Professional Profile
I have been in the Pipeline Industry since 2008 and have completed several projects. I have experience from preliminary route selection to above ground as-built’s. I am proficient with the C.A.T.S. Traceability. I am current CPWI+ Certified Pipeline Welding Inspector. I am familiar with API 1104, ASME B31.4, ASME B31.8, Transportation DOT 195 and 192. Proficient with excel, digital camera, various inspection reports. I am very hands on and detail oriented.
Linked In Profile link:
https://www.linkedin.com/profile/view?id=287118702&trk=nav_responsive_tab_profile_pic
Project Coordination
Preliminary Route Selection
Staking and Restake
HDD and Road Bores
Weld Mapping
Tie In’s
Site Work and ISO Drawing’s
Lowering In
Pot Hole
Clearing, Grade, Ditching and Clean up
Boundary Survey
Pipe Tally
Steven [email protected] Page 2
Thanks
Professional Experience
Projects :
Kinder Morgan 2008-2009, 2015:
42” Rockies Express (Restake and Asbuilt) Illinois and Indiana 140 Miles
8’’ Ethanol Rail Terminal, Tank and Truck Terminal (Above Ground Asbuilt) Belton, SC
6’’ Bio Diesel Rail Terminal, Tank and Truck Terminal (Above Ground Asbuilt) Belton, SC
43 Acre Topographic Survey for Future Rail Terminal and Tank Farm Expansion Belton, SC
5 Acre Topographic Survey for Compressor Station, North Augusta, SC
43 Acre Topographic Survey for Future Trucking Terminal, Richmond Hill, Ga
Energy Transfer 2010-2012, 2015 :
42” Tiger Pipeline (Restake and Asbuilt) Louisiana 120 Miles
16” Lone Star Pipeline(Stake, Restake, and Asbuilt)Texas 120 Miles
36” Lone Star Express(Preliminary and Boundary)Texas 150 Miles
Enterprise Products Partners L.P 2010-2012:
20’’ & 24” Shilling to Shoup (Preliminary) Texas 93 Miles
42’’ & 36’’ Acadian Haynesville Extension (Restake and Asbuilt) Louisiana 100 Miles
24’’ Sealy to Falls City Crude Pipeline (Restake and Asbuilt) Texas 120 Miles
Copano 2011:
24’’ Boldt Pipeline (Asbuilt) Texas 25 Miles
24’’ Brisco Pipeline (Asbuilt) Texas 27 Miles
Steven [email protected] Page 3
Thanks
30’’ Liberty Pipeline (Asbuilt) Texas 30 Miles
NET 2011-2013: 30’’ Eagle Ford Midstream (Restake and Asbuilt) Texas 106 Miles 16’’ Tilden to Cotulla (Asbuilt) Texas 27 Miles 4’’ Ashe 1 (Meter Site Asbuilt) Texas 4’’ Cresent Sea (Meter Site Asbuilt) Texas 6’’ Goodridge Lateral (Preliminary, Restake and Asbuilt) Texas 2 Miles 6’’ Nueces Mineral Lateral (Preliminary, Restake and Asbuilt) Texas 6 Miles Devon Energy 2013-2014: 12’’ Victoria Express Pipeline (Staking and Asbuilt)Texas 57 Miles
Sunoco 2014: 12’’ Granite Wash Extension (Asbuilt) Oklahoma and Texas 186 Miles Navitas Midstream 2014-2015: 20’’ Labahia (Preliminary) Texas 13 Miles 12’’ Innerconnect (Preliminary) Texas 2 Miles 6’’ Blinky (Preliminary) Texas 1.5 Mile 6’’ Chapparal (Preliminary) Texas 4.5 Mile Pipeline Project Services West Monroe, La 10/14 to 1/15, 3/15 to current Survey Supervisor/ Party Chief Responsibilities: Direct three crew on 4 Project
Steven [email protected] Page 4
Thanks
Time and Expense Management Coordinate with Row and Gas Company on project priorities Stantec West Monroe, La 07/14 to 10/14 Party Chief Responsibilities: Daily Reports Asbuilt Pipelines Clean Professional Appearance
Mustang Engineering, Houston, Tx 10/12 to 7/14, 1/15 to 3/15 Crew Chief
Responsibilities:
Tie Ins Lowering In Staking Row
Daily progress and expense reports
Gullet and Associates, Houston, Tx 4/10 to 9/10-4/11 to 10/12 Party Chief
Responsibilities:
Hiring new employee’s and training Daily progress and expense reports Asbuilts
Vehicle maintenance and professional appearance
Sam Inc, Austin, Tx 9/10 to 4/11 Instrument man/ Crew Chief
Responsibilities:
Preliminary
Asbuilt Daily progress reports and JSA’s
Locate existing hot line’s
Steven [email protected] Page 5
Thanks
Education
University Louisiana Monroe, Monroe, La Occupational Therapy DNF National Welding Burton, Tx Welding Inspection CPWI+
References
Laz Machen-RPLS-318-732-0060 Pipeline Project Services (former Stantec)
Danny Smith- RPLS -903-563-5072 Crossways Survey
Noel Collum-Survey Supervisor-318-805-8410 Wood Group Mustang Engineering
Robert Hood-RPLS-832-269-0011 DPS HDD
Jermey Harrel-Senior Vice President-318-665-4571- Marion State Bank
Carl Blaylock-Inspector-318-334-0177 DPS HDD