Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

23
Day 1, Session 4 (D1S4) Steve Major, P.E. Brian Codianne Finally…an Engineer’s Perspective: 9 MBRs and Counting

Transcript of Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

Page 1: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

Day 1, Session 4 (D1S4)Steve Major, P.E.

Brian Codianne

Finally…an Engineer’s Perspective:9 MBRs and Counting

Page 2: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

2 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

• Jim Porteous

• Dennis Livingston

• Jim Gleason

• Kimberly (Mathis) Codianne

• Kevin Cox

• Paul Helenberg

• Bob Dillard

Three River Casino WWTP

PROJECT TEAM

Page 3: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

3 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

PLANT TIMELINE

2002 2005 2006 20082003 2004 20102009 201220112007 20142013 2015

BandonJune, 2002 Rolling Hills

April, 2004 LummiAug., 2006

Three RiversJune, 2007 Spirit

MountainMarch, 2008

The Next One…2016Angel of the

WindsFebruary,

2005

Not Shown: Palm Desert – June 2005, Grand Ronde Housing – March 2007, Coeur D’Alene – November 2011

Page 4: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

4 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

• All Facilities Utilized Flat Plate Technology• Effluent Disposal Requirements Driving Treatment• Reuse Common Goal• 78% of Projects Design-Build• Typical Duration of Project – 8 Months • 89% of Projects were for Tribal Facilities• 67% of Projects were for Gravity Systems• Treatment Capacity of all Facilities Expandable,

Utilizing Existing Tanks• 89% of projects completed by the same contractor• Had a “Nitch” from 2002 to 2010• Constantly “Bitching” About Equipment Costs

PLANT FUN FACTS

Page 5: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

5 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

History On Napkins

One day, on a Bullet Train somewhere in Japan, suffering from sake and beer poisoning, two engineers conceived of Bandon Dunes, OR on the back of a napkin…

Ten years later, in a hotel somewhere in Seattle, suffering from tequila poisoning they conceived of Canyonville, OR on the back of another napkin…

Page 6: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

6 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Dennis Livingston in Japan

MBR SYSTEM DESIGN EVOLUTION

Dennis Livingston in Germany

Bandon Dunes The Next One

Page 7: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

7 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Bandon Dunes Project Highlights

The first operational flat plate MBR in the United States Bandon Dunes is still in operation, still has the same SCADA, has no fine screens. One operator runs the plant and…four world class golf courses…

• June, 2002

• Domestic WW

• 0.075 MGD / 0.125 MGD

• Replaced Constructed Wetlands Treatment

• Converted Aerated Lagoon to FSL

• Spray Irrigation Disposal

• Max 4,000 mg/L MLSS

• 1 PTE

“No free rounds of golf”- The Management

Page 8: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

8 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Screen

Bandon Dunes Project Highlights

Effluent Piping

Process Piping

Control Panel

Page 9: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

9 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Rolling Hill Project Highlights

“It was harder saying goodbye to the Contractor than it was to my Son when he left to play pro baseball.”

- Larry Lohse Environmental Director

• April, 2004

• Casino WW

• 0.10 MGD / 0.20 MGD

• Replaced Below Grade Activated Sludge Treatment System (Kill Zones)

• Separated Kitchen Waste From Casino Waste

• Kitchen Pump Station with 10,000 Gallon Grease Trap

• Spray Irrigation Disposal / Reuse

• Facultative Sludge Lagoon

• 1 PTE “WWTP effluent is better quality than treated water from WTP”- EPA

Page 10: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

10 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Rolling Hill Project Highlights

Headworks/MBR

Process/Effluent Piping

UV Disinfection

Control Panel

Page 11: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

11 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Lummi Nation Project Highlights

First (Dyer) facility to utilize band screens at headworks, a pumped effluent system, and drain fields for disposal.

• May, 2006

• Casino/Domestic Waste

• 0.10 MGD/0.15 MGD

• Supplement Existing Treatment Facility

• 0.10 MGD Drain Field Disposal

• WAS Pumped to Existing Force Main

• 1 PTE

• Adding Stand By Generator 2015

Page 12: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

12 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Lummi Nation Project Highlights

Effluent Piping/Headworks

Headwork Box

Effluent Pumps

Brain (?)Headworks Screens Control Panel

Page 13: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

13 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Spirit Mountain Casino Project Highlights

“Why didn’t you recommend MBR over SBR the first time you upgraded our plant?”

- Ron Reibach Director of Facilities

• March, 2008

• Changed SBR to MBR Utilizing Existing Tanks

• Utilized Existing Headworks

• Increased Capacity of Peak Day from 0.45 MGD to 0.60 MGD

• Spray Irrigation / Sub Surface Disposal

• Biosolids Dewatering / Landfill Disposal

• 4 FTE to 2 FTE “MBR’s are the only way to go for Casino WWTPs.”

- Rod Smith Lead Operator

Page 14: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

14 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

Headworks Screen

Spirit Mountain Casino Project Highlights

Top Side MBR

MBR Screen

Process Piping

Page 15: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

15 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

The Next One - City of Canyonville

“We want the best quality effluent and technology possible”

- Frank Braudt Council Member

SBR vs MBR

Rogue River SBR

Item Value UnitAvg. Annual Flow 0.37 MGD

Max. Monthly Flow 0.48 MGDMax. Daily Flow 1.70 MGD

Peak Instant. Flow 2.20 MGDBOD 300 / <10 mg/lTSS 275 / <10 mg/lTKN 40 / NA mg/lNH3 29 / <6 mg/lTP 8 / <0.3 mg/lTN 40 / NA mg/l

Alkalinity 45 / <75 mg/lTurbidity NA / 2 NTU

Medium Temp. 25 ⁰CElevation 747 ft

Page 16: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

16 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

The Next One - City of Canyonville

SBR vs MBRSite Plan

Page 17: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

17 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

The Next One - City of Canyonville

SBR vs MBRCosts

Option Construction O&M TotalSBR $10,531,100 $3,336,800 $13,867,900

MBR $10,717,700 $3,004,500 $13,722,200

Page 18: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

18 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

18 ovivowater.com/mbrCopyright© 2013 GLV Inc. All rights reserved.

TOP 5 OPTIMIZATION STRATEGIES

Strategies to reduce cost and make competitive with SBR

Optimization Accurately size MBR portion of process

Don’t be fooled by apparent complexity of system

Maximize flat sheet operating characteristics

Take advantage of existing facilities

Get your equipment representative to lower sales commission

Page 19: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

19 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

19 ovivowater.comCopyright© 2015 Ovivo Inc. All rights reserved.

MBR System Design Evolution

The widgets have changed but the importance of the process has stayed the same. There are more options now especially for retrofit and stormflow.

MBR System Design Evolution

Parameter Bandon Dunes Next DesignFine Screen Type: No Screen Perforated Plate

Aperture/Slot Size: NA < 3 mm

Supp. Aeration Technology: Fine Bubble (Disks) Conc. O2

Solids Management: FSL Aerobic Digester / Screw Press

SCADA System: RSView Wonderware

Disinfection Method: UV UV

Filtration Mode: Gravity Pumped

Membrane Unit Type(s): ES OV

Design MMF: 0.12 MGD 0.8 MGD

Min. Temp.: 12 C⁰ 12 C⁰Peak Factor: 2.0 4.61

Design MLSS: 4,000 15,000

Page 20: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

20 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

20 ovivowater.comCopyright© 2015 Ovivo Inc. All rights reserved.

Process

1. Facilities2. Septic3. Anoxic Zone4. MBR + Aeration5. Chlorine Contact Chamber6. Spray Irrigation Field

(Winter)7. Golf Course (Summer)

The Bandon Process

FILTERED WATER TANK

Page 21: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

21 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

21 ovivowater.comCopyright© 2015 Ovivo Inc. All rights reserved.

The Next Process

1. Headworks2. Equalization3. Anoxic Zone4. Aeration + MBR5. Storm Flow6. Aerobic Digestion7. Biosolids Dewatering Unit8. Disinfection9. Concentrated Oxygen

The Next Process

Land Applied

River Discharge

(Year Round)

Page 22: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

22 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

22 ovivowater.com/mbrCopyright© 2013 GLV Inc. All rights reserved.

TOP 5 IMPROVEMENTS

From an engineer’s perspective numerous system improvements were necessary to get costs down and to get the full benefit of MBR and storm flow management (peak capabilities).

ImprovementsecoBLOX / microBLOX Process

stormBLOX

On-Site Oxygen Generation

Flat Sheet Membranes

Product Support/Education

Page 23: Steve Major: Finally…an Engineer’s Perspective: 9 MBRs and Counting

23 MBRcentral.comCopyright© 2015 Ovivo Inc. All rights reserved.

23 ovivowater.com/mbrCopyright© 2013 GLV Inc. All rights reserved.

OPERATOR FEEDBACK

My Top 3 recommendations that you can take to the bank for a more reliable, more efficient MBR System.

Optimization Utilize Flat Sheet Membranes

Network with other operators and OVIVO to make it a better widget

Work closely with your engineer’s (Demand it!)