Stores:
1. Store procedure, Store Work instruction are submitted to store in charge .
2. Bolt nuts not stacked on Platform & in closed Shed
3. Store layout not displayed
4. Identification boards are to be placed for major materials
5. Store keeper Signature & MRN numbers not complete in Inward register
6. Reconciliation statement not available
7. Stock statement for materials
8. Verification reports for the material received are not available.
9. Cement week number not mentioned in Register /inward
10. Authorization letters available for Unique const & venkateswaran. lavanya const not
available
11. Inward, outward , cement registers stickers for files
12. First location number for tools issue to be noted down in Tools issue register
Location Related
1. Cement Issue VS consumption to be made by section in charge( daily wise consumption
update from Site is required)
2. Empty cement bags are to be collected at Stores
3. Royalty challans & Bill from Quarry shall be collected location wise by site engineers &
to be submitted monthly for accounts for billing .
4. Understood separate cement go down were setup by Subcontractors. Periodical
verification of the Issue from store, stock & consumed in Location are to be carried by
section in charges/Engineers .