Status of SNOLAB Development Fraser Duncan SNOLAB Workshop 4 Oct 2008

description

Status of SNOLAB Development. Fraser Duncan SNOLAB Workshop 4 Oct 2008. SNOLAB. Surface Facility. 2km overburden (6000mwe) ‏. Muon Flux = 0.27/m 2 /day. Underground Laboratory. MEI & HIME astro/ph 0512125. Fraser Duncan. SNOLAB Workshop 4-5 Oct 2008. SNOLAB. Existing - PowerPoint PPT Presentation

Transcript of Status of SNOLAB Development

Page 1: Status of  SNOLAB Development

Status of SNOLAB DevelopmentFraser Duncan

SNOLAB Workshop4 Oct 2008

Page 2: Status of  SNOLAB Development

2km overburden(6000mwe)

UndergroundLaboratory

SurfaceFacility

SNOLAB

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Muon Flux = 0.27/m2/day

MEI & HIME astro/ph 0512125

Page 3: Status of  SNOLAB Development

ExistingSNO Facility

SNOLAB

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 4: Status of  SNOLAB Development

ExistingSNO Facility

Phase I

Relocate-Lab Entry-Personnel Facilities

UtilityArea- Chiller- Generator

SNOLAB

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 5: Status of  SNOLAB Development

ExistingSNO Facility

Phase I

Relocate-Lab Entry-Personnel Facilities

UtilityArea- Chiller- Generator

Phase II

SNOLAB

Page 6: Status of  SNOLAB Development

Excavation Clean Rm LaboratoryArea Volume Area Volume Area Volume

Existing

Existing+ Phase I

Existing

+ Phase I &I I

20,049 f t2 582,993 f t3 12,196 f t2 470,360 f t3 8,095 f t2 412,390 f t3

1,863 m2 16,511 m3 1,133 m2 13,321 m3 752 m2 11,679 m3

65,340 f t2 1,367,488 f t3 41,955 f t2 1,049,393 f t3 26,117 f t2 837,604 f t3

6,072 m2 38,728 m3 3,899 m2 29,719 m3 2,427 m2 23,721 m3

77,636 f t2 1,647,134 f t3 53,180 f t2 1,314,973 f t3 32,877 f t2 1,043,579 f t3

7,215 m2 46,648 m3 4,942 m2 37,241 m3 3,055 m2 29,555 m3

Laboratory Space

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 7: Status of  SNOLAB Development

Construction (Underground) Project Management: by Acres (now Hatch Energy) – Satish Bhan

Project Manager.

Engineering: Design – Hatch Energy; Geotechnical – Itasca; Excavation - Macintosh.

Excavation: Contracted to J.S.Redpath Ltd.

Phase I: Began Nov 2004, completed May 2007

Phase II: Began Jun 2007, completed Jun 2008

Total excavation 6000 m2 / 39,000 m3.

Outfitting: Contracted to Comstock Canada Ltd with sub contracting for specialties.

Began Jun 2007

Done: Refuge station, Lab entrance

To Do: Completion of Utility Area (chillers, stp, fire water system); Ventilation in Ladder Labs, Cube Hall and Cryopit

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 8: Status of  SNOLAB Development

Excavation Status: Aug 2007

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 9: Status of  SNOLAB Development

Excavation Status: Today

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 10: Status of  SNOLAB Development

Lab Entry

Page 11: Status of  SNOLAB Development

Lab Entry

Page 12: Status of  SNOLAB Development

Lab Entry

Page 13: Status of  SNOLAB Development

Lab Entry

Page 14: Status of  SNOLAB Development

Lab Entry

Page 15: Status of  SNOLAB Development

Lab Entry

Page 16: Status of  SNOLAB Development

PersonnelArea

Page 17: Status of  SNOLAB Development

PersonnelArea

Page 18: Status of  SNOLAB Development

LadderLabs

Page 19: Status of  SNOLAB Development

Cube Hall

Page 20: Status of  SNOLAB Development

Cube Hall

Page 21: Status of  SNOLAB Development

Cryopit

Page 22: Status of  SNOLAB Development

Cryopit

Page 23: Status of  SNOLAB Development

Cryopit

Page 24: Status of  SNOLAB Development

Hall BottomAccess

Page 25: Status of  SNOLAB Development

ChillerRm

Page 26: Status of  SNOLAB Development

ChillerRm

Page 27: Status of  SNOLAB Development

STPRm

Page 28: Status of  SNOLAB Development

AccessDrift

Page 29: Status of  SNOLAB Development

Next Steps Contractors

Finish Utility Area: Finish chiller assembly; piping to waste water plant; fire water lines to 6600L; commission chillers, STP.

Finish work in Experimental Areas: running water lines to Cube Hall and Cryopit; hook up electrics; Building Automation System; Fire Alarm.

SNOLAB Fine cleaning of Personnel Area (showers, change

rooms, lunch room, meeting room). Fine cleaning of laboratory entrance (carwash, junction,

access drift to SNO facilities). Services including network Infrastructure, water

pretreatment (relocation), up size 13kV power feed, ...

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 30: Status of  SNOLAB Development

Finish Line Day 1

Support Facilities: Enlarged personnel area and material handling facilities.

Experimental Spaces: Existing SNO Cavern, Cube Hall, Ladder Labs all operated as Clean Rooms. Cube Hall and Ladder Labs will be “bare rooms” but with nearby services.

Day 2 Cryopit: Paint and fine clean. South Drift: Remove old carwash and personnel

facilities. Recover as experimental space. Underground “clean room” machine shop. Underground chemistry lab.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 31: Status of  SNOLAB Development

Day 1 Infrastructure Power Distribution

2000 kVA capacity at 600V. 400A/600V services to the experimental areas except the Cryopit (deferred). Able to accommodate a future backup generator.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Future

Page 32: Status of  SNOLAB Development

Day 1 Infrastructure Power Distribution

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 33: Status of  SNOLAB Development

Day 1 Infrastructure Cooling

300 T (1MW) Chiller; Chilled Water Loop: 250 PSIG, 5C. Distribution to SNO Utility, Cube Hall and Cryopit.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

CHILLER

Page 34: Status of  SNOLAB Development

Day 1 Infrastructure Ventilation

Main ventilation hard ducted. Distribution into Experimental areas with soft duct. 5-10 air changes per hour. HEPA filtered.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 35: Status of  SNOLAB Development

Day 1 Infrastructure Communications

Multimode 200 Mb/s capacity between surface and underground. 1 Gb/s off site.

Will complete a Gb/s single mode fibre link between underground and surface in the near future.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 36: Status of  SNOLAB Development

Day 1 Infrastructure

Other Services

Industrial water, fire water, forced drain, compressed air.

Ultrapure water from the SNO water purification plant.

LN2 supplied by transport dewar from surface.

Low Background Counting

1 existing HPGe Gamma Counter. Requesting funds for 2 additional counters.

Rn/Ra Emanation (Electrostatic Counters, Radon emanation.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 37: Status of  SNOLAB Development

Staff

Staff of ~40 Operations: Cleaning, material handling, maintenance,

lab supervision. Technical Support: Plant operations, chemistry, electrical,

electronics, instrumentation. Design: Primarily mechanical and process systems

expertise. Design work, reviews. Construction: Small construction group with expertise in

the SNOLAB related issues. Assists with experiment installation.

IT: Networking, system administration. Admin: Procurement, shipping and receiving, training.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 38: Status of  SNOLAB Development

Experimental Program The experimental program has concentrated on

astroparticle physics but has also had submissions from other fields such as seismology and fundamental constants.

Requests for space are reviewed by the Experiment Advisory Committee (EAC) which makes recommendations to the Director. To date 25 Letters of Interest or proposals have been

submitted, 13 of which have been recommended by the EAC as appropriate for pursing for siting at SNOLAB. Of these 8 have developed mature plans to come to SNOLAB.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 39: Status of  SNOLAB Development

Day 1 Experiments

Experiment Solar Nu 0nuBB Other Space Allocated Status

SNO+ X X X X SNO Install

Cavern 2009

PICASSO X SNO Utility Running

Room

DEAP-1 X SNO Control Running

Room

X Cube Install

360 Hall 2009

X Cube Install

3600 Hall 2009

EXO X Install

2010?

X Ladder Install

Labs 2010?

HALO X Install

2009

PUPS Seismic Various Running

Locations

Dark Matter

Super nova

GeoNu

MiniCLEAN

DEAP/CLEAN

SuperCDMS

Page 40: Status of  SNOLAB Development

Personnel facilities

SNOCavern

Ladder Labs

Cube Hall

Cryopit

UtilityArea

Now:DEAP-1

2009: SNO+

Now:PICASSO-II

2010: SuperCDMS

Experimental Program2009: DEAP/CLEAN 3600,MiniCLEAN 360

Unallocated

Unallocated

Unallocated

Unallocated

SouthDrift

Unallocated

Phase IIIStub

UtilityDrift

Now:PUPS

Experiments expectedto request space soon:EXO 200 GasHALOPICASSO-III

Page 41: Status of  SNOLAB Development

Beyond Construction With the laboratory almost complete, construction

emphasis is shifting to facilitating the siting of experiments.

Cube Hall: Begin steel work for DEAP/CLEAN and MiniCLEAN.

SNO Cavern: Repair of liner floor and install of hold downs for SNO+.

SNO Utility Rm: Excavation of pit for SNO+ scintillator plant.

Renovation of South Drift, old Carwash, ...

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 42: Status of  SNOLAB Development

Schedule

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Contractor OutfittingCommission Major Systems

Cleaning Refuge Station

Cleaning Lab Entrance

* Relocate to New Lab Entrance

Cleaning Ladder Labs and Cube Hall

Paint Cryopit

Final Cleaning Cryopit

Renovate Old Refuge and Carwash

* Begin civil work for DEAP/CLEAN and MiniCLEAN in Cube Hall

* Begin Conversion of SNO Cavity for SNO+

2008 2009

Page 43: Status of  SNOLAB Development

Summary

Construction is almost complete! Ready to begin the installation of the Day 1

experiments. Civil work can being any time in the new laboratory areas. We plan to install steel in the Cube Hall at the

beginning of 2009. Some space has been allocated for

experiments but there is still significant room available.

SNOLAB is open for business.

Fraser Duncan SNOLAB Workshop 4-5 Oct 2008

Page 44: Status of  SNOLAB Development

End