STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

19
STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes

Transcript of STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

Page 1: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

STEP MANAGEMENT OVERVIEW

CURRENT STATUS OF STEP

Module 5

Estimated Viewing Time: 30 Minutes

Page 2: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

Sponsored BySponsored By

The NationalThe National Institute of Standards & TechnologyInstitute of Standards & Technology

Developed Under Contract by:

Product Data Integration Technologies, Inc.

100 W. Broadway, Suite 540

Long Beach, CA 90802

Page 3: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

Topics for This Module

STEP Current Development Status This section describes the availability of STEP

resources and Application Protocols for use by industry.

STEP Current Implementation Status This section describes the state of industry

implementation of STEP and the availability of supporting development and implementation tools.

Page 4: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

STEP Current Development Status

Page 5: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

When is STEP available?

Basic STEP capability has been available since December 1994. 12 Parts registered as ISO 10303 international standards in

December 1994. This is the “Initial Release”. This includes 2 AP’s (Part 201) address the exchange of 2D

drawing data and (Part 203) 3D design data under configuration control and included in the 12 parts.

Continuing STEP development schedule is aggressive (as of 1/1/96) 10 AP’s are in different stages of ballot cycle to be

standardized. 7 additional APs have industrial validation and 3 of them are

technically complete. 11 new APs have been approved as active development

projects.

Page 6: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

STEP Development Industry-Specific Views (1 of 2)

Discrete Manufacturing Product Design Configuration Management Core Data for Automobile Industry CAD System Shape Geometry for Mechanical Product

Design Engineering Drawing Information Manufacturing Technologies: Composites, NC Process

Planning, Casting, Forging

Electrical and Electronics PCA, PCB and Component Design Electronic Test Diagnostic and Remanufacture Electrotechnical Plant Design and Installation

Page 7: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

Architecture and Construction Building Element Shape Design Ship Building Building Construction Core Model Building Services: Heating, Ventilation and AC Building Structural Frame: Steelwork

Process Plants Plant Spatial Configuration Plant Functional Design Process Engineering

STEP Development Industry-Specific Views (2 of 2)

Page 8: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

AP Current Development Status (as of 1 Jan 1996)

Sta

nd

ard

ize

Sp

ecif

icat

ion

Req

uir

emen

ts

AAM

ARM

AIM

IS

DIS

CD

20

1 20

2 20

3 20

4 20

5 20

7 20

8 20

9 21

0 21

1 21

2 21

3 21

4 21

5 21

6 21

7 21

8 22

0 22

1 22

2 22

3 22

4 22

5 22

6 22

7 22

8 22

9 23

0 23

1

Page 9: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

STEP CURRENT IMPLEMENTATION

STATUS

Page 10: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

STEP Usage and Implementation

Many companies are experimenting with various implementations, several are at the pilot or production usage stage.

Some commercial CAD vendor translators are available, with many more are under development: UNIGRAPHICS, CATIA, ProEngineer.

Many commercial software toolkits are available for development, STEP browsing, and implementation.

Training and consulting services are commercially available for STEP development and implementation.

Page 11: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

Current Implementation Status

Example Application Protocol Prototype, Demo,

and Pilot Development Projects in the U.S.

AEROSTEP: AP203 (Boeing, GE)

AWS: AP203 (IBM, Lockheed, NG)

GM/EDS Prototype: AP207 (GM/EDS)

PAS-C: AP209 (Lockheed, Vought, Boeing)

PAP-E: AP211 (Intermetrics, TRW, WH)

PDXI: AP 231 (Chevron, DuPont, and others)

PlantSTEP: AP 227 (The top 10 Plant Design Vendors)

PREAMP: AP210,AP 220 (Hughes, MMA, Rockwell, Boeing)

RASP: AP210 (Ford, UTC, Hughes, MMA, TI)

PEP: AP201 and 203 (DoD Joint Center - FCIM/IPDE)

RAMP: AP224 (Grumman)

Page 12: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

STEP Centers

PDES, Inc. - US, UK aerospace/automobilePROSTEP - Germany automobileJapan STEP Center - JapanC-STEP - ChinaPISTEP - UK processPlantSTEP - US and Japan process ind.PDXI - US and Europe process ind.Nat’l PDES Testbed - USGOSET - FranceSTEP Data Ex. Ctr. - Australia

Examples of established centers to accelerate the development and implementation of STEP:

Page 13: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

STEP Production Software Tools -- (1 of 2)

ORGANIZATION SOFTWARE TOOLS

Cadlab ICE Toolset

Canonical ExWare

CIMIO EXPRESS-M schema mapping

CSTB SPDI Station

DCM DCMem

DEC DECexpress

EPM EDM

Erlangen fedex

Fraunhofer-IGD Xpresso

as of 1/1//96

Page 14: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

ORGANIZATION SOFTWARE TOOLS

GE EDEX - EDitor for EXpress

GIDA EXEP Tool Kit

GOPAS ExpressLab

IDA Pstep-CaseLib

ITI(OH) PDE/Lib

NIST NIST STEP Toolset

PDIT FirstSTEP Toolkit

Siemens EXPREME

STEP Tools ST- Toolkit

Theorem AP203 browser, editor, viewer

Versant EXPRESS/STEP

STEP Production Software Tools -- (2 of 2)

as of 1/1//96

Page 15: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

Legend

Implementing STEP

No current commitments

Leading CAD/CAM HW & SW MfgrsRanked by 1992 Market Share

Source: Electronic Business, April 93, p 75

Unknown

IBM

Intergraph

Computervision

Cadence Designer Sys,

Autodesk

Mentor Graphics

Hewlett Packard

Page 16: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

CAD/CAM Sector's Top 10 in 1994Software Revenue Totaled $4.1B

Hausman, Eric, "CAD/CAM Sector's Top 10," Computer Reseller News, Dec 5, 1994

Autodesk

IBM

IntergraphCadence

Design Sys.

Computervision

Parametric

EDS Unigraphics

SDRC

Mentor Graphics

Synopsys

Unknown

Legend

Implementing STEPNo current

commitments

Page 17: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

CAD/CAM/CAE Software MarketProjected Revenue of Top 7 - 1995

Percentages based on $4.6B total market projection.Source: Computer Reseller News, April 10, 95, n625, p 47(1)

Unknown

Autodesk

IBM/Dassault SystemsIntergraph

ParametricTech

Computervision

Synopsys Inc.

Struct. Dynamics

Legend

Implementing STEP

No current commitments

Page 18: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

Plant Design CAD Software Vendors

Inte

rgra

ph

CA

DC

entr

e

EA

Sys

tem

s

Das

sau

lt(C

AT

IA)

$0

$5

$10

$15

$20

Mill

ion

$ R

eve

nue

Inte

rgra

ph

CA

DC

entr

e

EA

Sys

tem

s

Das

sau

lt(C

AT

IA)

Com

put

erv

isio

n

Top Five Vendors (and the next three as well) are all implementing STEP.

Source: DARATECH 1995 estimates

Page 19: STEP MANAGEMENT OVERVIEW CURRENT STATUS OF STEP Module 5 Estimated Viewing Time: 30 Minutes.

NIST/ECRC

CURRENT STATUS OF STEP

End of Module 5