Status / conditions of success Report to WP29/AC3 March 2005
-
Upload
driscoll-mooney -
Category
Documents
-
view
52 -
download
0
description
Transcript of Status / conditions of success Report to WP29/AC3 March 2005
04 March. 2005 WWH-OBD status 1
WWH-OBD
Status / conditions of successReport to WP29/AC3 March 2005
WP29-135-23
04 March. 2005 WWH-OBD status 2
WWH-OBD
WWH-OBD – WP29/AC3 decisions
WP29_125 Nov01
158. […] the proposal by the United States of America to develop a global technical regulation concerning on-board diagnostic system for heavy-duty vehicles and engines (informal document No. 13) was well accepted […].
Inf. Doc. 13 [OBD] systems that detect emission related malfunctions and alert the vehicle operator by the illumination of a light on the vehicle control panel, thereby helping to ensure that emissions reductions from in-use vehicles are maintained. These systems […] also assist the repair technicians in the identification and repair of the problem thereby reducing overall repair time
04 March. 2005 WWH-OBD status 3
WWH-OBDG
RP
E -
Ja
n 2
002
GR
PE
- J
un
e 2
002
2n
d W
WH
-OB
D -
No
v 2
00
2
3rd
WW
H-O
BD
- J
an
200
3
4th
WW
H-O
BD
- J
une
20
03
5th
WW
H-O
BD
- S
epte
mb
er
200
3
6th
WW
H-O
BD
- N
ov
20
03
7th
WW
H-O
BD
- J
anu
ary
20
04
8th
WW
H-O
BD
- M
arc
h 2
00
4
9th
WW
H-O
BD
- M
ay
20
04
10
th W
WH
-OB
D -
No
v 2
00
4
11
th W
WH
-OB
D -
Jan
ua
ry 2
00
5
12
th W
WH
-OB
D -
Ap
ril 2
00
5
ed
itoria
l me
etin
g -
Ma
y 20
05
13
th W
WH
-OB
D -
Jun
e 2
005
GR
PE
- J
an
ua
ry 2
00
6
WP
29
- J
un
e 2
00
6
1st GTR draft proposalinformal document
1st GTR proposalformal document
To
kyo
WWH-OBD is created
GR
PE
Lyo
n
Pa
ris
GR
PE
GR
PE
To
kyo
Kick-Off meeting
time-schedule overview
Win
dso
r
GR
PE
Lo
nd
on
GR
PE
GR
PE
Bo
nn
GR
PE
04 March. 2005 WWH-OBD status 4
WWH-OBD
WWH-OBD – project status March 2005
OBD Regulated functionsDiagnosis
• To be noted: New concept enabling a failure classification
AlertOn-board / Off-board Communication
• wired/wireless issue: guidance requested
Structure of the gtrStructure developed according to AC3 desiresMagnitude of the generic part: guidance requested
04 March. 2005 WWH-OBD status 5
WWH-OBD
WWH-OBD – Wired/Wireless communication
Current recommendations of the drafting groupTelematics in the long term, but out of the scope of the present GTR2 options within the GTR: wired and wireless, left to the decision of the regional authorities
Project development (risks)Wireless provisions can probably not be developed within the given project time-frame (ISO indication)Lack of expertise on wireless communication within the working team (experts on emissions) to provide ISO with appropriate terms of reference.
Possible condition of success = good sense measuresThe scope of the GTR could in a first stage be limited to wired communicationWhen decided by WP29/AC3 and on the basis of the work on ITS currently under work a second version of the gtr could incorporate provisions for wireless communication.The new ISO standard to enable a future extension to wireless
04 March. 2005 WWH-OBD status 6
WWH-OBD
WWH-OBD – Structure of the GTR
WP29 131 Nov03
148. […] The representative of the United Kingdom suggested that the informal group should also take into account the use of OBD systems in other fields than the control of pollutants emissions.
AC.3 endorsed that suggestion, and asked the gtr informal group to develop a suitable structure to allow other systems to be added at a later date.
04 March. 2005 WWH-OBD status 7
WWH-OBD
GTR structure - concept
Generic OBD Provisions
- Considerations- Definitions- Requirements
Emission related OBD provisions
Function X OBD provisions
Function Y OBD provisions
WHDC
WWH-oce
ISO standards
OBD - GTR
Other emissions related GTRs and
standards
04 March. 2005 WWH-OBD status 8
WWH-OBD
WWH-OBD – Content of the generic part
The generic partContent of the generic part developed by GRPE expertsGRRF, GRSP, GRSG have been/will be informedA multi-GR informal meeting intended to be convened on 30 MayFinal draft planned October 2005 – No time for developing high level multi-functional provisions
Condition of success (timing issue) = good sense measures
Generic provisions could be limited to "low hanging fruits" (e.g. definitions) in this first version of the gtrGeneric part could be completed by technical provisions (generic communication system, generic alert system, etc..) in a later stage when the OBD modules for other functions will be decided by AC3