risk issues and the location and type of development proposed, avoiding expensive flood modelling and development of mitigation measures where it is not necessary.

Page 10: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 10

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

2.0 Study Area

2.1 Introduction

This Section provides an overview of the study area, on which the impact of flooding will be determined in this SFRA. The study area comprises of the Listowel Municipal District, as illustrated in Figure 2.1 below. It is a predominately rural Municipal District that accommodates an extensive network of settlements as follows:

• One Regional Town comprising of Listowel.

• Four District towns comprising of Ballybunion, Ballyheigue, Ballylongford and Tarbert.

• Seven Villages comprising of Abbeydorney, Ballyduff, Causeway, Duagh, Kilflynn, Lixnaw and Moyvane.

• Five Development Nodes comprising of Asdee, Finuge, Kilmorna, Knockanure and Lisselton.

The Listowel Municipal District lies within the South West (Planning) Region and is currently covered by the Regional Planning Guidelines (RPGs) for the South West Region 2010 – 2022. A Regional Flood Risk Appraisal (RFRA) for the South West was undertaken as part of the development of the RPGs. The findings of the RFRA have been reviewed and have informed the County SFRA. Figure 2.1 Listowel Municipal District

Page 11: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 11

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

2.2 Population and Household Growth

The Listowel Municipal District covers an area of approx. 73,990 Ha and has an existing population of 28,418 persons according to the 2016 Census. The Kerry County Development Plan 2015 – 2021 provides for a growth in population of 891 persons corresponding to an allocation of 345 housing units up to the year 2021. This level of housing provision is primarily in the main towns, with additional housing opportunities in the villages and rural areas. The majority of growth is allocated to the towns, with 122 new houses proposed in Listowel, the designated Regional Town in the National Spatial Strategy and in line with the South West Regional Planning Guidelines. Housing growth is also planned within the villages and smaller settlements. The distribution of projected growth throughout the County is in accordance with the Core Strategy and the settlement hierarchy outlined in Section 3.1 of the Kerry County Development Plan 2015 – 2021. Table 2.1 below outlines the population growth target for the individual settlements of the Municipal District provided for in this Local Area Plan. Table 2.1 Listowel Municipal District Population Allocation.

Municipal District

Settlements Population Growth Target

Housing Requirements

Listowel Listowel 314 122

Ballybunion 101 39

Ballyheigue 47 18

Tarbert 42 16

Ballylongford 31 12

Rural Area 356 138

Total

891

345

Page 12: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 12

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

2.3 Environment and Heritage

A significant percentage of the Listowel Municipal District is located within a designated site of nature conservation importance, while the majority of any remaining areas would be located upstream of such sites. Sites of importance include Natura 2000 site designations (SAC and SPA), Natural Heritage Areas (NHA), Proposed Natural Heritage Areas (pNHAs) and Ramsar sites. Up to date maps and details of these are available on line at www.npws.ie or from the National Parks and Wildlife Service (NPWS), who are the lead agency for nature conservation in Ireland. European and National Legislation now protects the most valuable of our remaining wild places, through the designation of these sites as proposed Natural Heritage Areas, Candidate Special Areas of Conservation and Special Protection Areas. The current list of protected sites is contained in the County Development Plan 2015 - 2021 and is shown on the Heritage and Scenic Amenity Maps in Volume 3 in that Plan. Designated sites in the Listowel Municipal District are detailed in the table below. Table 2.2 Designated Sites in the Listowel Municipal District

Designated Sites in the Listowel Municipal District

Code

Description

Natura 2000 Site

SPA 004077 River Shannon and River Fergus Estuaries

Yes

SPA 004161 Stack’s to Mullaghareirk, West Limerick Hills and Mount Eagle

SPA 004189 Kerry Head Yes

SPA 004188 Tralee Bay Complex Yes

SAC 000332 Akeragh, Banna And Barrow Harbour

Yes

SAC 002165 Lower River Shannon Yes

SAC 002351 Moanveanlagh Bog Yes

NHA 001352 Bunaruddee Bog No

pNHA 000332 Akeragh, Banna And Barrow Harbour

No

pNHA 002351 Moanveanlagh Bog No

pNHA 001340 Cashen River Estuary No

pNHA 001332 Ballylongford Bay No

pNHA 001386 Tarbert Bay No

Page 13: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 13

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Sites of geological of interest have not been covered comprehensively to date by the existing nature conservation designations. Kerry County Council recognises the importance of geological heritage and to this end has listed the important geological features within the county, in the County Development Plan 2015 – 2021, with the intention of maintaining their possible conservation value. Geological features of interest in the Listowel Municipal District include; Palynological and Palaeobotanical assemblages in Kerry Head, a Spring in Ballymacquin/Sluggaire in Ballyheigue, Devonian features in Ballyheigue Shore, Sulphides, Gonitatites and bivalves in Ballybunion, a raised beach in Ballybunion, exposed Waulsortian along coastal sections of Ballybunion, Carb. rocks exposed at Beat Point and Lixnaw Quarry. A full list of geological sites of interest identified by the geological Survey of Ireland (GSI) is outlined in Appendix IV, Table 10.6 in the County Development Plan 2015 - 2021. In terms of built heritage, there are numerous recorded monuments and protected structures throughout the Municipal District and these are also detailed in the County Development Plan 2015 – 2021.

2.4 Infrastructure

Infrastructural deficiencies within the Municipal District will need to be addressed in terms of waste water treatment and water supply over the lifetime of the Local Area Plan if the growth targets for the electoral area are to be achieved. Particular infrastructural improvements will include upgrading of waste water treatment plant facilities and implementing water conservation measures across the Municipal District.

Page 14: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 14

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

3.0 Identifying Flood Risk in the Listowel Municipal District

3.1 Sources of Flooding

This SFRA has primarily reviewed flood risk from fluvial sources, (i.e. flooding from a river or other watercourses). Flood risks from pluvial flooding (i.e. flooding as a result of rainfall-generated overland flows which arise before run-off enters any watercourse or sewer), groundwater sources or from drainage systems, reservoirs and canals and other artificial or man - made systems have not been considered in detail in this study and such risks will need to be assessed at the project stage. This approach has been adopted for two reasons. Firstly, the review of flooding in the Listowel Municipal District shows rivers to be the most common source of damage and it is this source of flooding that has been taken into account in the Local Area Plan process. Other sources of flooding are considered to present a lesser risk in this Municipal District but should be considered at the planning application stage. Secondly, Flood Zones in the 'Planning System and Flood Risk Management' are defined on the basis of fluvial, and where appropriate, tidal flood risk.

3.2 Fluvial Flooding

Flooding of watercourses is associated with a channel exceeding capacity during higher flows. The process of flooding on watercourses depends on a number of characteristics associated with the catchment including; geographical location and variation in rainfall, steepness of the channel and surrounding floodplain and infiltration and rate of runoff associated with urban and rural catchments. There are two main catchment types; large and relatively flat or small and steep. These give two very different responses during large rainfall events. In a large, relatively flat catchment, flood levels will rise slowly and natural floodplains may remain flooded for several days, acting as the natural regulator of the flow. In small, steep catchments, local intense rainfall can result in the rapid onset of deep and fast-flowing flooding with little warning. Such “flash” flooding, which may only last a few hours, can cause considerable damage and possible threat to life. The form of the floodplain, either natural or urbanised, can influence flooding along watercourses. The location of buildings and roads can significantly influence flood depths and velocities by altering flow directions and reducing the volume of storage within the floodplain. Critical structures such as bridge and culverts can also significantly reduce capacity creating pinch points within the floodplain. These structures are also vulnerable to blockage by natural debris within the channel or by fly tipping and waste. Rivers are the primary cause of flooding in the Listowel Municipal District with flood events attributed to fluvial sources ranging from the River Feale and River Lee to smaller tributaries and drains.

Page 15: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 15

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

3.3 Rivers in the Listowel Municipal District

The main watercourse is the River Feale which rises in the Mullaghareirk Mountains and flows in a north-westerly direction before flowing into the River Cashen and discharging into the Shannon Estuary.

The River Cashen is made up of the final 10km of The River Feale’s course and discharges itself into the Shannon Estuary, near Ballybunion.

The River Brick and the River Galey are the major tributaries of the Feale sub-catchment. Other tributaries include the Allaghaun and Oolagh rivers. These mainly drain the upland areas to the east and south of the area, with the exception of the River Brick which drains a lowland area towards the west. The Smearlagh River, a tributary of the River Feale and the Crumpane River are located in located in the Stack's Mountains in North Kerry and the rivers converge just downstream from Lyracrumpane Bridge. The Glena River, Tullaleague river and the Owveg River, a tributary of the River Feale, are located in the lowlands surrounding Knocknagashel village. The Shanow River, a tributary of the River Feale flows north, north-west along the boundary of the Listowel Municipal District. Other rivers under consideration in the Listowel Municipal District are the Ballyline River, the Agahanagran River and the Glashanagalloon Stream.

3.4 Historical Flood Events

Recent significant flood events have included: Flood Event of 22nd November 2017 Following heavy rainfall, the Galey River overflowed, flooding a domestic property in Gortacrossane, Listowel. Flood Event of 15th December 2015 Following heavy rainfall after Storm Desmond, the Galey River overflowed, flooding the same domestic property in Gortacrossane, Listowel. Flood Event of September 2015 Flooding was observed on the R552 road with Clieveragh industrial estate and Curraghtoosane severely affected. Flooding was also observed on the R553, Ballybunion Road, near the entrance road to the graveyard. Flood Event of 20th May 2014 The flood event of May in North Listowel was similar to September 2015. Flooding was observed on the R552 road with Clieveragh industrial estate and Curraghtoosane severely affected. Flooding was also observed on the R553, Ballybunion Road, near the entrance road to the graveyard. Torrential rain flooded The Listowel Arms Hotel and a

Page 16: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 16

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

business premises in the Clieveragh Industrial Estate. A Domestic property was also damaged downhill from the industrial estate. Flood Event of February 2014 Moneycashen, located at the Feale Estuary, is susceptible to tidal/coastal flooding. This area suffered flooding during February. Flood Event of January 2014 Moneycashen, located at the Feale Estuary, is susceptible to tidal/coastal flooding. This area suffered flooding during January. Flood Event of 12th August 2003 A combination of pluvial and fluvial flooding in Coibee, Listowel flooded land as a result of storm events which generated high surface runoff beyond the capacity of the drainage system.

Flood Event of 11th November 2002 A combination of pluvial and fluvial flooding in Gortaminch, Listowel flooded a house and a septic tank as a result of storm events which generated high surface runoff beyond the capacity of the drainage system. Flood Event of 25th July 2002 A combination of pluvial and fluvial flooding in Greenville, Listowel flooded a field as a result of storm events which generated high surface runoff beyond the capacity of the drainage system.

Flood Event of 01st February 2002 Ballylongford is located within the Shannon tidal regime. The town was affected by the storm event, caused by high tides, low pressure and strong south westerly winds. Kerry STW, main street and some 10 houses flooded. The high tide level reached 6.3m O.D. which was estimated to have an AEP of 2% (1:50 year event).

Flood Event of February 2002 A major tidal flood occurred that saw water levels reach their highest in 80 years flooded 4 houses at Cashen Village and Moneycashen. It is a recurring problem that sees the same 4 houses being flooded as a result of tidal flooding.

Flood Event of 22nd February 2001 A combination of pluvial and fluvial flooding in Shrone West, Listowel flooded a field as a result of storm events which generated high surface runoff beyond the capacity of the drainage system.

Flood Event of October/November 1994 The village of Abbeydorney was affected by local surface water flooding.

3.5 Other Sources of Flooding

Other sources of flooding including pluvial, groundwater, drainage systems and reservoirs are detailed below. Risks from these sources have not been specifically considered in the Strategic Flood Risk Assessment undertaken for the Listowel Municipal District Local Area Plan and need to be addressed at the planning application stage.

Page 17: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 17

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

• Pluvial Flooding: Pluvial flooding is a result of rainfall generated overland flows which arise before run-off enters any watercourse or sewer. The intensity of rainfall can be such that the run-off totally overwhelms surface water and underground drainage systems. Flooding of land from surface water runoff is usually caused by intense rainfall that may only last a few hours. The resulting water follows natural valley lines, creating flow paths along roads and through and around developments and ponding in low spots, which often coincide with fluvial Floodplains in low lying areas.

• Groundwater Flooding: Groundwater flooding is caused by the emergence of water originating from underground when the water table rises to or above ground level and is particularly common in karstic landscapes. This can emerge from either point or diffuse locations. The occurrence of groundwater flooding is usually very local and unlike flooding from rivers and the sea, does not generally pose a significant risk to life due to the slow rate at which the water level rises. However, groundwater flooding can cause significant damage to property, especial in urban areas and pose further risks to the environment and ground stability. Groundwater flooding can persist over a number of weeks and even months. In most cases groundwater flooding cannot be easily managed nor lasting solutions engineered, although the impact on buildings can be mitigated against through various measures.

• Flooding from Drainage Systems: Flooding from artificial drainage systems occurs when flow entering a system, such as an urban storm water drainage system, exceeds its discharge capacity, it becomes blocked or it cannot discharge due to a high water level in the receiving watercourse. Sewer flooding problems will often be associated with regularly occurring storm events during which sewers and associated infrastructure can become blocked or fail.

• Flooding from Reservoirs, Lakes and other Artificial Sources: Reservoirs can be a major source of flood risk. Whilst the probability of dam failure or breach occurring is very small, the consequences of such an event can be devastating thereby presenting a risk of flooding which has to be considered.

4.0 Addressing Flood Risk in the Listowel Municipal District Local Area Plan

4.1 Introduction

This section details the approach to Flood Risk Management adopted in the Listowel Municipal District Local Area Plan.

4.2 Collation of Flood Risk Data

In 2015, as part of the review of its Local Area Plans, and in order to meet the needs of the Strategic Environmental Assessment process and the requirements of the Department of the Environment, Heritage and Local Government / Office of Public Works Guidelines, “The Planning System and Flood Risk Management” (2009), Kerry County Council undertook a county wide Strategic Flood Risk Assessment. The Council also conferred with OPW officials, the Lead Agency for Flood Risk Management in Ireland, in

Page 18: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 18

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

completing the county wide assessment of flood risks and in formulating the flood risk management strategy which informed the preparation of the Listowel Municipal District Local Area Plan. For the purposes of the assessment, information about flood risks was collated from a number of sources including but not limited to:

• Predictive and historic flood maps, and Benefiting Lands Maps, from the national flood hazard mapping website, http://www.floodmaps.ie; operated by the Office of Public Works (OPW), where information about past flood events is Recorded and made available to the public.

• Preliminary Predictive flood maps available, produced under the CFRAM Studies.

• OPW Preliminary Flood Risk Assessment indicative flood maps.

• River Basin Management Plans and reports.

• Expert advice from OPW who may be able to provide reports containing the results of detailed modeling and flood-mapping studies, including critical drainage areas, and information on historic flood events, including flooding from all sources.

• National, regional and local spatial plans, such as the National Spatial Strategy (NSS), Regional Planning Guidelines (RPGs), Development Plans and Local Area Plans that provide key information on existing and potential future receptors.

This data was amalgamated into an indicative flood data map for the County, which is used as the basis for this SFRA. Further information that has become available in the intervening period from other flood studies, including the outputs from the National CFRAM Programme, (Catchment Flood Risk Assessment and Management), undertaken by the OPW has been undertaken. The updated flood zone mapping provides information on the three main flood zones as follows: Zone A - High probability of flooding. Most types of development would be considered inappropriate in this zone. Development in this zone should be avoided and/or only considered in exceptional circumstances such as in major urban or town centres, or in the case of essential infrastructure that cannot be provided elsewhere. A Justification Test as set out in the Ministerial Guidelines must be applied in such cases. Only water-compatible development such as docks, marinas, dockside activities that require a waterside location, amenity open space, outdoor sports and recreation, would be appropriate in this zone. Zone B - Moderate probability of flooding. Highly vulnerable development such as hospitals, residential care homes, Garda, Fire and Ambulance stations, dwelling houses and primary strategic transport and utilities infrastructure would be generally considered inappropriate at this location unless the justification test can be met. Less vulnerable development such as retail, commercial and industrial uses, sites used for short term caravan and camping and secondary strategic transport and utilities, infrastructure and water compatible development might be considered appropriate in this zone. Less vulnerable development, such as retail, commercial and industrial uses, sites used for short term letting for caravans and

Page 19: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 19

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

camping and secondary strategic transport and utilities infrastructure should only be considered if adequate lands/sites are not available in Zone C and subject to a flood risk assessment to the appropriate level of detail to demonstrate that flood risk to/from the development can or will be managed adequately.

Zone C - Low probability of flooding. Localised flooding from sources other that rivers and the coast can still occur. Development in this zone is appropriate from a flood risk perspective, subject to assessment of flood hazard from sources other than rivers or tidal and would need to meet the normal range of proper planning and sustainable development considerations at the planning application stage. Extracts from the flood zone map, where relevant, informed the settlement maps included in the Local Area Plan. The maps are indicative in nature and are intended to primarily function as a screening tool. The areas at risk may be more or less extensive in practice than indicated in the flood mapping. The mapping may be refined where possible over time as other more detailed flood risk assessments are completed by the OPW.

Within areas not specifically identified by the plan as being at risk of fluvial or tidal flooding (i.e. within Zone C) a flood risk screening assessment may still be required to assess potential impact of development on adjoining Flood Zones A or B, particularly with respect to surface water management. An assessment of the risk of other sources of flooding such as pluvial or ground water flooding may also be needed.

The inclusion of the flood zone information on the settlement maps of the Listowel Municipal District is the first step in managing flood risk in the future. The updated mapping provides for an improved understanding of flood risk issues within the Municipal District. The maps indicate the extent of flood zones that should be safeguarded from development and will support the application of the sequential approach, and the justification test as appropriate, in areas where development is proposed.

As part of the review of the Listowel Municipal District Local Area Plan, all zoned lands in areas at risk of flooding have been considered in the context of the updated indicative flood zone maps.

4.3 Flood Risk within the Listowel Municipal District

The Strategic Flood Risk Assessment provides an appraisal and assessment of available flood risk data for the land use plans contained within the boundaries of the Listowel Municipal District Local Area Plan. This process identifies flood risk indicators in each area and may also demonstrate a requirement for the gathering of additional information at specific locations where proposed zoning may be at significant risk of flooding and where a detailed flood risk assessment is therefore necessary.

Stage 1 SFRA (flood risk identification) was undertaken in order to identify whether there may be any flooding or surface water management issues within or adjacent to lands and consequently whether Stage 2 SFRA (initial flood risk assessment) should be proceeded to. The Stage 1 SFRA examines existing flooding information to identify flood risk within the Local Plan Area and was based on existing information on flood risk indicators based on historical evidence and computational models.

Page 20: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 20

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Flood risk to each settlement has been appraised based on the indicative Flood Zones within the settlement boundary and is summarised in Table 4.1 below, Table 4.1 Flood Risk by Settlement in the Listowel Municipal District

Flood Risk by Settlement in the Listowel Municipal District

Settlement

Indicative Fluvial

within Development Boundary

Comment

Regional Town

Listowel Yes

All development proposals within the Indicative Flood Zone Areas will need to comply with the flood risk assessment procedure detailed in section 4.6 of this report, i.e. verification of Indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test, and detailed site specific assessment, as appropriate.

District towns

Ballybunion No All development proposals within the Indicative Flood Zone Areas will need to comply with the flood risk assessment procedure detailed in section 4.6 of this report, i.e. verification of Indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test, and detailed site specific assessment, as appropriate.

Ballyheigue No

Ballylongford

Yes

Tarbert

No

Villages

Abbeydorney

Yes All development proposals within the Indicative Flood Zone Areas will need to comply with the flood risk assessment procedure detailed in section 4.6

Ballyduff

No

Causeway

No

Page 21: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 21

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Duagh

No of this report, i.e. verification of Indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test, and detailed site specific assessment, as appropriate.

Kilflynn

No

Lixnaw

No

Moyvane

No

Development Nodes

Asdee

No

Finuge

No

Kilmorna

No

Knockanure

No

Lisselton

No

4.4 Flood Risk Management Strategy

The assessment and management of flood risks in relation to planned future development is an important element of sustainable development. The majority of towns, villages and smaller settlements have either a river or a stream running through the built-up area or close by and are inevitably exposed to some degree of flood risk when those rivers or streams overflow their normal course. Similarly, in coastal areas, flooding can periodically occur following unusual weather or tidal events.

Generally, the purpose of zoning is to indicate to property owners and members of the public the types of development which the Planning Authority considers most appropriate in each land use category. Zoning is designed to reduce conflicting uses within areas, to protect resources and, in association with phasing, to ensure that land suitable for development is used to the best advantage of the community as a whole.

The approach adopted has generally been to:

• Include, on the settlement maps, information on the areas at risk of flooding (extent of Flood Zones A and B),

• Avoid development in areas at risk of flooding; and

• Where development in floodplains cannot be avoided, to take a sequential approach to flood risk management based on avoidance, reduction and mitigation of risk.

Page 22: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 22

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

In response to local circumstances, particularly where there may be some uncertainties in relation to flood risk data or where land has been zoned in a previous plan or planning permission has already been granted, the approach has been modified and lands have been zoned for development with a requirement that a detailed site specific flood risk assessment be carried out at the project stage. A more detailed explanation of this is given in the next section.

4.5 The Approach to Zoning in Areas at Risk of flooding

Within the areas identified by the Indicative Flood Risk Mapping as being at risk (Zone A or B), all proposals for development will need to comply with the Ministerial Guidelines–‘The Planning System and Flood Risk Management. In this LAP, land use zoning objectives within the indicative Flood Risk Areas have been included in the plan where either:

• The land use zoning objective has been considered in the context of the “Development Plan Justification Test” set out in the Ministerial Guidelines;

• The zoning objective has been stemmed from a similar objective in the County Development Plan and is included in this Local Area Plan in order to facilitate the local verification of the indicative Flood Risk Maps at the project planning/planning application stage.

In the preparation of the Listowel Municipal District Local Area Plan/Third Variation to the Listowel Town Development Plan 2009-2015 (as extended), proposed zonings were generally assessed relative to the provisions of the Guidelines and the Justification Test for Development Plans as detailed in the Guidelines. The Justification Test is generally required in situations where the planning authority needs to consider future development in areas at a high or moderate risk of flooding, for uses or development vulnerable to flooding that would otherwise be inappropriate. In such circumstances, all of the following criteria must be satisfied:

a) The urban settlement is targeted for growth in the National Spatial Strategy, Regional Planning Guideline’s, or Statutory Plans defined under the provisions of the Planning and Development Act, 2000, as amended.

b) The zoning is required to achieve the proper planning and sustainable

development of an urban settlement and is

o Essential to facilitate the regeneration and/or expansion of the centre of the urban settlement;

o Comprises significant previously developed and/or under-utilised lands;

o Is within or adjoining the core of an established or designated urban settlement;

o Will be essential to achieving compact and sustainable urban growth; and

o There are no suitable alternative lands for the particular use in areas at lower

risk of flooding within or adjoining the core of the urban settlement.

Page 23: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 23

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

c) A Flood Risk Assessment to the appropriate level of detail has been carried out as part of the SEA, which demonstrates that flood risk to the development can be adequately managed and the development will not cause adverse impacts elsewhere.

The approach taken in the Local Area Plan provides, for the detailed assessment of the extent of the actual flood risk relative to that indicated on the indicative mapping via a phased flood risk assessment procedure. The first stage of this assessment process provides a prospective developer with the opportunity to verify the Indicative Flood Zone Mapping in the first instance and address any local ambiguities. Depending on the outcome of the verification stage, a prospective developer may then have the opportunity to demonstrate compliance with the requirements of the Development Plan Justification Test and carry out a detailed site specific assessment, as appropriate. This flood risk assessment process is set out in Chapter 10 of the County Development Plan 2015 –2021. Development proposals on lands within areas at risk of flooding will also be subject to the “Development Management Justification Test”, details of which are set out in the Guidelines. The Table below lists the specific zoned sites within the Listowel Municipal District that are located within either Flood Zone A or B and the circumstances of their inclusion.

Page 24: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 24

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Table 4.2 Specific Land Use Zonings Located within Flood Zone A or B

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Listowel

Listowel

(R2.6) Existing Residential

Justification Test

Not Applied

Zoning Zoned for existing residential in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & Zone B). A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Page 25: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 25

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Listowel

(R1.6) New/Proposed Residential Phase 1

Justification Test

Not Applied

Zoning Zoned for New /Proposed Residential Phase 1 in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Listowel

(M4) Built up Area

Justification Test

Not Applied

Zoning Zoned for Built up Area in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone B). Inappropriate development should be avoided in that

Page 26: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 26

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Listowel (M2) Town Centre

Justification Test

Not Applied

Zoning Zoned as Town Centre in the Kerry County Development Plan 2015 – 2021. Part of the Zone is at risk of flooding (Zone B) and inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as

Page 27: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 27

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Listowel (G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” / Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Listowel (P1) Agriculture

Justification Test

Not Applied

Zoning Zoned for Agriculture in the Kerry County Development Plan 2015 – 2021.

Page 28: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 28

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Lands are at risk of flooding (Zone B) and inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Listowel (O1) Strategic Reserve

Justification Test

Not Applied

Zoning Zoned for Strategic Reserve in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the

Page 29: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 29

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballygowloge (G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” / Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Part of the Zone is at risk of flooding (Zone A & Zone B) and inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County

Page 30: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 30

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Development Plan 2015 – 2021.

Curraghatoosane (G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” / Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Islandganniv North

(G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” /

Page 31: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 31

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Islandganniv North

(R2.6) Existing Residential

Justification Test

Not Applied

Zoning Zoned for existing residential in the Kerry County Development Plan 2015 – 2021. Part of the Zone is at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area.

Page 32: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 32

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Islandganniv North

(P1) Agriculture

Justification Test

Not Applied

Zoning Zoned for Agriculture in the Kerry County Development Plan 2015 – 2021. Lands are at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as

Page 33: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 33

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Islandmacloughry (G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” / Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Islandmacloughry (C2.1) Industrial/Enterprise/ Employment

Justification Test

Not Applied

Zoning Zoned for

Page 34: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 34

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Industrial/Enterprise/ Employment in the Kerry County Development Plan 2015 – 2021. A very small part of the Zone is at risk of flooding (Zone A & Zone B) and inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballygrenane (C2.1) Industrial/Enterprise/ Employment

Justification Test

Not Applied

Zoning Zoned for Industrial/Enterprise/ Employment in the Kerry County Development Plan 2015 – 2021. A small part of the Zone is at risk of flooding (Zone B) and inappropriate development should be avoided in that

Page 35: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 35

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballygrenane

(M4) Built up Area

Justification Test

Not Applied

Zoning Zoned for Built up Area in the Kerry County Development Plan 2015 – 2021. Lands are at risk of flooding (Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as

Page 36: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 36

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballygrenane (G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” / Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballygrenane (P1) Agriculture

Justification Test

Not Applied

Zoning Zoned for Agriculture in the Kerry County

Page 37: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 37

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Development Plan 2015 – 2021. A small part of the Zone is at risk of flooding (Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Clieveragh N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Ballybunion

N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Page 38: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 38

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Ballyheigue

N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Ballylongford

Ballymacasy (G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” / Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Lands are at risk of flooding (Zone A &

Page 39: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 39

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballymacasy (M4) Built Up Area

Justification Test

Not applied

Zoning Zoned as Built Up Area in the Kerry County Development Plan 2015 – 2021. Part of the Zone is at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan

Page 40: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 40

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballymacasy (R4.6) Strategic Residential Reserve

Justification Test

Not applied

Zoning Zoned as Strategic Residential Reserve in the Kerry County Development Plan 2015 – 2021. Part of the Zone is at risk of flooding (Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Aghanagran Middle

(ACA) Architectural Conservation Area

Justification Test

Not applied

Zoning Zoned as Architectural

Page 41: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 41

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Conservation Area in the Kerry County Development Plan 2015 – 2021. The Zone is at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Aghanagran Middle

(M4) Built Up Area

Justification Test

Not applied

Zoning Zoned as Built Up Area in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e.

Page 42: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 42

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Aghanagran Middle

(G5) Mixed / General “green” / Recreational / Conservation

Justification Test

Not Applied

Zoning Zoned for Mixed / General “green” / Recreational / Conservation in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as

Page 43: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 43

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Aghanagran Middle

(O1) Strategic Reserve, White Land

Justification Test

Not Applied

Zoning Zoned for Strategic Reserve, White Land in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Aghanagran Middle

Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry

Page 44: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 44

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

County Development Plan 2015 – 2021. Part of the Zone is at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Lislaughtin (M4) Built Up Area

Justification Test

Not applied

Zoning Zoned as Built Up Area in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood

Page 45: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 45

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Lislaughtin (R4.6) Strategic Residential Reserve

Justification Test

Not applied

Zoning Zoned as Strategic Residential Reserve in the Kerry County Development Plan 2015 – 2021. A small part of the Zone is at risk of flooding (Zone B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Page 46: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 46

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Lislaughtin Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballyline West Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood

Page 47: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 47

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Rusheen Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County

Page 48: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 48

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Development Plan 2015 – 2021.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Tarbert N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Abbeydorney

Montanagay (M2) Village Centre

Justification Test

Not applied

Zoning Zoned for Village Centre in the Kerry County Development Plan 2015 – 2021. The site is substantially at risk of flooding (Zone A & B). Inappropriate development should

Page 49: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 49

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Montanagay (P1) Agriculture

Justification Test

Not applied

Zoning Zoned as agriculture in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as

Page 50: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 50

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Montanagay (G1) Open Space/Park

Justification Test

Not applied

Zoning Zoned as Open Space/Park in the Kerry County Development Plan 2015 – 2021. The site is substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Montanagay (G4) Active Open Space

Justification Test

Not applied

Zoning Zoned as Active Open Space in the Kerry County

Page 51: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 51

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Development Plan 2015 – 2021. The site is substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Montanagay Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of

Page 52: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 52

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Cloonametagh (P1) Agriculture

Justification Test

Not applied

Zoning Zoned as agriculture in the Kerry County Development Plan 2015 – 2021. Some Lands are at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Page 53: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 53

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Milltown Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Knockaunmore Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area.

Page 54: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 54

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Boherroe Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the

Page 55: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 55

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Aulanebane Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are substantially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Ballysheen Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021.

Page 56: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 56

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Only a small part of the lands are at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Knockreagh Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are partially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the

Page 57: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 57

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Dromcunnig Rural General Justification Test

Not applied

Zoning Zoned as rural general in the Kerry County Development Plan 2015 – 2021. Lands are partially at risk of flooding (Zone A & B). Inappropriate development should be avoided in that area. A site specific flood risk assessment will be required, i.e. verification of indicative Flood Zone Mapping, compliance with the requirements of the Development Plan Justification Test and detailed site specific assessment, as appropriate, in accordance with the objectives as detailed in Chapter 10 of the County Development Plan 2015 – 2021.

Page 58: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 58

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Ballyduff N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Causeway N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment

Reason for

inclusion in the LAP

Comment

Page 59: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 59

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Criteria

Duagh N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Kilflynn N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Lixnaw N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Reason for

inclusion in the LAP

Comment

Page 60: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 60

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Assessment Criteria

Moyvane N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Astee N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Finuge N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Reason for

inclusion in the LAP

Comment

Page 61: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 61

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

Assessment Criteria

Kilmorna N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Knockanure N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

Specific Land Use Zonings Located within Flood Zone A or B

Settlement General Zone Types (GZTs) /

Zoning Objective

Development Plan

Justification Test

& Other

Assessment Criteria

Reason for

inclusion in the LAP

Comment

Lisselton N/A N/A N/A Specific land use zonings are not located within Flood Zone A or B.

4.6 Approach to Development in Areas at Risk of Flooding

Where development is proposed within an area at risk of flooding, either on land that is subject to a specific zoning objective, lands within the “existing built up area” of a town or within a development boundary of a village, intending applicants need to comply with the provisions and objectives, as appropriate, of Chapter 10 of the Kerry County Development Plan 2015 – 2021, and with the provisions of the Ministerial Guidelines “The Planning System and Flood Risk Management”.

Page 62: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 62

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

4.7 Flood Risk and Development Management

The following key requirements for the management of development in areas at risk of flooding shall be adhered to:

a) Minor proposals for development, for example small extensions to existing houses or changes of use, in areas at moderate to high risk of flooding should be assessed in accordance with Planning Guidelines: “The Planning System and Flood Risk Management”.

b) Where flood risk constitutes a significant environmental effect of a development

proposal, a sub-threshold EIS may be triggered. Screening for EIA should be an integral part of all planning applications in areas at risk of flooding.

c) Any proposal in an area at risk of flooding that is considered acceptable in

principle must demonstrate that appropriate mitigation measures can be put in place and that residual risks can be managed to acceptable levels. Addressing flood risk in the design of new development should consider the following:

• Locating development away from areas at risk of flooding, where possible.

• Substituting more vulnerable land uses with less vulnerable ones.

• Identifying and protecting land required for current and future flood risk management, such as conveyance routes, flood storage areas and flood protection schemes etc.

• Addressing the need for effective emergency response planning for flood events in areas of new development.

d) Site layout, landscape planning and drainage of new developments must be

closely integrated to play an effective role in flood-reduction. As such, proposals should clearly indicate:

• The use of Sustainable Drainage Systems (SuDS) to manage surface water run-off.

• Water conveyancing routes free of barriers such as walls or buildings.

• The signing of floodplain areas to indicate the shared use of the land and to identify safe access routes.

e) To ensure that adequate measures are put in place to deal with residual risks,

proposals should demonstrate the use of flood-resistant construction measures that are aimed at preventing water from entering a building and that mitigate the damage floodwater causes to buildings. Alternatively, designs for flood resilient construction may be adopted where it can be demonstrated that entry of floodwater into buildings is preferable to limit damage caused by floodwater and allow relatively quick recovery. Such measures include the design and specification of internal building services and finishes. Further detail on flood

Page 63: STRATEGIC FLOOD RISK ASSESSMENT (SFRA)docstore.kerrycoco.ie/KCCWebsite/planning/listowellap/sfra.pdf · management and seek to integrate flood risk management into the planning process,

Listowel MD SFRA Page 63

Listowel Municipal District Local Area Plan Strategic Flood Risk Assessment

resilience and flood resistance are included in the Technical Appendices of the Planning Guidelines, The Planning System and Flood Risk Management.

5.0 Managing Flood Risk in the Future

5.1 Achievement of the Local Area Plan

The inclusion of Indicative Flood Zone maps for the settlements of the Municipal District is the first step in managing flood risk in the future. The maps are primarily intended to function as a screening tool. They are not a substitute for detailed hydraulic modelling, such as may be required to assess the level of flood risk for a specific development. The flood maps should be used to guide decision making when determining whether a detailed Flood Risk Assessment is required for any given site. The maps are intended for guidance, and cannot provide details for individual properties.

5.2 Monitoring and Review

Information in relation to flood risk will be monitored and reviewed by the Council and the Flood Risk Assessment (FRA) will be updated as appropriate as new information becomes available. There are a number of key outputs from possible future studies and datasets which could inform any update of the FRA as availability allows. A list of potential sources of information which will inform an FRA review is provided in Table 5.1 below. Table 5.1 Potential Sources of Flood Risk Data

Potential Sources of Flood Risk Data

Data Source Timeframe

Ongoing CFRAM Studies OPW 2017

County Development Plan/ variations / updates

Kerry County Council 2017 onwards

Significant flood events Various -

Flood maps from other sources such as drainage networks

Various -

Changes to Planning and / or Flood Management Policy

DoEHLG / OPW / Kerry County Council

-

SFRA’s for Local Area Plans Kerry County Council Upon LAP review

Detailed FRA’s Various -

Flood Defence Feasability / Design Reports

OPW (primarily) -