STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public...

136
STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION IN THE MATTER OF AN ORDER APPROVING ADVISORY COMMITTEE RECOMMENDATIONS PURSUANT TO INDIANA CODE CHAPTER 8-1-26. ) ) ) ) APPROVED: ORDER OF THE COMMISSION MAY 1 6 2018 Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case. The Cases received pursuant to Ind. Code ch. 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations. Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is directed to prepare and send notice to the parties advising them of the determination. Any approved civil penalties are due within 90 days of the date of this Order unless payment arrangements are made with the Secretary of the Commission. Any approved trainings must be completed no later than 180 days from the date of this Order or the alternative civil penalty noted in the attached recommendation is due. IT IS SO ORDERED. HUSTON, FREEMAN, AND ZIEGNER CONCUR; OBER ABSENT; APPROVED: MAY 1 6 2018 I hereby certify that the above is a true and correct copy of the Order as approved.

Transcript of STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public...

Page 1: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

STATE OF INDIANA

INDIANA UTILITY REGULATORY COMMISSION

IN THE MATTER OF AN ORDER APPROVING ADVISORY COMMITTEE RECOMMENDATIONS PURSUANT TO INDIANA CODE CHAPTER 8-1-26.

) ) ) )

APPROVED:

ORDER OF THE COMMISSION

MAY 1 6 2018

Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.

The Cases received pursuant to Ind. Code ch. 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.

Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is directed to prepare and send notice to the parties advising them of the determination.

Any approved civil penalties are due within 90 days of the date of this Order unless payment arrangements are made with the Secretary of the Commission.

Any approved trainings must be completed no later than 180 days from the date of this Order or the alternative civil penalty noted in the attached recommendation is due.

IT IS SO ORDERED.

HUSTON, FREEMAN, AND ZIEGNER CONCUR; OBER ABSENT;

APPROVED: MAY 1 6 2018

I hereby certify that the above is a true and correct copy of the Order as approved.

Page 2: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Matthew Wichlinski Citizens Gas 16532 3/20/2018 8/21/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

I"! Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

Ill Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

0 Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Warren

Additional Information:-----------------------

APPROVED: Dan Meiners · Vice Chairman

Page 3: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Tony Lackey Other Party: Case Number:

Northern Indiana Public Service Company 16554

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/13/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

\Q. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$----------------------

0 Other-------------------------~

Abstentions: Selking

APPROVED: 222-' -Ben Warren Chairman

Page 4: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Brooks Construction Co., Inc. Northern Indiana Public Service Company 16556 3/20/2018 7/12/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1·26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special insn·uctions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Po1holing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

~ Civil penalty of$ -<-3"'4-'/ ee()=:.=------------------0 Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 5: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Premier Car Ports Other Party: Case Number:

Northern Indiana Public Service Company 16557

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/12/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

;!f. Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

ij_ Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 6: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Larry Kreft Other Party: Case Number:

Northern Indiana Public Service Company 16559

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/12/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

18 Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 7: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

B & B Roofing & Constrnction, Inc. Northern Indiana Public Service Company 16560

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ ~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 8: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Brooks Construction Co., Inc.

Case Number: 16562 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 9: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Scott Szczypiorski Other Party: Case Number:

Northern Indiana Public Service Company 16563

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

& Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

m Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 10: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Ironclad Excavating, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16564

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

~ Civil penalty of$ --'~"-L-5_0-0 ________________ _ D Other _________________________ ~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chainnan

Page 11: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Atlee Wickey Other Party: Case Number:

Northern Indiana Public Service Company 16565

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

I([ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

fil.I Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: -=-Ben Warren Chairman

Page 12: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Glen Franzen Other Party: Case Number:

Northern Indiana Public Service Company 16566

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

jil Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

li!l Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Reparr

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 13: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017

The IURC Pipeline Safety Division finds the following violation( s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

fS. Civil penalty of$ _Lj....,_,~-=-----------------D Other-------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 14: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Northern Indiana Public Service Company All Star Construction & Excavating, Inc. 16568 3/20/2018 7/7/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Ti,kets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

K Civilpenaltyof$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ----------------------------Abstentions: Selking

Additional Information:------------------------

APPROVED: Ben Warren Chairman

Page 15: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Trine University, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16569

Date of Advisory Meeting: 3/20/2018 Date of Damage: 717/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special insn·uctions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Qi. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 16: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Walsh & Kelly

Case Number: 16570 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/7/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines D Potholing

D Dig Tickets

D Demolitions

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

II'!. Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 17: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company PG X, Inc.

Case Number: 16571 Date of Advisory Meeting: 3/20/2018 Date of Damage: 717/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

0 Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 18: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Winona Lake Restoration LLC Other Party: Case Number:

Northern Indiana Public Service Company 16572

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/7/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines

D Dig Tickets

D Demolitions

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

ii!!. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 19: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Craig Excavating LLC Other Party: Case Number:

Northern Indiana Public Service Company 16573

Date of Advisory Meeting: 3/20/2018 Date of Damage: 717/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

S. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

I

APPROVED: Ben Warren Chairman

Page 20: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Town of Greentown Other Party: Case Number:

Northern Indiana Public Service Company 16574

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

8 Warning letter (Special instructions:)

!"f Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 21: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Manchester, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16576

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$----------------------

0 Other -------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 22: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Cornerstone Homes & Construction LLC Northern Indiana Public Service Company 16578

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ___________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 23: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Schwartz Barn Restoration Other Party: Case Number:

Northern Indiana Pnblic Service Company 16580

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 24: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Area Plumbing & Sewer Co., Inc.

Case Number: 16581 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Ill. Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ___________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 25: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Sikma Plumbing, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16582

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

1\1. Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 26: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Hoosierland Excavating Other Party: Case Number:

Northern Indiana Public Service Company 16583

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 27: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Frank Kustron Other Party: Case Number:

Northern Indiana Public Service Company 16584

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

II Warning letter (Special insu·uctions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 28: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Winona Lake Restoration LLC Northern Indiana Pnblic Service Company 16586 3/20/2018 7/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Ii'!-' Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ______ ~-------------------

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 29: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Fordale Construction Other Party: Case Number:

Northern Indiana Public Service Company 16587

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

°"' Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

Additional Information:-----------------------

APPROVED: Ben Warren Chairman

Page 30: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Steve Ritchie Other Party: Case Number:

Northern Indiana Public Service Company 16589

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

g._ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

iK:J Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 31: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Zachary Storm Other Party: Case Number:

Northern Indiana Public Service Company 16590

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(l)

The Advisory Committee recommends the following penalty:

fil. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

ii.J. Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D Wbite Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 32: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Rick Nettrouer Vectren Energy Delivery 16596 3/20/2018 7/4/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

let- Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

Iii Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 33: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Acme Plumbing & Drain Service Vectren Energy Delivery

Case Number: 16597 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)

The Advisory Committee recommends the following penalty:

12!. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

ilt Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions:

APPROVED: Ben Warren Chairman

Page 34: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Culy Contracting, Inc. Vectren Energy Delivery 16598 3/20/2018 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D W aming letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines D Potholing

0 Dig Tickets 0 Probing

D Demolitions

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$----------------------

0 Other -------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 35: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Midwest Paving 16599 3/20/2018 7/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

l5J. Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions:

APPROVED: Ben Warren Chairman

Page 36: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Drainage Construction Unlimited, Inc. Vectren Energy Delivery

Case Number: 16600 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)

The Advisory .Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000 3 oeio 3,oaO

liil Civil penalty of ${,see, can mitigate $r;500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions:

Additional Information: _.P-'-"'OJ..,'_,.\t.d.....,__.....;-\i2:....:;.._W.._._..ll.!""'..._f\_,___-'l'....:.l\'---'C"-'a.:=.u..1r<'...=-_._\ 5=-=gc.:.~=O....:.._

-£il~ Ben Warren ----..._

APPROVED:

Chairman

Page 37: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery BM B, Inc. 16601 3/20/2018 7/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 38: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Charles Blevens Vectren Energy Delivery 16602 3/20/2018 7/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 39: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Berry-It, Inc. Vectren Energy Delivery 16603 3/20/2018 717/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

O Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of $1,000

0 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

~

0

Civil penalty of$ _4_..,._0_.0..,.,0.___--'('-=~=.......<3'--', 00""""'""0.___+-'--'1..,.~_.,I,,..... 000""""''--'-n-o"'-=--_,-\j-'-' c..LJ--"-'--'=---Other esccJ~'on')

-----------==.:-=---'-------'----------~

Abstentions:

Additional Information:

APPROVED:

---------------------~

Ben Warren Chairman

Page 40: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Affordable Fence Builders LLC Vectren Energy Delivery

Case Number: 16604 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/7/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)·

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

0 Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

APPROVED: Ben Warren Chairman

Page 41: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

W E Simmons & Sons Vectren Energy Delivery 16606 3/20/2018 7/9/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

")( Warning letter (Special instructions:)

0 Clearance Zone 0 Failure to Plan

0 Damaging Lines 0 Potholing

0 Dig Tickets

0 Demolitions

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

~ Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of$1,000

0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other -------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 42: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

White Construction, Inc. Vectren Energy Delivery 16612 3/20/2018 7/13/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 43: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Petro Towery Vectren Energy Delivery 16613 3/20/2018 7/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

IA. Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

APPROVED: Ben Warren Chainnan

Page 44: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

RT Moore, Co. Vectren Energy Delivery 16615 3/20/2018 7/12/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

~ Civil penalty of$ _S=+-,oo~~o~----------------0 Other

-------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 45: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery Other Party: Case Number:

Drainage Construction Unlimited, Inc. 16617

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/12/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Conunittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --~-----~-------------------

Abstentions:

Additional Information:------------------------

APPROVED: Ben Warren Chairman

Page 46: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Luminaire Service 16618 3/20/2018 7/13/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Conunittee reconunends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Di.. Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

APPROVED: Ben Warren Chairman

Page 47: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Thomas Naas Builders Vectren Energy Delivery 16619 3/20/2018 7/13/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

!'!. Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of $1,000

0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other --------------------------Abstentions:

APPROVED: Ben Warren Chairman

Page 48: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Patriot Electric Co., LLC Vectren Energy Delivery 16620 3/20/2018 7/13/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 49: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery B MB, Inc. 16622 3/20/2018 7/14/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines

D Dig Tickets

D Demolitions

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

!fl.. Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 50: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

G E S General Contractors LLC Vectren Energy Delivery

Case Number: 16623 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/14/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

APPROVED: Ben Warren Chairman

Page 51: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Atlas Excavating, Inc. Vectren Energy Delivery 16695 3/20/2018 8/112017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special insn·uctions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

ll1l- Civil penalty of$ -=S~,_e00 _________________ _ D Other

-~~~~~~~~~~~~~~~~~~~~~~~~~

Abstentions:

APPROVED: Ben Warren Chairman

Page 52: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Fishero & Fishero, Inc. Vectren Energy Delivery 16696 3/20/2018 8/1/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

C(! Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 53: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Johnson County REMC 16697 3/20/2018 8/1/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D W aming letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

L Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

APPROVED: Ben Warren Chaillnan

Page 54: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

William Talbert Vectren Energy Delivery 16699 3/20/2018 8/1/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

[l. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 55: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date ofDarnage:

Blankenberger Brothers, Inc. Vectren Energy Delivery 16702 3/20/2018 8/1/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

Im- Civil penalty of$ _5=''-'00-0'-=--='------------------D Other-------------------------~

Abstentions:

APPROVED: z 17-_· --Ben Warren Chairman

Page 56: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery James H Drew Corp. 16705 3/20/2018 8/2/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

[l Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

l(t Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

APPROVED: Ben Warren Chairman

Page 57: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

C C & T Construction, Inc. Vectren Energy Delivery 16707 3/20/2018 8/2/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ ~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 58: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Forest Lawn Cemetery Vectren Energy Delivery 16710 3/20/2018 8/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ ~

Abstentions:

APPROVED: Ben Warren Chairman

Page 59: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Smith Projects, Inc. 16713 3/20/2018 8/4/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Connnittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

iill Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 60: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

2 Brothers Fencing LLC Vectren Energy Delivery 16715 3/20/2018 8/4/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 61: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Ryan Drown Vectren Energy Delivery 16716 3/20/2018 8/5/2017

The IURC Pipeline Safety Division finds the following violation(s ): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

tiq Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 62: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Lineal Contracting 16717 3/20/2018 8/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

,Ji.! Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

APPROVED: Ben Warren Chafilnan

Page 63: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vive Exterior Design, LLC Vectren Energy Delivery 16718 3/20/2018 8/5/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

® Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~igTickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 64: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Miller Pipeline, LLC 16719 3/20/2018 817/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Conunittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

8 Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Miller

APPROVED: Ben Warren Chairman

Page 65: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Siteworx LLC 16724 3/20/2018 8/9/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

OS. Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

APPROVED: Ben Warren Chairman

Page 66: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery The Uncloggables 16725 3/20/2018 8/9/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines

D Dig Tickets

[I Demolitions

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Ii!! Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions:

APPROVED: Ben Warren Chairman

Page 67: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery Other Party: Case Number:

City of Evansville (Water & Sewer Departments) 16728

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

K Civilpenaltyof$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 68: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Bowen Engineering Corporation Vectren Energy Delivery

Case Number: 16729 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Reparr

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

IJ!.. Civil penalty of$ _._5"""-L,=$1'\)""""""'"'------------------

o Other -------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 69: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Robert Beadles Vectren Energy Delivery 16731 3/20/2018 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

iif Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

li'I Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 70: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

West Trailer Park Vectren Energy Delivery 16732 3/20/2018 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)

The Advisory Committee recommends the following penalty:

Qil,. Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions:

APPROVED: Ben Warren Chairman

Page 71: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Asplundh Construction Corp. 16733 3/20/2018 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 72: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Vectren Energy Delivery Crider & Crider Construction 16734

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ~---------------------------

Abstentions:

APPROVED: Ben Warren Chairman

Page 73: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Brooks Striping 16735 3/20/2018 8/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

II!. Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$----------------------0 Other _________________________ ~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 74: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Kenneth Centers Vectren Energy Delivery 16736 3/20/2018 8/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 75: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Ricks Drain Care 16738 3/20/2018 8/1112017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

O Training or $5,000 civil penalty if fail to complete training

I& Civil penalty of$1,000

O Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other -------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 76: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery City of Anderson 16740 3/20/2018 8/13/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special insn·uctions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

APPROVED: Ben Warren Chairman

Page 77: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery Other Party: Case Number:

Bowen Engineering Corporation 16744

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/14/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

.!!J, Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ----------------------------Abstentions:

APPROVED: Ben Warren Chairman

I

0

Page 78: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Jeff Partain Vectren Energy Delivery 16745 3/20/2018 8/14/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

~Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 79: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Mister Quik Home Services Vectren Energy Delivery 16748 3/20/2018 8/15/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines

D Dig Tickets

D Demolitions

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

M Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 80: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Brackney, Inc. Vectren Energy Delivery 16751 3/20/2018 8/15/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Conunittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

!>'!. Civil penalty of$ --'5"",'""'W"""'------------------D Other

~~~~~~~~~~~~~~~~~~~~~~~~~~

Abstentions:

APPROVED: Ben Warren Chainnan

Page 81: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Concreteplus Foundations LLC Vectren Energy Delivery

Case Number: 16753 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/16/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

Civil penalty of$ Y'OOO ($2, 000 ;- j? lOOO ~o ti cAltl-' Other e-::,c_tjccb'on. J

Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 82: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Goran Brboric Other Party: Case Number:

Northern Indiana Public Service Company 16754

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failnre to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 83: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Paul Wert Other Party: Case Number:

Northern Indiana Public Service Company 16755

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 84: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Albert Jones Other Party: Case Number:

Northern Indiana Public Service Company 16756

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

ti!. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

Qil Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 85: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: MarkGypson Other Party: Case Number:

Northern Indiana Public Service Company 16757

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines

ji(j Dig Tickets

D Demolitions

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 86: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Griffin Irrigation Other Party: Case Number:

Northern Indiana Public Service Company 16758

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/17/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

Oil Warning letter (Special instructions:)

R Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 87: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Jerardo Robles Other Party: Case Number:

Northern Indiana Public Service Company 16759

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/17/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

fJ.. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

It!- Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Reparr

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$----------------------0 Other _________________________ ~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 88: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

BradCronmiller 'fop Gea..,;r (-\~ G,-r00p L/_.,C. Northern Indiana Public Service Company

Case Number: 16760 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/17/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

£2l- Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$--------------~-------

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 89: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: C D Concrete LLC Other Party: Case Number:

Northern Indiana Public Service Company 16761

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 90: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Fourway Communications, LLC Other Party: Case Number:

Northern Indiana Public Service Company 16763

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

® Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 91: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Hipskind Concrete Other Party: Case Number:

Northern Indiana Public Service Company 16764

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

0 Training or $5,000 civil penalty if fail to complete training

O Civil penalty of$1,000

0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

Civil penalty of$ -~$~{7(Ji) _________________ _

O Other -------------------------~

Abstentions: Selking

Additional Information: -----------------------

APPROVED: Ben Warren Chairman

Page 92: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Premium Concrete Services, Inc.

Case Number: 16765 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

g, Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 93: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dunigan Bros., Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16766

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/19/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

e5I. Civil penalty of$ __..'2>_,_,_, "60.:.._ __________________ _

D Other~------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 94: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Rieth-Riley Construction Co., Inc. Northern Indiana Public Service Company 16769

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/19/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

0 Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of$1,000

O · Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

Ill. Civilpenaltyof$ (a,eoo ~5.ooo .,.. S \,llCQ no ·hcit.el- escaJa.i,'f>nJ 0 Other

-------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 95: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company True Line Fence (Merrilville)

Case Number: 16770 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/19/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

O Training or $5,000 civil penalty if fail to complete training

~ Civilpenaltyof$1,000

0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 96: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Michelle L Kessler Other Party: Case Number:

Northern Indiana Public Service Company 16772

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/20/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

&. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

Kl Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 97: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Walls By Walls, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16773

Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/21/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

ltl.. Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 98: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Cash Transport, LLC Fonntaintown Gas Company, Inc 16814 3/20/2018 8/26/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special insn·uctions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

~ Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions:

APPROVED: Ben Warren Chairman

Page 99: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Dunigan Bros., Inc.

Case Number: 16818 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017

TheIURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

0 Training or $5,000 civil penalty if fail to complete training

lm.. Civil penalty of $1,000

0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other --------------------------Abstentions: Selking

Additional Information:-----------------------

APPROVED: Ben Warren Chairman

Page 100: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Matthew Miller Other Party: Case Number:

Northern Indiana Public Service Company 16819

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

g Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 101: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: City of Knox Other Party: Case Number:

Northern Indiana Public Service Company 16820

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

e<I Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

!liL Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 102: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Shady Acres Repair, SAR LLC Other Party: Case Number:

Northern Indiana Public Service Company 16821

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions:

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 103: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Taylor Gage Concrete, LLC Other Party: Case Number:

Northern Indiana Public Service Company 16822

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/14/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

& Training or $5,000 civil penalty if fail to complete training

0 Civilpenaltyof$1,000

0 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 104: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Fred Bailey Other Party: Case Number:

Northern Indiana Pnblic Service Company 16824

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/14/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

fig. Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 105: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: A Slide Hammer LLC Other Party: Case Number:

Northern Indiana Public Service Company 16826

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/12/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

{Jl._ Training or $ 5, 000 civil penalty if fail to comp 1 ete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

Additional Information:-----------------------

APPROVED: Ben Warren Chairman

Page 106: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lance Brockmann Other Party: Case Number:

Northern Indiana Public Service Company 16827

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

fl- Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 107: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Residential Electrical Systems Other Party: Case Number:

Northern Indiana Pnblic Service Company 16828

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

"!<.... Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines D Potholing

0 Dig Tickets

D Demolitions

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

II Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 108: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Northern Indiana Public Service Company PirTano Construction Company, Inc. 16829 3/20/2018 8/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Di! Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 109: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northwest Indiana Fence Co. Other Party: Case Number:

Northern Indiana Public Service Company 16830

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/11/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special insu·uctions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

Ill-. Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

~ Civil penalty of$ _L\-'+-, roQ"'""""-"'-------------------

0 Other --------------------------Abstentions: Selking

Additional Information: __,_[~\>"""ccU""""'a.1""' ..... ~"""'&~__...\a:..:.[..:::::C.'--f'at-'-="'-'=lQC}=---+o-=-=-----+.rovi {\ I (\ QL\G i 7 3 8'

APPROVED: Ben Warren Chairman

Page 110: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Solid Finish Construction Inc.

Case Number: 16831 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

ii Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ----------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 111: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Northern Indiana Public Service Company Indiana American Water Co. DBA Indiana American 16832 3/20/2018 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D Wbite Lining

D Training or $5,000 civil penalty if fail to complete training

!l'I. Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ___________________________ _

Abstentions: Selking

Additional Information:------------------------

APPROVED: Ben Warren Chairman

Page 112: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company Other Party: Case Number:

John Boettcher Sewer & Excavating Contractor, LTD 16833

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory C01mnittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

6l Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 113: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Patriot Cable Other Party: Case Number:

Northern Indiana Public Service Company 16834

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

& Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of$1,000

0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other ----------------------------Abstentions: Selking

APPROVED: Ben Warren Chainnan

Page 114: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lawn Care 4 Aces LLC Other Party: Case Number:

Northern Indiana Pnblic Service Company 16835

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Daroaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

/fJ. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$----------------------

0 Other -------------------------~

Abstentions: Selking

Additional Information: rel)bi cJ.ed £/ew llt

APPROVED: Ben Warren Chairman

Page 115: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Travis Dearinger Other Party: Case Number:

Northern Indiana Pnblic Service Company 16836

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines D Potholing

~ Dig Tickets

D Demolitions

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 116: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dewes Excavating, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16837

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

0 Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

IR Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 117: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Litco Mechanical Other Party: Case Number:

Northern Indiana Public Service Company 16838

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

f(l.. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

Additional Information: Vl'i!:tvtcled //ew J f-

APPROVED: Ben Warren Chairman

Page 118: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Ritschard Brothers, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16839

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 119: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Northern Indiana Public Service Company All Star Construction & Excavating, Inc. 16840

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

® Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 120: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: A-Hope OS Systems, LLC Other Party: Case Number:

Northern Indiana Pnblic Service Company 16841

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)

The Advisory Committee recommends the following penalty:

Ii!. Warning letter (Special instructions:)

!II Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

,!lJ Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 121: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Todo Excavation & Grading, Inc. Northern Indiana Public Service Company 16842

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

IB Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 122: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Mr. Underground

Case Number: 16843 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Cmmnittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

l'!l Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 123: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Eventt Norris

Case Number: 16844 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

S. Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ___________________________ _

Abstentions: Selking

Additional Information:------------------------

APPROVED: =-Ben Warren Chairman

Page 124: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: K & M Concrete LLC Other Party: Case Number:

Northern Indiana Pnblic Service Company 16845

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

. 0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

!1'J-. Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of $1,000

0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ _____________________ _

0 Other ___________ ~-------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 125: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Asplundh Construction Corp. Northern Indiana Public Service Company 16846 3/20/2018 8/8/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

0 Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

121- Civil penalty of$ __,,5-"'-'-, =Ee()='-------------------

0 Other-------------------------~

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 126: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Caribbean Pools, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16847

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/7/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

i2l. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

ii!!. Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 127: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Meyers Development Other Party: Case Number:

Northern Indiana Public Service Company 16848

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/7/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 128: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company The Robert Henry Corporation

Case Number: 16851 Date of Advisory Meeting: 3/20/2018 Date of Damage: 817/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civilpenaltyof$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other --------------------------Abstentions: Selking

Additional Information:-----------------------

APPROVED: Ben Warren Chairman

Page 129: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Charles Wentworth Other Party: Case Number:

Northern Indiana Public Service Company 16852

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

If!'.. Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 130: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Clayton Julian Other Party: Case Number:

Northern Indiana Public Service Company 16853

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/6/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

!!.! Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

!!!. Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 Whlte Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ ~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 131: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: City of Wabash Other Party: Case Number:

Northern Indiana Public Service Company 16854

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/4/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

g Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions: Selking

APPROVED: --== Ben Warren Chairman

Page 132: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: William Herman Other Party: Case Number:

Northern Indiana Public Service Company 16855

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/4/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

l!'l.. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

0 Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other _________________________ _

Abstentions: Selking

Additional Information:----------------------

APPROVED: Ben Warren Chairman

Page 133: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Carey Excavation, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 16856

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other-------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 134: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Greg Logan Other Party: Case Number:

Northern Indiana Public Service Company 16857

Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________ ~-------

D Other _________________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 135: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Hire Construction, Inc.

Case Number: 16858 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/3/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

ll!J Civil penalty of$1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions: Selking

APPROVED: Ben Warren Chairman

Page 136: STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017 The IURC Pipeline Safety Division finds

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Geiger Excavating, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 17229

Date of Advisory Meeting: 3/20/2018 Date of Damage: 9/19/2017

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civilpenaltyof$1,000

f)J.. Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _

D Other -------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chainnan