STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory &...

22
UNCLASSIFIED STATEMENT OF WORK (SOW), PERFORMANCE BASED B-2 Weapons Bay Door 24 September 2015 Prepared by: 424 SCMS/GUEA 3001 Staff Drive, 1AD294B Tinker AFB, OK 73145

Transcript of STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory &...

Page 1: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

STATEMENT OF WORK (SOW), PERFORMANCE BASED

B-2 Weapons Bay Door

24 September 2015

Prepared by:

424 SCMS/GUEA 3001 Staff Drive, 1AD294B

Tinker AFB, OK 73145

Page 2: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

TABLE OF CONTENTS 1.0  SECTION I – DESCRIPTION OF SERVICES/GENERAL INFORMATION. ................ 3 

1.1  Purpose .............................................................................................................................3 1.2  Item Background ..............................................................................................................3 1.3  Scope ................................................................................................................................3 1.4   Reference Documents ......................................................................................................6 1.5   Period of Performance .....................................................................................................7 1.6  Delivery Schedule ............................................................................................................8 1.7  Expertise/Professional Services .......................................................................................8 1.8  Government Inspection and Acceptance of Deliverables ................................................8 1.9   Timeline ...........................................................................................................................8 1.10  Mission Essential Services ...............................................................................................9 1.11  Special Considerations .....................................................................................................9 1.12  Advisory & Assistance Services (A&AS)/Office Space. ..............................................10 1.13  Government Program Management ...............................................................................10 1.14  Government Contract Management ...............................................................................10 1.15  Safety Requirements ......................................................................................................10 1.16  Travel Requirements ......................................................................................................10 

2.0  SECTION II – SERVICE SUMMARY ............................................................................ 11 2.1  Summary ........................................................................................................................11 

3.0  SECTION III – GOVERNMENT-FURNISHED PROPERTY AND SERVICES .......... 12 3.1  Refer to Requisitioned Government Furnished Property Attachment 4 ........................12 

ATTACHMENT 1, ACRONYM LIST ........................................................................................ 13 ATTACHMENT 2, SAMPLE CONTRACT CLOSURE LETTER............................................. 14 ATTACHMENT 3 – TDP Option Selection Worksheet .............................................................. 15 ATTACHMENT 4 - User Defined Metadata Attribute List ......................................................... 17 

Page 3: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

1.0 SECTION I – DESCRIPTION OF SERVICES/GENERAL INFORMATION.

1.1 Purpose

The objective of this project is to regain buy and repair supportability of the B-2 Weapons Bay Door, Part Number: DAB3116B301-129, NSN 1560-01-444-9498, by achieving the four following objectives.

1.1.1 Develop and deliver a complete manufacturing technical data package (TDP). 1.1.2 Successful fabrication and delivery of Qty (1) prototype door. 1.1.3 Develop and deliver a full and complete build procedure, detailing the fabrication process. 1.1.4 Successful qualification through prototype test and test fit on aircraft. 1.2 Item Background

DAB3116B301-129 is the left-hand, outboard weapon bay door used on the B-2 aircraft, configured as ready to install. The door conceals the weapons in the left hand bomb bay. The door panel consists of graphite/epoxy carbon fiber layup applied to fiberglass and aramid honeycomb core material. The door is approximately rectangular in shape, measuring approximately 24 feet by 4 feet, with features and contour to reduce observable signature. The parts list for the door assembly includes sandwich composite structural panel, blade seals, hinges, rods, uplock fittings, fasteners, and all items necessary for aircraft rigging. A full parts list is provided for the end item. This item has not been built new since initial fielding; instead it has been upgraded and repaired. Air Force Supply Chain Management Wing cannot currently support the spares requirement, which resulted from irreparable damage to this door. To maintain B-2 aircraft operational readiness, a partnership with industry sought to achieve the objectives listed in Paragraph 1.1. The data package for this item is incomplete. Drawings owned by the USAF and are listed in the Reference Documents section of this work statement. However, process specifications are often proprietary to the Original Equipment Manufacturer (OEM), and cannot be released for competitive purposes. Last, some tooling and tooling drawings are available for the composite panel layup – as listed in the Reference Documents and Government Furnished Material (GFM) list. For the hardware needed to attach the door panel to the aircraft, (blade seals, hinges, rods, uplock fittings, etc.) no tooling or tool drawings are available.

1.3 Scope

This project is to gain new manufacture capability of B-2 Weapons Bay Door (Part Number: DAB3116B301-129 and NSN: 1560-01-444-9498FW). The Contractor may accomplish this task utilizing a partially complete technical data package provided by the USAF. The Contractor will review and solve obsolescence issues and provide

Page 4: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

engineering solutions for missing item and tooling data. The program will undergo design reviews at multiple stages, and seeks to not alter the existing form/fit/function of the described weapons bay doors. Unless constrained by obsolescence or other technical issues, altering configuration is undesirable as it would increase qualification requirements. Additionally, once this project is completed, the technical data and manufacturing procedures produced under this contract will be made available to support USAF organic repair.

1.3.1 The Contractor shall complete the following tasks for this effort. Unless otherwise

specified, all time spans given are in calendar days. The Contractor shall deliver a program management plan in accordance with CDRL A001, which shall include primary points of contact for technical and program management coordination. The Contractor shall conduct an Integrated Baseline Review in accordance with CDRL A007. The IBR shall assess the scope of the contract, evaluate the executability of the schedule and performance measurement baselines, review the CWBS to level four (4), and assess risks to the performance of schedule baselines. The Contractor shall complete an Integrated Master Schedule (IMS) IAW CDRL A009, and Contractor Work Breakdown Structure (CWBS) IAW CDRL A010. Prior approval by the government is required for changes to WBS structure and reporting level.

1.3.2 The Contractor shall analyze and reverse engineer the B-2 Weapons Bay Door based on

available technical data, documents, and physical access to the Weapons Bay Door when available.

1.3.3 The Contractor shall analyze the current Weapons Bay Door, and its detail/subassembly

items, for parts and material obsolescence and include logistically supportable replacement parts where obsolescence is found and/or where reliability, maintainability, and supportability can be improved. Obsolescence report provided IAW CDRL A006.

1.3.4 The Contractor shall conduct the following design reviews: Integrated Baseline Review

(IBR), Preliminary Design Review (PDR), Critical Design Review (CDR), and Functional Configuration Audit (FCA) in accordance with CDRL A007. Any changes to the existing configuration shall be presented to the Government for evaluation prior to implementation into the proposed design. The new design (reverse engineer or redesign) shall maintain the same Form, Fit, and Function (FFF) with the current B-2 Weapons Bay Door.

1.3.5 No changes to the Weapons Bay Door shall be incorporated that will require new or

additional field installation procedures, depot test procedures, or additional qualification, without approval from the Procurement Contractor Officer (PCO).

1.3.6 The contractor will host Technical Interchange Meetings (TIMs) on a monthly or as-

required basis to resolve technical issues. Monthly status reports, earned value management report and all other meeting reports/minutes shall be submitted per CDRL A003 and A004 Contractor’s Progress, Status, and Management Report. If other

Page 5: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

coordination is necessary, the Contractor shall request a meeting with Government Engineering, through the procurement contracting officer, to obtain clarifications on an as-needed basis. Any deviations from the Government provided engineering data shall be validated through engineering/scientific analysis, and shall be delivered to the Government as an addendum to the monthly status report CDRL A003.

1.3.7 The Contractor shall build tooling equivalent to the OEM drawing, when provided. Refer

to the Reference Documents section for provided tooling drawings. Where tooling drawings are not available, the Contractor shall develop the tooling required to produce the prototype unit and support on-going repair activity.

1.3.8 The Contractor shall develop and deliver a prototype asset along with a prototype test

report (PTR) to the Government for FFF test/verification/validation in the Next Higher Assembly (NHA) or end system IAW CDRL A006. The PTR shall compare the prototype with the technical data package using dimensional measurements, material properties, and non-destructive inspection methods. Additionally, the PTR shall contain documentation of subcontractor processes, material expiration dates, and cure cycle. The Government will perform a fit check on an aircraft using current AF Technical Order 1B-2A-2-52JG-30-1. Contractor shall resolve all issues that arise during the prototype fit check until all technical parameters/requirements are met IAW AF Technical Orders and scope of the project. Project success is defined as completion of PTR and fit check without a non-conformance. Unless there are unresolved security issues, the Contractor may witness or participate in the fit check at an aircraft facility.

1.3.9 The Contractor shall develop and deliver a Draft and Final Engineering Data Package

IAW CRDL A002, with full/unlimited data rights to the Government. The following elements shall be included in the data package. 1) a Level 3 (production level) engineering technical data package for Part Number: DAB3116B301-129, which may utilize Government provided drawings where applicable. 2) Specification Control Drawings, as needed, where original engineering specifications are obsolete, unusable, or not applicable. 3) 3D digital model with 2D drawings of all tooling created under this effort. 4) Manufacturing process sheets used in production. With delivery of final engineering technical data package, the Contractor shall provide a Data Transmittal Letter releasing the technical data package to the Government. Reference Attachment 3 and 4 for TDP Option Selection Worksheet.

1.3.10 The Contractor shall develop and deliver a test plan/procedure for the B-2 Weapons Bay

Door IAW any available depot test or OEM procedures and demonstrating Form, Fit, and Function operational capability within the NHA. Test plan shall be submitted IAW Test and Evaluation Program Plan (CDRL A005). Test Reports shall be submitted IAW Test/Inspection Report (CDRL A006).

All documents referenced within this section shall be submitted to the Government with

the following notification on the document’s coversheet:

Page 6: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

The following notification shall be shown on all subsequent pages within delivered documents (at the top or bottom of each page):

1.3.11 Contractor shall submit a Contract Closure Letter (CDRL A008) after all deliverables

have been accepted by the Government. This letter shall be submitted on vendor’s letterhead, and shall be delivered to the Procurement Contracting Officer (PCO). Attachment 2 shows a sample Contract Closure Letter with all of the required information.

1.4 Reference Documents Aircraft Rigging Tech Order 1B-2A-2-52JG-30-1 (Unclassified Portion) Parts List, DAB3116B301, Installation parts list for weapons bay door Parts List, DAB3116A302, Parts list for Left-Hand, Outboard weapons bay door Aircraft Loft Data, surface contour (provided on contract award) Bill of Materials DAB3116B301-129

Drawing  Rev  Title  Drawing  Rev Title 

DAB3116A380  varies  Hinge/Beam Assy  04A062  10  Bearing, Sleeve  

DAB3116D311  varies  Door Panel  03A073  08  Pin, Hi‐Lok 

DAA3116A302  AAX  Spacer  03A077  05  Pin, Hi‐Lok 

DAA3116A351  J Center Alignment Fitting  03A136  8  Nut 

WARNING: EXPORT CONTROLLED This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD Contractors only (Critical Technology) (date of document submission). Other requests shall be referred to 424 SCMS/GUEAA.

WARNING: EXPORT CONTROLLED Subject to distribution statement shown on face of this document.

Page 7: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

DAA3116A352  R   Fitting Assembly  03A158  3  Washer 

DAA3116A430  varies  Bracket Assembly  03A186  02  Nut 

03A070  03  Collar, Hi‐Lok  03A187  02  Nut 

03A075  05  Pin, Hi‐Lok  03A217  4  Bolt, Shoulder 

04A068  04  Bushing  04A067  5  Bushing  

04A079  04  Bearing  09A106  2  Sleeve‐Crimp 

DAA3116A353  E  Spoiler Drive Fitting  09A135  5  Lanyard Kevlar 

DAA3116D303  AD  Tabbed Washer  DAA3116A308  R Jumper Cable Assembly 

DAA3116D384  P  Bearing  DAA3116D320 V  Seal 

DAA3116P003  C  Roller Assembly  DAA3116D431 E  Bracket   

DAB3116A363   F  Handle Assembly  DAB3116D320  F  Seal 

DAB3116A365   E  Rod Assemly  03A063  09  Bolt   

DAB3116A369  varies  Fitting Assembly  03A137  3  Nut 

DAA3116V001  C  Loose Parts  03A153  3  Nut, Barrel 

1.5 Period of Performance See contract for period of performance. Early completion and delivery is acceptable and

encouraged, but without additional monetary compensation/reward. Early and acceptable completion may be reflected favorably in Contract Performance Assessment Report (CPAR).

Page 8: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

1.6 Delivery Schedule

Paragraph Description CDRL Delivery Schedule Paragraph 1.3 Prototype N/A Per Contract Paragraph 1.3 Program Management Plan A001 30 days ARO Paragraph 1.3 Prototype Test Report A006 Established in Proposal Paragraph 1.3 Monthly Status Report A003 Within 5 days of month

conclusion Paragraph 1.3 Meeting Report/Minutes A004 Within 3 days of meeting Paragraph 1.3 Test Plan A005 Established in Proposal Paragraph 1.3 Draft TDP A002 Established in Proposal Paragraph 1.3 Final TDP A002 Established in Proposal Paragraph 1.3 Test Report A006 Established in Proposal Paragraph 1.3 Integrated Baseline Review A007 Per CDRL Paragraph 1.3 Contract Closure Letter A008 Conclusion of Contract Paragraph 1.3 Integrated Master Schedule A009 Per CDRL Paragraph 1.3 Contractor Work

Breakdown Structure A010 60 days ARO

1.7 Expertise/Professional Services

The Contractor shall furnish professional and technically qualified personnel to perform all assigned tasks. The Contractor shall provide total task management and supervision of Contractor personnel. The Contractor shall identify primary points of contact for technical and program management issues in the program management plan, CDRL A001.

1.8 Government Inspection and Acceptance of Deliverables

The Government Program Manager while functioning in his/her capacity as Contracting

Officer Representative (COR), in conjunction/coordination with local DCMA representative, will have the right to reject or require correction of any deficiencies found in deliverables. In the event of rejection of any deliverable, the Government may notify the Contractor in writing via the PCO the specific reasons why the deliverable was rejected. The Contractor shall have 30 workdays to correct the rejected deliverable and resubmit to the Government Program Manager for re-inspection. If no comments are provided within 30 calendar days of deliverable receipt, the deliverable will be deemed to have been accepted by the Government.

1.9 Timeline Refer to CDRL’s, the SOW, and the contract for timeline of deliverables.

Page 9: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

1.10 Mission Essential Services N/A. 1.11 Special Considerations 1.11.1 Contractor personnel shall only share documentation, data, or reports generated by or

through use of Government systems to parties specified in the contract. All other requests for information shall be forwarded to 424 SCMS/GUEA, Tinker AFB, OK, or 424 SCMS/GUMF, Tinker AFB, OK. The Contractor shall not divulge any information regarding files, data, processing activities/functions, user ID's, passwords, or other knowledge that may be gained, to anyone who is not authorized to have access to such information. Contractor personnel shall abide by all Government security protocols, procedures, and standard of conduct. Contractors requiring access to Government Automated Information Systems (AIS) shall have background investigations and security awareness training completed, after task order award but prior to AIS access. When the period of performance is complete and/or Contractor personnel leave work on this project they will have 5 business days to terminate all their network user account and to return all access cards and base identification badges and notify the contracting officer.

1.11.2 The structural design of this item is UNCLASSIFIED, however, for Contractor to

participate in the fit check a security clearance is required. A security clearance of SECRET with Special Access Requirement is required for all personnel having access to the aircraft. A DD Form 254 will be submitted for persons requiring access.

1.11.3 Deleted 1.11.4 Deleted 1.11.5 Access to Government facilities is limited. Therefore, the Contractor shall coordinate

required access/usage times and dates through 424 SCMS/GUEAA at least ten business days prior to the need date. Control of the facilities shall remain with the Government.

1.11.6 Contractor employees shall identify themselves as Contractor personnel by introducing

themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.11.7 Emergency Procedures: Contractor employees may follow the direction of Government

employees in regards to emergency procedures, i.e., fire, tornado, active shooter, bomb threats. It is the responsibility of the Contractor to provide guidance and establish procedures for responding to an emergency for their employees. It is the Contractor’s responsibility to account for their employees following an emergency evacuation.

Page 10: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

Contractor personnel shall participate with Government personnel in all emergency response drills at no additional cost to the Government.

1.12 Advisory & Assistance Services (A&AS)/Office Space.

N/A. 1.13 Government Program Management 424 SCMS/GUEAA will provide the Government Program Manager for this Task Order.

The Government Program Manager will provide the Contractor access to all technical data required to perform approved tasking that is available and releasable. Only the Government Program Manager while functioning in his/her capacity as COR, in conjunction/coordination with local DCMA representative has authority to review and approve contract deliverables (see paragraph 1.8). All communications with the Government Program Manager shall be made via the PCO.

1.14 Government Contract Management

Responsibility for contracting activities rests solely with the Government Contracting

Officer. No conversation, recommendations, or direction, whether given directly by, or implied by Government personnel, that will affect the scope, schedule, or price of the program covered by this SOW, shall be acted upon by the Contractor unless specifically approved by the Government Contracting Officer.

1.15 Safety Requirements 1.15.1 The Contractor shall comply with all safety provisions, e.g., technical specifications,

technical publications, Federal Occupational Safety and Health Standards (Title 29 CFR. Part 1910). If there is no applicable Occupational Safety and Health Administration (OSHA) standard, use other applicable nationally recognized sources of safety, health, and fire prevention standards referenced in the work requirements of this contract.

1.16 Travel Requirements When travelling is required, it will be IAW the Federal Travel Regulation (FTR) and the

Federal Acquisition Regulation, where applicable. Contractor is not authorized to travel in support of the project without the necessary funds being available and approval from the Government is required. Contractor travel may be requested to support the Fit Check and Configuration Audits.

1.17 Contractor Manpower Reporting The contractor shall report ALL contractor labor hours (including subcontractor labor

hours) required for performance of services provided under this contract for the USAF via

Page 11: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.

Reporting Period: Contractors are required to input data by 31 October of each year. Uses and Safeguarding of Information: Information from the secure web site is

considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

User Manuals: Data for Air Force service requirements must be input at the Air Force

CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

2.0 SECTION II – SERVICE SUMMARY

2.1 Summary

The Contractor service requirements are summarized into performance requirements. The performance threshold describes the minimum acceptable levels of service for each requirement. The absence of contract requirements from the service summary does not detract from its enforceability nor limit the rights or remedies of the Government under any methods contained in the Quality Assurance Surveillance Plan (QASP) to evaluate the Contractor’s performance for the performance objectives listed below. In the event the performance requirement is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action IAW the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.

Performance Requirement Paragraph Performance Requirement Threshold Delivery of Prototype and Prototype

Test Report 1.3 PTR results 100% successful prior to

contract close out, unless non-compliance waived by PCO. Fit check of prototype door, following delivery of PTR, must

meet installation requirements. Delivery of Program Management Plan 1.3 No later than 5 days after due date.

Delivery of Monthly Status Report 1.3 No later than 5 days after due date. Delivery of Meeting Report/Minute 1.3 No later than 5 days after due date.

Page 12: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

Delivery of Test Plan 1.3 No later than 5 days after due date. Delivery of Draft TDP 1.3 No later than 5 days after due date. Delivery of Final TDP 1.3 No later than 5 days after due date. Delivery of Test Report 1.3 No later than 5 days after due date.

Delivery of Draft Overhaul Procedures 1.3 No later than 5 days after due date. Delivery of Final Overhaul Procedures 1.3 No later than 5 days after due date.

Delivery of Contract Closure Letter 1.3 No later than 5 days after due date. Delivery if Integrated Master Schedule 1.3 No later than 5 days after due date.

Delivery of Contractor WBS 1.3 No later than 5 days after due date.

3.0 SECTION III – GOVERNMENT-FURNISHED PROPERTY AND SERVICES

3.1 Refer to Requisitioned Government Furnished Property Attachment B

All products developed under this contract shall be considered Government work and shall have no license encumbrances. All Government Furnished Equipment (GFE) and Government Furnished Material (GFM) shall be returned to the Government upon completion of this contract. When returning the GFE, the Contractor shall contact the PCO for specific shipping instructions.

With PCO approval, the Contractor shall destroy any drawings or data (by shredding or other suitable method that prevents possible reconstruction) provided by the Government within 90 business days of the conclusion of the contract. The Contractor shall protect Government property to prevent damage during the period of time the property is in the possession of the Contractor. The Contractor shall report promptly to the Administrative Contracting Officer (ACO) all available facts relating to each instance of damage to Government property.

Page 13: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

ATTACHMENT 1, ACRONYM LIST

A & AS Advisory and Assistance Services ACO Administrative Contracting Officer AFARS Air Force Federal Acquisition Regulations AFI Air Force Instruction AIS Automated Information System ARO After Receipt of Order BLK Block CD Compact Disk CDRLS Contract Data Requirements Lists CFR Code Federal Regulation DACA Days After Contract Award DD Department of Defense DID Data Item Description DOD Department of Defense DODI Department of Defense Instruction FAST Flexible Acquisition Sustainment Tool FFF Form, Fit, Function GFE Government Furnished Equipment GFM Government Furnished Material GFS Government Furnished Software IAW In Accordance With JTR Joint Travel Regulations LAN Local Area Network MIPR Military Interdepartmental Purchase Request NSN National Stock Number NO Number OSHA Occupational Safety and Health Administration PARA Paragraph PCO Procurement Contracting Officer P/N Part Number PMP Program Management Plan PR Purchase Request PTR Prototype Test Report PWS Performance Work Statement SEC Section SLEP Service Life Extension Program SOW Statement of Work SS Services Summary TDP Technical Data Package QAP Quality Assurance Personnel QTY Quantity USC United States Code

Page 14: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

ATTACHMENT 2, SAMPLE CONTRACT CLOSURE LETTER

ABC Systems Engineering Services, Inc. 123 Main Street Springfield, OK 76802 02JAN2011 [Include date Contract Closure Letter is submitted]

Contract Closure Letter for: Contract Number: FAxxxx-11-xxxx [Include Contract Number from front of contract] CAGE: 1ABC2 [Include vendor’s CAGE code] CSAG Project Number: 1234 [Contact PCO for this number] This letter certifies that the deliverables for the above referenced contract have been delivered per the requirements of this contract, and that ABC Systems Engineering Services has fulfilled all contractual obligations. The table below lists all deliverables received by the Government: [List all deliverables] CDRL Description Date Delivered A001 Program Plan 15DEC2011 A002 Monthly Status Report – JAN2012 05JAN2012 A002 Monthly Status Report – FEB2012 05FEB2012 A002 Monthly Status Report – MAR2012 05MAR2012 A003 PDR Meeting Minutes 15JAN2012 A004 Test Plan 17MAR2012 A005 Prototype 10MAR2012 etc. Any questions regarding these deliverables should be directed towards:

John Smith Engineering Manager (918)987-6543 ext. 210 [email protected]

Respectfully Submitted, John Albert - President

Page 15: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

ATTACHMENT 3 – TDP Option Selection Worksheet

TDP OPTION SELECTION WORKSHEET

SYSTEM: B-2 Weapons Bay Door DATE PREPARED: 15 Oct 2015 A. CONTRACT NO. FD20301600486

B. EXHIBIT/ATTACHMENT NO.TBD

C. CLINTBD

D. CDRL DATA ITEM NO(s) 

CDRL A002

1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) Note: The level selected must coincide with the requirements of the elements selected in Block 5. 

A. ☐CONCEPTUAL LEVEL 

☐DEVELOPMENTAL LEVEL 

☒PRODUCTION LEVEL 

B. REMARKS:  

2. DELIVERABLE DATA PRODUCTS (X ALL THAT APPLY AND COMPLETE AS APPLICABLE) 

TYPE FORMAT A. ☐ 2D DRAWINGS  ☐ NATIVE CAD ☐ ISO 32000 PDF ☐ HARD

COPY ☐ OTHER FORMAT (SPECIFY)_________________________________

B. 3D MODELS: 

☐ 3D Digital MODELS ONLY 

☒ 3D Digital MODELS 

      W/ ASSOCIATED 2D  

      DRAWINGS 

☐ NATIVE CAD (Specify level of

annotation)___________________________ ☐ MODEL ORGANIZATION SCHEMA (Specify Appendix B or

other)_______ ☐ NEUTRAL FORMAT (SPECIFY, e.g., ISO 10303

APxxx)____________________ ☒ OTHER FORMAT: 2D Dawings in DXF, 3D model in IGES or STEP

C. ☒ METADATA (Specify in Section 9) 

☐ ASCII TEXT-PIPE DELIMITED ☐ ISO 10303 (SPECIFY, e.g.,

APxxx & DEX) ____ ☒ JEDMICS (DLF) ☐ OTHER FORMAT (SPECIFY)_

D. ☒ ASSOCIATED       LISTS (See Sect 7) 

☐ NATIVE FORMAT ☐ ISO 32000 PDF ☐ HARD COPY ☒ OTHER FORMAT (SPECIFY)_Refer to Section 7(As Applicable)__

E. ☒SUPPLEMENTAL TECHNICAL DATA (Specify in Section 9) 

NATIVE___________________________________________________ NEUTRAL (SPECIFY e.g., STEP AP238, 240, DEX, Other)___________________________________ OTHER (SPECIFY e.g., PDF)_Manufacturing Process Sheets in PDF__

3. CAGE CODE & DOCUMENT  A. ☒ CONTRACTOR CAGE & DOCUMENT NUMBERS 

Page 16: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

NUMBERS  ☐ GOVERNMENT CAGE (COMPLETE 3B, 3C, and 3D) 

B. USE CAGE CODE: 

TBD C. USE DOCUMENT NUMBERS:  

TBD D. TO BE ASSIGNED BY:  

TBD 4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICABLE) 

☒ CONTRACTOR FORMAT ☐ GOVERNMENT FORMAT REMARKS:____________________________________________________________________________ 5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY) 

☐ CONCEPTUAL DESIGN DRAWINGS/MODELS 

☐ DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS 

☒ PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS 

☒ SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS, MODELS AND ASSOCIATED LISTS 

☒ SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS 

☐ SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS 

☒ SPECIFICATIONS AND/OR STANDARDS (SPECIFY)_(As applicable, example‐curing)__________  

☐ SOFTWARE DOCUMENTATION (SPECIFY)______________________________________________  

☐ QUALITY ASSURANCE PROVISIONS (QAP) (SPECIFY)_____  

☒ METADATA (SPECIFY)_Per JEDMICS format requirements_________________  

☒ SUPPLEMENTARY TECHNICAL DATA (SPECIFY)  

_________________________________________  

6. TDP DATA MANAGEMENT PRODUCTS 

☒ SOURCE CONTROL DRAWING (SOCD) APPROVAL REQUEST 

☒ DRAWING NUMBER ASSIGNMENT REPORT 

☒ PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION (If changed or OEM Proprietary) 

7. ASSOCIATED LISTS (X AND COMPLETE AS APPLICABLE) 

A. PARTS LISTS (X ONE)  ☐ (1) INTEGRAL ☐ (2) SEPARATE

☒ (3) CONTRACTOR SELECT

B. DATA LISTS   ☐ REQUIRED (Specify Levels of Assy)______________________________

C. INDEX LISTS  ☐ REQUIRED (Specify Levels of Assy)______________________________

D. WIRING LISTS  ☐ REQUIRED (Specify Levels of Assy)______________________________

E. APPLICATION LISTS  ☐ (1) INTEGRAL ☐ (2) SEPARATE

☐ (3) CONTRACTOR SELECT

Page 17: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

UNCLASSIFIED

F. OTHER  ☒ REQUIRED (Specify)_Indentured BOM containing all metadata in Appendix

B________ 8. APPLICABILITY OF STANDARDS. THE FOLLOWING STANDARDS APPLY: (X AS APPLICABLE) 

☒ ASME Y14.100 ENGINEERING DRAWING PRACTICES WITH APPENDICES:

☐ B ☐ C ☐ D ☐ E

☒ ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS ☐ ASME Y14.34 ASSOCIATED LIST ☒ ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST ☐ ASME Y14.41 DIGITAL PRODUCT DEFINITION

DATA PRACTICES ☒ ASME Y14.5 DIMENSIONING AND

TOLERANCING

☐ OTHER STANDARDS

APPLY AS DESCRIBED:

COMPANY STANDARDS PERMITTED

☒ YES ☐ NO

9. OTHER TAILORING (ATTACH ADDITIONAL SHEETS AS NECESSARY) 

ATTACHMENT 4 - User Defined Metadata Attribute List

The following part, assembly, and product structure user-defined metadata attributes shall be permanently incorporated into delivered JLTV Production Technical CAD Data (content items) using the naming conventions listed in the table below. Notes:

a. Metadata shall follow the following calendar date convention: yyyy-mm-dd (year-month-day).

b. Marking Requirements - All technical data delivered as part of this CDRL submission shall have affixed the appropriate distribution statement, appropriate data rights legend, and export control warning.

Page 18: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

*Parameter value will be added after approval. 

** Parameters are 'REQ' when relevant. *** "PRELIMINARY" value is required for initial delivery. "PRELIMINARY" will be taken off at time of release. 

UNCLASSIFIED

USAF – 448 SCMS REQUIRED MINIMUM PARAMETERS IN CAD PARTS AND ASSEMBLIES 

Line # 

PARAMETER NAME 

TYPE 

PARAMETER DESCRIPTION 

FORMAT EXAMPLE 

POPULATE PARAMETERS FOR INITIAL DELIVERY (REQ=REQUIRED)

PLM SEARCHABLE 

(DESIGNATED)? 

1  AGENCY  String  Agency or service  US ARMY  REQ  Yes 

2  CAD_FORMAT_TYPE  String  CAD system used, version and release  WILDFIRE 5 M040  REQ  Yes 

CAGE_CODE 

String 

Original Design Activity CAGE code‐The activity originally authorizing/creating the design. For TACOM Army Ordnance Part Numbers, use 19207; commercial designs use original design manufacturer CAGE corresponding to the original design manufacturer’s part number in parameter name PART_NUMBER 

19207 

REQ 

Yes 

4  CENTER_OF_GRAVITY  String  Calculated center of gravity of a part or assembly  X, Y, Z = 3, 4, 6  REQ  No 

5  CHECKER_NAME  String  Person that checked the original drawing  J. DOE  REQ  No 

6  CONTRACT_NUMBER  String  Contract # under which technical data is being delivered  W31P4Q‐11‐R‐0043  REQ  Yes 

7  CRITICAL_SAFETY_ITEM  Yes No  Part Criticality to System Operation  YES  REQ  Yes 

DATA_RIGHTS_CODE 

String 

Data rights concern the ability to modify, reproduce, perform, display, 

release, or disclose recorded  information. 

U ‐ Unlimited Rights. All uses for all purposes, Government and 

Commercial. 

G ‐ Government Purpose Rights. All uses, but only for Government 

purposes. 

L ‐ Limited. Internal Government use for Government purpose with very 

little else authorized. 

R ‐ Restricted Rights. Internal Government use for Government purpose 

with very little else authorized. 

SB ‐ Small Business Innovative Research (SBIR). A special catch‐all category 

(SBIR Rights) and alters the normal use of some of the other legends. When 

dealing with a SBIR contract, the SBIR data rights clause must be applied. 

SL ‐ Special License Rights. As specified by the negotiated contract terms. 

Often used to alter the default rights under the clauses or agree to an 

apportionment of rights which does not fit neatly into the default 

categories. 

REQ 

Yes 

Page 19: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

*Parameter value will be added after approval. 

** Parameters are 'REQ' when relevant. *** "PRELIMINARY" value is required for initial delivery. "PRELIMINARY" will be taken off at time of release. 

UNCLASSIFIED

Line # 

PARAMETER NAME 

TYPE 

PARAMETER DESCRIPTION 

FORMAT EXAMPLE 

POPULATE PARAMETERS FOR INITIAL DELIVERY (REQ=REQUIRED)

PLM SEARCHABLE 

(DESIGNATED)? 

DESIGN_ACTIVITY 

String  Design activity 

TANK AUTOMOTIVE & ARMAMENTS COMMAND

REQ  Yes 

10 

DESIGN_ACTIVITY_LOCATION 

String  Design activity city, state and zip code WARREN, MICHIGAN 

48397‐5000REQ  Yes 

11  DESIGN_APPROVAL_NAME  String  Government approver name for engineering design  J. DOE  *REQ  Yes 

12 

DESIGN_CONTRACTOR 

String 

Contractor/Agency/Office physically creating drawings and models for the original design activity (optional with commercial data; mandatory with Government funded noncommercial or mixed funded product data) 

STEWART & STEVENSON SERVICES, SEALY TEXAS 

U.S.A.

REQ 

Yes 

13 

DISTRIBUTION_CODE 

String 

Technical Distribution Statement Code (DoDD 5230.24) 

A (Approved for public release; distribution is unlimited) B (Distribution authorized to U.S. Government Agencies only) C (Distribution authorized to U.S. Government Agencies and their contractors) D (Distribution authorized to the Department of Defense and U.S. DoD 

contractors only) E (Distribution authorized to DoD Components only) F (Further dissemination only as directed) X (Distribution authorized to U.S. Government Agencies and private individuals or enterprises eligible to obtain export‐controlled technical data) 

REQ 

Yes 

Page 20: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

*Parameter value will be added after approval. 

** Parameters are 'REQ' when relevant. *** "PRELIMINARY" value is required for initial delivery. "PRELIMINARY" will be taken off at time of release. 

UNCLASSIFIED

Line # 

PARAMETER NAME 

TYPE 

PARAMETER DESCRIPTION 

FORMAT EXAMPLE 

POPULATE PARAMETERS FOR INITIAL DELIVERY (REQ=REQUIRED)

PLM SEARCHABLE 

(DESIGNATED)? 

14 

DOCUMENT_TYPE 

String 

Type of item being defined in accordance with doc types listed below CD (Computer Aided Design (CAD) Document) D1 (Altered Item) D7 (Stable Base: Master Pattern) DA (Interface Control) DC (Installation) DD (Inspection) DE (Inspection Equipment & Maintenance) DG (Envelope) DI (Instruction) DN (Rework) DO (All Kits) DP (Product) DV (On vehicle Equipment/ Basic Issue Item) DX (Source Control) DZ (Vendor Item Control) 

ED (List of Equipment ‐ Depot Installed) EM (List of Equipment ‐ Manufacturer Installed) ET (List of Equipment‐Troops Installed) IM (Inspection Manual/Standard) PD (Packaging Data Sheet) PE (Per/Detail Design/Purchase Description) QF (Final Inspection Record) QP (Inspection Equipment Supply List) QS (Supplemental QA Provision) SC (Schematic) 

DP 

REQ 

Yes 

15  DRAWING_APPROVAL_NAME  String  Government approver name of drawing.  J. DOE  *REQ  Yes 

16  DRAWING_DATE  String  Date original drawing created  12/4/2013  REQ  No 

17  DRAWING_NUMBER  String  Drawing number the part/assembly is defined on  12414568  REQ  Yes 

18  DRAWN_BY  String  Person who created original drawing  J. DOE  REQ  No 

19  ENGINEER_NAME_1  String  Primary design engineer  J. DOE  REQ  No 

20  ENGINEER_NAME_2  String  Secondary design engineer  J. DOE  No 

21  ERR_ECP_APPROVAL  String  Government approving official of latest ECP  J. DOE  **REQ  No 

22  ERR_ECP_DATE  String  Date current revision was released  12/9/2020  **REQ  No 

23 

ERR_ECP_NUMBER 

String 

Approved Engineering Change Proposal (ECP), Change Request or Change Order, Change Notice, or Engineering Release Record (ERR) authorizing initial release or new revision. (For Level 3 product data the three‐character contractor name prefix as assigned by the government followed by the 5 alpha‐numeric characters the Contractor assigns from the Government‐issued block of ECP/ERR numbers.) ERR number required for level 3 product data at initial Product Baseline and beyond; ECP or contractor’s change documentation number required for tech data prior to Product Baseline. (if assigned, otherwise put “NA”) 

TACV1234 

**REQ 

No 

Page 21: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

*Parameter value will be added after approval. 

** Parameters are 'REQ' when relevant. *** "PRELIMINARY" value is required for initial delivery. "PRELIMINARY" will be taken off at time of release. 

UNCLASSIFIED

Line # 

PARAMETER NAME 

TYPE 

PARAMETER DESCRIPTION 

FORMAT EXAMPLE 

POPULATE PARAMETERS FOR INITIAL DELIVERY (REQ=REQUIRED)

PLM SEARCHABLE 

(DESIGNATED)? 

24  EXPORT_CONTROL  Yes No  Controlled by International Traffic in Arms Regulation  YES  REQ  Yes 

25  MATERIAL_ENGINEER  String  Person who approved material for design  J. DOE  REQ  No 

26  MATERIAL_TYPE  String  Material type used for part or assembly  STEEL  REQ  No 

27  MATL_CLASS  String  Classification of material used in part or assembly (e.g., metal, ceramic, composite) 

METAL  REQ  No 

28  MATL_GRADE  String Grade of material used in part or assembly

AISI 1020 CARBON STEEL REQ  No 

29  MATL_HEAT_TREAT  String Description of heat treatment used on material in part or assembly PRECIPITATION 

HARDENED **REQ  No 

30 MATL_SURF_TREAT  String 

Description of surface treatment used on material in part or assembly ANNODIZED  **REQ  No 

31  MATL_UNS_NO  String Unified Numbering System designation of material used in part or assembly G10200  **REQ  No 

32 

MODEL_REV 

String Only alpha revisions following ASME Y 14.35M revision standard allowed after Product Baseline release for production Product Data. 

C  REQ  Yes 

33  MODELER_NAME_1  String  Primary Pro/E modeler  J. DOE  REQ  No 

34  N/A           

35  NEXT_ASSY_1  String  First next higher assy part no. (shall match USED_ON_1 above)  12419847  REQ  No 

36  NEXT_ASSY_2  String  Second next higher assy part no.  12586793  No 

37  NEXT_ASSY_3  String  Third next higher assy part no.  12957485  No 

38  NEXT_ASSY_4  String  Fourth next higher assy part no.  12456873  No 

39  NEXT_ASSY_5  String  Fifth next higher assy part no.  12213484  No 

40  NEXT_ASSY_6  String  Sixth next higher assy part no.  12436875  No 

41  NEXT_ASSY_7  String  Seventh next higher assy part no.  12435623  No 

42  NEXT_ASSY_8  String  Eighth next higher assy part no.  12986458  No 

43 

NOMENCLATURE 

String Drawing name. It can be a combination of the three nomenclature lines or represents only the first line. 

BODY ASSEMBLY, CARGO, MTV LWB 

REQ  Yes 

44  NOMENCLATURE_1  String  First line of drawing nomenclature  BODY ASSEMBLY,  No 

45  NOMENCLATURE_2  String  Second line of drawing nomenclature  CARGO, MTV LWB  No 

46  NOMENCLATURE_3  String  Third line of drawing nomenclature  No 

47  PART_NUMBER  String  Item part number  12423205  REQ  Yes 

Page 22: STATEMENT OF WORK (SOW), PERFORMANCE … OF WORK (SOW), PERFORMANCE BASED ... 1.12 Advisory & Assistance Services ... management report and all other meeting reports/minutes shall

Line # 

PARAMETER NAME 

TYPE 

PARAMETER DESCRIPTION 

FORMAT EXAMPLE 

POPULATE PARAMETERS FOR INITIAL DELIVERY (REQ=REQUIRED)

PLM SEARCHABLE 

(DESIGNATED)? 

48  PMIC  String  Precious Metal Indicator Code  A  No 

49  QA_ENGINEER_NAME  String  Quality assurance engineer  J. DOE  REQ  No 

50 

REMARKS  String  Remarks  PRELIMINARY  ***REQ  No 

51  SPEC_NUMBER  String  Spec number  MIL‐STD‐105  No 

52  TOLERANCE_1_PLACE  String  Default tolerance if indicated on drawing  0.1 REQ No 

53  TOLERANCE_2_PLACE  String  Default tolerance if indicated on drawing  0.03 REQ No 

54  TOLERANCE_3_PLACE  String  Default tolerance if indicated on drawing  0.002 REQ No 

55  TOLERANCE_ANG  String  Default tolerance if indicated on drawing  1 REQ No 

56  UID_MARKABLE 

Yes No 

In accordance with contract requirements, indicate if part requires 

Unique Identification (UID) marking 

YES  REQ  Yes 

57  UNIT_WEIGHT  Real Number  Mass value  1.25  REQ  No 

58  USED_ON_1  String  First used on item  M270A1  REQ  No 

59  USED_ON_2  String  Second used on item  No 

60  USED_ON_3  String  Third used on item  No 

61  USED_ON_4  String  Fourth used on item  No 

62  USED_ON_5  String  Fifth used on item  No 

63  USED_ON_6  String  Sixth used on item  No 

64  USED_ON_7  String  Seventh used on item  No 

65  USED_ON_8  String  Eighth used on item  No 

66  WEIGHT_UNIT  String  Automatically filled out ‐ toolkit application  lb  REQ  No