Siam Toyota Manufacturing Co., Ltd
Project STM2 – TC3 & TC4
Scope of Work
PCMC Engineering Co., Ltd
STM 2 : Key Mile Stone
PCMC Engineering Co., Ltd
• Award and Sign Contract • Detail Engineering Design (1 month) – Material Approval and Shop Drawing Approval
• Procurement Process and Material Delivery • PreparaNon and FabricaNon Work • InstallaNon • Test and Commissioning • FAT
STM 2 : 1st Material Delivery
PCMC Engineering Co., Ltd
Material Vendor Source Leadtime
PDU Saiver Maylasia 8-10 Weeks
Hitemp-Exhaust Fan GreenHeck 12-15 Weeks
Duct Silencer Mason Acoustic Local 6-8 Weeks
Smoke Damper GreenHeck
Exhaust Extraction Local Local 8 Week
N2 Cylinder LPG Spain 12-15 Weeks
Diaphragm Pump Debem 8 Week
Gas Detector 8 Week
Galvanized Steel Pipe Ex-Stock
Valve Crane, TA Local Ex-Stock
Insulation Aeroflex Local Ex-Stock
STM 2 : PDU, Piping, Duct InstallaNon
PCMC Engineering Co., Ltd
STM 2 : PDU and Piping InstallaNon
PCMC Engineering Co., Ltd
STM 2 : PDU and Piping InstallaNon
PCMC Engineering Co., Ltd
STM 2 : Cooling Piping Work
PCMC Engineering Co., Ltd
STM 2 : Cooling Piping Work
PCMC Engineering Co., Ltd
1. Site Survey 2. Support and Piping FabricaNon 3. Start InstallaNon aher finish AVL Engine Base InstallaNon
STM 2 : Chilled Piping Work
PCMC Engineering Co., Ltd
STM 2 : Air-‐Compressor Piping Work
PCMC Engineering Co., Ltd
STM 2 : Exhaust ExtracNon Work
PCMC Engineering Co., Ltd
STM 2 : N2 InstallaNon
PCMC Engineering Co., Ltd
STM 2 : N2 InstallaNon
PCMC Engineering Co., Ltd
STM 2 : Modify APC-‐03 and 04
PCMC Engineering Co., Ltd