Stormwater Management Report Les Terrasses Francesca ...
Transcript of Stormwater Management Report Les Terrasses Francesca ...
Stormwater Management Report
Les Terrasses Francesca
Presland Road, Ottawa, Ontario
June 12, 2013
Project No.: 11-5591
Submitted by
Dillon Consulting
Limited
Stormwater Management Report
Les Terrasses Francesca
Dillon Consulting Limited – Project Number: 11-5591 i
TABLE OF CONTENTS
Page No.
1.0 INTRODUCTION ............................................................................................................................ 1
2.0 SWM CRITERIA.............................................................................................................................. 1
3.0 SWM PLAN...................................................................................................................................... 1
3.1. Quantity Control ........................................................................................................................... 1
3.2. Quality Control ............................................................................................................................. 3
4.0 CONCLUSIONS............................................................................................................................... 3
List of Figures
Figure 1.0 Pre-Development Drainage Plan
Figure 2.0 Post-Development Stormwater Management Plan
List of Drawings
SERV-1 Grading and Servicing Plan
List of Appendices
Appendix A Detailed Calculations
Appendix B Stormceptor® Sizing Report
Stormwater Management Report
Les Terrasses Francesca
Dillon Consulting Limited – Project Number: 11-5591 1
1.0 INTRODUCTION
This Stormwater Management (SWM) Report has been prepared on behalf of Groupe Lépine in support
of a site plan application for the development of Les Terrasses Francesca (‘the Site’). The Site, currently
occupied by a convent constructed in the 1950s and private residence, is located in the northeast quadrant
of the intersection of Vanier Parkway and Presland Road, in the City of Ottawa (‘the City’), Ontario.
2.0 SWM CRITERIA
Based on discussions with the City of Ottawa Infrastructure Approvals Department, Rideau Valley
Conservation Authority (RVCA), and in accordance with the City’s Sewer design Guidelines (2004), it
was determined that the SWM criteria for the site consist of the following:
- Quantity Control – control the 100-year post-development flows to the 5-year pre-development
flows at C = 0.50; and
- Quality Control – Enhanced (80%) Total Suspended Solids Removal.
3.0 SWM PLAN
3.1. Quantity Control
Under existing conditions, the Site is occupied by a convent and private residence with some area
dedicated to natural landscaping; please see Figure 1.0 for the pre-development drainage plan. According
to a geotechnical report prepared by InspecSol, the Site is predominately situated on silty clay and sandy
silts. Based on a Site Servicing Report prepared by Genivar in September 2010, and correspondence with
the City of Ottawa, a runoff coefficient of C = 0.50 was assigned to represent the Site under existing
conditions.
A pre-development drainage plan (Figure 1.0) was developed to delineate existing conditions drainage
areas to existing Presland Road and Vanier Parkway outlets. Individual peak flows were calculated on the
basis of the City’s 5-year IDF data (Sewer Design Guidelines, 2004), and added together resulting in an
overall Site target. Table 1 below summarizes the 5-year target peak flows calculated by means of the
Rational Method for each catchment (see Appendix A). It should be noted that a portion of a residential
community to the north (103) drains overland onto the Site and outlets to Vanier Parkway; quantity
control will be provided for this catchment. Site target is not based on the external area.
Table 1 - Target Peak Flow Release Rates
Catchment ID Outlet 5-Year Peak
Flow Rate (L/s)
101 Vanier Parkway 37.6
102 Presland Road 134.6
SITE TARGET 172.2
Under post-development conditions, the Site will be occupied by a large terraced condo development,
landscaping and ground-level patios. Based on these post-development works and criteria noted above,
the following strategy was developed to satisfy the applicable criteria. Please refer to the pre-development
plan (Figure 1.0), the stormwater management plan (Figure 2.0) and the grading and servicing plan
(SERV-1) for additional details.
Based on information received from the City, the existing municipal system is surcharged during the 1 in
100 year event. The City indicates that the Hydrologic Grade Line (HGL) is at the pipe obvert of the
Stormwater Management Report
Les Terrasses Francesca
Dillon Consulting Limited – Project Number: 11-5591 2
receiving municipal system. This stormwater management strategy has been developed under the same
assumption.
Site drainage from Catchments 201 and 202 will be directed and controlled in an underground detention
facility (Tank N) in the northwest corner of the building. It will be equipped with a pump that discharges
into the sewer draining to the main trunk along Vanier Parkway.
Similarly, runoff from Catchments 203 and 205 will be directed and stored in a detention facility (Tank S)
constructed within the building’s underground parking lot on the south side. This tank will be equipped
with a pump that discharges to the proposed 300 mm storm sewer. Based on direction and input from the
City, this proposed sewer will connect to the existing 1120 mm storm sewer on Presland Road. While the
City has indicated that this storm sewer is surcharged during the 1 in 100 year event, it is still
recommended to pump the stormwater from Tank S with a backwater valve to this system. This strategy
was recommended by the City rather than connect into the existing combined sewer system on Presland
Road.
Catchment 204 will drain uncontrolled from the site to Presland Road. It should be noted that the post-
development peak flow rate from Catchment 204 (20 L/s) draining overland to Presland Road is less than
the overland pre-development peak flow rate from Catchment 101 (37.6 L/s). This implies that overland
flow to Presland Road, which eventually enters the combined sewer system, is actually reduced (from
37.6 L/s to 20 L/s). This is due to the stormwater from Tank S being re-directed to the Presland Road
storm sewer.
The stormwater management strategy assumes the use of a variable rate pump at both tank locations, with
the maximum pump rate set to ensure that the overall target Site release rate (172.2 L/s) is achieved, even
with Catchment 204 being uncontrolled. Our stormwater management plan does not account for surface
storage in the design to achieve the quantity target, as sufficient storage has been provided by
underground cisterns.
In order to achieve the target Site release rate, storage volumes of 230 m3 and of 93 m
3 are required at
Tank N and Tank S, respectively. The final dimensions of the detention tanks and associated pumps will
be determined by the Mechanical Engineers during detailed design.
Please see Table 2 for a summary of the 100-year post-development peak flows, and the required and
provided storages as calculated using the Modified Rational Method (see Appendix A).
Stormwater Management Report
Les Terrasses Francesca
Dillon Consulting Limited – Project Number: 11-5591 3
Table 2 - Summary of 100-year post-development flows and storage
Catchment
ID
Catchment
Area
(ha)
Area
Draining
To Tank
(ha)
Outlet and
Description of Quantity Control
Measures
100-Year
Peak
Flow Rate
(L/s)
Storage
Required
(m3)
Storage
Provided
(m3)
201 0.43
Vanier Parkway Landscaped area directed to underground
detention facility (Tank N) where it will be
stored and then pumped out to Vanier Parkway.
202 0.51
0.94 (To Tank N) Vanier Parkway
Roof area directed to underground detention
facility (Tank N) where it will be stored and
then pumped out to Vanier Parkway.
122 229 230
203 0.27
Presland Road Directed to underground detention facility
(Tank S) where it will be stored and then
pumped out to storm sewer on Presland Road.
205 0.05
0.32 (To Tank S) Presland Road
Directed to underground detention facility
(Tank S) where it will be stored then pumped
out to storm sewer on Presland Road.
30 93 93
204 0.04 - Presland Road Drains overland and uncontrolled to Presland
Road and eventually enters combined sewer.
20 0 0
SITE RELEASE RATE TARGET 172
3.2. Quality Control
In order to provide for quality control for the Site, an oil-grit separator (OGS) is proposed to provide
enhanced (80% TSS Removal) protection for the impervious surfaces near the entrance. It should be
noted that runoff from rooftops and pervious/landscape areas can be considered to be clean and do not
require additional treatment at Tank N. Quality control will therefore only be provided for the impervious
driveway area in front of the condo development (Catchment 203).
To achieve the Site water quality target, the Stormceptor system model STC750 is proposed. For the
detailed report please refer to Appendix B. The location of the OGS will be determined in collaboration
with the Mechanical Engineers during detailed design.
4.0 CONCLUSIONS
This report documents the development and detailed design of the Stormwater Management Plan for the
proposed development, and provides details for how the SWM Plan meets the City and RVCA criteria to
the extent practicable given the site constraints.
Stormwater Manzgem ent ReparlLes Terrasses Frencesca
Respectfully submitted;
Dillon
Grace Tesa,Water Resources Engineer
Lorenzo De Santis, P.Eng.Civil Engineer
eli:
{i. TñSAî0il1rË451
Díllon Consultíng Limíted - Projece Number: I1-5591 4
Project No.: 11-5591Project Name: Presland
ABC Location: City of Ottawa
IDF InformationStorm (year) 5 100
A 998.071 1735.688B 6.053 6.014 time in minutesC 0.814 0.82
tc (minutes) 10 10i (mm/hr) 104.19 178.56
Outlet CharacteristicsID Area C CxA Q5=CiA Q100=CiA
(ha) (m3/s) (m3/s)101 0.26 0.50 0.13 0.038 0.081102 0.93 0.50 0.465 0.135 0.288
SITE TARGET 1.19 0.50 0.172 0.369
Notes:1. IDF information as per the City of Ottawa Sewer Design Guidelines (2004)2. Under existing consitions runoff coefficient is to be 0.5 as the City of Ottawa Sewer Design Guidelines (2004)
M:\PROJECTS\DRAFT\11\115591 Les Terrasses Francesca - Presland\Toronto SWM\LATEST CALCS\June 112013\130611 Presland Modified Rational Method Existing Conditions 6/13/2013
Release Rates and Storage Requirements for 5-year Storm
Catchment Area Runoff CxA Flow Storage Storage Storage Sub-Surface Surface Type Diameter Invert Cd A Stage Head Orifice Major
ID Coeff. Required Provided Check Storage Storage (h) Flow Flow
(ha) (C) (m3/s) (ha-m) (ha-m) (ha-m) (ha-m) (mm) (m) (m2) (m) (m) (m3/s) (m3/s)
201+202 0.94 0.84 0.79 0.122 0.0064 0.0230 OK 0.0230 0.0000 - 0 0 0.62 0.0 0 0
203+205 0.32 0.95 0.30 0.030 0.0036 0.0093 OK 0.0093 0.0000 - 0 0 0.62 0.0 0 0204 0.04 1.00 0.04 0.012 0.0000 0.0000 uncontrolled 0 0 0.62 0.0 0 0
Total 1.30 0.87 1.13 0.164 0.0100 0.0324 0.0324 0.0000
Target 0.172 m3/s (5 year post to 5 year pre)
Release Rates and Storage Requirements for 100-year Storm
Catchment Area Runoff CxA Flow Storage Storage Storage Sub-Surface Surface Type Diameter Invert Cd A Stage Head Orifice Major
ID Coeff. Required Provided Check Storage Storage (h) Flow Flow
(ha) (C) (m3/s) (ha-m) (ha-m) (ha-m) (ha-m) (mm) (m) (m
2) (m) (m) (m
3/s) (m
3/s)
201+202 0.94 1.00 0.94 0.122 0.0229 0.0230 OK 0.0230 0.0000 - 0 0 0.62 0.0 0 0
203+205 0.32 1.00 0.32 0.030 0.0093 0.0093 OK 0.0093 0.0000 - 0 0 0.62 0.0 0 0204 0.04 1.00 0.04 0.020 0.0000 0.0000 uncontrolled 0 0 0.62 0.0 0 0
Total 1.30 1.00 1.30 0.172 0.0323 0.0324 0.0324 0.0000
Target 0.172 m3/s (100 year post to 5 year pre)
Notes:
1.100-year runoff coefficients adjusted as per MTO Drainage Design Manual (1997)
Catchment Parameters Storage Information Orifice Calculations: Q = CdA(2gh)1/2
Catchment Parameters Storage Information Orifice Calculations: Q = CdA(2gh)1/2
M:\PROJECTS\DRAFT\11\115591 Les Terrasses Francesca - Presland\Toronto SWM\LATEST CALCS\June 11 2013\130611 Presland Modified Rational MethodSummary of Storage-Flows 6/13/2013
Catchment ID 201+2025 year Modified Rational
IDF-ABC Informationstart time 5 A 998.071increment 5 B 6.053
C 0.814
Catchment ParametersArea 0.94 ha
Runoff C 0.84AxC 0.79
catchment target 0.122 m3/s
Sreq'd 64 m3
time flow vol in target vol out net(min) (m3/s) (m3) (m3/s) (m3) (m3)
5 0.31 92.88 0.12 36.60 56.2810 0.23 137.10 0.12 73.20 63.90 << MAX. STORAGE15 0.18 164.92 0.12 109.80 55.1220 0.15 184.88 0.12 146.40 38.4825 0.13 200.32 0.12 183.00 17.3230 0.12 212.88 0.12 219.60 -6.7235 0.11 223.44 0.12 256.20 -32.7640 0.10 232.56 0.12 292.80 -60.2445 0.09 240.57 0.12 329.40 -88.8350 0.08 247.73 0.12 366.00 -118.2755 0.08 254.19 0.12 402.60 -148.4160 0.07 260.09 0.12 439.20 -179.1165 0.07 265.51 0.12 475.80 -210.2970 0.06 270.54 0.12 512.40 -241.8675 0.06 275.22 0.12 549.00 -273.7880 0.06 279.61 0.12 585.60 -305.9985 0.06 283.74 0.12 622.20 -338.4690 0.05 287.63 0.12 658.80 -371.1795 0.05 291.33 0.12 695.40 -404.07
100 0.05 294.84 0.12 732.00 -437.16
M:\PROJECTS\DRAFT\11\115591 Les Terrasses Francesca - Presland\Toronto SWM\LATEST CALCS\June 112013\130611 Presland Modified Rational Method201+202 - Mod Rtl 5yr 6/13/2013
Catchment ID 201+202100 year Modified Rational
IDF-ABC Informationstart time 5 A 1735.688increment 5 B 6.014
C 0.82
Catchment ParametersArea 0.94 ha
Runoff C 1.00AxC 0.94
catchment target 0.122 m3/s
Sreq'd 229 m3
time flow vol in target vol out net(min) (m3/s) (m3) (m3/s) (m3) (m3)
5 0.63 190 0.122 37 15410 0.47 280 0.122 73 20715 0.37 336 0.122 110 22620 0.31 376 0.122 146 229 << MAX. STORAGE25 0.27 407 0.122 183 22430 0.24 432 0.122 220 21235 0.22 453 0.122 256 19740 0.20 471 0.122 293 17845 0.18 487 0.122 329 15750 0.17 501 0.122 366 13555 0.16 514 0.122 403 11160 0.15 525 0.122 439 8665 0.14 536 0.122 476 6070 0.13 546 0.122 512 3475 0.12 555 0.122 549 680 0.12 564 0.122 586 -2285 0.11 572 0.122 622 -5090 0.11 580 0.122 659 -7995 0.10 587 0.122 695 -108
100 0.10 594 0.122 732 -138
M:\PROJECTS\DRAFT\11\115591 Les Terrasses Francesca - Presland\Toronto SWM\LATEST CALCS\June 112013\130611 Presland Modified Rational Method201+202 - Mod Rtl 100yr 6/13/2013
Catchment ID 203+2055 year Modified Rational
IDF-ABC Informationstart time 5 A 998.071increment 5 B 6.053
C 0.814
Catchment ParametersArea 0.32 ha
Runoff C 0.95AxC 0.30
catchment target 0.030 m3/s
Sreq'd 36 m3
time flow vol in target vol out net(min) (m3/s) (m3) (m3/s) (m3) (m3)
5 0.12 35.59 0.03 9.00 26.5910 0.09 52.53 0.03 18.00 34.5315 0.07 63.19 0.03 27.00 36.19 << MAX. STORAGE20 0.06 70.84 0.03 36.00 34.8425 0.05 76.75 0.03 45.00 31.7530 0.05 81.57 0.03 54.00 27.5735 0.04 85.61 0.03 63.00 22.6140 0.04 89.11 0.03 72.00 17.1145 0.03 92.18 0.03 81.00 11.1850 0.03 94.92 0.03 90.00 4.9255 0.03 97.39 0.03 99.00 -1.6160 0.03 99.65 0.03 108.00 -8.3565 0.03 101.73 0.03 117.00 -15.2770 0.02 103.66 0.03 126.00 -22.3475 0.02 105.45 0.03 135.00 -29.5580 0.02 107.13 0.03 144.00 -36.8785 0.02 108.71 0.03 153.00 -44.2990 0.02 110.21 0.03 162.00 -51.7995 0.02 111.62 0.03 171.00 -59.38
100 0.02 112.97 0.03 180.00 -67.03
M:\PROJECTS\DRAFT\11\115591 Les Terrasses Francesca - Presland\Toronto SWM\LATEST CALCS\June 112013\130611 Presland Modified Rational Method203+205 - Mod Rtl 5yr 6/13/2013
Catchment ID 203+205100 year Modified Rational
IDF-ABC Informationstart time 5 A 1735.688increment 5 B 6.014
C 0.82
Catchment ParametersArea 0.32 ha
Runoff C 1.00AxC 0.32
catchment target 0.030 m3/s
Sreq'd 93 m3
time flow vol in target vol out net(min) (m3/s) (m3) (m3/s) (m3) (m3)
5 0.22 65 0.030 9 5610 0.16 95 0.030 18 7715 0.13 114 0.030 27 8720 0.11 128 0.030 36 9225 0.09 138 0.030 45 93 << MAX. STORAGE30 0.08 147 0.030 54 9335 0.07 154 0.030 63 9140 0.07 160 0.030 72 8845 0.06 166 0.030 81 8550 0.06 171 0.030 90 8155 0.05 175 0.030 99 7660 0.05 179 0.030 108 7165 0.05 183 0.030 117 6670 0.04 186 0.030 126 6075 0.04 189 0.030 135 5480 0.04 192 0.030 144 4885 0.04 195 0.030 153 4290 0.04 197 0.030 162 3595 0.04 200 0.030 171 29
100 0.03 202 0.030 180 22
M:\PROJECTS\DRAFT\11\115591 Les Terrasses Francesca - Presland\Toronto SWM\LATEST CALCS\June 112013\130611 Presland Modified Rational Method203+205 - Mod Rtl 100yr 6/13/2013