Step 7 v5_2_e share by voip.com.vn

56
Automation and Drives SIMATIC Software STEP 7 V5.2 STEP 7 V5.2 Highlights of the new STEP 7 version SIMATIC Software

description

Step 7 v5_2_e share by voip.com.vn

Transcript of Step 7 v5_2_e share by voip.com.vn

Page 1: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Software

STEP 7 V5.2

STEP 7 V5.2Highlights of the new STEP 7

version

SIMATIC Software

Page 2: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 2

Introduction

The new STEP 7 V5.2 will enter the market in December 2002, replacing STEP 7 V5.1 that has been shipping since 08.2001.

In STEP 7 V5.2 we have implemented new functions such as

STEP 7 goes InternetMulti-projectConfiguration in Run...

Multi-language project managementBlock comparison...

as well as further developing existing functions such as

This set of slides provides information covering all aspects of the new STEP V5.2.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 3: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 3

Ordering information

Order number Description

6ES7810-4CC06-0YX0

SIMATIC S7, STEP7 V5.2SINGLE LICENSE FOR 1 INSTALLATIONE-SW, SW AND DOCU. ON CD, LICENSE KEY ON FD, CLASS A,5-LANGUAGE (G,E,F,I,S),EXECUTABLE UNDER WIN95/98/ME/WINNT4/2000PROF/XPPROF,REFERENCE HARDWARE: S7-300/400, C7

STEP 7 V5.2Single License for one installation

Requirements: none

For installation on one programming device/PC.

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 4: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 4

Ordering information

Order number Description

6ES7810-4CC06-0YX4

SIMATIC S7, STEP7 V5.2UPGRADE,SINGLE LICENSE FOR 1 INSTALLATIONE-SW, SW AND DOCU. ON CD, LICENSE KEY ON FD, CLASS A,5-LANGUAGE (G,E,F,I,S),EXECUTABLE UNDER WIN95/98/ME/WINNT4/2000PROF/XPPROF,REFERENCE HARDWARE: S7-300/400, C7

STEP 7 V5.2 – UpgradeSingle License for one installation

Requirements: STEP 7 V3.x, V4.x, V5.0 or V5.1

For upgrading an existing STEP 7 installation (V3.x, V4.x, V5.0 or V5.1) to the new STEP 7 V5.2.

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 5: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 5

Ordering information

Order number Description

6ES7810-4CC06-0YX5

SIMATIC S7, STEP7 V5.2POWERPACK – STEP 7 LITE TO STEP 7E-SW, SW AND DOCU. ON CD,LICENSE KEY ON FD, CLASS A,5-LANGUAGE (G,E,F,I,S),EXECUTABLE UNDER WIN95/98/ME/WINNT4/2000PROF/XPPROF,REFERENCE HARDWARE: S7-300/400, C7

STEP 7 V5.2 – PowerPackSingle License for one installation

Requirements: STEP 7 Lite V2.0

For upgrading an existing STEP 7 installation STEP 7 Lite V2.0 installation to the new STEP 7 V5.2.

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Note: If STEP 7 Lite is installed at a XP Home PC, bevor upgrading STEP 7 Lite to STEP 7 the operating system must be upgraded too, because STEP 7 is not executeable under XP Home.

Page 6: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 6

Ordering information

STEP 7 – Software Update Service

Requirements for new order: STEP 7 V5.2

STEP 7 is under continuous development. The Software Update Service is the most user-friendly way of consistently utilizing these improvements. It guarantees automatic shipment of all new software versions released after ordering the Software Update Service. This keeps the software always up to date.

Order number Description

6ES7810-4BC01-0YX2

SIMATIC S7, STEP7SOFTWARE UPDATE SERVICEFOR 1 YEAR W.AUTOM.RENEWAL,REQUIRES LATEST SW-RELEASE

Ordering

One Software Update Service is required per installed software license The Software Update Service is valid for a period of 1 year from ordering It is automatically extended by one year if not cancelled 3 months before

expiry An annual flat rate is charged per license

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 7: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 7

Ordering information

STEP 7 V5.2 documentation - basic knowledge

Order number Description

6ES7810-4CA06-8AA0

SIMATIC S7, STEP7 DOCUMENT.BASIC KNOWLEDGE, COMPRISES:GETTING STARTED, HW CONFIG MAN.,PROGRAMM. MANUAL, CONVERTER MAN., FOR V5.2, GERMAN

6ES7810-4CA06-8BA0

SIMATIC S7, STEP7 DOCUMENT.BASIC KNOWLEDGE, COMPRISES:GETTING STARTED, HW CONFIG MAN.,PROGRAMM. MANUAL, CONVERTER MAN., FOR V5.2, ENGLISH

6ES7810-4CA06-8CA0

SIMATIC S7, STEP7 DOCUMENT.BASIC KNOWLEDGE, COMPRISES:GETTING STARTED, HW CONFIG MAN.,PROGRAMM. MANUAL, CONVERTER MAN., FOR V5.2, FRENCH

6ES7810-4CA06-8DA0

SIMATIC S7, STEP7 DOCUMENT.BASIC KNOWLEDGE, COMPRISES:GETTING STARTED, HW CONFIG MAN.,PROGRAMM. MANUAL, CONVERTER MAN., FOR V5.2, SPANISH

6ES7810-4CA06-8EA0

SIMATIC S7, STEP7 DOCUMENT.BASIC KNOWLEDGE, COMPRISES:GETTING STARTED, HW CONFIG MAN.,PROGRAMM. MANUAL, CONVERTER MAN., FOR V5.2, ITALIAN

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 8: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 8

Ordering information

STEP 7 V5.2 documentation - reference manuals

Order number Description

6ES7810-4CA06-8AR0

SIMATIC S7, STEP7 DOCUMENTATIONREFERENCE MANUAL, COMPRISES:MANUAL FOR STL/LAD/CSFREFERENCE MANUAL S7-300/400,FOR V5.2, GERMAN

6ES7810-4CA06-8BR0

SIMATIC S7, STEP7 DOCUMENTATIONREFERENCE MANUAL, COMPRISES:MANUAL FOR STL/LAD/CSFREFERENCE MANUAL S7-300/400,FOR V5.2, ENGLISH

6ES7810-4CA06-8CR0

SIMATIC S7, STEP7 DOCUMENTATIONREFERENCE MANUAL, COMPRISES:MANUAL FOR STL/LAD/CSFREFERENCE MANUAL S7-300/400,FOR V5.2, FRENCH

6ES7810-4CA06-8DR0

SIMATIC S7, STEP7 DOCUMENTATIONREFERENCE MANUAL, COMPRISES:MANUAL FOR STL/LAD/CSFREFERENCE MANUAL S7-300/400,FOR V5.2, SPANISH

6ES7810-4CA06-8ER0

SIMATIC S7, STEP7 DOCUMENTATIONREFERENCE MANUAL, COMPRISES:MANUAL FOR STL/LAD/CSFREFERENCE MANUAL S7-300/400,FOR V5.2, ITALIAN

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 9: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 9

Ordering information

STEP 7 Professional Edition 12/2002

To accompany STEP 7 V5.2, there will also be a new STEP 7 Professional Edition. Below is a list of the STEP 7 Professional components with their version releases:

STEP 7 V5.2

S7-GRAPH V5.2

S7-SCL V5.1 including SP4

S7-PLCSIM V5.1

New

New

New

Updated

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 10: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 10

Ordering information

STEP 7 Professional Edition 12/2002Single License for one installation

Requirements: none

For installation on a programming device/PC.

Order number Description

6ES7810-5CC07-0YE0

SIMATIC S7,STEP7 PROF ED12/2002SINGLE LICENSE FOR 1 INSTALLATIONE-SW, SW AND DOCU. ON CD,SINGLE LICENSE ON FD, CLASS A5-LANGUAGE (G,E,F,I,S),EXECUTABLE UNDER WIN95/98/ME/WINNT4.0/2000PROF/XPPROF,REFERENCE HARDWARE:S7-300/400, C7

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 11: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 11

Ordering information

STEP 7 Professional Edition 12/2002 – PowerPackSingle License for one installation

Requirements: STEP 7 V3.x, V4.x, V5.0 or V5.1 (V5.2)

For upgrading an existing STEP 7 installation (V3.x, V4.x, V5.0 or V5.1) to the new STEP 7 Professional Edition 12/2002

Order number Description

6ES7810-5CC07-0YE5

SIMATIC S7,STEP7 PROF ED12/2002POWERPACK,SINGLE LICENSE FOR 1 INSTALLATIONE-SW, SW AND DOCU. ON CD, LICENSE KEY ON FD, CLASS A,5-LANGUAGE (G,E,F,I,S),EXECUTABLE UNDER WIN95/98/ME/WINNT4.0/2000PROF/XPPROF,REFERENCE HARDWARE: S7-300/400, C7

Note: You can, of course, upgrade from an existing STEP 7 V5.2 installation to STEP 7 Professional Edition 12/2002 with this PowerPack.

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 12: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 12

Ordering information

Order number Description

6ES7810-5CC07-0YE4

SIMATIC S7,STEP7 PROF ED12/2002UPGRADE,SINGLE LICENSE FOR 1 INSTALLATIONE-SW, SW AND DOCU. ON CD, LICENSE KEY ON FD, CLASS A,5-LANGUAGE (G,E,F,I,S),EXECUTABLE UNDER WIN95/98/ME/WINNT4.0/2000PROF/XPPROF,REFERENCE HARDWARE: S7-300/400, C7

STEP 7 Professional Edition 12/2002 – UpgradeSingle License for one installation

Requirements: STEP 7 Professional Edition 01/2000, Edition 08/2000 or Edition 08/2001

For upgrading from an existing STEP 7 Professional Installation (Edition 01/2000, Edition 08/2000 or Edition 08/2001) to the new STEP 7 Professional Edition 12/2002

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 13: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 13

Ordering information

STEP 7 Professional – Software Update Service

Requirements for new order: STEP 7 Professional Edition 12/2002

We also offer a Software Update Service for STEP 7 Professional. The contract conditions are identical.

Order number Description

6ES7810-5CC04-0YE2

SIMATIC S7, STEP7 PROFSOFTWARE UPDATE SERVICEFOR 1 YEAR W.AUTOM.RENEWAL,REQUIRES LATEST SW-RELEASE

IntroductionOrdering informationSystem requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 14: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 14

System requirements - software

STEP 7 V5.2 runs on the following Microsoft operating systems:

Windows 95 Windows 98SE Windows Me Windows NT 4.0 Workstation (SP6a) Windows 2000 Professional (at least SP2) Windows XP Professional

Note:

Windows XP Home is not supported. Windows 95 / 98 / Me / NT were last supported by STEP 7

V5.2. With the successor version of STEP 7 V5.2, support will

be provided only for Windows 2000 Professional and Windows XP Professional, and possibly also for new MS operating systems.

Introduction

Ordering informationSystem requirementsSTEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 15: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 15

System requirements - hardware

 

Win

95S

P1

Win

98,

Win

98S

E

Win

ME

Win

NT

4.0

WS

SP

6A

Win

2000

Pro

f.S

P2

Win

XP

Pro

f.S

P1

Minimal P166 P300Recommended

Minimal

SVGA, 16-bit color

depthRecommended

CD-ROMMinimal 16 24 32 64 64 64Recommended 32 128 128

Internet Explorer 4.01 SP1 5.01 5.01 5.01 5.01 6STEP 7 Professional Release OS

, recommend. , recommend.

Additional RAMSTEP 7 Release OS , recommend. , recommend.

Additional RAM

64 MB

32 MB300 MB

Processor

Graphics

Req

uire

s fre

e sp

ace

on h

ard

disk

for

2-la

ngua

ge

inst

alla

tion

450 MB

Pentium P133P III 450 or Celeron 600

RAM required for operating system

Super VGA (SVGA)800 x 600, 256 colors

Extended VGA (XGA), 1024 x 768, 16-bit color depthCD-ROM or CD-ROM/DVD drive

Explanation: Windows NT 4.0 and free memory 1GB.I want to use STEP 7 Professional on this. How much RAM do I require?Windows NT 4.0 with Service Pack 6a with Internet Explorer V4.01 alone requires 64MB.To this are added a further 64MB for STEP 7 Professional.With 128MB RAM, I’ll be able to load all my desired applications in parallel.

Note: The values listed are recommendations from Microsoft. STEP 7 V5.2 can, of course, run on hardware platforms with lower specifications. However, performance restrictions can then result.

Introduction

Ordering informationSystem requirementsSTEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 16: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 16

STEP 7 goes Internet

STEP 7 is already equipped with a powerful, context-sensitive Help system.

To be able to access current information and software updates quickly and accurately (finding instead of searching), we now link STEP 7 with our Internet product information system.

The following functions are possible:

Detailed information (technical specifications, FAQs, documentation) on modules can be queried direct from HW Config via our Product Support pages on the Internet.

Updating of HW Config via Internet – this provides the opportunity of integrating individual components such as new CPUs or new distributed I/O devices "a bit at a time" into the current version of STEP 7 without having to install an extensive Service Pack.

Introduction

Ordering information

System requirementsSTEP 7 goes InternetMulti-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 17: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 17

STEP 7 goes InternetDetailed information on modules

Product Information System

InternetIntroduction

Ordering information

System requirementsSTEP 7 goes InternetMulti-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

STEP 7 - Hardware Configuration

Page 18: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 18

STEP 7 goes InternetHardware Config - updating the module catalog

Introduction

Ordering information

System requirementsSTEP 7 goes InternetMulti-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Internet

STEP 7 - Hardware Configuration

Product Information System

Page 19: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 19

Multi-project

Benefits

The Multi-project allows you to configure your systems flexibly. At the forefront here is time-saving parallel creation of projects that can be combined with support from the system.

With the help of the Multi-project, you can, for example, create one project per operator for distributed processing and share the stations among the projects according their operators.

Agreement is only needed for executing cross-project functions such as networking.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 20: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 20

Multi-project

Previous situation: centralized project

Advantages 1 project Project is always consistent with

regard to Networks (AS-OS assignment) (Mapping)

Centralized projectStation 1 Station 2

Station 3

Station 2 *

Copy

Station 3 *Station 1 *

CopyCopy

Disadvantages Copying/moving of project

sections time-consuming Centralized project can

become extremely large ‘Save as’ to centralized

project

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 21: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 21

Multi-project

New: Multi-project as additive method for structuring the project

Advantages:

Distributed working easily possible (even on different computers)

(Sub-)projects are completely independent No complex operations required (Copy) Small sub-projects Only a few functions need to access ALL sub-projects Cross-project sub-networks can be created within the scope of

working with projects of a multi-project.

Multi-project

Reference to Project 3Reference to Project 2Reference to Project 1

Station 1 Station 2 Station3

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 22: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 22

Configuration in RUN (CiR)

There are plants that must not be shut down during operation. Nevertheless, dismantling work or conversion work can become necessary.

With the help of CiR, it is possible to carry out certain changes to the hardware configuration during operation (that is, in the RUN state of the S7-CPU). In doing so, operation of the process is interrupted for one second at the most.

This requires the use of an S7-400-CPU (from FW V3.1*) or an S7-400-H-CPU of expansion stage 1v1 (from FW V3.1*).

*Planned start of delivery: start of 2003

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-projectConfiguration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 23: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 23

Configuration in RUN (CiR)

Principle of CiR In configuring the hardware, provision is made for later

hardware modifications by setting “CiR capability activated”.

CiR elements are defined that can be replaced later, step-by-step, with actual objects (slaves and/or modules) in the RUN operating state.

CiR means During the CiR synchronization time, the process inputs

and outputs are maintained at their last values. The CiR synchronization time depends on the degree of

expansion of the line (input and output bytes of the DP master system)

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-projectConfiguration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 24: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 24

Configuration in RUN (CiR)

Permissible configuration changes

Addition of modules in the case of the ET 200M modular DP slave

Re-parameterization of ET 200M modules; selection of other alarm limits, for example, or the use of previously unused channels

Addition of DP slaves to an existing DP master system Addition of PA slaves (field devices) to an existing PA

master system Addition of DP/PA couplers behind an IM157 Addition of DP/PA Links (including PA master systems) to

an existing DP master system Assignment of added modules to a partial process image Modification of partial process image assignment in the

case of existing modules or compact slaves Undoing of changes: added modules, DP slaves and PA

slaves (field devices) can be removed again.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-projectConfiguration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 25: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 25

LAD/STL/FBD Editor

New operator interfaceThe program editor for LAD/FBD/STL contains a restructured, user-friendly operator interface. All the important information is presented at a glance. Navigation is made simple and fast by the use of tabs.

Monitoring variables from the program editor Binary inputs and bit memories can be monitored in the program editor using a button

Further development of existing functionality

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 26: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 26

LAD/STL/FBD EditorNew operator interface

Explanation of the structure of the interface: Overview

Program Elements provides a complete overview of the commands that you can insert in your LAD, FBD, or STL program.

Call structure shows the call hierarchy of the blocks in the current S7 program.

Variable declaration Variable declaration is subdivided into an overview and a detailed view.

Statements – program code The block code is shown in the statement section.

Details Displaying error messages Information on addresses Processing symbols Monitoring addresses Comparison of blocks Processing fault definitions for process diagnostics

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 27: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 27

Statement - program code

Variable declaration

Overview

Details

Fast navigation using tabs

LAD/STL/FBD EditorNew operator interface

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 28: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 28

LAD/STL/FBD EditorMonitoring variables from the program editor

Binary inputs and bit memories can be provided with a button in the program editor that enables these addresses to be monitored easily and quickly at the click of the mouse. Using multiple selection (CTRL key), several addresses can be monitored simultaneously. The function can also be used from SIMATIC WinCC.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 29: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 29

LAD/STL/FBD EditorFurther development of existing functionality

STL sources When generating a source from a block, the configuring data from

message and project diagnostics are also stored and are therefore retained when the source is compiled again.

Format, character font, and printer settings for the text in STL sources can be selected freely.

Address browser as input aid also for local addresses, structures, and DB components.

Example: address browser to DB components

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 30: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 30

LAD/STL/FBD EditorFurther development of existing functionality

The designation of addresses has been extended by the facility for adding symbol information to the address. The information is also visible on the printout to supplement the tooltip.

Address with symbol comment

Tooltip

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 31: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 31

LAD/STL/FBD EditorFurther development of existing functionality

Automatic setting of network title The network title can be adopted into the network if desired from the

symbol comment of the first assignment in the network.

Network title

Symbol comment

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 32: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 32

LAD/STL/FBD EditorFurther development of existing functionality

Variables can be tested direct in the program editor. Addition to the Standard Library of the new

"Miscellaneous Blocks" for time stamping and clock synchronization.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 33: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 33

LAD/STL/FBD –EditorFurther development of existing functionality

The function "Go to" can now also be used for local variables.

Editing of arrays has been made easier. Colors have been introduced for different text types

when editing sources. Symbols and symbol comments can be redefined,

modified, or deleted. The data type of the symbol can be changed.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 34: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 34

LAD/STL/FBD EditorFurther development of existing functionality

When selecting the program elements, the blocks can be sorted in libraries or in the program according to "Type And Number" or "Block Family".Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in RunLAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 35: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 35

Multi-language management of projects

Since STEP 7 V5.1, we have offered the facility for multi-language management of project texts (line and symbol comments, etc.). Incorporating the feedback from our customers, we have further developed this functionality. Automatic correction of the database from the

LanguageSupportTool in the case of changes to comments in blocks

Automatic correction of the database from the LanguageSupportTool after copying blocks to other projects

“Concealment” of comments in the languages into which they are not to be translated

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 36: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 36

Address priority (symbolic/absolute)

Setting the address priority (symbolic/absolute)

In the dialog box for block folder properties, you can specify whether the symbol or the absolute value is to have priority when opening the blocks following changes to the symbol table. In STEP 7 versions older than V5, the absolute value has priority.

This functionality has been expanded and is now valid for all accesses (inputs, outputs, bit memories, timers, counters, and data blocks). You can specify STEP 7’s behavior, from absolute access right up to symbolic access.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 37: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 37

Address priority (symbolic/absolute)

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 38: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 38

Block comparison

Further development of block comparison Block comparison can be started both in the LAD/STL/FBD

Editor and from the SIMATIC Manager. The first difference per network is now displayed. You can navigate between the differences.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 39: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 39

Block comparison

Offline project Online project

Navigation

Differences – textual

representation

Differences – graphical

representation

Compatibility

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 40: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 40

Parameterizing data blocks

Using the function "Parameterizing Data Blocks", you can carry out the following outside the LAD/STL/FBD program editor:

Process actual values of instance data blocks and load them into the PLC without having to load the entire data block

Monitor instance data blocks online User-friendly parameterization and online

monitoring of instance data blocks and multi-instances in the parameterization view (technological functions)

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparisonDB parameterizationSymbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 41: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 41

Parameterizing data blocks

User-friendly parameterization

view(Stage 1: for Siemens blocks only)

New view for parameterizing instance DBs

Delta loading into the CPU

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparisonDB parameterizationSymbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 42: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 42

Symbol table

The symbol table has been completely revised. The following performance features deserve a special mention here: The previous restriction to a maximum of 16380 symbols

in one symbol table has been removed. The "special object properties" of the symbols are

represented clearly and are easy to edit. All the information on the symbol is available at a glance.

In the new "Status" column, non-unique symbols, for example, are graphically designated. There is also a powerful filter function.

Support for the wheel mouse.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 43: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 43

Monitor/force variables

The table for the monitoring and forcing of variables has been revised:

Address priority is taken into account when opening a table.

If the "Symbol Comments" column is blanked out, the symbol comments are displayed in a condensed form in the "Symbol" column.

Condensed information can now also be shown using the keyboard.

The table can be maximized and minimized. It is possible to display force values with results.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 44: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 44

Diagnostics and status/monitor on native PROFIBUS services

This new functionality makes it possible to access PROFIBUS nodes online with STEP 7, even if only DP slaves are connected to PROFIBUS (without DP master).

Access is possible from the SIMATIC Manager or from the HW Configuration.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 45: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 45

Configuring networks and connections

Cross-project sub-networks can be created within the scope of working with projects of a multi-project.

In NetPro, connections can be exported and imported with the station data.

NetPro can automatically merge connections that are loaded back into the programming device.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 46: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 46

Hardware Configuration

New versions of the CPU 31xC have additional functions already familiar in other CPUs, for example:

Distributed reading and writing of consistent data (> 4 bytes)

In "DP slave" mode, the option "Startup/test mode" can be set. This option allows powerful execution of the programming device functions and it enables S7 routing.

The new S7-400-CPUs (V 3.1) offer the possibility of operating up to four DP master systems in clocked mode with the help of OBs 61 to 64.

Parameterization of acknowledgement-triggered signaling (SFB 33 to 35) for CPUs used for PCS 7: if this function is activated on the tab "Diagnostics/Clock" of CPU Properties, the above-named SFBs only report a signal change again if the previous fault message has been acknowledged. This prevents the piling up of messages that cannot then be processed.

New versions of the DP/PA Link support DPV1 mode. When the DP/PA Link is plugged in, the mode of the higher-level DP master is automatically adopted.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 47: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 47

Hardware Configuration

Online coordination of identification data: For the new ET 200M interface module (153-2AA03) and

the new DP/PA Link (157-0AA82) as well as for other signal modules of the S7-300, modifiable identification data such as plant designation and creation date can be coordinated (that is coordination between configuration and loaded identification data).

The times specified for events in the diagnostics buffer can be displayed both as module time and as local time.

In module status (PLC >Module Status), specific help can be called up for many of the displayed hardware channel faults. In the case of DP slaves integrated via GSD file, help for device-specific diagnostics can be called up, provided the associated GSD file contains the relevant help texts.

The module status of slaves can be called up via accessible nodes.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 48: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 48

Hardware Configuration

Visualization of possible slotsPossible slots are highlighted in color in mounting racks. This makes configuring simpler and faster

Help in selecting possible modulesA selection of possible modules for the slots of a mounting rack can be displayed using the context menu (right mouse key). This saves searching the Hardware Catalog

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 49: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 49

Topology display - diagnostics repeaters

In conjunction with diagnostics repeaters Stage 2 (6ES7 972-0AB01), it is possible to display the topology of the PROFIBUS network in addition to displaying PROFIBUS line diagnostics.

In contrast to the network view with NetPro, it is not the "logical" view of a PROFIBUS sub-network that is presented but the physical arrangement of the PROFIBUS nodes with the actual order and distanced to the nodes.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 50: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 50

Saving data on MMC/flash card

Since STEP 7 V5.1, we have offered the facility for storing the entire project (programs, symbol information, comments, and HW Configuration) on a MicroMemoryCard (MMC). We have expanded this function too.

Now, any data can be stored along with the project data on the MMC or, in the case of the S7-400, on the flash card.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 51: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 51

Configuring messages

In addition to project-wide assignment of message number, CPU-wide assignment is also possible.

Advantage: with CPU-wide assignment of the message numbers, a program can be copied without the message numbers changing and giving rise to the necessity for recompiling.

Standardizing the message attributes Advantage: there are no more specifications for monitors. This

simplifies configuring. Integration of the message texts into the project

texts Advantage: multi-language message texts can be exported, edited,

and centrally managed in a user-friendly way. Text libraries

Advantage: users can create their own text libraries.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 52: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 52

Report system fault

Since STEP 7 V5.1, S7 components and DP standard slaves can initiate organization block calls when a system fault occurs.

Example: in the event of a wirebreak, a diagnostics-enabled module can initiate a diagnostics interrupt(OB 82).

With the function "Report system fault", STEP 7 offers a user-friendly method of displaying the diagnostics information provided by the component in the form of messages.

STEP 7 automatically generates the blocks and message texts required for this. The user only has to load the generated blocks into the CPU and transfer the texts to the connected HMI devices.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

MessagesReport system faultOnline help

Compatibility

Page 53: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 53

Report system faultFurther development of functions

The function "Report system fault" can now also be used for F systems.

The name of the user blocks and the diagnostics blocks can be entered as an absolute name or as a symbolic name.

In the case of an existing block, the available parameters of the interface are preset after the block name has been entered.

For messages, the help texts for correcting the fault can be incorporated into the message text or the info text.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

MessagesReport system faultOnline help

Compatibility

Page 54: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 54

Online help - information management

In STEP 7 Help, an information portal is opened using the "Start page" symbol. The information portal provides you with access to the summarized centralized topics of the online help system, such as:

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 55: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 55

Compatibility

In previous STEP 7 versions it was possible that the modules and the lower-level objects were not displayed when opening a project - if the project contained new modules unknown to that STEP 7 version.

With the new STEP 7 version, this behavior is a thing of the past: Effective retroactively from STEP 7 V5.1 including

Service Pack 3, all modules will be represented, even those configured with a later STEP 7 version and therefore unknown to the "older" STEP 7. Modules configured with an optional package will also be represented - even if the required optional package is not installed on the programming device used to open the project. Normally it is also possible to delta load the new module over the Internet into the existing version (from STEP 7 V5.2) (see also "STEP 7 goes Internet").

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility

Page 56: Step 7 v5_2_e share by voip.com.vn

Automation and Drives

SIMATIC Industrial Software STEP 7 V5.2 – Highlights of the Version

SIMATIC Software

STEP 7 V5.2

A&D AS FA PS , 15.01.03, 56

Compatibility

Basic information on compatibility:

STEP 7 V5.2 is fully upwards compatible with STEP 7 V5.1, V5.0, V4.x and V3.x, that is, programs and projects created with these predecessor versions can continue to be processed unchanged with STEP 7 V5.2.

STEP 7 V5.2 is also downwards compatible with these versions provided no components and functions are used in a new V5.2 project that are not supported by STEP7 V5.1, V5.0, V4.x or V3.x, such as the new CPUs or the multi-project function.

If a project created with STEP 7 V5.2 is to be further processed with, for example, STEP 7 V5.0, only module MLFBs that are known to STEP 7 V5.0 must be used in the V5.2 project. In certain circumstances, new modules must be configured with the "predecessor MLFB".

Effective retroactively from STEP 7 V5.1 including SP3, this no longer has to be taken into account, since new modules unknown to the STEP 7 version are also represented here.

Normally new modules can be "delta loaded" with STEP 7 V5.2.

Introduction

Ordering information

System requirements

STEP 7 goes Internet

Multi-project

Configuration in Run

LAD/STL/FBD EditorMulti-language projects Symbols

Block comparison

DB parameterization

Symbol table

Monitor/forceNetworks/connectionsHardware Config

Topology display

Data on MMC

Messages

Report system fault

Online help

Compatibility