STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS)...

44
STEEL FRAMING SYSTEM INSTALLATION GUIDE The Optimum Fast-Track Solution www.eosframing.co.uk

Transcript of STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS)...

Page 1: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

STEEL FRAMING SYSTEM INSTALLATION GUIDE

The Optimum Fast-Track Solution

www.eosframing.co.uk

Page 2: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

2

Welcome to the EOS Steel Framing System (SFS) Installation Guide

A successful project requires every trade in the design and construction process to deliver with the highest standards

and precision. As part of our drive to deliver sustainable light gauge steel materials and energy efficient buildings,

we have endeavoured to share best practice and provide a complete set of SFS standard details for use primarily by

installers.

Good projects start with good designs, and a good design is one that is matched to the client’s expectations, both in

terms of cost and performance. This Guide presents best practice site checks to deliver optimum build quality for SFS

non-loadbearing schemes. The Guide is aimed to assist:

• Project Managers

• SFS Installers

• Site Managers

• Site Inspectors

• Trade Trainers

Page 3: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

3

CONTENTS Page

Standard Details

REF SFS

201 G Fixing Details for Head / Base Tracks 4204 F Deflection Base / Head Bracket Fixing 5205 F Head Track Fixing Details 6206 E Stud Corner Fixing Details 7207 C Deflection Head Track Fixing Details - Restricted Access 8208 F Head Track Fixing Details - to Steel Edge Beam (SSB) 9209 E Restraint Options for Overhangs 10 210 D Oversail Stud Fixing Details (SCB) 11211 F Cloaking Deflection Details 12212 F Deflection Head EFIX100 Fixing Details 13213 C Structural Movement Joint Details 14214 D DHT - Deflection Head / Base Fixing 15215 D DHT - Head into Steel / Head in Concrete 16216 D DHT - Deflection Head Restricted Access 17217 Typical Cladding Movement Joint Detail (S & T) 18218 A Indicative Bracing Avoidance Method - Flat Strap 19219 C Indicative Bracing Avoidance Method - Box Section 20220 B EOS Framing Stock Fixings Table 21221 B Zed Bar Head Details 22 222 A Shot Fired Fixings Specification 23223 Fixings into Blockwork Plinths 24 241 C DHT - Installation Quick Guide 25

242 C DHB - Installation Quick Guide 26

REF OPENINGS IN SFS

261 F Typical Opening - Single Track Cill / Lintel 27262 G Typical Opening - Single Jamb / Double Track Cill / Lintel 28263 F Typical Opening - Double Jamb / Double Track Cill / Lintel 29265 F Double Stud Connections 30269 E Typical Mid-Height Restraint Details 31270 E Typical Vent Opening Details 32 271 D Typical Hard Fixed Lintel Connection 33272 F Typical Parapet Wind Post Details 34273 D DHT - Double Stud Connections 35274 C Typical Opening Wind Post Deflection Details 36275 C DHT - Typical Opening Wind Post Deflection Details 37276 A Typical Opening - Dropped Lintel Details 38277 C Typical Opening Inline Wind Post Deflection Details 39 278 C DHT - Typical Opening Inline Wind Post Deflection Details 40279 Typical Triple & Quad Jamb Details 41

Page 4: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL FIXING DETAIL FOR HEAD & BASE TRACKS (S & T) STAGE:

Preliminary:Approval:

Construction:

201Drawing No. Revision: Approved By:

TYPICAL SECTION

NOTES1. Minimum fixing requirements to head and base tracks, U.N.O.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209

3. Each track length to have fixing between 60mm and 100mm from each end.

PLAN

Alternativefixing position.

3D VIEW

FDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017AH/KB

Alternativefixing position.

1 No. Fixing atevery jamb position

1 No. Fixing 60-100mm in from end of each track

END S

TUD

STUD

STUD

STUD

JAMB

1 No. Fixing @ centresto match stud centres

APPLICABLE TO BOTH HEAD & BASE TRACKS,INTO EITHER CONCRETE OR HOT ROLLED STEEL

HEAD & BASE TRACKS

60-100mm

4

REF 201G FIXING DETAILS FOR HEAD / BASE TRACKS

www.eosframing.co.uk

AUG 2020G

Date:

TYPICAL FIXING DETAIL FOR HEAD & BASE TRACKS (S & T) STAGE:

Preliminary:Approval:

Construction:

201Drawing No. Revision: Approved By:

TYPICAL SECTION

NOTES1. Minimum fixing requirements to head and base tracks, U.N.O.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209

3. Each track length to have fixing between 60mm and 100mm from each end.

PLAN

Alternativefixing position.

3D VIEW

FDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017AH/KB

Alternativefixing position.

1 No. Fixing atevery jamb position

1 No. Fixing 60-100mm in from end of each track

END S

TUD

STUD

STUD

STUD

JAMB

1 No. Fixing @ centresto match stud centres

APPLICABLE TO BOTH HEAD & BASE TRACKS,INTO EITHER CONCRETE OR HOT ROLLED STEEL

HEAD & BASE TRACKS

60-100mm

4.DPCtobeincludedbelowbasetracksifspecifiedbyArchitect

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 5: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL STUD BASE FIXING & DEFLECTION HEAD BRACKET (S & T) STAGE:

Preliminary:Approval:

Construction:

204Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSTE May 2016

17m

m

DEFLECTION HEADELEVATION

TYPICAL STUD BASE FIXING

TYPICAL DEFLECTION HEAD

Head track(Fixing to suit structure)

Deflection head bracket fixed to head trackeach side using 5.5 x 25mm Tek screws(EOS-1005 or similar approved)

Base Track

Vertical Stud

Base track fixed to vertical stud each side using 5.5 x 25mm Tek screws(EOS-1005 or similar approved)

AH/KB

Deflection head bracket fixed to vertical stud through slotted holes using 2 No 6.3 x 25mm screws with large washer heads (EOS-1003 or similar approved).Screws fixed central in slot to allow +/- 12.5mm of movement.

Date:

TYPICAL STUD BASE FIXING & DEFLECTION HEAD BRACKET (S & T) STAGE:

Preliminary:Approval:

Construction:

204Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSTE May 2016

17m

m

DEFLECTION HEADELEVATION

TYPICAL STUD BASE FIXING

TYPICAL DEFLECTION HEAD

Head track(Fixing to suit structure)

Deflection head bracket fixed to head trackeach side using 5.5 x 25mm Tek screws(EOS-1005 or similar approved)

Base Track

Vertical Stud

Base track fixed to vertical stud each side using 5.5 x 25mm Tek screws(EOS-1005 or similar approved)

AH/KB

Deflection head bracket fixed to vertical stud through slotted holes using 2 No 6.3 x 25mm screws with large washer heads (EOS-1003 or similar approved).Screws fixed central in slot to allow +/- 12.5mm of movement.

5

DEFLECTION BASE / HEAD BRACKET FIXING REF 204F

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

F

DEFLECTIONALLOWANCE

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

for movement.

NOTE1.Bracketlengthandslotsizetosuitrequiredstructuraldeflections

Page 6: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL HEAD TRACK FIXING DETAILS (S & T) STAGE:

Preliminary:Approval:

Construction:

205Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

Head track

Deflectionhead bracket

Vertical stud

STEEL EDGE BEAM CONNECTIONTYPICAL DEFLECTION HEAD

EOS head track securely fixed to steelwork using HR tek screws (EOS-1020 or similar approved) at each stud centre.

Steel frame by others

CONCRETE SLAB EDGE CONNECTIONTYPICAL DEFLECTION HEAD

Head track

Deflectionhead bracket

Vertical stud

Concrete frame by others

EOS head track securely fixed to concrete using fixings (EOS-1021 or similar approved) at each stud centre.

AH/KB

6

REF 205F HEAD TRACK FIXING DETAILS

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

F

Date:

TYPICAL HEAD TRACK FIXING DETAILS (S & T) STAGE:

Preliminary:Approval:

Construction:

205Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

Head track

Deflectionhead bracket

Vertical stud

STEEL EDGE BEAM CONNECTIONTYPICAL DEFLECTION HEAD

EOS head track securely fixed to steelwork using HR tek screws (EOS-1020 or similar approved) at each stud centre.

Steel frame by others

CONCRETE SLAB EDGE CONNECTIONTYPICAL DEFLECTION HEAD

Head track

Deflectionhead bracket

Vertical stud

Concrete frame by others

EOS head track securely fixed to concrete using fixings (EOS-1021 or similar approved) at each stud centre.

AH/KB

NOTE1.Bracketlengthandslotsizetosuitrequiredstructuraldeflections

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 7: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL STUD CORNER FIXING DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

206Drawing No. Revision: Approved By:

DDrawn By: Scale:

Title:

NTSPK Aug 2017

5.5 x 25mm Tek screws (EOS-1002, EOS-1005 or similar approved) fixed into corner stud @ 600 vertical c/c's.

Min. 300mm or stud *punched with access holes

*

NOTEAdditional stud required on corners to providevertical fixing face for fixing of internal wall finishes.

3D VIEW

PLAN

AH/KB

7

STUD CORNER FIXING DETAILS REF 206E

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

E

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 8: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL HEAD TRACK FIXING DETAIL - RESTRICTED ACCESS (S & T) STAGE:

Preliminary:Approval:

Construction:

207Drawing No. Revision: Approved By:

CDrawn By: Scale:

Title:

NTSTE Aug 2015

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

TYPICAL DEFLECTION HEAD RESTRICTED ACCESS

Vertical stud

Head tra

ck

Deflection head bracketfixed to head track.

Indicative concrete slab edge (by others)

In locations where access is restricted, deflection head bracket fixed to head trackprior to fixing head track to structure.

AH/KB

8

REF 207C DEFLECTION HEAD TRACK FIXING DETAILS - RESTRICTED ACCESS

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 9: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

A4

Date:

TYPICAL HEAD TRACK FIXING DETAIL - TO STEEL EDGE BEAM (S & T) STAGE:

Preliminary:Approval:

Construction:

TOLERANCES:Construction tolerances between framesis -0mm +2mm. Frames are manufacturedand assembled to +0mm -2mm.

TOLERANCES:Construction tolerances between framesis -0mm +2mm. Frames are manufacturedand assembled to +0mm -2mm.

208Drawing No. Revision: Approved By:

FDrawn By: Scale:

Title:

NTSTE Apr 2018

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

STEEL EDGE BEAM CONNECTIONTYPICAL DEFLECTION HEAD

Vertical stud

Indicative steel frame (by others)

Simpson SSB Bracket

NOTE: Bracket suitability to be determined by EOS Engineer subject to tech review and cladding loadsTYPICAL SECTION

Vertical stud

Head track

Indi

cati v

e st

eel f

ram

e (b

y ot

hers

)

AH/KB

Simpson SSB bracket fixed to soffit of steelwork using min 3 No 5.5 x 25mm Hot Rolled Tek screws (EOS-1020 or similar approved) UNO and fixed to vertical stud through slotted holes using 3 No. fixings supplied in each hole. Screws fixed central in slot to allow +/- 25mm of movement.

9

HEAD TRACK FIXING DETAILS - TO STEEL EDGE BEAM (SSB) REF 208F

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 10: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

RESTRAINT OPTIONS FOR OVERHANGS TO TRACK WIDTH (S & T) STAGE:

Preliminary:Approval:

Construction:

209Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

NTSPK Aug 2017

OPTION 2

Support plate sized to suit overhang dimensions & loading requirements to be confirmed by EOS Engineer

CB

A

SCI GUIDANCE

OPTION 1

mm min.

CB

Support angle sized to suit overhang dimension & loading requirements to be confirmed by EOS Engineer

EOS-1021 or similar approved fixing into base track A

mm min.

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

AH/KB

10

REF 209E RESTRAINT OPTIONS FOR OVERHANGS

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 11: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

A4

Date:

TYPICAL OVERSAIL STUD FIXING DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

TOLERANCES:Construction tolerances between framesis -0mm +2mm. Frames are manufacturedand assembled to +0mm -2mm.

TOLERANCES:Construction tolerances between framesis -0mm +2mm. Frames are manufacturedand assembled to +0mm -2mm.

210Drawing No. Revision: Approved By:

DDrawn By: Scale:

Title:

NTSTE Apr 2018

Indicative concrete

slab edge (by others)

Vertical stud

TYPICAL OVERSAIL STUD FIXING

TYPICAL SECTION

SSL.Vertical stud

Simpson SCB Bracket

AH/KB

Simpson SCB bracket fixed to face of concrete slab using min 2 No fixings (EOS-1007 or similar approved) and fixed to vertical stud through slotted holes using 3 No. fixings supplied in each slot, UNO. Screws fixed central in slot to allow +/- 25mm of movement.

11

OVERSAIL STUD FIXING DETAILS (SCB) REF 210D

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 12: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL DEFLECTION HEAD BRACKET WITH CLOAKED TRACK DETAIL(S & T) STAGE:

Preliminary:Approval:

Construction:

211Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

NTSTE May 2016

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

17m

m

DEFLECTION HEADELEVATION

WITH CLOAKED TRACK DETAILTYPICAL DEFLECTION HEAD

Head track(Fixing to suit structure)

Head track(Fixing to suit structure)Deflection head bracket

fixed to head track eachside using 5.5 x 25mmTek screws (EOS-1005or similar approved)

Vertical stud

Deflection head bracket fixed tocloaking track piece through slotted holesusing 2 No 6.3 x 25mm Tek screws with largewasher heads (EOS-1003 or similar approved)Screws fixed central in slot to allow+/- 12.5mm of movement.

Cloaking track piece fixed to vertical studeach side using 5.5 x 25mm Tek screws(EOS-1005 or similar approved)

Vertical stud

DEFLECTION HEADELEVATION

AH/KB

12

REF 211F CLOAKING DEFLECTION DETAILS

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

DEFLECTIONALLOWANCE

F

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

NOTE1.Bracketlengthandslotsizetosuitrequiredstructuraldeflections

Date:

TYPICAL DEFLECTION HEAD BRACKET WITH CLOAKED TRACK DETAIL(S & T) STAGE:

Preliminary:Approval:

Construction:

211Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

NTSTE May 2016

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

17m

m

DEFLECTION HEADELEVATION

WITH CLOAKED TRACK DETAILTYPICAL DEFLECTION HEAD

Head track(Fixing to suit structure)

Head track(Fixing to suit structure)Deflection head bracket

fixed to head track eachside using 5.5 x 25mmTek screws (EOS-1005or similar approved)

Vertical stud

Deflection head bracket fixed tocloaking track piece through slotted holesusing 2 No 6.3 x 25mm Tek screws with largewasher heads (EOS-1003 or similar approved)Screws fixed central in slot to allow+/- 12.5mm of movement.

Cloaking track piece fixed to vertical studeach side using 5.5 x 25mm Tek screws(EOS-1005 or similar approved)

Vertical stud

DEFLECTION HEADELEVATION

AH/KB

for movement.

Page 13: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL DEFLECTION HEAD FIXING DETAIL FOR 65mm STUDS (S & T) STAGE:

Preliminary:Approval:

Construction:

212Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

NTSPK Aug 2017

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

2 No. Titen fixing (EOS-1007 or similar approved) in slot to fix bracket into concrete slab - head track to be pre-drilled prior to fixing in place

1 No. 6.3 x 25mm Tek screw with large washer head (EOS-1003 or similar) to fix bracket into cold formed steel. Fixings located centrally in slot.

EFIXS100 DEFLECTION DETAIL

EFIXS-100 Bracket to be fixed to each stud - brackets can be fixed to either web face

Vertical stud

Head track(Fixing to suit structure)

DEFLECTION HEADELEVATION

17m

m

EFIXS100 FIXING DETAIL

AH/KB

13

DEFLECTION HEAD EFIX100 FIXING DETAILS REF 212F

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

DEFLECTIONALLOWANCE

F

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 14: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL STRUCTURAL MOVEMENT JOINT DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

213Drawing No. Revision: Approved By:

CDrawn By: Scale:

Title:

NTSPK Aug 2017

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NOTE:- HEAD & BASE TRACKS TO BE SPLIT EITHER SIDE OF THE MOVEMENT JOINT - EACH TRACK SECTION TO BE FIXED 60-100mm FROM THE END OF THE TRACK

ELEVATION

50

Vertical stud

Base Track

PLAN

60-100mm60-100mm

50

Vertical stud

Base Track

3D VIEW

AH/KB

14

REF 213C STRUCTURAL MOVEMENT JOINT DETAILS

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 15: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL STUD BASE FIXING & DEFLECTION HEAD TRACK (S & T) STAGE:

Preliminary:Approval:

Construction:

214Drawing No. Revision: Approved By:

CDrawn By: Scale:

Title:

NTSPK Aug 2017

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

17m

m

DEFLECTION HEADELEVATION

TYPICAL STUD BASE FIXING

TYPICAL DEFLECTION HEAD

Vertical swaged stud fixed to Deflection Head Track through slotted holes using 2 No 5.5 x 25mm tek screws (1 No. each side)(EOS-1005 or similar approved). Screws fixed central inslot to allow +/- 17mm of movement.

Base track fixed to vertical swaged stud each sideusing 5.5 x 25mm Tek screws (EOS-1005 orsimilar approved)

Base track

Vertical stud

Vertical stud

Deflection head track(Fixing to suit structure see standard detail 215)

AH/KB

DHT for use with raking pitches up to 5 degrees.If pitch >5deg, use DHB

15

DHT - DEFLECTION HEAD / BASE FIXING REF 214D

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

toallow+/-25mmofmovement

DEFLECTIONALLOWANCE

D

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 16: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL DEFLECTION HEAD TRACK FIXING DETAILS (S & T) STAGE:

Preliminary:Approval:

Construction:

215Drawing No. Revision: Approved By:

CDrawn By: Scale:

Title:

NTSPK Aug 2017

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

TYPICAL DEFLECTION HEAD STEEL EDGE BEAM CONNECTION

TYPICAL DEFLECTION HEAD CONCRETE SLAB EDGE CONNECTION

Vertical stud fixed to Deflection Head Trackthrough slotted holes using 2 No 5.5 x 25mmtek screws (EOS-1005 or similar approved). Screws fixed central in slot to allow +/- 17mm of movement.

EOS deflection head track securely fixed to concrete using anchor (EOS-1021 or similar approved). Refer to detail 201.

Vertical stud

Deflectionhead track

Vertical stud

Deflectionhead track

EOS head track securely fixed to steelwork using HR tek screws (EOS-1020 or similar approved). Refer to detail 201. Alternatively, shot fired to steelwork. Consult EOS for advice.

AH/KB

DHT for use with raking pitches up to 5 degrees.If pitch >5deg, use DHB

16

REF 215D DHT - HEAD INTO STEEL / HEAD IN CONCRETE

www.eosframing.co.uk

AUG 2020

+/-25mmofmovement

D

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

notsuppliedbyEOS.ConsultEOSforadvice.

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 17: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL HEAD TRACK FIXING DETAIL - RESTRICTED ACCESS (S & T) STAGE:

Preliminary:Approval:

Construction:

216Drawing No. Revision: Approved By:

CDrawn By: Scale:

Title:

NTSPK Aug 2017

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

Deflectio

n

Head Trac

k

Vertical stud fixed to Deflection Head Track through slotted holes using 2 No 5.5 x 25mm tek screws (EOS-1005 or similar approved). Screws fixed central in slot to allow +/- 17mm of movement.

Vertical stud

Indicative concrete slab edge (by others)

Indi

cativ

e st

eel f

ram

e

AH/KB

In locations where access is restricted and fixings cannot be installed to BOTH sides, please revert to the use of Deflection Head Brackets (Detail 207), or utilise oversail bracketry as per details details 208 & 210.

Please contact EOS for guidance and advice.

DHT for use with raking pitches up to 5 degrees.If pitch >5deg, use DHB

17

DHT - DEFLECTION HEAD RESTRICTED ACCESS REF 216D

www.eosframing.co.uk

AUG 2020

toallow+/-25mmofmovement

D

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 18: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL FACADE MOVEMENT JOINT DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

217Drawing No. Revision: Approved By:

-Drawn By: Scale:

Title:

NTSTE Sep 2015

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NOTE:- 2 No. VERTICAL STUDS PROVIDED WITH NOMINAL 10mm GAP FOR BRICK TIE PROVISION AROUND FACADE MOVEMENT JOINTS

ELEVATION

10

Vertical stud

Base Track

PLAN

10

Vertical stud

Base Track

3D VIEW

AH/KB

18

REF 217 TYPICAL CLADDING MOVEMENT JOINT DETAIL (S & T)

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

TYPICALCLADDINGMOVEMENTJOINTDETAIL(S&T)

CLADDINGMOVEMENT

Page 19: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

3D VIEW

Date:

INDICATIVE BRACING AVOIDANCE METHOD - FLAT STRAP (S & T) STAGE:

Preliminary:Approval:

Construction:

218Drawing No. Revision: Approved By:

ADrawn By: Scale:

Title:

NTSTE May 2016

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NOTE:- NATURE OF BRACING AVOIDANCE FRAMING SUBJECT TO BUILDING DESIGN. FIXING REQUIREMENTS SUBJECT TO EOS ENGINEER SPECIFICATION

Full height studs notched around bracing and re-dressed with angle profile to re-instate basic stud profile.

10 No. 5.5 x 25mmTek screws above notchconnecting angle to stud.- 5 No. to flange- 5 No. to web

AH/KB

10 No. 5.5 x 25mmTek screws below notchconnecting angle to stud.- 5 No. to flange- 5 No. to web

IMPORTANT:

Angle to extend at least 150mm above andbelow notch

Angle must be sized tofully re-dress notched outsteel.

Min

. 15

0M

in. 15

0

10 No. 5.5 x 25mm Tek Screws(5 No. to web, 5 No. to flange)

10 No. 5.5 x 25mm Tek Screws(5 No. to web, 5 No. to flange)

Angle to be sized by EOS Design

Brace notched around

Stud

19

INDICATIVE BRACING AVOIDANCE METHOD - FLAT STRAP REF 218A

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 20: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

INDICATIVE BRACING AVOIDANCE METHOD - BOX SECTION (S & T) STAGE:

Preliminary:Approval:

Construction:

219Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

NTSPK Aug 2017

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

Box Section

3D VIEW

NOTE:- NATURE OF BRACING AVOIDANCE FRAMING SUBJECT TO BUILDING DESIGN.

Head & Base Track used to form tapered SFS panels. Studs supplied cut to length.

AH/KB

Plain 'T' track (Not DHT)

17

Studfixed direct tohead track(17mm gap)

20

REF 219C INDICATIVE BRACING AVOIDANCE METHOD - BOX SECTION

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

Deflectionallowanceifrequired

C

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 21: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Dat

e:

EOS F

RAM

ING

STO

CK

FIXIN

GS

TABLE

STA

GE:

Prel

imin

ary:

App

rova

l:

Con

stru

ctio

n:

220

Dra

win

g N

o.Rev

isio

n:App

rove

d By:

BD

raw

n By:

Sca

le:

Title:

NTS

PKAug

201

7AH

/KB

EO

S F

RA

MIN

G S

TO

CK

FIX

ING

S TA

BLE

21

EOS FRAMING STOCK FIXINGS TABLE REF 220B

www.eosframing.co.uk

AU

G 2

020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE

THISDRAWING,CONTRACTORSMUSTCHECKALL

DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONS

TOBEWORKEDFROM.ALLERRORSAND

DISCREPANCIESMUSTBEIMMEDIATELYREPORTED

TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 22: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL ZED BAR HEAD DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

221Drawing No. Revision: Approved By:

ADrawn By: Scale:

Title:

NTSPK Aug 2017AH/KB

TYPICAL ZED BAR HEAD DETAIL

Head Track Fixed to Zed Bar at each stud centre.Zed Bar Size by EOS.

Gap to allow Intumescent coating to expand

Date:

TYPICAL ZED BAR HEAD DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

221Drawing No. Revision: Approved By:

ADrawn By: Scale:

Title:

NTSPK Aug 2017AH/KB

TYPICAL ZED BAR HEAD DETAIL

Head Track Fixed to Zed Bar at each stud centre.Zed Bar Size by EOS.

Gap to allow Intumescent coating to expand

22

REF 221B ZED BAR HEAD DETAILS

www.eosframing.co.uk

AUG 2020

NOTE1.Detailtobeapprovedbyfireconsultantoneachproject

B

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 23: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

SHOT FIRED FIXINGS SPECIFICATION (S & T) STAGE:

Preliminary:Approval:

Construction:

222Drawing No. Revision: Approved By:

-Drawn By: Scale:

Title:

NTSTE July 2016AH/KB

SINGLE NAILS COLLATED NAILS (MX)

FIXINGS INTO HOT ROLLED STEEL SUBSTRATE

SUPPLIER MIN. EDGE MIN. FIXING MIN. SUBSTRATEREFERENCE: DISTANCE: SPACING: THICKNESS:LENGTH:

FIXING

HILTI X-U 16 P8 20mm 40mm#237330 16mm

HILTI X-U 16 MX 20mm 40mm#237344 16mm 6mm

6mm

FIXINGS INTO REINFORCED CONCRETE SLAB SUBSTRATE

SUPPLIER MIN. EDGE MIN. FIXING MIN. SUBSTRATEREFERENCE: DISTANCE: SPACING: THICKNESS:LENGTH:

FIXING

HILTI X-U 27 P8 70mm 80mm#237333 27mm

HILTI X-U 27 MX 70mm 80mm#237347 27mm 80mm

80mm

IMPORTANT NOTES1. Applicator gun (Dx) and cartridge type to be specified by EOS Engineer.2. Gas (Gx) actuated applicator guns are NOT supported.3. Fixing quantities and spacings to be determined by EOS Engineer on a job-by-job basis.4. For fixing into concrete, each piece of track MUST have a minimum of 5 No. fixings.

23

SHOT FIRED FIXINGS SPECIFICATION REF 222A

www.eosframing.co.uk

AUG 2020

Date:

SHOT FIRED FIXINGS SPECIFICATION (S & T) STAGE:

Preliminary:Approval:

Construction:

222Drawing No. Revision: Approved By:

-Drawn By: Scale:

Title:

NTSTE July 2016AH/KB

SINGLE NAILS COLLATED NAILS (MX)

FIXINGS INTO HOT ROLLED STEEL SUBSTRATE

SUPPLIER MIN. EDGE MIN. FIXING MIN. SUBSTRATEREFERENCE: DISTANCE: SPACING: THICKNESS:LENGTH:

FIXING

HILTI X-U 16 P8 20mm 40mm#237330 16mm

HILTI X-U 16 MX 20mm 40mm#237344 16mm 6mm

6mm

FIXINGS INTO REINFORCED CONCRETE SLAB SUBSTRATE

SUPPLIER MIN. EDGE MIN. FIXING MIN. SUBSTRATEREFERENCE: DISTANCE: SPACING: THICKNESS:LENGTH:

FIXING

HILTI X-U 27 P8 70mm 80mm#237333 27mm

HILTI X-U 27 MX 70mm 80mm#237347 27mm 80mm

80mm

IMPORTANT NOTES1. Applicator gun (Dx) and cartridge type to be specified by EOS Engineer.2. Gas (Gx) actuated applicator guns are NOT supported.3. Fixing quantities and spacings to be determined by EOS Engineer on a job-by-job basis.4. For fixing into concrete, each piece of track MUST have a minimum of 5 No. fixings.1.

2.3.EOSprovidefixingspecificationonly–fixingsnotsuppliedbyEOS.

A

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 24: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

FIXINGS INTO BLOCKWORK PLINTHS SPECIFICATION (S & T) STAGE:

Preliminary:Approval:

Construction:

223Drawing No. Revision: Approved By:

-Drawn By: Scale:

Title:

NTSTE July 2016AH/KB

FIXINGS INTO BLOCKWORK PLINTHS

TYPICAL SECTION

RAWL R-WHO-75072 FIXING

MINIMUM EDGE DISTANCE = 50mm(Fixing not suitable for blocks narrower than 100mm)

MINIMUM EMBEDMENT = 60mm

MINIMUM SPACING BETWEEN FIXINGS = 30mm

IMPORTANT:

BLOCKWORK PLINTH MUST BE ADEQUATELY RESTRAINED BACK TO STRUCTURAL SLAB.BY OTHERS.

SFS NOT SUITABLE ATOP UNRESTRAINED BLOCKWORK PLINTHS.

FIXING QUANTITIES AND SPACINGSTO BE DETERMINED BY EOS ENGINEERSON A JOB-BY-JOB BASIS

24

REF 223 FIXINGS INTO BLOCKWORK PLINTHS

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 25: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

25

DHT - INSTALLATION QUICK GUIDE REF 241C

Dat

e:

INST

ALLA

TIO

N Q

UIC

K G

UID

E -

DEF

LECTI

ON

HEA

D T

RAC

K (

S &

T)

STAG

E:

Prel

imin

ary:

Appr

oval

:

Con

stru

ctio

n:

241

Dra

win

g N

o.Rev

isio

n:App

rove

d By:

BD

raw

n By:

Scal

e:

Title

:

NTS

PKAug

201

7AH

/KB

www.eosframing.co.uk

AU

G 2

020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE

THISDRAWING,CONTRACTORSMUSTCHECKALL

DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONS

TOBEWORKEDFROM.ALLERRORSAND

DISCREPANCIESMUSTBEIMMEDIATELYREPORTED

TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

C

STU

DS P

RE-

CU

T SH

ORT

FOR D

EFLE

CTI

ON

/ T

OLE

RAN

CE

SW

AG

ED

DO

UB

LE S

TU

D P

LAIN

Page 26: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Dat

e:

INST

ALLA

TIO

N Q

UIC

K G

UID

E -

DEF

LECTI

ON

HEA

D B

RACKET

S (S

& T

)ST

AGE:

Prel

imin

ary:

Appr

oval

:

Con

stru

ctio

n:

242

Dra

win

g N

o.Rev

isio

n:App

rove

d By:

BD

raw

n By:

Scal

e:

Title

:

NTS

PKAug

201

7AH

/KB

26

REF 242C DHB - INSTALLATION QUICK GUIDE

www.eosframing.co.uk

AU

G 2

020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE

THISDRAWING,CONTRACTORSMUSTCHECKALL

DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONS

TOBEWORKEDFROM.ALLERRORSAND

DISCREPANCIESMUSTBEIMMEDIATELYREPORTED

TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

C

SW

AG

ED

DO

UB

LE S

TU

D P

LAIN

STU

DS P

RE-

CU

T SH

ORT

FOR D

EFLE

CTI

ON

/ T

OLE

RAN

CE

Page 27: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

27

TYPICAL OPENING - SINGLE TRACK CILL / LINTEL REF 261F

Date:

TYPICAL OPENING - SINGLE TRACK LINTEL & CILL CONNECTION DETAIL(S & T) STAGE:

Preliminary:Approval:

Construction:

261Drawing No. Revision: Approved By:

FDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

OPENING SINGLE TRACK CILL FIXING

OPENING SINGLE TRACK LINTEL FIXING

LINTEL/CILL TRACK FIXED INTO CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK SCREWS (EOS-1005 or similar approved) ONE FIXING CENTRALLY INTO EACH FLANGE.

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

JAMB STUD

JAMB STUD

SINGLE TRACK LINTEL

SINGLE TRACK CILL

BASE TRACK

AH/KB

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 28: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

28

REF 262G TYPICAL OPENING - SINGLE JAMB / DOUBLE TRACK CILL / LINTEL

Date:

TYPICAL OPENING - SINGLE JAMB & DOUBLE STUD LINTEL & CILLCONNECTION DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

262Drawing No. Revision: Approved By:

FDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

DOUBLE STUD LINTEL / CILL FORMEDFROM 2 No. STUDS CONNECTEDBY NOGGINS @ 600mm c/c. WITHTRACK TOP OR BOTTOM

BASE TRACK

CILL TRACK

LINTEL TRACK

DOUBLE STUD CILL FIXINGOPENING SINGLE JAMB AND

DOUBLE STUD LINTEL FIXINGOPENING SINGLE JAMB AND

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

SWAGED DOUBLE STUD LINTEL / CILL FIXED INTO CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK SCREWS (EOS-1005 or similar approved) ONE FIXING CENTRALLY INTO EACH FLANGE.

DOUBLE STUD LINTEL / CILL FIXED TOGETHER USING 5.5 x 25mm TEK SCREWS (EOS-1005 or similar approved) 4 FIXINGS PER NOGGIN. DOUBLE STUD LINTEL / CILL FIXED TO LINTEL & CILL TRACK USING 5.5 x 25mm TEK SCREWS (EOS-1001 or similar approved) @ 600mm CENTRES.

AH/KB

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

G

PLAINCRIPPLETRACKFIXEDTO

PLAINCRIPPLETRACKFIXEDTO

Page 29: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

29

TYPICAL OPENING - DOUBLE JAMB / DOUBLE TRACK CILL / LINTEL REF 263F

Date:

TYPICAL OPENING - DOUBLE STUD JAMB & DOUBLE STUD LINTEL & CILLCONNECTION DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

263Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSTE June 2016

DOUBLE STUD CILL FIXINGOPENING DOUBLE JAMB AND

DOUBLE STUD LINTEL FIXINGOPENING DOUBLE JAMB AND

DOUBLE STUD LINTEL / CILL FORMEDFROM 2 No. STUDS CONNECTEDBY NOGGINS @ 600mm c/c. WITHTRACK TOP OR BOTTOM

LINTEL TRACK

CILL TRACK

BASE TRACK

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

SWAGED DOUBLE STUD LINTEL / CILL FIXED INTO CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK SCREWS (EOS-1005 or similar approved) ONE FIXING CENTRALLY INTO EACH FLANGE.

DOUBLE STUD LINTEL / CILL FIXED TOGETHER USING 5.5 x 25mm TEK SCREWS (EOS-1001 or similar approved) 4 FIXINGS PER NOGGIN. DOUBLE STUD LINTEL / CILL FIXED TO LINTEL & CILL TRACK USING 5.5 x 25mm TEK SCREWS (EOS-1001 or similar approved) @ 600mm CENTRES.

DOUBLE STUD JAMBS / DOUBLE STUD LINTELS / CILLS MANUFACTURED OFFSITE IN EOS FACTORY

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

AH/KB

NOTE:- DOUBLE STUDS ARE MANUFACTURED AT 175mm WIDE AS STANDARD TO ENCAPSULATE A BRICK TIE CHANNEL POSITION.

DOUBLE STUDS CAN BE MANUFACTURED BETWEEN 100mm AND 225mm WIDE FOR NON-STANDARD APPLICATIONS. PLEASE ENQUIRE WITH EOS FACADES.

www.eosframing.co.uk

AUG 2020

.

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

F

PLAINCRIPPLE

PLAINCRIPPLE

Page 30: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

30

REF 265F DOUBLE STUD CONNECTIONS

Date:

TYPICAL DOUBLE STUD CONNECTION DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

265Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

HEAD FIXING

BASE FIXING

HEAD TRACK

HEAD TRACK

DEFLECTION HEAD FIXING

DOUBLE STUD JAMBS MANUFACTURED OFFSITE IN EOS FACTORY.

DOUBLE STUDS CONNECTED USING NOGGINSFIXED WITH 4 No. 5.5 x 25mm TEK SCREWS (EOS-1001 or similar approved).

NOTE:- DOUBLE STUDS ARE MANUFACTURED AT 100mm WIDE AS STANDARD (OR 150mm FOR 65 FLANGE SECTIONS).

FOR MASONRY FINISHES A 175mm DOUBLE STUD IS USED TO ACCOMODATE BRICK TIE CHANNELS SPACED 150mm FROM OPENING REVEAL.

BASE TRACK

AH/KB

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

Date:

TYPICAL OPENING - DOUBLE STUD JAMB & DOUBLE STUD LINTEL & CILLCONNECTION DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

263Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSTE June 2016

DOUBLE STUD CILL FIXINGOPENING DOUBLE JAMB AND

DOUBLE STUD LINTEL FIXINGOPENING DOUBLE JAMB AND

DOUBLE STUD LINTEL / CILL FORMEDFROM 2 No. STUDS CONNECTEDBY NOGGINS @ 600mm c/c. WITHTRACK TOP OR BOTTOM

LINTEL TRACK

CILL TRACK

BASE TRACK

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

SWAGED DOUBLE STUD LINTEL / CILL FIXED INTO CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK SCREWS (EOS-1005 or similar approved) ONE FIXING CENTRALLY INTO EACH FLANGE.

DOUBLE STUD LINTEL / CILL FIXED TOGETHER USING 5.5 x 25mm TEK SCREWS (EOS-1001 or similar approved) 4 FIXINGS PER NOGGIN. DOUBLE STUD LINTEL / CILL FIXED TO LINTEL & CILL TRACK USING 5.5 x 25mm TEK SCREWS (EOS-1001 or similar approved) @ 600mm CENTRES.

DOUBLE STUD JAMBS / DOUBLE STUD LINTELS / CILLS MANUFACTURED OFFSITE IN EOS FACTORY

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS(EOS-1005 or similar approved)

AH/KB

NOTE:- DOUBLE STUDS ARE MANUFACTURED AT 175mm WIDE AS STANDARD TO ENCAPSULATE A BRICK TIE CHANNEL POSITION.

DOUBLE STUDS CAN BE MANUFACTURED BETWEEN 100mm AND 225mm WIDE FOR NON-STANDARD APPLICATIONS. PLEASE ENQUIRE WITH EOS FACADES..

F

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 31: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

31

TYPICAL MID-HEIGHT RESTRAINT DETAILS REF 269E

Date:

TYPICAL STUD & TRACK MID-HEIGHT RESTRAINT DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

269Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

NTSKB Aug 2017AH/PK

Track Noggin every alternate stud spacing

50mm x 2mm Flat straps to run across full bay. 2 No fixings into each stud.

This detail is to be used in all situations where a mid-height restraint is required.

Length of mid-height restraint to be specified by Engineer.

Plan on Typical Corner

Stud Size and Spacing to be Job Specific specified by EOS

Flat plate runs full length of bay.50mm x 2mm thk,

1 No 5.5 x 25mm Tek screwinto each flange of each stud

(EOS-1005 or similar approved)

Track to be fixed to strap each side with2 No 5.5 x 25mm Tek screws (EOS-1005

or similar approved)

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 32: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

32

REF 270E TYPICAL VENT OPENING DETAILS

Date:

TYPICAL VENT OPENING CONNECTION DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

270Drawing No. Revision: Approved By:

DDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

17m

m

TYPICAL VENT OPENINGELEVATION

17m

m

THE HEAD TRACK CAN BE CUT OUT LOCALLY IF IT CLASHES WITH THE VENT HOWEVER PLEASE ENSURE THAT A FIXING IS PLACED A 50-100mm AWAY FROM EACH END OF TRACK

TRACK FORMING OPENING

JAMB STUD

OPENING TRACK FIXED INTO CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK SCREWS (EOS-1005 or similar approved) ONE FIXING CENTRALLY INTO EACH FLANGE.

100mm LONG SWAGED CRIPPLE TRACK FIXED TO JAMB STUD USING 3 No 5.5 x 25mm TEK SCREWS (EOS-1005 or similar approved)

AH/KB

DEPENDING ON THE DIMENSIONS AND POSITION OF THE VENT OPENING DOUBLE MEMBERS MAY BE REQUIRED

www.eosframing.co.uk

AUG 2020

DEFLECTIONALLOWANCE

DEFLECTIONALLOWANCE

E

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 33: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

33

TYPICAL HARD FIXED LINTEL CONNECTION REF 271D

Date:

TYPICAL HARD FIXED LINTEL CONNECTION (S & T) STAGE:

Preliminary:Approval:

Construction:

271Drawing No. Revision: Approved By:

CDrawn By: Scale:

Title:

NTSPK Aug 2017

DEFLECTION BRACKETS OR DEFLECTION HEAD TRACK IS NOT REQUIRED ON THE STUDS ABOVE THE OPENING FOR A HARD FIXED LINTEL - DEFLECTION IS TO BE ALLOWED FOR ABOVE THE WINDOW

WINDOW MANUFACTURER TO ALLOW ADDITIONAL TOLERANCE FOR MOVEMENT / DEFLECTION ABOVE THE HEAD OF THE WINDOW

TYPICAL HARD FIXED LINTEL ELEVATION

TYPICAL SECTION

NOTE:- PROJECT SPECIFIC HARD FIXED LINTEL DETAILS WILL BE PROVIDED DURING DESIGN REVIEW WITH AN EOS ENGINEERS AS ADDITIONAL BRACKETRY OR WINDPOSTS MAY BE REQUIRED FOR LARGER OPENINGS

DEFLECTION GAP (TYP 17mm)

Head track(Fixing to suit structure)

WINDOW MANUFACTURER TO ALLOW ADDITIONAL TOLERANCE FOR MOVEMENT / DEFLECTION ABOVE THE HEAD OF THE WINDOW

Alternative fixingposition.

Vertical stud

mm minimum.

Lintel track

AH/KB

www.eosframing.co.uk

AUG 2020D

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 34: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

34

REF 272F TYPICAL PARAPET WIND POST DETAILS

Date:

TYPICAL PARAPET WIND POST CONNECTION DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

272Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209 or shown on project specific WPBP detail.3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CONNECTS TOSTRUCTURE AT SSL & PROTRUDESINTERNALLY PAST THE WALL LINE

BASE FIXING

HEAD FIXING

HEAD TRACK

Head track fixed to Wind Post Double Stud each side using 5.5 x 25mm Tek screws (EOS-1005 or similar approved)

Wind Post Double studWIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK

WIND POST BASEPLATE - TO BE INSTALLED AS PER PROJECT SPEICIFC DETAILS

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each sideas per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

AH/KB

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

Date:

TYPICAL PARAPET WIND POST CONNECTION DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

272Drawing No. Revision: Approved By:

EDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209 or shown on project specific WPBP detail.3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CONNECTS TOSTRUCTURE AT SSL & PROTRUDESINTERNALLY PAST THE WALL LINE

BASE FIXING

HEAD FIXING

HEAD TRACK

Head track fixed to Wind Post Double Stud each side using 5.5 x 25mm Tek screws (EOS-1005 or similar approved)

Wind Post Double studWIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK

WIND POST BASEPLATE - TO BE INSTALLED AS PER PROJECT SPEICIFC DETAILS

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each sideas per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

AH/KB

4.Ifthedoublestudwindpostisunder300mmlongthesewillbesuppliedas2No.singlestudsthatcanbefixedtothewindpost baseplateinthesamemannerasthedoublestuds

F

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

SPECIFICDETAILS

Page 35: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

35

DHT - DOUBLE STUD CONNECTIONS REF 273D

Date:

TYPICAL DOUBLE STUD CONNECTION DETAIL (S & T)[DHT - DEFLECTION HEAD TRACK] STAGE:

Preliminary:Approval:

Construction:

273Drawing No. Revision: Approved By:

CDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

17m

m

DEFLECTION HEADELEVATION

BASE FIXING

HEAD FIXING

DOUBLE STUD JAMBS MANUFACTUREDOFFSITE IN EOS FACTORY

DOUBLE STUDS CONNECTED USING NOGGINSFIXED WITH 4 No. 5.5 x 25mm TEK SCREWS (EOS-1001 or similar approved).

BASE T

RACK

DEFLECTION HEAD TRACK

Vertical Double stud fixed to Deflection Head Track through slotted holes using 2 No 5.5 x 25mm tek screws (EOS-1005or similar approved). Screws fixed central in slot to allow +/- 17mm of movement UNO.

VerticalDoublestud

AH/KB

NOTE:- DOUBLE STUDS ARE MANUFACTURED AT 175mm WIDE AS STANDARD TO ENCAPSULATE A BRICK TIE CHANNEL POSITION.

DOUBLE STUDS CAN BE MANUFACTURED BETWEEN 100mm AND 225mm WIDE FOR NON-STANDARD APPLICATIONS. PLEASE ENQUIRE WITH EOS FACADES.

DHT for use with raking pitches up to 5 degrees.If pitch >5deg, use DHB

www.eosframing.co.uk

AUG 2020

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

.

toallow+/-25mmof

D

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

DEFLECTIONALLOWANCE

Page 36: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

36

REF 274C TYPICAL OPENING WIND POST DEFLECTION DETAILS

Date:

TYPICAL OPENING WIND POST CONNECTION DETAIL[DEFLECTION HEAD BRACKET] (S & T) STAGE:

Preliminary:Approval:

Construction:

274Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209 or shown on project specific WPBP detail.3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CONNECTS TOSTRUCTURE AT SSL & PROTRUDESINTERNALLY PAST THE WALL LINE

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS head track securely fixed to concrete soffitusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot.Note where deflection is required, do not fix boarding to wind post.

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

Date:

TYPICAL OPENING WIND POST CONNECTION DETAIL[DEFLECTION HEAD BRACKET] (S & T) STAGE:

Preliminary:Approval:

Construction:

274Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209 or shown on project specific WPBP detail.3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CONNECTS TOSTRUCTURE AT SSL & PROTRUDESINTERNALLY PAST THE WALL LINE

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS head track securely fixed to concrete soffitusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot.Note where deflection is required, do not fix boarding to wind post.

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

www.eosframing.co.uk

AUG 2020C

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

Date:

TYPICAL OPENING WIND POST CONNECTION DETAIL[DEFLECTION HEAD BRACKET] (S & T) STAGE:

Preliminary:Approval:

Construction:

274Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209 or shown on project specific WPBP detail.3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CONNECTS TOSTRUCTURE AT SSL & PROTRUDESINTERNALLY PAST THE WALL LINE

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS head track securely fixed to concrete soffitusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot.Note where deflection is required, do not fix boarding to wind post.

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

gap for

4.Ifthedoublestudwindpostisunder300mmlongthesewillbesuppliedas2No.singlestudsthatcanbefixedtothewindpost baseplateinthesamemannerasthedoublestuds

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 37: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL OPENING WIND POST CONNECTION DETAIL[DEFLECTION HEAD TRACK] (S & T) STAGE:

Preliminary:Approval:

Construction:

275Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209 or shown on project specific WPBP detail.3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CONNECTS TOSTRUCTURE AT SSL & PROTRUDESINTERNALLY PAST THE WALL LINE

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK WIND POST BASEPLATE - TO BE INSTALLED AS PER PROJECT SPECIFIC DETAILS

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS deflection head track securely fixed to concrete soffit using fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 60-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot. Note where deflection is required do not fix boarding to wind post.

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

37

DHT - TYPICAL OPENING WIND POST DEFLECTION DETAILS REF 275C

www.eosframing.co.uk

AUG 2020C

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

Date:

TYPICAL OPENING WIND POST CONNECTION DETAIL[DEFLECTION HEAD TRACK] (S & T) STAGE:

Preliminary:Approval:

Construction:

275Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 209 or shown on project specific WPBP detail.3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CONNECTS TOSTRUCTURE AT SSL & PROTRUDESINTERNALLY PAST THE WALL LINE

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK WIND POST BASEPLATE - TO BE INSTALLED AS PER PROJECT SPECIFIC DETAILS

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

WIND POST BASEPLATE - AS PER PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS deflection head track securely fixed to concrete soffit using fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 60-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot. Note where deflection is required do not fix boarding to wind post.

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

gap for

4.Ifthedoublestudwindpostisunder300mmlongthesewillbesuppliedas2No.singlestudsthatcanbefixedtothewindpost baseplateinthesamemannerasthedoublestuds

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 38: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

38

REF 276A TYPICAL OPENING - DROPPED LINTEL DETAILS

Date:

TYPICAL DROPPED LINTEL DETAIL (S & T) STAGE:

Preliminary:Approval:

Construction:

276Drawing No. Revision: Approved By:

-Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSTE Sep 2015

Dropped Lintel Framing supported on 1 No. Simpson E5/2C50 Bracket each end. Bracket fixed using 2 No. EOS-1005 to each leg

Dropped Lintel Framing consists of 'hard-fixed ladder frame' with a 15-25mm gap to the underside of the structural soffit.

15-25mm gap

1 No. Simpson EFIXS100 Bracket to each vertical stud within the Dropped Lintel to provide lateral restraint and maintain deflection allowance. Bracket fixed to underside of structure using 2 No. EOS-1007 fixings. Bracket fixed to EOS studs using 1 No. EOS-1003 large washer head fixing, fixed centrally in slot.

DEFLECTION HEADELEVATION

15-2

5mm

Gap

Main head track stops either side of the opening

AH/KB

www.eosframing.co.uk

AUG 2020

deflectiongaptothe

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

A

DEFLECTIONGAP

Deflectiongap

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 39: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

39

TYPICAL OPENING INLINE WIND POST DEFLECTION DETAILS REF 277C

Date:

TYPICAL OPENING INLINE WIND POST CONNECTION DETAIL - FIXING INTO STEEL ONLY [DEFLECTION HEAD BRACKET] (S & T) STAGE:

Preliminary:Approval:

Construction:

277Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 2093. Each track length to have fixing 50-100mm from each end.

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK WIND POST BASEPLATE - TYPICAL HR CONNECTION, PLEASE REFER TO PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

INLINE WIND POST BASEPLATE - TYPICAL HR CONNECTION, PLEASE REFER TO PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS head track securely fixed to concrete soffitusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot. Note where deflection is required do not fix boarding to wind post.

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

www.eosframing.co.uk

AUG 2020

Date:

TYPICAL OPENING INLINE WIND POST CONNECTION DETAIL - FIXING INTO STEEL ONLY [DEFLECTION HEAD BRACKET] (S & T) STAGE:

Preliminary:Approval:

Construction:

277Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 2093. Each track length to have fixing 50-100mm from each end.

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK WIND POST BASEPLATE - TYPICAL HR CONNECTION, PLEASE REFER TO PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

INLINE WIND POST BASEPLATE - TYPICAL HR CONNECTION, PLEASE REFER TO PROJECT SPECIFIC DETAIL

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS head track securely fixed to concrete soffitusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot. Note where deflection is required do not fix boarding to wind post.

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

4.Ifthedoublestudwindpostisunder300mmlongthesewillbesuppliedas2No.singlestudsthatcanbefixedtothewindpost baseplateinthesamemannerasthedoublestuds

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

gap for

C

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 40: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

Date:

TYPICAL OPENING INLINE WIND POST CONNECTION DETAIL - FIXING INTO STEEL ONLY [DEFLECTION HEAD TRACK] (S & T) STAGE:

Preliminary:Approval:

Construction:

278Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 2093. Each track length to have fixing 50-100mm from each end.

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK

WIND POST BASEPLATE - TYPICAL HR CONNECTION. PLEASE REFER TO PROJECT SPECIFIC DETAIL.

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

WIND POST BASEPLATE - TYPICAL HR CONNECTION. PLEASE REFER TO PROJECT SPECIFIC DETAIL.

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS deflection head track securely fixed to concrete soffit using fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot. Note where deflection is required do not fix boarding to wind post

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

40

REF 278C DHT - TYPICAL OPENING INLINE WIND POST DEFLECTION DETAILS

www.eosframing.co.uk

AUG 2020

Date:

TYPICAL OPENING INLINE WIND POST CONNECTION DETAIL - FIXING INTO STEEL ONLY [DEFLECTION HEAD TRACK] (S & T) STAGE:

Preliminary:Approval:

Construction:

278Drawing No. Revision: Approved By:

BDrawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSPK Aug 2017

NOTES1. Fixing provided as required for windloading restraint.2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs exceeding the limits highlighted in detail 2093. Each track length to have fixing 50-100mm from each end.

BASE FIXING

HEAD FIXING

HEAD TRACK

Wind Post Double stud

WIND POST DOUBLE STUDMANUFACTURED OFFSITEIN EOS FACTORY

Wind Post Double stud

BASE TRACK

WIND POST BASEPLATE - TYPICAL HR CONNECTION. PLEASE REFER TO PROJECT SPECIFIC DETAIL.

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS base track securely fixed to concrete floorusing fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

WIND POST BASEPLATE - TYPICAL HR CONNECTION. PLEASE REFER TO PROJECT SPECIFIC DETAIL.

Wind Post Double Stud fixed to Wind Post Base Plate using 4 No. 5.5 x 25mm Tek screws (EOS-1020 or similar approved) each side as per project specific detail

EOS deflection head track securely fixed to concrete soffit using fixings (EOS-1021 or similar approved) @ centres to suit wind loading. Note:- fixing to be 50-100mm from end of track

2 No. Deflection Head Brackets provided at lintel level to allowance for deflection. Fixed with 2 No. EOS-1003 located centrally in the slot. Note where deflection is required do not fix boarding to wind post

EOS DeflectionHead Bracket

AH/KB

Maintain 17mm gap for deflection between lintel track and end of Double Stud Wind Post

gap for

4.Ifthedoublestudwindpostisunder300mmlongthesewillbesuppliedas2No.singlestudsthatcanbefixedtothewindpost baseplateinthesamemannerasthedoublestuds

C

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

Page 41: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

41

TYPICAL TRIPLE & QUAD JAMB DETAILS REF 279

Date:

TYPICAL TRIPLE & QUAD JAMB DETAILS (S & T) STAGE:

Preliminary:Approval:

Construction:

279Drawing No. Revision: Approved By:

-Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the trackso that both studs & tracks are the same width to assist in providing as flush a finish as is possible

NTSTE June 2016

TRIPLE JAMBS CONSIST OF SINGLE STUD FIXED TO PRE-ASSEMBLED DOUBLE STUD.

QUAD JAMBS CONSIST OF 2 NO. PRE-ASSEMBLED DOUBLE STUDS FIXED TOGETHER WITH PLATES AS SPECIFIED BY EOS ENGINEERS.

AH/KB

NOTE:-DOUBLE STUDS ARE MANUFACTURED AT 175mm WIDE AS STANDARD.

DOUBLE STUDS CAN BE MANUFACTURED BETWEEN 100mm AND 225mm WIDE FOR NON-STANDARD APPLICATIONS. PLEASE ENQUIRE WITH EOS FACADES.

FOR HEAD FIXINGS PLEASE REFER TO STANDARD DETAILS 273 (DHT DEFLECTION HEAD TRACK) OR 265 (DHB DEFLECTION HEAD BRACKETS)

TRIPLE JAMB QUAD JAMB

2 No. EOS-1005 @ 600mm vertical centres

Single Stud

Double Stud

Double Studs

Plates to both sides as per EOS specification

www.eosframing.co.uk

AUG 2020

.

NOTES

THISDRAWINGISCOPYRIGHT:DONOTSCALE THISDRAWING,CONTRACTORSMUSTCHECKALL DIMENSIONSONSITE,ONLYFIGUREDDIMENSIONSTOBEWORKEDFROM.ALLERRORSAND DISCREPANCIESMUSTBEIMMEDIATELYREPORTED TOTHEDESIGNOFFICEOFEOSFRAMINGLTD

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

EOSFramingLtd,HeighingtonLane,AycliffeIndustrialPark,NewtonAycliffe,CountyDurham,DL56QG,Tel:01325303030

Page 42: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

42

NOTES

DISCLAIMER

Whilst EOS Framing has prepared this document in good faith, it is designed to provide guidance on SFS construction. EOS Framing accepts no liability and offers no warranties in relation to its contents. Users are therefore required to satisfy themselves as to the suitability of the contents of this guidance for their specific intended purpose.

© EOS 2020

Page 43: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

www.eosframing.co.uk

INTRODUCING THRUBUILD®

A Faster Way of Specifying and Constructing Your Building Integrated floor and walling systems for loadbearing and non-loadbearing applications. Meeting building performance requirements for fire, thermal, weathering, acoustics and airtightness – our range of Thrubuild® systems deliver a fast-track ‘all in one’ solution providing crucial time and cost benefits.

Framing:Min. 100mm x 1.2mm (SS10012) EOS Stud*

Sheathing:2x 12.5mm Weather Defence externally.

Internal Boarding:2x 12.5mm Siniat Frameboard internally.

Insulation:100mm 45kg/m3 Rock Mineral Wool.

4

3

2

1

THRUBUILD® • Fully Tested Systems • 30-Year Warranty • Meets Building Performance Requirements • Achieves a Rapid Installation Process • Delivers Cost and Programme Certainty

Part of Etex, EOS offers an unparalleled level of support from our design team. To learn more about our Thrubuild® systems contact the team today.

Call: 01325 303 030 Email: [email protected]

MANUFACTURING MEMBER

Page 44: STEEL FRAMING SYSTEM INSTALLATION GUIDE...2 Welcome to the EOS Steel Framing System (SFS) Installation GuideA successful project requires every trade in the design and construction

For detailed up to date information, to book a CPD session or to arrange a meeting please contact:

EOS Framing LtdHeighington LaneAycliffe Industrial ParkNewton AycliffeCounty DurhamDL5 6QG

T: 01325 303 030 E: [email protected]

IF IN DOUBT… STOP AND CONSULT!

@EOS_Framing EOS Framing EOS Framing

www.eosframing.co.uk