March, 2009 Status of J PARC Status of J-PARC Director of J-PARC Center at KEK/JAEA Shoji Nagamiya Director of J PARC Center at KEK/JAEA 1 Milestones Achieved b th J PARC P j t by the J-PARC Project 2

Transcript of Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1...

Page 1: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

March, 2009

Status of J PARCStatus of J-PARC

Director of J-PARC Center at KEK/JAEA

Shoji Nagamiya

Director of J PARC Center at KEK/JAEA

1

Milestones Achievedb th J PARC P j tby the J-PARC Project

2

Page 2: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Construction Schedule

3Construction

Start

Time when thisschedule was created

NOW

Major Events during the Past One Year

22008 Beam power of 5 kW/pulse (130 kW equiv.), 50 kW extracted at 3 GeV

Injection, RF capture and extraction with 3 GeV beams at MR (5/22)

3

4

5 j p ( )Production of neutrons (5/30)

5

6

7

8

9

10

Beam power of 12 kW/pulse (300 kW equiv.), 210 kW extracted at 3 GeVProduction of muons (9/26)

Open House (8/10)

Acceleration of Beams to 30 GeV at the 50 GeV MR (12/23)Neutrons + Muons: Beam Usage for General Users (12/23)

10

11

12 Neutrons + Muons: Beam Usage for General Users (12/23)

1

2

2009 Extraction of the 30 GeV beams to the Hadron Experimental Hall (1/27)

4

3 Completion of the Neutrino Experimental Hall

(2009/7/6: Celebration for the Completion of the Project)

Page 3: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Injection and Extraction for MR (1)

5

Injection and Extraction for MR (2)

6

Page 4: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

First Production of Neutron Beams (1)

7

First Production of Neutron Beams (2)

8

Page 5: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Example of Test Results in June, 2008p

Obtained atObtained at KEK KENS

Result at J-PARC(world record)

Bragg Diffraction

9

Lattice distance

New Invention for Moderator

Neutron Source M d t T #1Neutron Source

Neutrons

Moderator Type#1

fromReflector

Neutronbeamsbeams

Protons TowardbeamlineLiquid

AIC Decoupler (blue)covers around the

ti f

beamlineHydrogen

Other two types of moderators

10

entire surface

Ag,In,Cd

yphave been prepared. All workingexactly in the way as designed.

Page 6: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Open House in the Summer

About 2,600people visited p pJ-PARC(August 10)

11

210 kW Attained at 3 GeV

12

Page 7: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Expected Power vs. Actual Power

November of 2003

For shortperiod

Actual

13

Power at KEK-Booster = 3 kW

First Production of the Muon Beams

14

Page 8: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Muon Lifetime and Muon Rotation

September 26, 2008p ,

Lif ti 2 2

15

Lifetime = 2.2 μs

Muon Spin Rotation in a Magnetic Field

Opening Ceremony for a New Buildingp g y g

16

Page 9: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Open Usage for the MLF Facilitiesp g

17

Successful Acceleration to 30 GeV

18

Page 10: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

MR Acceleration

2008.12.23.Abort Kicker On

Main Ring Intensity

17:34

0 1 2 3 4Time from acceleration (s)

Horizontal Vertical

19

Beam ProfileHorizontal Vertical

Extraction of Beams to Hadron Hall

20

Page 11: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

1 (q01in) 2 (q02in) 5 (q11in) 6 (T0in)

9 (Dump in)

3 (v04in)

4 (v06in)

7 (q1Aout)

8 (T1in)(v04in) (v06in) (q1Aout)

1 2

21

1 2 3 4 5 6 789

Current Status

22

Page 12: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

1st Experimental Hall (East Hall)Beam

HRCNNRI

4SEASONS

HRCNOP

NOBORU

S-HRPD

iBIX

237 Feb., 2008

2nd Experimental Hall (West Hall)

AMATERASBeam

NOVAiMATERIA

AMATERAS

HH--REFREF NOVAHH REFREF

TAKUMITAKUMI

247 Feb., 2008

Page 13: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Muon Beam Area

25

Hadron Hall

26

Page 14: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Status of Neutrino Facility ConstructionTargetHorn 

Neutrino monitor building

P i t li l t dUA1 t d t d Primary proton line completedUA1 magnet donatedFrom CERN installed

2727Decay volume completed

Beam dump installed Target station completed

Primary BeamPrimary Beam--linelineAssumed Beam LossAssumed Beam Loss

[email protected]@[email protected]@FF.

(1W/m @ ARC)(1W/m @ ARC)11 NC mags

Beam Monitor Intensity (CT) 5

Preparation SectionPreparation Section

Intensity (CT) 5Beam position (ESM) 21Profile (SSEM) 19Profile (OTR@target) 1

Beam loss monitor 5010 NC mags

ARC SectionARC Section

28 SC combined func magsg(+3 SC corr mags from BNL)

28Final Focusing SectionFinal Focusing Section

Page 15: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

J-PARC Facility(KEK/JAEA)Linac ( )

South to North

3 GeV

Neutrino Beams

3 GeV Synchrotron

Neutrino Beams(to Kamioka)

Materials and Life E perimentalExperimental

Facility

H d ECY2007 Beams

29Bird’s eye photo in January of 2008JFY2009 Beams

Hadron Exp. Facility

JFY2008 BeamsCY2007 Beams

Budgetg

30

Page 16: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Operational Budgetp g

FullPower

31

Now

JFY2009 Budgetg

Operational:p– 65.0 Oku Yen for KEK and 59.6 Oku Yen for JAEA.– With this, 110 day Operation is possible.

400 MeV Linac Construction:400 MeV Linac Construction:– Linac Energy Recovery = 18.0 + 25.0 Oku Yen for JAEA

JYF2009 Construction JYF2008 Supplemental

Neutron Beamline Construction:– Two beamlines = 5.0 Oku Yen for the 1st year at JAEA

JYF2009 Construction JYF2008 Supplemental

Hadron Beamline Construction:

From New Budget Scheme (see next page)

– K 1.1 beamline = 5.0 Oku Yen at KEK

JFY2008 Supplemental

32

Page 17: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Plan for the Running of JFY2009g

33

Expected Power vs. Actual Powerp

Budget Requested

JFY2008: 1 5 Oku Yen for “Linac Recovery #1” approved

34

JFY2008: 1.5 Oku Yen for Linac Recovery #1 approved. JFY2009: 43 Oku Yen for “Linac Recovery #2” approved. Must be

competed by JFY2010 (practically, by JFY2011).

Page 18: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

NNRI (Tokyo Tech. U., JAEA, Hokkaido U.)OPERATIONFUNDED

OPERATION

OPERATION

OPERATION

SHRPD (KEK)

OPERATION

Hi h P Diff ti

FUNDED~JFY'09

COMMISSIONIG~Dec.,'08

iBIX (Ibaraki Pref.)

NOBORU (JAEA)

NOP (KEK)

COMMISSIONIG

OPERATION

FUNDED~JFY'09

High-Pressure Diffraction Station (U. of Tokyo,

JAEA)

,

HRC (KEK)

DNA(JAEA)

4SEASONS

OPERATION

COMMISSIONIG~Dec.,'08

JFY 09

AMATERAS (JAEA)

4SEASONS (JAEA, KEK, Tohoku U.)

COMMISSIONIG~Dec.,'08

UNDER CONSTRUCTION

・7 Instruments are fAMATERAS (JAEA)

FUNDED~JFY'09

open for user program.

・4 Instruments have been working from D '08

NOVA (NEDO, KEK)

Hi-SANS (JAEA) COMMISSIONIG~Dec.,'08

OPERATIONOPERATION

Dec. 08.・1 Instrument is

under construction.・3 Instrument are

l f d d (t

35TAKUMI (JAEA)

Reflectometer (KEK)iMATERIA (Ibaraki Pref.)

newly funded (two for JAEA and 1 for U. Tokyo & JAEA).

Hadron Experimental Hall

Strangeness Nuclear Beam Dump(Movable on the Rail)Strangeness Nuclear

Physics on Day-1 Baryons in Nuclei (Movable on the Rail)

K1.8

K1.8BR KL

Mesons in Nuclei

K1.8BR KL

Production

T1 target K1.1S-typeK0.830~50 GeV

target (T1)

C-typePrimary Beam This side was funded !

36

Page 19: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Creation of New Budget Schemeg

JAEA– At the Government level, an establishment of a new law, which

was adopted at SPring-8, will be applied for J-PARC from JFY2011.JFY2011.

– This new scheme will cover a) operations for Linac and 3 GeVb) b li t ti d i t f t b lib) beamline construction and maintenance for neutron beamlines

– The Government controls directly this funding.– Usage open for universities, institutes, industries, internationals.g p , , ,

KEK– The normal operational budget scheme is still used for KEK.The normal operational budget scheme is still used for KEK.

However, the normal operation budget decreases every year.– Competition with B-Factory (or, in particular, with Super B, if it

were ever constructed) will be an issue for the future

37

were ever constructed) will be an issue for the future.– Preparation of a new scheme is in progress at the Government

level.

Grand Design of J-PARCg

38

Page 20: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Users Steering Committeeg

New members were l d i N belected in November

of 2007.Representatives from fourfrom four communities are included.Roadmap of the future J PARC willfuture J-PARC will be discussed at this committee.

– Discussion items b thi ittby this committee were re-identified.

– The committee will start intense discussions fromdiscussions from February about future plans of the J-PARC.

39

Phase 2 for J-PARC will be discussed at this Committee

Major Upgrades Items (from 2008 IAC) j pg ( )

Neutrons and MuonsNeutron equipments: How to fill the 23 beamlines (so far about ten– Neutron equipments: How to fill the 23 beamlines (so far about ten were funded).

– Muon equipments: Among four beamlines, only one will be in operation in 2008. Others have to be funded.

Hadrons– Must construct several kaon beamlines plus a primary beamline.– Hadron hall expansion: Necessary to accommodate many user

groups.– Any future possibilities recommended from PAC.

Neutrinos– Power upgrade.– The 2 km detector for T2K.

Nuclear Transmutation– The major item for Phase 2.

Others– Energy upgrade to 50 GeV

40

– Energy upgrade to 50 GeV.– Third extraction line or Fast Extraction at Hadron Hall?– Polarized protons, heavy-ions, ….

Page 21: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Committee Report

This Report will beThis Report will be presented by T. Yamanaka on 3/10.

41

Achievement and Issues

42

Page 22: Status of JStatus of J-PARC - KEK · 2009. 3. 6. · Director of J PARC Center at KEK/JAEA 1 Milestones Achieved bthJby the J-PARC P j tPARC Project 2. Construction Schedule 3 ...

Achievement

Milestones achieved during the past one year– Construction for both equipments and facilities: Almost on schedule.

Production of neutrons and muons, 30 GeV acceleration and extraction to the Hadron Hall

Neutrino construction will be completed by the end of March of this year.

– Started a usage of the MLF facilitiesStarted a usage of the MLF facilities.

Budget– Operational money for JFY2009 was funded, to allow 110 day

tioperation.

– New budget scheme for JAEA started. Two neutron beamlines were funded.

– Supplemental budget funded for the energy recovery for Linac and K=1.1 beamline for Hadron.

Grand Design for the future started

43

G g

Issues

Stability of the accelerator

– RFQ, RF (Finement), Power Station, Beam Loss

Intensity growth of the accelerator

Need to create Accelerator Review Committee to review all– Need to create Accelerator Review Committee to review all needed items for the intensity growth to 1 MW.

– Several elements must be replaced and also must be newly constructed.

Spares

All items need spares Some critical items are say the– All items need spares. Some critical items are, say, the mercury target, RF systems, etc.

How to grow an operational fund

How to grow the organizational structure (KEK has done a reorganization).

Mechanisms for an easier access by industries

44

Mechanisms for an easier access by industries

Internationalization of the J-PARC Project