Status of thebeam diagnostics
for the SPES project
Conforto Nicola SPES Control System Group Marzo 2010
Conforto Nicola SPES Control System Group Marzo 2010
Final goal:- Beam diagnostic system based on grid profiler and faraday cup read-out- Realisation of emittance-meter
Work done:- Setup of an EPICS database to get data from faraday cup and beam profiler, and to set their position too.- Configuration of ADC boards, Digital IO boards, Digital Output boards.- Configuration of Stepper-Motor boards.- Use of CSS interfaces to set and use the diagnostic devices.- Final Setup of the hardware
Conforto Nicola SPES Control System Group Marzo 2010
Digital Output Board:-Allows to set output bits-Actual usage: sets the position of the Faraday Cup.
Farday Cup interface:- “FC IN” “FC OUT” switch button- Actual value (1nA = 1mV)- 10s, 30s, 60s averages (compress record, updated every 10s)- Plot of the actual value and the 60s average
Conforto Nicola SPES Control System Group Marzo 2010
Beam Profile:- “SET BP IN” “SET BP OUT” buttons- Motor status info (BP position)- Actual value, both grids
Conforto Nicola SPES Control System Group Marzo 2010
Problems:- Noises when using F.C. with suppressor- B.P. multiplexers are slightly different from each other- B.P. hardware problems on the horizontal grid
Next steps:- Set final PV name for the new Pvs- Emittance meter