Three River Casino WWTP
PROJECT TEAM
3 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
PLANT TIMELINE
2002 2005 2006 20082003 2004 20102009 201220112007 20142013 2015
BandonJune, 2002 Rolling Hills
April, 2004 LummiAug., 2006
Three RiversJune, 2007 Spirit
MountainMarch, 2008
The Next One…2016Angel of the
WindsFebruary,
2005
Not Shown: Palm Desert – June 2005, Grand Ronde Housing – March 2007, Coeur D’Alene – November 2011
4 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
• All Facilities Utilized Flat Plate Technology• Effluent Disposal Requirements Driving Treatment• Reuse Common Goal• 78% of Projects Design-Build• Typical Duration of Project – 8 Months • 89% of Projects were for Tribal Facilities• 67% of Projects were for Gravity Systems• Treatment Capacity of all Facilities Expandable,
Utilizing Existing Tanks• 89% of projects completed by the same contractor• Had a “Nitch” from 2002 to 2010• Constantly “Bitching” About Equipment Costs
PLANT FUN FACTS
5 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
History On Napkins
One day, on a Bullet Train somewhere in Japan, suffering from sake and beer poisoning, two engineers conceived of Bandon Dunes, OR on the back of a napkin…
Ten years later, in a hotel somewhere in Seattle, suffering from tequila poisoning they conceived of Canyonville, OR on the back of another napkin…
6 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Dennis Livingston in Japan
MBR SYSTEM DESIGN EVOLUTION
Dennis Livingston in Germany
Bandon Dunes The Next One
7 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Bandon Dunes Project Highlights
The first operational flat plate MBR in the United States Bandon Dunes is still in operation, still has the same SCADA, has no fine screens. One operator runs the plant and…four world class golf courses…
• June, 2002
• Domestic WW
• 0.075 MGD / 0.125 MGD
• Replaced Constructed Wetlands Treatment
• Converted Aerated Lagoon to FSL
• Spray Irrigation Disposal
• Max 4,000 mg/L MLSS
• 1 PTE
“No free rounds of golf”- The Management
8 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Screen
Bandon Dunes Project Highlights
Effluent Piping
Process Piping
Control Panel
9 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Rolling Hill Project Highlights
“It was harder saying goodbye to the Contractor than it was to my Son when he left to play pro baseball.”
- Larry Lohse Environmental Director
• April, 2004
• Casino WW
• 0.10 MGD / 0.20 MGD
• Replaced Below Grade Activated Sludge Treatment System (Kill Zones)
• Separated Kitchen Waste From Casino Waste
• Kitchen Pump Station with 10,000 Gallon Grease Trap
• Spray Irrigation Disposal / Reuse
• Facultative Sludge Lagoon
• 1 PTE “WWTP effluent is better quality than treated water from WTP”- EPA
10 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Rolling Hill Project Highlights
Headworks/MBR
Process/Effluent Piping
UV Disinfection
Control Panel
11 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Lummi Nation Project Highlights
First (Dyer) facility to utilize band screens at headworks, a pumped effluent system, and drain fields for disposal.
• May, 2006
• Casino/Domestic Waste
• 0.10 MGD/0.15 MGD
• Supplement Existing Treatment Facility
• 0.10 MGD Drain Field Disposal
• WAS Pumped to Existing Force Main
• 1 PTE
• Adding Stand By Generator 2015
12 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Lummi Nation Project Highlights
Effluent Piping/Headworks
Headwork Box
Effluent Pumps
Brain (?)Headworks Screens Control Panel
13 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Spirit Mountain Casino Project Highlights
“Why didn’t you recommend MBR over SBR the first time you upgraded our plant?”
- Ron Reibach Director of Facilities
• March, 2008
• Changed SBR to MBR Utilizing Existing Tanks
• Utilized Existing Headworks
• Increased Capacity of Peak Day from 0.45 MGD to 0.60 MGD
• Spray Irrigation / Sub Surface Disposal
• Biosolids Dewatering / Landfill Disposal
• 4 FTE to 2 FTE “MBR’s are the only way to go for Casino WWTPs.”
- Rod Smith Lead Operator
14 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
Headworks Screen
Spirit Mountain Casino Project Highlights
Top Side MBR
MBR Screen
Process Piping
15 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
The Next One - City of Canyonville
“We want the best quality effluent and technology possible”
- Frank Braudt Council Member
SBR vs MBR
Rogue River SBR
Item Value UnitAvg. Annual Flow 0.37 MGD
Max. Monthly Flow 0.48 MGDMax. Daily Flow 1.70 MGD
Peak Instant. Flow 2.20 MGDBOD 300 / <10 mg/lTSS 275 / <10 mg/lTKN 40 / NA mg/lNH3 29 / <6 mg/lTP 8 / <0.3 mg/lTN 40 / NA mg/l
Alkalinity 45 / <75 mg/lTurbidity NA / 2 NTU
Medium Temp. 25 ⁰CElevation 747 ft
16 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
The Next One - City of Canyonville
SBR vs MBRSite Plan
17 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
The Next One - City of Canyonville
SBR vs MBRCosts
Option Construction O&M TotalSBR $10,531,100 $3,336,800 $13,867,900
MBR $10,717,700 $3,004,500 $13,722,200
18 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
18 ovivowater.com/mbrCopyright© 2013 GLV Inc. All rights reserved.
TOP 5 OPTIMIZATION STRATEGIES
Strategies to reduce cost and make competitive with SBR
Optimization Accurately size MBR portion of process
Don’t be fooled by apparent complexity of system
Maximize flat sheet operating characteristics
Take advantage of existing facilities
Get your equipment representative to lower sales commission
19 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
19 ovivowater.comCopyright© 2015 Ovivo Inc. All rights reserved.
MBR System Design Evolution
The widgets have changed but the importance of the process has stayed the same. There are more options now especially for retrofit and stormflow.
MBR System Design Evolution
Parameter Bandon Dunes Next DesignFine Screen Type: No Screen Perforated Plate
Aperture/Slot Size: NA < 3 mm
Supp. Aeration Technology: Fine Bubble (Disks) Conc. O2
Solids Management: FSL Aerobic Digester / Screw Press
SCADA System: RSView Wonderware
Disinfection Method: UV UV
Filtration Mode: Gravity Pumped
Membrane Unit Type(s): ES OV
Design MMF: 0.12 MGD 0.8 MGD
Min. Temp.: 12 C⁰ 12 C⁰Peak Factor: 2.0 4.61
Design MLSS: 4,000 15,000
20 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
20 ovivowater.comCopyright© 2015 Ovivo Inc. All rights reserved.
Process
1. Facilities2. Septic3. Anoxic Zone4. MBR + Aeration5. Chlorine Contact Chamber6. Spray Irrigation Field
(Winter)7. Golf Course (Summer)
The Bandon Process
FILTERED WATER TANK
21 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
21 ovivowater.comCopyright© 2015 Ovivo Inc. All rights reserved.
The Next Process
1. Headworks2. Equalization3. Anoxic Zone4. Aeration + MBR5. Storm Flow6. Aerobic Digestion7. Biosolids Dewatering Unit8. Disinfection9. Concentrated Oxygen
The Next Process
Land Applied
River Discharge
(Year Round)
22 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
22 ovivowater.com/mbrCopyright© 2013 GLV Inc. All rights reserved.
TOP 5 IMPROVEMENTS
From an engineer’s perspective numerous system improvements were necessary to get costs down and to get the full benefit of MBR and storm flow management (peak capabilities).
ImprovementsecoBLOX / microBLOX Process
stormBLOX
On-Site Oxygen Generation
Flat Sheet Membranes
Product Support/Education
23 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.
23 ovivowater.com/mbrCopyright© 2013 GLV Inc. All rights reserved.
OPERATOR FEEDBACK
My Top 3 recommendations that you can take to the bank for a more reliable, more efficient MBR System.
Optimization Utilize Flat Sheet Membranes
Network with other operators and OVIVO to make it a better widget
Work closely with your engineer’s (Demand it!)