Status of pre-production at TESLA

9
Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics AS CR, Prague Status of pre-production at TESLA

description

Status of pre-production at TESLA. Václav Vrba Institute of Physics AS CR, Prague. Last week TESLA finished second part of pre- production with: 3-tile wafers and 13 2-tile wafers.  Significant improvement of yield. - PowerPoint PPT Presentation

Transcript of Status of pre-production at TESLA

Page 1: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR1

Václav Vrba

Institute of Physics AS CR, Prague

Status of pre-production at TESLA

Page 2: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR2

.Last week TESLA finished second part of pre- production with:

133-tile wafers and

13 2-tile wafers

Significant improvement of yield

Process flow practically the same all the time, significant changes on production line – the most pronounced one was change of manual/semiautomatic aligner for the automatic one.

Page 3: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR3

New alignerHandling spots

Page 4: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR4

Basic characteristics

Ufd 80 V

Page 5: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR5

Basic characteristics (cont)

Iox @ 50 V 100 pA

Page 6: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR6

Basic characteristics (cont)

3-Tiles - New delivery

Good Tiles - Old delivery

Significant improvement of leakage current !

Page 7: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR7

Basic characteristics (cont)

Batch Waferp-spray-

new formula

p-spray - old

formula-/cm 2̂ -/cm 2̂

ATL-30 7 2.55E+12 2.06E+12ATL-31 7 3.12E+12 2.63E+12ATL-33 8 3.13E+12 2.45E+12ATL-34 4 3.22E+12 2.92E+12

Diode with Guard ring

P-spray doses

Page 8: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR8

DeliveryAccording contract:

11 3-tile wafers

2 2-tile wafers

1 2-tile wafer (Prague, replacement of nonconform.)

1 2-tile wafer (NM, broken)

Additionally available:

2 3-tile wafers

9 2-tile wafers

Page 9: Status of pre-production at TESLA

Pixel week, October 2001 Václav Vrba, Institute of Physics, AS CR9

Conclusions

• TESLA finished second part of the pre-production with significant improvement of the yield and the quality of sensors