STOP!STOP!...STOP!STOP! 16647-TT Call Us First! DO NOT RETURN TO STORE. For immediate help with...
Transcript of STOP!STOP!...STOP!STOP! 16647-TT Call Us First! DO NOT RETURN TO STORE. For immediate help with...
STOP!STOP!
16647-TT
Call Us First!DO NOT RETURN TO STORE.
For immediate help with assembly or product informationcall our toll free number:
1-800-696-75951-800-696-7595
or email:
[email protected]@backyardproductsllc.comOur staff is ready to provide assistance
April through October M-F 8:00 AM to 4:30 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST
(This page intentionally left blank.)
01/04/2012
KEEP THIS MANUAL FOR FUTURE REFERENCE
ASSEMBLY MANUAL
BEFORE YOU BEGIN
IMPORTANT!READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
- CUSTOMER SERVICE -
Call: 1-800-696-75951-800-696-7595 email: [email protected]
• BUILDING RESTRICTIONS AND APPROVALS
Be sure to check with local
• ENGINEERED DRAWINGS
Contact our Customer Service Team if engineered drawings are needed to pull local permits.
• SURFACE PREPARATION
To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are
listed on page 7.
• CHECK ALL PARTS
Inventory all parts listed on pages 5 - 6. Contact our Customer Service Team if any parts are missing or damaged.
• ADDITIONAL MATERIALS
You will need additional materials to complete your shed. See page 4 for required and optional materials and quantities.
ACTUAL FLOOR SIZE IS 96 x 92-5/8" (244 x 235 cm)PRESCOTT GABLE 8' x 8' (244 x 244 cm)
16647-TT
A Backyard Products Company
2
TOOLS
Safety! Always use approved safety glasses during assembly.
OptionalRequired
HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
= Mark part with pencil.
= Beginning of steps for assembly or installation.
= You have � nished the assembly or installation.
= Level
� Gloves
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
� Safety Glasses
� Tape Measure
� Paint Tools
� Ladder
� Wood Glue
� Caulk Gun
� Hammer
� Level
FINISH
BEGIN
� Pencil
� Phillips Screwdriver
� Drill / Driver� 3/8" Drill Bit� 1/4" Drill Bit� 1/2" Drill Bit� 1/8" Drill Bit� #2 Philips Drive Bit
� Tool Belt/ Nail Pouch
� Chalk Line
� Nail Gun
• gun nails
� Tin Snips (for drip edge)
� Square or
� Utility Knife
� Shingle Blades
B C
3
CONCRETE FOUNDATIONIf you choose to install your kit on a concrete slab refer to the diagram below.
A
B C
4" (10,2 cm)
3-1/2"(8,9 cm)
DOOR
A B CActual Floor SizeBuilding Size
• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint: Use treated lumber in your kit or purchase full length treated lumber.
• Use a high quality exterior grade caulk beneath all sill plates.
• Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fasteners not included).
• Check local code for concrete foundation requirements.
96" (243,8 cm) 85-5/8" (217,5 cm)8'x 7'-8-5/8" (243,8 x 235,3 cm)8'x 8' (243,8 x 243,8 cm) 92-5/8" (235,3 cm)
Treated Sill Plate
Caulk between sill plate and concrete.
2 x 4 x 8' (5,1 x 10,2 x 243,8 cm)
Requires:
x4 MUST be treated lumber.
Caulkx1
Allow new concrete slabs to cure for at least seven (7) days.
NOTES
4
COMPLETING YOUR SHEDYou will need these additional materials:
OPTIONAL MATERIALS
ADDITIONAL MATERIALS
DRIP EDGE ..................... 40 Feet #15 ROOFING FELT To cover 73 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 LbFor roo� ng felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 4 Bundles
PAINT FOR SIDING .......................... 2 GallonsUse 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 TubesUse acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 2 LbsFor shingles.
PAINT FOR TRIM .............................1 QuartUse 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! The included � oor has been designed for general use. Depending on your speci� c use you may want to construct a heavy duty � oor frame by adding additional � oor joists (shown below as shaded). Below is a list of additional materials (not included):
x4
x16
2 x 4 x 8' (5,1 x 10,2 x 243,8 cm) Treated LumberCut to 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
Optional12" (30,5 cm) spacing
Standard24" (61 cm)spacing
FOUNDATION OR FLOOR MATERIALS
• This shed kit includes a wood � oor system.
• This shed does not include any leveling materials.
• See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your � oor, as this will vary depending on your speci� c site.
PARTS IDENTIFICATION AND SIZESTR
US
STR
IMW
ALL
6 x 24" (15,2 x 61 cm)x6
PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.
WOOD SIZE CONVERSION CHARTNominal Board Size Actual Size
1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)
2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)
1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)
x2 2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm) BV
x2 2 x 3 x 13" (5,1 x 7,6 x 33 cm) RK
x10 2 x 3 x 67-3/8" (5,1 x 7,6 x 171,1 cm)CJ
x2 2 x 3 x 69-1/2" (5,1 x 7,6 x 176,5 cm)KU
x2 2 x 3 x 92-5/8" (5,1 x 7,6 x 235,3 cm) PM
x2 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) PT
x1 1 x 4 x 60" (2,5 x 10,2 x 152,4 cm) JF
x4
x2
x4
x2
2 x 4 x 52" (5,1 x 10,2 x 132,1 cm)x6 CM
5/8 x 2-1/2 x 92-5/8" (1,6 x 6,4 x 235,3 cm)x2
1 x 3 x 55" (2,5 x 7,6 x 137,2 cm)x1
2 x 3 x 34" (5,1 x 7,6 x 86,4 cm) x2 CI
stamped on some parts.
• Check these locations for part stamp.
RS RS
x1 2 x 3 x 91 " (5,1 x 7,6 x 231,1 cm) PS
DO
OR
FLO
OR
OOx1 2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) Finger Jointed
x2
2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)x5
2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)
TREATED
TREATED
2 x 4 x 53-11/16" (5,1 x 10,2 x 136,4 cm)
3/8 x 1-3/4 x 71" (1 x 4,4 x 180,3 cm)
3/8 x 1-3/4 x 69" (1 x 4,4 x 175,3 cm)
3/8 x 1-3/4 x 72" (1 x 4,4 x 182,9 cm)
x4 CL
DS
ZJ
x1 19/32 x 2-1/2 x 55" (1,5 x 6,4 x 139,7 cm)ZB
5
Treated lumber is stamped:
Treated lumber is stamped:
19/32 x 2-1/2 x 72" (1,5 x 6,4 x 182,9 cm)
WALL PANELS, AND DOORS
FASTENER/HARDWARE BAG
NAIL BOXES
x13
x24
x73
x42
x25
3" (7,6 cm)
3" (7,6 cm)
2" (5,1 cm)
2" (5,1 cm)
2" (5,1 cm)
3/4" (1,9 cm)
1-1/4" (3,2 cm)
x1 BOXES x3 BOXES
x23/8 x 48 x 72"(1 x 121,9 x 182,9 cm)
x43/8 x 46-1/8 x 72"(1 x 117,2 x 182,9 cm)
x23/8 x 23-7/8 x 72"(1 x 60,6 x 182,9 cm)
x2 x2 5-7/8" x 96"(14,9 x 243,8 cm)
48" x 96"(121,9 x 243,8 cm)
x1 DOOR
ROOF PANELS
x1071-1/2" (3,8 cm)
x3 Sets
1-1/2" (3,8 cm)
x73/4" (1,9 cm)
6
Roof panels are7/16" (1,1 cm) thick.
DOOR HARDWARE
FLOOR PANELSx1x1
x1
x1
x1
x1
48" x 96"(121,9 x 243,8 cm)
44-5/8" x 96"(113,3 x 243,8 cm)
Floor panels are5/8" (1,6 cm) thick.
x3
x3
x4
x7
x5
2-1/2" (6,4 cm)
1" (2,5 cm)
x3
7
FLOOR LEVELING OPTIONSThere are multiple ways to level your � oor frame. Our recommended leveling method is shown below.
Leveling materials are not included in this kit.
PREFERRED METHOD - 4x4 TREATED RUNNERS
12"(30,5 cm)
12"(30,5 cm)
Measurements tocenters of 4x4's.
• 3" Screw angled into 4x4.• (2) at each point frame
and 4x4 touch.
4x4 Runners(not included).
• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.
LEVELING METHODS
• If you are building your shed on a concrete foundation see the following page.
CONCRETE
MATERIAL REQUIRED
x2 4" x 4" x 8' (10,2 x 10,2 x 243,8 cm) Treated Lumber
Fasteners for Frame to 4"x 4".(3" Screws shown as one option.) Minimum (20) 3" screws / exterior grade.
Use only wood treated for ground contact and fasteners approved for use with treated wood.
Always support frame seams.
Leveling higher than 16" not recommended.
LEVELING MATERIALSGravel
2x4 Treated Lumber
Solid Masonry Blocks in 1", 2", 4" or 8" thickness
Asphalt Shingles
4" Block
8" Block
GravelGravel
Do not exceed 16".
4x4 Runner
Shingle
ShingleMaximum between levelingmaterial locations.
48"12"
2x4 Treated Lumber
2" Block
Level
12"
DOOR
96"96"(243,8 cm)(243,8 cm)
PARTS REQUIRED: NOTE:Look for Stamp.
STANDARD FLOOR FRAME
3" (7,6 cm)
x5 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
x2 2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)
TREATED
TREATED
96"(243,8 cm)
92-1/2"(235 cm)
93"(236,2 cm)
48"(121,9 cm)
24"(60,9 cm)
20-1/2"(52,1 cm)
72"(182,8 cm)
92-1/2"(235 cm)
Flushat ends.
x20
HINT:For easier nailingstand on frame.
• FOR 10' x 12', SKIP TO PAGE 16
Centeron marks.
Centeron marks.
You have � nished your � oor frame. Proceed to level and square frame.
BEGIN
1 Orient parts as shown on � at surface. Measure and mark each dimension from end of boards
2 Use two 3" nails at each mark
FINISH
3
DO
OR
8
First, secure at endswith one fastener.
Second, secure at ends with one fastener.
133-5/16"(338,6 cm)
133-5/16"(338,6 cm)
Fig. A
LEVEL AND SQUARE FLOOR FRAMEBefore attaching � oor decking, it is important to level and square the � oor frame.
A level and square � oor frame is required to correctly construct your shed.
FINISH
5
BEGIN
2
3
4
1
Use level and check the frame is level before applying � oor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 133-5/16" (338,6 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).
Once the � oor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners.
See page 7 for the preferred � oor leveling method.
9
5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)
PARTS REQUIRED:
Ensure your � oor frame is square by installing one panel and squaring frame.
FLOOR PANELS
x1 2" (5,1 cm)
Fig. C
(2) Nails
Flush
Fig. A
Flush at top corner edge.
Fig. B
(2) Nails
x53
Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner � ush to the � oor frame (Fig A). Secure panel with two 2" nails in the corners.
Move to the opposite end. Using the long edge of the panel as a lever move thepanel side-to-side until the top corner is � ush to the � oor frame (Fig. B).Secure panel with two 2" nails in the corners.
2
BEGIN
1
3
4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel.Use a chalk line or use pre-painted grid lines to nail into joists under panel.
Check the � oor frame is square by measuring diagonally across the frame corners. If the measurements are the same, your � oor frame is square. The measurement will be approximately 133-5/16" (Fig. C).
96"(243,8 cm)
133-5/16"(338,6 cm)
133-5/16"(338,6 cm)
92-1/2"(235 cm)
48"(121,9 cm)
Flush
12" (30,5 cm) inside panel.
Grid lines UP
3/4"(1,9 cm)
Approximately
6" (15,2 cm) edges of panel.
Flush
DO
OR
10
FLOOR PANELS
2" (5,1 cm)
Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. .
5/8 x 44-5/8 x 96"(1,6 x 113,3 x 243,8 cm)
Continue by installing 44-5/8 x 96" panel with rough side up (painted grid lines).5
PARTS REQUIRED:x1
6
96"(243,8 cm)
96"(243,8 cm)
44-5/8"(113,3 cm)
Flush
12"(30,5 cm)
6"(15,2 cm)
Flush
Flush
Grid lines UP.
x53
You have � nished Installing your � oor panels.FINISH
7
DO
OR
11
12
I M P O R T A N T !
Check the � oor frame is level after installing � oor panels. Re-level if needed.
• The � oor should be used as a stable work surface for wall construction.
• Organize your assembly procedure during the build process to avoid over-handling of the walls.
HINT:
IMPORTANT!
DOOR
SIDEWALL
SIDEWALL FRONTWALL
BACKWALL
DOOR
22-5/16"(56,7 cm)
24"(61 cm)
24"(61 cm)
22-5/16"(56,7 cm)
1-1/2"(3,8 cm)
1-1/2" (3,8 cm)
5/8"(1,6 cm)
92-5/8"(235,3 cm)
SIDE WALL FRAMES
1BEGIN
2
Orient parts on edge on � oor. Measure and mark from end of boards. IMPORTANT! You will build two walls the same.
Use two 3" nails at each mark.
3" (7,6 cm) PARTS REQUIRED: x20
2" (5,1 cm)x20
Center on marks.
HINT:
3" (7,6 cm) Nails
2" (5,1 cm) Nails
x102 x 3 x 67-3/8" (5,1 x 7,6 x 171,1 cm)
CJ
x22 x 3 x 92-5/8" (5,1 x 7,6 x 235,3 cm)
PM
5/8 x 2-1/2 x 92-5/8" (1,6 x 6,4 x 235,3 cm)
x2
PM
CJ
13
14
2" (5,1 cm)PARTS REQUIRED:
3/8 x 46-1/8 x 72"(1 x 117,2 x 182,9 cm)
46-1/8"(117,2 cm)
1-1/2"(3,8 cm)
3/4"(1,9 cm)
3/4"(1,9 cm)
x2
x90
SIDE WALL PANELS
BEGIN HERE
6" (15,1 cm)
12" (30,2 cm)
For squareness maintain 3/4" and 1-1/2" measurement along stud.
Fig. A
Fig. B
3/4"(1,9 cm)
3/4"(1,9 cm)
2 NailsUse RK as gauge block.
Flush
2 Nails
Place the 46-1/8 x 72" panel onto wall frame with primed side up as shown.
Ensure a 3/4" measurement along the wall stud and locate the panel to 1-1/2" above side wall frame. Secure panel with two 2" nails in the corners (Fig. A).
5
4
3
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensure your wall frame is square by installing one panel and squaring frame.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B).
Primed Side UP
2 x 3 x 13" (5,1 x 7,6 x 33 cm) x1 RKTEMPORARY SPACER
15
2 x 3 x 13" (5,1 x 7,6 x 33 cm) x1 RK
1-1/2"(3,8 cm)
2" (5,1 cm)PARTS REQUIRED: x90
3/8" x 46-1/8" x 72"(1 x 117,2 x 182,9 cm)
x2
SIDE WALL PANELS
Place 46-1/8 x 72" panel on frame as shown with primed side facing up.
Nail using 2" nails 6" apart on edges and 12" apart inside panel.
6
6" (15,1 cm)
46-1/8"(117,2 cm)
12" (30,2 cm)
To draw panels tight at seams, angle nail.
Flush
Carefully � ip your side wall over.Repeat STEPS 1-6 to assemble your second side wall.
You have � nished building both of your side walls.FINISH
7
TEMPORARY SPACER
Use RK as gauge block.
Flush
2 x 3 x 34" (5,1 x 7,6 x 86,4 cm)
x1 CI
x12 x 3 x 91 " (5,1 x 7,6 x 231,1 cm)
PS
Flush
16
BACK WALL FRAME
1-1/2(3,8 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
34"(86,4 cm)
45-1/2"(115,6 cm)
45-1/2"(115,6 cm)
91"(231,1 cm)
1-1/2" (3,8 cm)
Nail using two 3" nails at each connection.3
2
1BEGIN
3" (7,6 cm)
CI
PS
PARTS REQUIRED:
(2) 3" (7,6 cm) Nails
x2
Center PS � ush on CI on edge on � oor as shown (Fig. A).
Orient CI on � at using a gusset as a temporary spacer.
x1 GUSSET TEMPORARY SUPPORT
Fig. A
2 x 3 x 34" (5,1 x 7,6 x 86,4 cm)
x1 CI
x12 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
PT
Flush
Flush
17
(2) 3" (7,6 cm) Nails
48"(121,9 cm)
48"(121,9 cm)
96"(243,8 cm)
1-1/2"(3,8 cm)
2-1/2"(6,4 cm)
34"(86,4 cm)
1-1/2(3,8 cm)
2-1/2"(6,4 cm)
Fig. B
Fig. A
Center PT on CI on edge on � oor as shown.
Center CI � ush on PS on � at using a gusset as a temporary spacer.
Nail PT to CI using (2) 3" Nails (Fig. A).
3" (7,6 cm)
BACK WALL FRAME
Use (2) 3" screws at middle connection (Fig. B).
4
5
6
7
FINISH
8 You have � nished building your back wall frame.
PARTS REQUIRED:3" (7,6 cm)
x2
PS
PT
CI
(2) 3" (7,6 cm)Screws
(2) 3" (7,6 cm)Nails
x2
x1 GUSSET TEMPORARY SUPPORT
3/8 x 48 x 72"(1 x 121,9 x 182,9 cm)
18
34"(86,4 cm)
6"(15,2 cm)
34"(86,4 cm)
2-1/2"(6,4 cm)
12"(30,5 cm)
1-1/4"(3,2 cm)
1-1/4"(3,2 cm)
1-1/4"(3,2 cm)
Flush
2" Nails
2" Nails
1-1/2" Nailsonly in vertical.
1-1/2" Nailsonly in vertical.
1-1/2" Nails
x1
Place LEFT panel on back frame as shown with primed side facing up.BEGIN
2
3
1
Nail horizontal framing using 2" nails 6" apart on edges and 12" apart inside panel.
Nail vertical framing using 1-1/2" nails 6" apart on edges.
BACK WALL PANELS
PARTS REQUIRED:
Primed side UP
For squareness maintain � ush and1-1/4" measurement along panel edges.
x111-1/2" (3,8 cm)
2" (5,1 cm)x11
3/8 x 48 x 72"(1 x 121,9 x 182,9 cm)
19
34"(86,4 cm)
6"(15,2 cm)
34"(86,4 cm)
2-1/2"(6,4 cm)
12"(30,5 cm)
1-1/4”(3,2 cm)
Flush
2" Nails
2" Nails
x1
Place RIGHT panel on back frame as shown with primed side facing up and � ush to panel.
5
6
4
BACK WALL PANELS
PARTS REQUIRED:
Primed side UP
FINISH
7 You have � nished installing your back wall panels.
Nail horizontal framing using 2" nails 6" apart on edges and 12" apart inside panel.
Ensure 34" (86,4 cm) between PT and PS.
Nail vertical framing using 1-1/2" nails 6" apart on edges.
x111-1/2" (3,8 cm)
2" (5,1 cm)x11
1-1/2" Nailsonly in vertical.
1-1/2" Nailsonly in vertical.
Flush
20
1"(2,5 cm)
1"(2,5 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
1"(2,5 cm)
1"(2,5 cm)
x22 x 3 x 13" (5,1 x 7,6 x 33 cm)
RK
Position RK on edge as shown (Fig A.)
Nail RK to wall panel using (3) 2" Nails.
3
2
1
Repeat step 1-2 for RIGHT wall panel. (Fig B.)
You have � nished building your back wall.
BEGIN
FINISH
4
BACK WALL BOTTOM PLATES
PARTS REQUIRED:2" (5,1 cm)
x6
Fig A. Fig B.
RKRK
MAINTAIN DIMENSION BETWEEN STUDS.
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
96"(243,8 cm)
48-1/2"(123,2 cm)
48-1/2"(123,2 cm)
23-3/4"(60,3 cm)
23-3/4"(60,3 cm)
69-1/2"(176,5 cm)
PT
KU KU
FRONT WALL FRAME
Orient parts on edge on � oor as shown.
Nail using two 3" nails at each connection.2
1BEGIN
3" (7,6 cm)PARTS REQUIRED:
HINT:
2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
x4
x1 PT
x22 x 3 x 69-1/2" (5,1 x 7,6 x 176,5 cm)
KU
21
(2) 3" Nails
3/8 x 23-7/8 x 72"(1 x 60,6 x 182,9 cm)
x2
Place LEFT panel on front wall frame as shown with primed side facing up. BEGIN
2
3
1
Nail using 2" nails 6" apart.
Repeat steps 1-2 for RIGHT panel.
FRONT WALL PANELS
2" (5,1 cm)PARTS REQUIRED: x36
MAINTAIN DIMENSIONBETWEEN STUDS.
MANTENGA LAS DIMENSIONES ENTRE LOS MONTANTES.
6"15,2 cm
HINT:Use � oor as a work
surface!
TOPFlush Flush
48-1/2" STUD TO STUD
48-1/2" 123,2 cm
22-1/4" 56,5 cm
Primed side up IMPORTANT DIMENSION
Note: Edge may result here.
BOTTOM 22
Center DS on PT on � at, � ush to front wall panel (Fig. A).BEGIN
2
1
Nail using 2" nails 6" apart.
FRONT WALL TOP PLATE
2" (5,1 cm)PARTS REQUIRED: x9
DS
DS
1 x 3 x 55" (2,5 x 7,6 x 137,2 cm)x1 DS
Flush
Fig. A
23
Flush
Front wall panel
CENTER CENTER
Use to maintain 3/8" overhang.
x1 GUSSET TEMPORARY SPACER
DOOR
DOOR
24
2" (5,1 cm)
PARTS REQUIRED (TEMPORARY):
x17
SIDE WALL INSTALLATION
3" (7,6 cm) x8
Use OO as a temporary brace. Secure with two 3" screws.
Center side wall assembly on the 92-1/2" (235 cm) � oor dimension.
Ensure 1-1/2" measurement is on top
2
BEGIN
1
First, nail lower edge of panel to � oor frame using 2" nails 6" apart.Angle nail to hit � oor frame (Fig. A).
3
Nail side wall bottom plate to � oor using (8) 3" nails.(Nail (2) 3" nails between each stud through bottom plate)
4
5 You have � nished standing your side wall.FINISH
92-1/2" (235 cm)3" (7,6 cm)
Screws
Nail 2" nails � rst.
Angle to nail into � oor frame.
2" (5,1 cm) Nail
Fig. A
1-1/2" overhang
3" Nails into bottom plate.
6"15,2 cm
Flush
Flush
OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
TEMPORARY SUPPORT
OO
3" (7,6 cm)x2
25
2" (5,1 cm)
PARTS REQUIREDx2x17
BACK WALL INSTALLATION
3" (7,6 cm)
3" (7,6 cm) x8
3" Nails into bottom plate.
(2) 3" (7,6 cm)Screws
x171-1/2" (3,8 cm)
2
BEGIN
Stand back wall on � oor.
CENTER
Fig. C
Fig. B
Center back wall on � oor side to side.
Nail the lower back wall corner to the side wall stud with one 2" nail (Fig. A).
1
2" (5,1 cm) NailFig. A
6" (15,2 cm)
6"(15,2 cm)
Ensure the measurement between the panel edges is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. B).
Nail along the panel edge into the stud using 2" nails spaced 6" apart.
Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit � oor frame (Fig. C).
3 Secure the back wall upright to � oor using two 3" screws as shown (Fig. D).
Nail the top plates at corners using two 3" nails (Fig. E).
Remove temporary brace.
You have � nished standing your back wall.
Fig. E
Fig. D
3" (7,6 cm) Nails
2x3"
FINISH
4
Same Measurement
2" (5,1 cm) Nail
It is important to secure the back wall in the following order:
DOOR
26
2" (5,1 cm)
PARTS REQUIRED:
x17
SIDE WALL INSTALLATION
3" (7,6 cm) x10
Center side wall assembly on the 92-1/2" (235 cm) � oor dimension.1
First, nail lower edge of panel to � oor frame using 2" nails 6" apart.Angle nail to hit � oor frame (Fig. A).
2
Nail side wall bottom plate to � oor using (8) 3" nails.(Nail (2) 3" nails between each stud through bottom plate)
3
6 You have � nished standing your back and side walls.FINISH
3" Nails into bottom plate.
6"15,2 cm
6"15,2 cm
Nail 2" nails � rst.
Angle to nail into � oor frame.
2" (5,1 cm) Nail
Fig. A
Flush
(2) 3" (7,6 cm) Nails
(17) 1-1/2" (3,8 cm) Nails
Fig. B
Nail back wall top plate to side wall using (2) 3" nails (Fig. B).4
DOOR
x171-1/2" (3,8 cm)
Nail Back wall panel to side wall stud using (17) 1-1/2" nails at 6" apart.
5
It is important to secure the side wall in the following order:Stand left wall on � oor.
BEGIN
27
6"15,2 cm
1
2" (5,1 cm)
PARTS REQUIRED:x8
FRONT WALL INSTALLATION
x4
Center front wall assembly on the 96" (243,8 cm) � oor dimension.
First, nail lower edge of panel to � oor frame using (8) 2" nails 6" apart.Angle nail to hit � oor frame (Fig. A).
2
Nail front wall to side walls using (26) 1-1/2" nails 6" apart.3
6 You have � nished standing your walls.FINISH
Center wall assembly on � oor.
(2) 3" (7,6 cm) Nails
Fig. B
Nail front wall top plate to side walls using (2) 3" nails (Fig. B, C).
Screw front wall uprights to � oor using (1) 3" Screw. Angle screw into � oor (Fig. D, E).
4
5
Fig. C
1"(2,5 cm)
Nail 2" nails � rst. Angle to nail into � oor frame.
2" (5,1 cm) Nail
Fig. A3" (7,6 cm)Screw
Fig. EFig. D
x23" (7,6 cm)
3" (7,6 cm)
1-1/2" (3,8 cm) Nails
x261-1/2" (3,8 cm)
It is important to secure the front wall in the following order:Stand front wall on � oor.
BEGIN
28
RAFTERS
2" (5,1 cm)PARTS REQUIRED:
2 x 4 x 54" (5,1 x 10,2 x 137,2 cm)
6 x 24" (15,2 x 61 cm)
x6
x6
x72
CM OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)TEMPORARY SUPPORT
Fit base of rafters in corners of back wall.
96”(243,8 cm)
GUSSET x2
1/4" gap (6 mm)
Center
Glue
Glue
You will build THREE assemblies;Place two rafter-halves CM in the corner of back and side walls.Rafters contact at peak.
BEGIN
1
Temporary support (OO)
HINT:Use � oor and walls to help
assemble rafters!
2" (5 cm)
Apply glue to rafters where the gusset will � t.
Contact at peak
Contact at peak
2
Nail gusset to rafters using twelve 2" nails in pattern shown. 3
Flip over rafter assembly and repeat STEPS 2-3 to attach second gusset to other side.4
Repeat STEPS 1-4 to build TWO additional rafter assemblies.5
FlushFINISH
6 You have � nished assemblingyour rafters.
29
RAFTERS
3" (7,6 cm)PARTS REQUIRED:
pre-assembled
x3
x12
22-5/8"(57,5 cm)
22-5/8"(57,5 cm)
24" (61 cm)
24" (61 cm)
Align over studs.
Maintain the measurements between rafters.
NOTE: Measurements from outside of panels
Screw into top plate.
(2) 3" (7,6)Screws
Fig.A
Fig. B
Locate rafters directly over the wall studs.
Secure with two 3" screws angled at each end (Fig. B).
NOTE: Use two screws at siding seam.Screw through panel into end of rafter with 2" screw (Fig. A).
Check you have the measurements shown.1
FINISH
4 You have � nished installing your rafters.
BEGIN
2
3
2" (5,1 cm) Screw
2" (5,1 cm)x6
30
Place RIGHT gable panel primed side up, centered on BV with a 1" overhang on bottom. Nail using (4) 1-1/2" nails.
Place LEFT gable panel primed side up, � ush to right panel on BV with a 1" overhang on bottom. Nail using (4) 1-1/2" Nails.
Place BV on � at on � oor.
2
3
You have � nished building your back wall gable panels.FINISH
4
BEGIN
1
BACK WALL GABLE PANELS
PARTS REQUIRED:
2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm) x1
x1 x1
BV
1-1/4"(3,2 cm)
1-1/4"3,2 cm
1"(2,5 cm)
2-1/2"(6,3 cm)
6"(15,2 cm)
6"(15,2 cm)
BV
x81-1/2" (3,8 cm)
Primed side UP NO OFFSET
31
Nail assembly to back wall panels using (18) 2" nails.
Screw BV to top plate using (2) 3" screws (Fig. A).
Place gable assembly centered on back wall top plate overlapping back wall panels.
2
3
You have � nished installing your back wall gable panels.FINISH
4
BEGIN
1
BACK WALL GABLE PANELS
PARTS REQUIRED:
BACK WALL
6"(15,2 cm)
2" (5,1) Nails
Flush
Center gable panel assembly on back wall.
LEVEL
LEVEL
2" (5,1 cm)x18
(2) 3" (7,6 cm)Screws
(2) 3" (7,6 cm) Screws
Fig. A
PRE-ASSEMBLED
x23" (7,6 cm)
2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm) BV
32
Place RIGHT gable panel primed side up, centered on BV with a 3/4" overhang on bottom and 1-3/4" overhange on top. Nail using (4) 2" nails.
Place LEFT gable panel primed side up, � ush to right panel on BV with a 3/4" overhang on bottom. Nail using (4) 1-3/4" Nails.
Place BV on � at on � oor as shown.
2
3
You have � nished building your Front wall gable panels.FINISH
4
BEGIN
1
FRONT WALL GABLE PANELS
PARTS REQUIRED:
x1
x1
1-1/4"(3,2 cm)
1-1/4"(3,2 cm)
3/4"(1,9 cm)
3/4"(1,9 cm)
1-3/4"(4,4 cm)
2-1/2"(6,3 cm)
17-1/2"(44,5 cm)
6"(15,2 cm)
3/8 x 20 x 48"(1 x 50,8 x 121,9 cm)
3/8 x 20 x 48"(1 x 50,8 x 121,9 cm)
Flush
x1
x81-1/2" (3,8 cm)
Primed side UP
OFFSET
33
3" (7,6 cm)
Nail gable panels to front wall panels and DS using (18) 2" nails, 6" apart.
Screw BV to top plate using (2) 3" screws (Fig. A).
Place gable assembly centered on front wall top plate overlapping front wall panels.
2
3
You have � nished installing your back wall gable panels.FINISH
4
BEGIN
1
FRONT WALL GABLE PANELS
PARTS REQUIRED:
2" (5,1 cm) Nails
2" (5,1 cm) Nails
2" (5,1 cm) Nails
Flush
Center gable panel assembly on front wall.
LEVEL
LEVEL
2" (5,1 cm)x18
(2) 3" (7,6 cm)Screws
(2) 3" (7,6 cm) Screws
Fig. A
x2
DS
6"(15,2 cm)
PRE-ASSEMBLED
34
TRIM
PARTS REQUIRED: x562" (5,1 cm)
BEGIN
1̧
FINISH
5
Attach 72" trim � ush to top of side wall panel and � ush to edge of 71" trim (Fig. A) using (1) 2" (5,1 cm) nail as shown.
Attach 71" trim � ush under gable panel (Fig. A) using (2) 2" (5,1 cm) nails as shown.
Repeat steps 1-3 to attach trim to all four corners.
Finish attaching trim � ush to corners (Fig. B ) using (7) 2" (5,1 cm) � nish nails as shown.
You have attached your corner trim.
4
3
2
72" (182,9 cm)71" (180,3 cm)
Flush under gable panel.
x4
x43/8 x 1-3/4 x 71" (1 x 4,4 x 180,3 cm)
3/8 x 1-3/4 x 72" (1 x 4,4 x 182,9 cm)
Seam is � ush. Caulk seam before painting trim.
Fig. A
2 x 4 x 53-11/16" (5,1 x 10,2 x 136,4 cm)
x4 CL
1-1/4" (3,2 cm)
GABLE TRIM
PARTS REQUIRED:
Flush
x40
Center on gable panels.
CL
CL
CL
1-1/4" (3,1 cm)Screws
Flush to top of panel
1-1/4" (3,1 cm)Screws Stagger Screws
FINISH
4
Install front gable trim CL � ush to top of panel and � ush at peak (Fig. A) as shown. Attach trim with eight 1-1/4" screws from inside.
Secure to wall using 1-1/4" screws 7-1/4" apart. Screw through panels into CL.
Repeat above steps to secure back wall gable trim.
You have � nished installing your gable trim.
2
3
BEGIN
1̧
Fig. A
Flush
35
IF YOU DO NOT HAVE THE DELUXE PACKAGE CONTINUE TO PAGE 43.
Flush
ROOF PANELS
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is � ush to the peak (Fig. C) and there is 1/2" measurement to the gable trim (Fig. D).
You may need to move your backwall to get the 1/2" measurement. Secure panel with two 2" nails in the corners.
2
You must square the roof by attaching one panel � rst. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.
Roof panels may cause serious injury until securely fastened.
Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with a 1/2" measurement on the gable trim (Fig A) and the panel � ush at the peak (Fig. B).
Secure panel with two 2" nails inthe corners.
1BEGIN
Two Nails
48"(121,9 cm)
1/2"(1,3 cm)
1/2"(1,3 cm)
Flush at peak.
Fig. B
GableTrim
GableTrim
Fig. D
Flush at peak.
Fig. C
2" (5,1 cm)PARTS REQUIRED: x8
7/16 x 48 x 96"(1,1 x 121,9 x 243,8 cm)
x2
Fig. A
36
ROOF PANELS
Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E).
Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E).
Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel (Fig. F).
3
Attach the lower roof panel � ush to the upper panels and with a 1/2" measurement at the gable trim (Fig.G).
Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.
Repeat process to attach roofpanels on the opposite side.
4
12"(30,5 cm) 6" (15,2 cm)
Fig. F
5-7/8"(14,9 cm)
96"(243,8 cm)
1/2"(1,3 cm)
Gable Trim
Flush
Fig. G
PARTS REQUIRED:2" (5,1 cm)
x86
23"(58,4 cm)
23"(58,4 cm)
24" (61 cm)
24" (61 cm)
Fig. E
NOTE: Measurements from inside of gable trim.
2" Nail
x2 5-7/8" x 96"(14,9 x 243,8 cm)
37
DOOR TRIM
Attach ZJ
Repeat for other side of door opening.
1BEGIN
PARTS REQUIRED:
MAINTAIN DIMENSIONBETWEEN TRIM.
Flush
48-1/2" (123,2 cm) TRIM TO TRIM
ZJ
48-1/2"(123,2 cm)
Note: Edge may result here.
Align stud and trim.
x122" (5,1 cm)
x2 ZJ
38
19/32 x 2-1/2 x 72" (1,5 x 6,4 x 182,9 cm)
x11 x 4 x 60" (2,5 x 10,2 x 152,4 cm)
JF
2"(5,1 cm) Screws
JF
Temporary support.
CENTER
TEMPORARY SUPPORT
39
Orient parts as shown on � at surface. Center part JF over door.
PARTS REQUIRED:
x1
BEGIN
1
DOORS
2" (5,1 cm)
Attach temporary support JF using two (5,1 cm) screws. Tighten securely.
x2
40
PARTS REQUIRED:
x1
BEGIN1
DOORS
2" (5,1 cm)x4
2
x1
OO
2" (5,1 cm)Screws
1/4"(0,6 cm)
1/4"(0,6 cm)
72" from gable panels
OOFig. A
OO2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
72" (182,9 cm)from bottom of gable panel to top of ledger
board
Attach temporary support OO as a ledger board for doors to rest on, using three 3" screws. Measure 72" down from gable panels (Fig. A).
3" (7,6 cm)x3
Raise and center door between trim. Keep 1/4" gap between door and trim.Secure JF to side trim using four 2" (5,1 cm) Screws.
41
PARTS REQUIRED:
DOOR HARDWARE
x3x8
Fig. A
x62-1/2" (6,4 cm)1" (2,5 cm)
3
4
Place top hinge � ush to top and 1" (2,5 cm) from the outside of trim as shown.
Secure hinges using 2-1/2" (6,4 cm) screws on trim and 1" (2,5 cm) screws on door (Fig. A, B).
Repeat step for bottom hinge (Fig. A, B).
1/4"(0,6 cm)
1/4"(0,6 cm)
1/4"(0,6 cm)
1/4"(0,6 cm)
1"(2,5 cm)
1" (2,5 cm)
Flush
Flush
VERIFY 1/4" GAP.
1" (2,5 cm)Screws
x3
1" (2,5 cm)Screws
x3
2-1/2" (6,3 cm)Screws
x4
2-1/2" (6,3 cm)Screws
x3
Do not insert screw here.
3/8" (1 cm)
3/8" (1 cm)
Do not insert screw here.
IMPORTANT! If you want door to swing from opposite side, reverse position of hinges.
IMPORTANT! Verify 1/4" (0,6 cm) gap spacing on each side of door.
Fig. B
DOOR TRIM
PARTS REQUIRED:2" (5,1 cm)
x10x1 OO
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
x23/8 x 1-3/4 x 71" (1 x 4,4 x 180,3 cm)
42
Remove temporary support after wall is installed.
6
7
8
Place OO 1" (2,5 cm) from side opposite of hinge. Center between � oor and over-door header. Secure using � ve 2" (5,1 cm) screws from outside of door (Fig. B).
Place batten � ush to front of studs and center between � oor and over-door header (Fig. C,D). Secure using � ve 3/4" (1,9 cm) screws.
Reinforce door with 3/4" (1,9 cm) screws.
3/4" (1,9 cm)x24
OUTSIDE OF SHED
2" (5,1 cm)x5
2" (5,1 cm)
x10
3/4"(1,9 cm)
x5
3/4"(1,9 cm)
x5
3/4"(1,9 cm)
x5
3/4"(1,9 cm)
x5
OO
OO
Batten
Batten
BattenBattenFlush
Flush
Center OO,2 x 3 x 69"
between � oor and
over-door header.
Center battens between � oor
andover-door header.
HINGE SIDE
Inside of Door
Reinforce door with 3/4" screws from inside.
1" (2,5 cm)Approx.
3/4"(1,9 cm)
Fig. A
Fig. B Fig. DFig. C
5 Remove temporary support (Fig. A).
x3 Sets1-1/2" (3,8 cm)
x3
x4
x3
2-1/2" (6,4 cm)
1" (2,5 cm)x3
43
Install hex bolts after all screws are installed.
1-1/2" (3,8 cm) Hex Bolt
Hex Nut
Lock Washer
Flat Washer
1" (2,5 cm)
Flush
1" Screws(2,5 cm)
x3
2-1/2" Screws(6,3 cm)
x4
2-1/2" (6,3 cm)
1" (2,5 cm)
1-1/2" (3,8 cm)Hex Bolt
2-1/2" (6,3 cm)
9
11
10
12
PARTS REQUIRED:
DOOR HARDWARE
Place middle hinge centered on door and 1" (2,5 cm) from the outside of trim as shown (Fig. A). Secure hinge using 2-1/2" (6,4 cm) screws on trim and 1" (2,5 cm) screws on door.
Pre-drill 1/8 x 1/2" DEEP holes in remaining hinge holes.
Install 1-1/2" (3,8 cm) hex bolts on hinges as shown
� 1/8" Drill Bit
Fig. A
DOOR TRIM AND HARDWARE
PARTS REQUIRED:2" (5,1 cm)
x5
x7
x4
44
2
Flush
ZB
36"(91,4 cm)
3/4" (1,9 cm)
Center over door.
Ensure nails are pounded into wall frame, behind the panel.
door trim and hardware.
Install hasp door and latch on door trim. Bottom edge of hasp is36" (91,4 cm) up from bottom edge of door trim. Measure and mark locations and install with 3/4" screws as shown (Fig A).
14
3/4" (1,9 cm) Screw x7
Fig. A
13 Center ZB
FINISH
15
x119/32 x 2-1/2 x 55" (1,5 x 6,4 x 139,7 cm)
ZB
BEGIN
1̧
FINISH
3
Glue and Install collar tie JF on middle rafter.
Use (3) 2" nails at each side of collar tie. Collar tie should be � ush to the roof panels. Ensure the collar tie are level before nailing.
You have � nished attaching your collar tie.
2
x62" (5,1 cm)
COLLAR TIES
PARTS REQUIRED:
TECHO
GLUE
Flush
JF
HINT:For best appearance install
collar ties facing away from door.
x11 x 4 x 60" (2,5 x 10,2 x 152,4 cm)
JF
45
46
• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges
Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)
Snip bottom side of drip edge andbend over to other side of roof.
(Follow directions provided by manufacturer.)
PAINT & CAULK- NOT INCLUDED -
ROOF FELT- NOT INCLUDED -
DRIP EDGE- NOT INCLUDED -
• Install over roof felt on gable side and under roof felt on eave side (Fig. A).• Do not use nails on side of drip edge that hangs over side of building.• Only nail top of drip edge as shown.
• Install felt � ush to all roof edges overlapping 3". Use minimal amount of roo� ng nails to hold in place.
OK to overlap at ridge.3" OVERLAP
Flush
Flush
Edge � ush to trim.
Roof Felt
Drip Edge
Drip Edge
Fig. A
47
• Follow directions provided by manufacturer and these instructions.
SHINGLES- NOT INCLUDED -
Install � rst starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.Starter row must be straight and level all the way across with lower edge of roof deck.NOTE: If you have installed drip edge install shingles � ush to drip edge.
BEGIN
1
TABS UP
Shingle overlaps roof decking.
1" (2,5 cm) overhangpast roof deck.
1" (2,5 cm) overhang or � ush with drip edge.
(4) Nails
BACK OF SHED
FRONT OF SHED
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Familiarize yourself with a 3-Tab Shingle.
SHINGLE NAIL PATTERN
1"(2,5 cm)
NAILS
Sealing Strip 1"(2,5 cm)
1/2"(1,3 cm)
Full Rain Slot
Half A Rain Slot
NotchNotch
48
Beginning at front of shed, install � rst row of shingles with notch at 1" past roof edge or � ush with drip edge.22
FRONT OF SHED
BACK OF SHED
Notch- or -
Drip Edge
Notch
Roof Deck
1"(2,5 cm)
Flush with starter row.
Flush with starter row.
Continue installing rows of shingles by staggering at front.
4
SHINGLEScontinued...
Install second row of shingles � ush at top of � rst row's rain slots. Ensure 1" overhang or � ush to drip edge at front, stagger each row.
3
1"(2,5 cm)
1"(2,5 cm)
BACK OF SHED
FRONT OF SHED
FRONT OF SHED
Flush with rain slots. Flush with rain slots.
Notch
Notch
49
You have � nished shingling your roof. Proceed to capping the ridge.FINISH
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.
Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
Using your shingle hooked blade carefully cut shingles along chalk line.
5
7
6
9
8
SHINGLEScontinued...
• If more than 5" to rain slot you must install another row of shingles.
5"(12,7 cm) MAX.
Top of rain slot.
Cut Off.CUT
50
SHINGLES - RIDGE CAP
• You will � nish off the top of the roof with a ridge cap made from shingles.
Note: • You will need about 20 - 22 cut pieces.
Cut shingles into THREE pieces. Hint: Use cut-off pieces � rst.
Score shingle,then snap-off angled cut.
Install � rst ridge cap � ush to shingles at front, as shown.
Install second ridge cap 5" back, as shown.
2
3
BEGIN
1
2"(5,1 cm)
2"(5,1 cm)
2"(5,1 cm)
2"(5,1 cm)
2"(5,1 cm)
2"(5,1 cm)
Top of slot.Weather Seal
Flush
(1) Nail per side through weather seal.
(1) Nail per side through weather seal.
5"12,7 cm
FRONT OF SHED
FRONT OF SHED
Flush
20 to 22Pieces
51
SHINGLES - RIDGE CAPcontinued...
Continue installing ridge cap to back of roof.
Make sure there is 4" between the shingle-color and edge of shingles.
When you have 4" minimum of shingle color cut one piece to cap your roof.
Install � ush to shingles.
4
5
6
7
(2) Nails per side.
You have � nished your ridge cap.FINISH
8
Flush to shingles
Trim cap off � ush to shingles
Cap
52
WARRANTY B a cky a rd S tor a ge S ol u tion s , LLC w a rr a nt s the following: 1. Every prod u ct i s w a rr a nted from defect s in workm a n s hip a nd m a n u f a ct u ring for one ye a r. 2. All h a rdw a re a nd met a l component s a re w a rr a nted for two ye a r s . 3 . Trim i s w a rr a nted for 15 yea r s . 4. W a fer b o a rd s iding a nd s he a thing i s w a rr a nted for two ye a r s . 5. S m a rt S ide™ s iding i s w a rr a nted for 15 yea r s. 6. Tim b er s erie s bu ilding s’ s iding a nd trim a re w a rr a nted for 10 ye a r s . 7. S ol a r S hed window s a re w a rr a nted for 1 ye a r. 8 . Ced a r l u m b er i s w a rr a nted for 15 ye a r s . 9. Ced a r door s a nd Ced a r G a rden Center a re w a rr a nted for 10 ye a r s . 10. Met a l roof i s w a rr a nted for 25 ye a r s .
B a cky a rd S tor a ge S ol u tion s , LLC will rep a ir, repl a ce or p a y for the a ffected p a rt. In no event s h a ll B a cky a rd S tor a ge S ol u tion s , LLC p ay the co s t of l ab or or in s t a ll a tion or a ny other co s t s rel a ted thereto. All w a rr a ntie s a re from d a te of p u rch as e. If a c as h ref u nd i s p a id on a n a ffected p a rt, it will b e pror a ted from the d a te of p u rch as e.
CONDITION S The w a rr a nty i s effective only when: 1. The u nit h as b een erected in a ccord a nce with the ass em b ly in s tr u ction s . 2. The u nit h as b een properly s hingled a nd p a inted or s t a ined a nd re as on ab ly a nd reg u l a rly m a int a ined there a fter. 3 . The f a il u re occ u r s when the u nit i s owned b y the origin a l p u rch as er. 4. B a cky a rd S tor a ge S ol u tion s , LLC h as received the w a rr a nty regi s tr a tion c a rd within thirty ( 3 0) d a y s of p u rch as e a nd notific ation
of the f a il u re in writing within the w a rr a nty period s pecified ab ove. 5. B a cky a rd S tor a ge S ol u tion s , LLC h as h a d re as on ab le opport u nity d u ring the s ixty (60) d a y s following receipt of notific ation
to in s pect a nd verify the f a il u re prior to commencement of a ny rep a ir work.
REQUIREMENT S S tora g e Buildin gs & Playhou s e s To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit; s hingle the roof a nd p a int or s olid-colored s t a in the s iding us ing 100% a crylic l a tex exterior prod u ct with a minim u m of two (2) co a t s within thirty ( 3 0) d a y s of ass em b ly;
ab ove a ll door s a nd a ll horizont a l a nd vertic a l trim b o a rd s ; p a int a nd s e a l a ll expo s ed edge s , s ide s a nd f a ce s of S m a rt S ide™ and w a fer b o a rd s iding to incl u de a ll exterior w a ll s a nd a ll s ide s a nd a ll edge s of door s .
Gazebo s , Per g ola s & Timber Buildin gs To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit. Thi s incl u de s tre a ting all of the expo s ed ced a r a nd pine su rf a ce s on yo u r g a ze b o or tim b er bu ilding with a n exterior gr a de wood pre s erv a tive, a n exterior oil- bas ed s emi-tr a n s p a rent s t a in, a n a crylic l a tex exterior p a int or a n a crylic l a tex s olid color exterior s t a in within 3 0 d a y s of ass em b ly a nd as needed there a fter to m a int a in yo u r w a rr a nty.
Keep veget a tion trimmed a w a y from bu ilding a nd m a ke su re s iding p a nel s a nd trim do not come in cont a ct with m asonry or cement. The minim u m gro u nd cle a r a nce for s iding m us t b e one h a lf inch (½ inch) from concrete s l ab or two a nd one h a lf inche s (2 ½ ” ) from the ground when bu ilding i s erected or con s tr u cted on a tre a ted wood floor kit. W a ter from s prinkler s m us t b e kept off u nit. In no event will B a cky a rd
events, acts or omi ss ion s b eyond o u r control incl u ding, bu t not limited to, mi sus e or improper ass em b ly, improper m a inten a nce (which le a d s to rot or dec a y) a nd a ct s of God. B a cky a rd S tor a ge S ol u tion s , LLC will not b e held re s pon s i b le for a ny l ab or co s t s inc urred
to con s tr u ct your unit. Thi s w a rr a nty give s yo u cert a in s pecific right s th a t v a ry from s t a te to s ta te.
CLAIM PROCEDURE To m a ke a cl a im u nder thi s w a rr a nty, yo u c a n either c a ll 1- 888 - 8 27-9056 or prep a re a letter. Ple as e h a ve re a dy the inform a tion b elow when you c a ll or incl u de the inform a tion when writing: 1. The model a nd s ize of the prod u ct. 2. A li s t of the p a rt( s ) for which the cl a im i s m a de. 3 . Proof of p u rch as e of the B a cky a rd S tor a ge S ol u tion s , LLC item, as s hown on the origin a l invoice. 4. R u n code, as li s ted on the yellow w a rr a nty c a rd enclo s ed in the prod u ct p a ck a ge.
M a il the ab ove inform a tion to: B a cky a rd S tor a ge S ol u tion s , LLC Attn: C us tomer S ervice 1000 Terne s Monroe, MI 4 8162
Limited Conditional Warranty *
*WARRANTY TERM S MAY VARY OUT S IDE THE U. S .A. IMPORTANT: Thi s i s your warranty certificate. Plea s e complete and mail your warranty card to properly validate your warranty.
S tor a ge S ol u tion s , LLC b e re s pon s i b le for a ny indirect, incident a l, con s e qu enti a l or s peci a l d a m a ge s nor for f a il u re( s ) th a t a re c aus ed by eventually
caulk