April 22, 2016 Strategic Community Partnership Plan setting priorities for potential enhancement sites

Transcript of Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems –...

Page 1: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

April 22, 2016

Strategic Community Partnership Plan

s e t t i n g p r i o r i t i e s f o r p o t e n t i a l e n h a n c e m e n t s i t e s

Page 2: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel
Page 3: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel
Page 4: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

ASLA 2015 Annual Meeting and EXPO

Combined Sewer Area

355 square mile service area

Page 5: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

ASLA 2015 Annual Meeting and EXPO

Combined Sewer Area

126 CSO Locations Throughout Combined Sewer Area

Page 6: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel
Page 7: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

0

1

2

3

4

5

6

7

8

9

Baseline (1970s) Current (2015) Target (2036)

9

4.5

0.494

Typ

ical

Ye

arC

SO V

olu

me

Re

mai

nin

g (B

G)

Historical CSO & Consent Decree Requirement

Page 8: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Project Clean Lake: THE GRAY

25 years of tunnel construction

7 tunnel systems

– 21 miles

– 17’ to 24’ diameter

– 100’ to 200’ deep

– Three deep tunnel pump stations

– Drop structures

– Near-surface sewers , structures

Page 9: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

ASLA 2015 Annual Meeting and EXPO

Looking across combined sewer area for opportunities to manage stormwater before it enters combined system

Page 10: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Buckeye /

Woodland Hills

Neighborhood

Page 11: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Project Clean Lake

The Sewer District: COMBINED SEWER OVERFLOW CONTROL

Page 12: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

NEORSD Stated Goals for Project Clean Lake Community Enhancements:

• Meet requirements of EPA Consent Decree

• Leave behind investment following construction / disruption

• Develop a coordinated, system-wide approach

• Tell the story of NEORSD investment / impact

• Explore potential to integrate public art and public space enhancements with construction projects

• Create a Project Clean Lake identity

• Environmental education beyond a project’s construction

Community Enhancements

Page 13: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Phase I: Developing an Investment Framework

Page 14: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Project Clean Lake – Analysis of Initiatives

Project Clean Lake: • Green Infrastructure

Basin Sites

• Gray Infrastructure Tunnel Routes

• Pump Stations

• Miscellaneous Structures

• Neighborhood-Based Initiatives

Page 15: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Establishing a Community Investment Timeline

• Buckeye Road GI Basins

• Center Street Storage Tank

• Columbus Road Storage Tank

• CSO-045 Storage Tank

• CSO-063 Relief Consolidation Sewer

• Doan Valley Regulators / Relief

• Doan Valley Relief and Consolidation Sewer

• Doan Valley Storage Tunnel

• Dugway Regulators / Relief Sewer

• Dugway South Relief and Consolidation Sewer

• Dugway Storage Tunnel

• Dugway West Interceptor Relief

• East 140th Consolidation and

Relief Sewer & GI Basins

• East 37th Street Pump Station Pipes

• East 37th Street Pump Station Upgrade

• Lakeshore Boulevard Relief Sewer

• Fairhill GI Basin

• Fleet Avenue GI Basin

• Kingsbury Blvd Relief Sewer

• London Road Relief Sewer

• Low Level Interceptor Relief System

• Mary Street Pump Station

• Morgana Run & Burke Brook Rehabilitation

• Morgana Run Relief Sewer

• Regulator S-8 Upgrade

• Shoreline Storage Tunnel

• Shoreline Consolidation

• Slavic Village Demonstration GI Basins

• Southerly Pump Station

• Superior Avenue Pump Station

• UAIZ GI Basins

• Union Avenue GI Basin

• Wade Avenue Connector

• Westerly Main CSO Storage Tunnel

• Westerly Tunnel Dewatering Pump Station

• Woodland Central East / West GI Basins

Planning Horizon: Pre-2026 Projects:

Page 16: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Establishing a Community Investment Timeline

• Buckeye Road GI Basins

• Center Street Storage Tank

• Columbus Road Storage Tank

• CSO-045 Storage Tank

• CSO-063 Relief Consolidation Sewer

• Doan Valley Regulators / Relief

• Doan Valley Relief and Consolidation Sewer

• Doan Valley Storage Tunnel

• Dugway Regulators / Relief Sewer

• Dugway South Relief and Consolidation Sewer

• Dugway Storage Tunnel

• Dugway West Interceptor Relief

• East 140th Consolidation and

Relief Sewer & GI Basins

• East 37th Street Pump Station Pipes

• East 37th Street Pump Station Upgrade

• Lakeshore Boulevard Relief Sewer

• Fairhill GI Basin

• Fleet Avenue GI Basin

• Kingsbury Blvd Relief Sewer

• London Road Relief Sewer

• Low Level Interceptor Relief System

• Mary Street Pump Station

• Morgana Run & Burke Brook Rehabilitation

• Morgana Run Relief Sewer

• Regulator S-8 Upgrade

• Shoreline Storage Tunnel

• Shoreline Consolidation

• Slavic Village Demonstration GI Basins

• Southerly Pump Station

• Superior Avenue Pump Station

• UAIZ GI Basins

• Union Avenue GI Basin

• Wade Avenue Connector

• Westerly Main CSO Storage Tunnel

• Westerly Tunnel Dewatering Pump Station

• Woodland Central East / West GI Basins

Planning Horizon: Pre-2026 Projects:

Page 17: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Neighborhood Outreach

Partner Outreach: • Cleveland City Planning Commission • Northeast Shores • Cuyahoga Soil and Water • Famicos Foundation • NOAH: East Cleveland • University Circle Inc. • Buckeye Shaker Square • Campus District • St Clair Superior • Flats Forward • Detroit Shoreway • Ohio City Inc. • Tremont West

Page 18: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Opportunity Areas - Community Reinvestment Zones

Opportunity Areas: - Target redevelopment

areas within neighborhoods with uniquely identifiable characteristics, changes in land-use patterns, strongly defined physical edges, or topographic boundaries.

Page 19: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Opportunity Areas are evaluated on a scale of 1-5 for each of the following criteria to assess it’s viability for NEORSD sponsored

public space enhancements:

• Current Visibility: Automobile

• Current Visibility & Accessibility: Pedestrian / Bicycle / RTA station

• Increased Ped/Bike Visibility: Greenspace & Trails Initiative

• Development Potential

• Population Growth

• Partnership / Funding Opportunities

• Equity / Environmental Justice

• Proximity to Schools

Opportunity Areas – Criteria for Assessing Impact

Page 20: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Opportunity Areas – Criteria for Assessing NEORSD Impact

Opportunity Area Impact Ranking: - High Impact

- Medium Impact

- Low Impact

M

H

L

L

L

M

H

H

L

M

M

Page 21: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Catalytic Neighborhood Investment Opportunities

Page 22: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Catalytic Neighborhood Investment Opportunities

A

C

B

Enhancement Sites: - Potential locations at which

Project Clean Lake community investments can be integrated within neighborhoods have been identified. Investment opportunities build from planned / ongoing redevelopments, offer NEORSD education prospects, and occupy high-visibility locations throughout the City.

A

A

A

B

C

A

B

C A

Page 23: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Green Infrastructure

Page 24: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Fleet Avenue Streetscape Infiltration Basin Green Ambassador Project

M

H

L

H

Page 25: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Fairhill / Ambler Park Basin Green Ambassador Project

M

H

L

H

Page 26: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

UAIZ Basin Outdoor Classroom Green Ambassador Project

M

H

L

H

Page 27: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Gray Infrastructure

Page 28: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Dugway / Doan Initiatives

Glenville/ Famicos

Foundation

University Circle

East Cleveland

Opportunity Areas:

Forest Hills

Glenville Neighborhood

East Cleveland

Garrett Square

Heritage Lane

Little Italy / Red Line Route

Stokes / Ambler Park

Woodhill Road Buckeye

L

M

H

M

L H

M

M

H

H

L

Page 29: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Glenville: Forest Hills Park

Glenville Town Center / East Side Market

Eas

t 11

0th S

tree

t

Forest Hills Park

M

Shaft Site / Easement Locations

Page 30: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Glenville: Garrett Square

A

Glenville Town Center / East Side Market

Eas

t 11

0th S

tree

t

Superior Avenue

Garrett Square Redevelopment

A

M

Planned Development Initiatives

Page 31: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

East Cleveland: Pattison Park

A

Glenville Town Center / East Side Market

Eas

t 11

0th S

tree

t

2nd Ave GI Basin

Pattison Park

Forest Hills Park /

Cleveland

Phillips Avenue

H

Programming partnerships & community engagement

Active / Engaged Communities

Page 32: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

University Circle: Ambler Park

A

Glenville Town Center / East Side Market

Eas

t 11

0th S

tree

t 0

Case Western Reserve Master Plan / Stearns Road Proposal

CMSD John Hay / School of the Arts

Complex

UCI Gateway

UC 3

UC 3

Cleveland Museum

of Art

Ambler Park

Carnegie Avenue

H

High Visibility Civic Destinations

Page 33: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

SHAFT DVT-2

MLKCT

DVT

WCT

Doan Brook Culvert

Giddings Brook Culvert

CSO-073

Be

low

Gra

de

- i

nfr

astr

uctu

re

ISOMETRIC VIEW

Page 34: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

MLKCT

DVT

WCT

Ground Surface Reference Line

Flow Control/Gate

Structure

Gate Control Vault

SHAFT Ventilation

Vault

SHAFT DVT-2

ISOMETRIC VIEW

Doan Brook Culvert

Overflow Structure

Giddings Brook Culvert

CSO-073

Diversion Structure

Page 35: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel
Page 36: Strategic Community Partnership Plan€¦ · 25 years of tunnel construction 7 tunnel systems – 21 miles –17’ to 24’ diameter –100’ to 200’ deep –Three deep tunnel

Project Clean Lake Identity