STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by...

11
STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -

Transcript of STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by...

STF421 ITS G5 TESTING – AN OVERVIEW –CEN DSRC – ITS G5 Coexistence Workshop -

Presented by Friedbert Berens, in Ispra, Italy

STF421 – An Overview -

Overview

Scope

Members of STF421

Deliverables

Status and planning

STF421 overview

2

Scope of STF421

The STF421 develops a set of specifications for

the certification test of the CEN DSRC - ITS G5

coexistence mechanisms and the ITS – G5

Dynamic Congestion Control (DCC) mechanisms.

STF421 overview

3

Resources of STF421

220 Person Days from 01.06.2011 to 30.6.2012STF 421 Member:• Paul Alexander (not on photo)• Friedbert Berens (STF Leader)• Madalina Tepelmann• Peter Schmitting• Dieter Smely

With support from the ETSI CTI (Sebastian Müller)Photo with Christoph Wöste (TC ITS WG4 Chairman)

STF421 overview

4

Schedule and planning of STF421

Initial interims report to EC: • 30. September• Ready for ETSI 1. September

Stable draft of coexistence deliverables until Q4/2011Early draft of DCC deliverables until Q4/2011Final draft of deliverables for TC approval end Q1/2012 Final report EC: • 30. June 2012• Ready for ETSI approval in 1. June 2012

STF421 overview

5

Milestones of STF421 2011

Milestone A: ITSWG4#15 (21 June), ETSI • Progress Report #1 and first draft of DTS/ITS-0040022 (PICS), DTS/ITS-

0040023 (TSS&TPs), DTS/ITS-0040024 (ATS).

Milestone B: 1st September 2011• Interim Report to be approved by EC/EFTA.

• The Interim Report must be delivered by the STF Leader to the ETSI Secretariat before 1st September 2011. The deadline for delivery to EC/EFTA by the ETSI Secretariat is 30 September; EC/EFTA approval is expected mid-November

Milestone C: ITS#9, ETSI (October 2011)• Progress Report #2 and stable drafts of DTS/ITS-0040022, 023, 025• First drafts of DTS/ITS-0040025 (PICS), DTS/ITS-0040026 (TSS&TPs), DTS/ITS-

0040027 (ATS)

STF421 overview

6

Status of STF421

Preparatory meeting: 17. February 2011 in Sophia Antipolis

First Technical Meeting 31.5. and 1.6.2011

Milestone A achieved 21.06.2011Activities is dependent on initial work in STF420 and ITSWG4 Coexistence AdHoc group

STF421 overview

7

Deliverables

1. Coexistence of cooperative ITS G5 with RTTT DSRC• DTS/ITS-0040022 (PICS)

• DTS/ITS-0040023 (TSS&TPs)

• DTS/ITS-0040024 (ATS)

2. Channel congestion control algorithms operating in the 5.9GHz range• DTS/ITS-0040025 (PICS)

• DTS/ITS-0040026 (TSS&TPs)

• DTS/ITS-0040027 (ATS)

STF421 overview

8

Document schedule 1. Phase

DTS/ITS-0040022 (PICS): DSRC/G5 Radio Test• TS 102 916 – 1• First version early draft: 21.June • Stable draft: October 2011

DTS/ITS-0040023 (TSS & TPs) : DSRC/G5 Radio Test• TS 102 916 – 2• First version early draft: 21. June • Stable draft: October 2011

DTS/ITS-0040024 (ATS) : DSRC/G5 Radio Test• TS 102 916 -3• First version early draft: 21. June• Stable draft: October 2011

9

STF421 overview

Document schedule 1. Phase

DTS/ITS-0040025 (PICS): G5 Radio Test • TS 102 917 – 1• First version early draft: October 2011• Stable draft: Q1/2012

DTS/ITS-0040026 (TSS & TPs): G5 Radio Test• TS 102 917 – 2• First version early draft: October 2011• Stable draft: Q1/2012

DTS/ITS-0040027 (ATS): G5 Radio Test• TS 102 917 -3• First version early draft: October 2011• Stable draft: Q1/2012

10

STF421 overview

11

End

Comments and InputsThank you for your attention

For more [email protected]

STF421: overview