Stockpile Project Disposal-SPD - AP Mine Ban Convention ... · Stockpile Project Disposal-SPD ......
Transcript of Stockpile Project Disposal-SPD - AP Mine Ban Convention ... · Stockpile Project Disposal-SPD ......
Page 1
Stockpile Project Disposal-SPDStockpile Project Disposal-SPD
SPD PROJECTSPD PROJECT
Major General Roque de Oliveira –SPD Project ManagerJoaquim Merca – SPD Project Technical Adviser
Page 2
SPD PROJECTSPD PROJECT
Implementation of the OttawaConvention through the disposalof Anti-Personal Mines in Stock
FINANCIAL SUPPORT OF EC
SPD PROJECTSPD PROJECT
OBJECTIVESTo fulfill with Article 4 of the Ottawa Convention, ratified
by the Angolan Government and made into force inDecember 2002, aiming at the disposal of all Anti-Personal landmines in stock within 4 years by January2007; and
To develop the capacity building of the national authority, CNIDAH, and the operators, state bodies, FAA and INAD to carry out the operation of destruction of the AP mines in stock in accordance with mine action internationalhumanitarian standards.
Page 3
SPD PROJECTSPD PROJECT
Profile of the Project
Timeframe: maximum 2 years (01/01/05 -31/12/06)Areas of intervention: the whole countryTotal Budget: EUR 1,765,000 Execution modality: NEX (National Execution)Partners of the project: 4 Plan of Action: 5 phases
SPD PROJECTSPD PROJECT
Budget for the Project
The Project is co-financed by 3 parties as follows:
EC: EUR 1,500,000 (85%)GoA: EUR 170,000 (10%)UNDP: EUR 95,000 (5%)Total EUR 1,765,000
Angola GovUNDPEC
Page 4
SPD PROJECTSPD PROJECT
PARTNERS/CONNECTION
CNIDAH
FAA
UNDP
INAD
IMPLEMENTING BODY
ALL THE PARTNERS SIGNED THE PROTOCOL OF AGREEMENT ON 17NOV04
Ano 1 1º Semestre 2º Semestre Actividade 1 Mês 2 3 4 5 6 7 8 9 10 11 12 Orgão imlementador 1. Preparação
CNIDAH, PNUD
2. Planificação & coordenação
CNIDAH, PNUD, FAA, INAD
3. Pesquisa e analise de minas AP em paióis
FAA, CNIDAH, PNUD
4. Revisão do projecto, testes e formação do pessoal
CNIDAH, PNUD, FAA, INAD
5. Execução (destruição de minas AP armazenadas em paióis)
FAA, CNIDAH, PNUD
Avaliação & Monitoria
CNIDAH, PNUD
2nd Planification, Coordenation andTraining
Assessment & monitoring
CNIDAH, UNDP
CNIDAH, UNDP, FAA, INAD
FAA, CNIDAH, UNDP
CNIDAH, UNDP, FAA, INAD
FAA, CNIDAH, UNDP
CNIDAH, UNDP
2005/20061º Tr. 2º Tr. 3 Tr. 4º Tr. 5º Tr. 6º Tr. 7º Tr. 8º Tr.
ACTION PLAN
Activity1st Preparation
3rd Survey and AnalisyOf the AP mines in Stock
4th Review, tests andtraining5ª Execution(destruction of AP mines in Stock)
SPD PROJECTSPD PROJECT
Page 5
THE MAIN GOAL OF THIS ACTION PLAN
31 of December 2006, To fulfill with Article 4 ofthe Ottawa Convention, aiming at the disposalof all Anti-Personal landmines in stock underAngola jurisdiction.
SPD PROJECTSPD PROJECT
TRAINING AND DEVELOP OF NATIONAL CAPACITY
SPD PROJECTSPD PROJECT
Page 6
SPD PROJECTSPD PROJECT
TRAINING AND NATIONAL CAPACITY BUILDING
DemilitarizationCourse Technical
SurveyCourse
Reconvertion CourseOf Military Demining
Into Humanitarian Demining
DemolitionCourse
SPD PROJECTSPD PROJECT
22 FAA OFFICERS
02 NATIONAL POLICE OFFICERS
06 INAD INSTRUCTORS
02 UNDP TECHNICAL ASSISTANT
NATIONAL CAPACITY BUILDING
Page 7
FIELD OPERATIONS
SPD PROJECTSPD PROJECT
SPD team
SPD Operational Vehicle
AP Mines
Obsolete Ammu
SPD PROJECTSPD PROJECT
Page 8
40.000 m² of Acess Demining
SPD PROJECTSPD PROJECT
FIELD OPERATIONS
SPD PROJECTSPD PROJECT
FIELD OPERATIONS
Page 9
SPD PROJECTSPD PROJECT
FIELD OPERATIONS
QUANTITY OF ANTI PERSONAL IDENTIFY
83.557 AP Mines of 23 diferent “family”
DESTRUCTIONS 81.04570.179 (88%) RECYCLING
10.866 (12%) DEMOLITIONS
2.512 TO TRAINING
SPD PROJECTSPD PROJECT
Page 10
OZM (3,4 e 72) Ex.Soviet U. 360Nº 4 Israeli 45MAY75 Romania 4.688M 90 Poland 49.058M966 Portugal 17M35 (PRB) Belgium 13MON (50,100 e 200) Ex.Soviet U. 82Gayata Hungary 665Elsie (CRV9) Canada 7.080 Claymore USA 30Type Origin Quantity
Tipology & Quantity Of Anti Personal Identify thenacional level
SPD PROJECTSPD PROJECT
T72 A China 53R2M1 South Africa 68R1M1 South Africa 108PMD (6, 6m e 7) Ex.Soviet U. 3.902PPSrMi Ex.Czechoslovakia 232PRB (m409) Belgium 01PMA 1 Ex.Yugoslavia 86P5 Spain 01PPM 2 Ex.GRD 2.199VS MK2 Italy 54 PMM (1,2) Cuba (9.841 PMM1, 1.474 PMM2) 11.315PMN Ex.Soviet U. 376POMZ (2 e 2m) Ex.Soviet U. 3.124
Type Origin Quantity
Iniciar o Microsoft Office Outlook.lnk
SPD PROJECTSPD PROJECT
Page 11
ANTI PERSONAL MINES
DECLARE FROM ANGOLA IN 1fr REPORT SENT TO CICHD IN 2003
SPD PROJECTSPD PROJECT
M-90
42.350
OZM-4
1.377
PMM-1
6.932
SPD PROJECTSPD PROJECT
Page 12
M-90
49.058
+6.708
OZM-4
1.680
+ 303*
PMM-1
9.841
+ 2.909
NOW
*OBS: Demolition by FAA in 2003 and 2004, 1.320 OZM 4
SPD PROJECTSPD PROJECT
1.390TOTAL100M-9030GYATA30MON-5050OZM-4190OTK
30MINAS DE SINALIZAÇÃO
30PPMSR-150PMD-650MON-100200PMM-1100PMN200M-75200PONZ200PPM-2
QuantityType
ANTI PERSONAL MINES TO TRAINING
DECLARE FROM ANGOLA IN 1fr REPORT SENT TO GICHD IN 2003
Page 13
OZM (3,4 e 72) Ex.URSS 158MAY75 Roménia 953M 90 Polónia 719M966 Portugal 17M35 (PRB) Bélgica 12MON (50,100 e 200) Ex.URSS 35Gayata Hungria 20Elsie (CRV9) Canada 16 Claymore USA 19Type Origin Quantity
Tipology and Quantity of Anti personal Mines to Operational Training, NOW
SPD PROJECTSPD PROJECT
T 72ª China 16TOTAL 2.512
R2M2 Africa do Sul 03R1M1 Africa do Sul 10PMD (6, 6m e 7) Ex.URSS 26PPSrMi Ex.Checoslováquia 109PRB (m409) Bélgica 01P5 Espanha 01PPM 2 Ex.RDA 196PMM1/2 Cuba 114PMN Ex.URSS 37POMZ (2 e 2m) Ex.URSS 50Type Origin Quantity
SPD PROJECTSPD PROJECT
Page 15
28 of December 2006, Official Ceremony
SPD PROJECTSPD PROJECT
SPD PROJECTSPD PROJECT28 of December 2006, Official Ceremony, Example of
Recycle Process
Grafanil e 44 117.mpg
Page 16
SPD PROJECTSPD PROJECT
ANGOLA, FULFILL ARTICLE 4 OF OTTAWA CONVENTION, DISPOSAL ALL ANTI PERSONAL LANDMINES UNDER ANGOLA JURISDITION.
THE OPERATIONAL SPD TEAM WIIL BE TRY FOUND MORE BUSH DUMPS IN MINED AREAS AND AFTER REPORT THROUGH ARTICLE 7 OF OTTAWA CONVENTION
SPD PROJECTSPD PROJECT