• Minneapolis Campus 360 acres
• St. Paul campus 540 acres
• 265 buildings
• 46 miles of sidewalk and plaza
• 16 miles of streets
• Stairs, many stairs
University of Minnesota Winter Maintenance
![Page 2: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/2.jpg)
University of Minnesota Winter Maintenance
Seasonal snowfall avg. - 54 inches 2013/2014 – 70 inches At least 1 inch of snow on ground from 12/4/13 – 4/4/14
![Page 3: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/3.jpg)
University of Minnesota Winter Maintenance
53 days below zero Coldest day -23F
![Page 4: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/4.jpg)
University of Minnesota Winter Maintenance
![Page 5: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/5.jpg)
University of Minnesota Winter Maintenance
• Trace of snow – sidewalks mechanically
broomed & stairs swept/shoveled • 1” of snow – tops of parking ramps
plowed • 2” of snow – parking lots plowed • 3” of snow – streets plowed
Snow Removal Guidelines
![Page 6: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/6.jpg)
University of Minnesota Winter Maintenance
Snow Removal Personnel
• 25 FT Landcare employees • 50 student employees • 50 custodial staff • 30 snow-removal vendor staff • 10 Parking staff
![Page 7: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/7.jpg)
University of Minnesota Winter Maintenance
Snow Removal Equipment
• 6 skid steers • 2 Toolcats • 6 Polar Cats • 2 Walk-behind
Contractor
Mechanical Brooms
• 30 – 35 pickups with plows
Blade-equipped
Shovels, lots and lots of shovels
• Front-end loaders, dump trucks, road graders
![Page 8: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/8.jpg)
University of Minnesota Winter Maintenance
What happens when this happens?
![Page 9: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/9.jpg)
University of Minnesota Winter Maintenance
• If snow is forecast and temperature is in the range of 15F to 32F, streets and sidewalks pre-treated with 23% salt brine solution
• Pre-treatment helps prevent snow/ice from bonding to pavement
• If temperatures below 15F, calcium chloride w/beet solution used. Beet solution reduces corrosiveness
• Solutions spread using vehicles with 2,500 gallon tanks
![Page 10: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/10.jpg)
University of Minnesota Winter Maintenance
![Page 11: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/11.jpg)
University of Minnesota Winter Maintenance
Excessive use of snow-melt chemicals
![Page 12: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/12.jpg)
University of Minnesota Winter Maintenance
All hands on deck at 3:00 a.m. for forecast snow of 3 + inches
![Page 13: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/13.jpg)
University of Minnesota Winter Maintenance
![Page 14: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/14.jpg)
University of Minnesota Winter Maintenance
![Page 15: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/15.jpg)
University of Minnesota Winter Maintenance
![Page 16: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/16.jpg)
University of Minnesota Winter Maintenance
Where does all the snow go?
![Page 17: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/17.jpg)
University of Minnesota Winter Maintenance
As a practical matter, what does it all mean?
![Page 18: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/18.jpg)
University of Minnesota Winter Maintenance
• University estimates 80,000 visitors a day – 3rd largest trip generator in state
• Even in the depths of winter 1,000 + bikes a day on campus
• Tunnel and skyway system takes many people indoors, but usually results in longer trip time
![Page 19: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/19.jpg)
University of Minnesota Winter Maintenance
0
100
200
300
400
500
600
700
800
900
1000
September 2013
October 2013
November 2013
December 2013
January 2014
February 2014
909
766
573
191
115 146
Z
A
P
S
![Page 20: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders](https://reader036.fdocuments.net/reader036/viewer/2022070302/5483edeeb4af9fa00d8b4a8b/html5/thumbnails/20.jpg)
University of Minnesota Winter Maintenance
Steve Sanders - Alternative Transportation Manager http://www1.umn.edu/pts/bike/bikeRFID.html