Storm Water Pollution Storm Water Pollution Prevention Plan DevelopmentPrevention Plan Development
Todd E. Hubmer PETodd E. Hubmer PEWSB & AssociatesWSB & Associates
hubmerhubmer@[email protected]
![Page 2: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/2.jpg)
How to develop a SWPPPHow to develop a SWPPP
Description of the project Description of how storm water and
erosion will be manage on-site Includes narrative, erosion control plan
sheets, standard details Drainage map, soils map, ponding calcs
![Page 3: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/3.jpg)
SWPPP ComponentsSWPPP Components
Ponding must treat 0.5” of runoff from new Ponding must treat 0.5” of runoff from new impervious surface for entire impervious surface for entire subwatershed subwatershed Wet basin,Wet basin, Regional pond,Regional pond, Combination, orCombination, or Alternative method (rain garden, etc.; requires Alternative method (rain garden, etc.; requires
90 day review by MPCA)90 day review by MPCA) Road projects: fit in ponding if you can. If Road projects: fit in ponding if you can. If
cannot fit in, other options (grassy swales, cannot fit in, other options (grassy swales, rock checks grit chambers, etc.) should be rock checks grit chambers, etc.) should be usedused
![Page 4: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/4.jpg)
Inspections and MaintenanceInspections and Maintenance
NPDES requires inspection Every 7 days Within 24 hours of a 0.5 inch-24 hour rainfall
event Once a month for areas that have undergone
final stabilization (but work is ongoing in other areas)
See PCA calendar
![Page 5: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/5.jpg)
Inspections and MaintenanceInspections and Maintenance
Inspection and maintenance must be recorded in writing and include: Date and time Name of inspector Findings and recommendations Corrective actions taken Date and amount of rainfall >0.5” in 24 hrs Documentation of changes in SWPPP
![Page 6: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/6.jpg)
Penalties/EnforcementPenalties/Enforcement
PCA will be increasing PCA will be increasing enforcementenforcement SWCD’s, Watershed Districts can be SWCD’s, Watershed Districts can be
authorized agents for PCAauthorized agents for PCA
You will need to produce the You will need to produce the SWPPP and inspection reportsSWPPP and inspection reports
Penalty for non-conformance is Penalty for non-conformance is $10,000 per day per violation$10,000 per day per violation
Erosion Control
Jail
![Page 7: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/7.jpg)
Erosion Control BMP’sErosion Control BMP’sRequired by NPDESRequired by NPDES
![Page 8: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/8.jpg)
INLET PROTECTION
![Page 9: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/9.jpg)
GEOTEXTILE FABRIC
MAINTENANCE OF SILT FENCE OR IF ADDITIONAL BMP’S
MAY BE REQUIRED
![Page 10: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/10.jpg)
ROCK CONSTRUCTION ENTRANCE TO REDUCE SEDIMENT TRACKED OFF SITE
![Page 11: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/11.jpg)
FINAL STABILIZATION
![Page 12: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/12.jpg)
DESIGNATED WASH-OUT SITE
![Page 13: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/13.jpg)
CATEGORY 1 BLANKET, TEMPORARY SEED, AND SILT FENCE MAINTENANCE
AFTER
![Page 14: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/14.jpg)
Sediment tracked off site or on streets must Sediment tracked off site or on streets must be removed with 24 hoursbe removed with 24 hours
![Page 15: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/15.jpg)
Silt fence Silt fence repaired, repaired, replaced when replaced when down or sediment down or sediment reaches 1/3 reaches 1/3 height of fence height of fence w/i 24 hoursw/i 24 hours
![Page 16: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/16.jpg)
Other NPDES requirementsOther NPDES requirements Silt fence repaired, replaced when down or sed Silt fence repaired, replaced when down or sed
reaches 1/3 height of fence w/i 24 hoursreaches 1/3 height of fence w/i 24 hours Temp and perm basins must be drained and Temp and perm basins must be drained and
cleaned out when ½ storage volume is gone w/i cleaned out when ½ storage volume is gone w/i 72 hours72 hours
Sed deltas, filled CB’s, filled ditches must be Sed deltas, filled CB’s, filled ditches must be cleaned/stabilized w/i 7 dayscleaned/stabilized w/i 7 days
Sed tracked off site must be removed with 24 Sed tracked off site must be removed with 24 hourshours
![Page 17: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/17.jpg)
Other NPDES requirementsOther NPDES requirements If sed in lakes, wetlands, streams, stabilize area If sed in lakes, wetlands, streams, stabilize area
upstream and remove sed w/i 7 daysupstream and remove sed w/i 7 days Hazardous materials stored appropriatelyHazardous materials stored appropriately No dumping of oil, junk, etcNo dumping of oil, junk, etc Garbage must be disposed of properlyGarbage must be disposed of properly Once site has undergone final stabilization, NOT Once site has undergone final stabilization, NOT
submittedsubmitted
![Page 18: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/18.jpg)
Other inspection requirementsOther inspection requirements Seeding timeline w/i 200 feet of surface waterSeeding timeline w/i 200 feet of surface water
Slope steeper than 3:1 – 7 daysSlope steeper than 3:1 – 7 days Slope 10:1 to 3:1 – 14 daysSlope 10:1 to 3:1 – 14 days Slope flatter than 10:1 – 21 daysSlope flatter than 10:1 – 21 days
Surface water is stream, lake, wetland, ditches, Surface water is stream, lake, wetland, ditches, ponds, whether natural or artificial.ponds, whether natural or artificial.
Stockpiles need silt fenceStockpiles need silt fence Riprap at pipe ends w/i 24 hours of connectingRiprap at pipe ends w/i 24 hours of connecting Dewatering – Water must be directed to storm Dewatering – Water must be directed to storm
water pond or treated before dischargewater pond or treated before discharge
![Page 19: Storm Water Pollution Prevention Plan Development](https://reader035.fdocuments.net/reader035/viewer/2022062421/56812ad8550346895d8ebc14/html5/thumbnails/19.jpg)
Questions?Questions?