STATUTORY RULES / CERTIFICATION
Load Line Certificate, Safety Equipment, Safety
cycle diesel engines driving 2 azimuth CPP propellers, Radio, MARPOL 1973 - ANNEX 1, IV, V & VI
2 bow thruster, with fire fighting equipment Certificates, MARPOL ANNEX II (IMO A673(167),
and oil recovery capability. SPS Code 2008 Compliance.
Vessels ordered for Singapore Flag Registration.
CLASSIFICATION
ABS A1 (E) Offshre Support, Fire Fighting Vessel CARGO CAPACITIES
Class 1, OSR-C1, Fi-Fi 1 + AMS, +ACCU, +DP2 , +HNLS (Approximate for guidance only)
SPS, UWILD Fresh water 600 m³
Drill water / S.W. Ballast 1250 m³
MAIN DIMENSIONS Fuel oil 1200 m³
(Approximate for guidance only) Dirty oil 10.0 m³
Length overall 78.00 m Lub oil 10.0 m³
Length b.p. 70.20 m Bilge holding 10.0 m³
Breadth moulded 18.60 M Base oil / Methanol 200 m³
Depth moulded 7.80 m Bulk cement 300 m³
Draft designed 6.00 m Mud / Brine (SG 2.5) 800 m³
Draft scantling 6.30 m Rec. oil 1000 m³
Deadweight about 4,000 t Foam 14 m³
Deck area 800 m² Detergent 14 m³
Deck strength 7.5 t/m²
Deck cargo 1,500 t, VCG 0.9m above deck
Sheet 1 of 2
BRIEF SPECIFICATION FOR PROPOSED NEW 78.0M PLATFORM SUPPLY VESSELS
DESCRIPTION OF VESSEL
Platform Supply Vessel, with twin geared 4 stroke
BUILDERS
Major Chinese Shipyard
MAIN PROPULSION SYSTEM / MACHINERY SPEED & ENDURANCE
2 x Daihatsu (Japan) 4 stroke diesel engines 2353 kW Speed at sea trial 100% M.C.R. about 12.6 knots at
(3200p.s.) @ 750 rpm operating on Marine Diesel Oil full load draft (6 m).
driving 2 x Kawasaki Rexpeller CPP.
Main Generator : 4 x 450 kW, 415V, 50 Hz
Caterpillar
Emergency Generator : 1 x 99 kW, 415V, 50 Hz
Caterpillar
Shaft Generator : 2 x 1100 kW, 415V, 50 Hz
(driven off Main Engine
P.T.O.)
Bow Thurster : 2 units 10 tons thrust
C.P.P. Type
SAFETY SYSTEM/RESCUE EQUIPMENT MOORING EQUIPMENT & DECK EQUIPMENT
Rescue Boat & Davit : one (1) fast rescue raft Anchor Windlass/
Mooring Winch (elect.hydr): 2 x 10.0T @ 18.0 m/min
Safety Equipment / Life Tugger Winch (elect.hydr): 2 x 10.0T @ 12.0 m/min
Sav. Appliance / Fire-fighting Vertical Capstan (elect.hydr): 2 x 5.0T @ 15.0 m/min
Equipment / Rescue Zone : Deck cargo crane (elect.hydr) : 1 x 5.0t @ 10 m.radius
NAVIGATION & COMMUNICATION EQUIPMENT DP / JOYSTICK CONTROL
Fully equipped with Furuno / JRS or equivalent K-Pos DP-21 Dynamic Positioning System (DP2)
International brand equipment. GMDSS for areas cJoy Independent Joystick System
A1, A2 & A3.
ACCOMMODATION
8 x 1 man cabin 8 men
4 x 2 men cabin cabin 8 men
11 x 4 men cabin 44 men
Total : 60 men
****END****
Sheet 2 of 2
to SOLAS / Flag / Class
Requirements
20 June 2013
ITEMS QTY. Country
A
1 Main engines 2 Japan
2 Rudder Propellers 2 Japan
3 Bow Thrusters 2 Japan/China
4 Shaft Generators 2 USA/China
5 Main Diesel Generators 3 USA
6 Emergency Generator 1 USA
7 Pumps (All electric motor driven) Spain
8 Methanol/Base Oil Pump Norway
9 Mud Agitator 6 Norway
10 Bulk Handling System 6 Japan
B
11 Main and Emergency SwitchBoard 1 each Japan/China
12 Engine Alarm Monitoring System 1 Norway
C
13
Radio Communication & Navigation
Equipment
(GMDSS Area A1, A2, A3)
Japan/
Germany
14BNWAS Bridge Navigation Watch Alarm
System1 Israel
15 Dynamic positioning system DP2 1 Norway
D
16 Methanol Tank USAAPC
BRAND
Remark : Still subject to final change if any.
Daihatsu Japan
Kawasaki Japan
Wuhan-Kawasaki
Leroy Somer
Caterpillar C18
Caterpillar C4.4
Azcue
Per Gerdrum
Flygt
Unislip
Terasaki
Kockums
Furuno / Anschutz
Painting
Totemplus
Kongsberg
MAIN EQUIPMENT LIST -: 5 x 78M PSV
Machinery & Equipment
Electrical
Radio Communication & Navigation Equipment
(GMDSS Area A1, A2, A3)