STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public...
Transcript of STATE OF INDIANA INDIANA UTILITY …All Star Construction & Excavating, Inc. Northern Indiana Public...
STATE OF INDIANA
INDIANA UTILITY REGULATORY COMMISSION
IN THE MATTER OF AN ORDER APPROVING ADVISORY COMMITTEE RECOMMENDATIONS PURSUANT TO INDIANA CODE CHAPTER 8-1-26.
) ) ) )
APPROVED:
ORDER OF THE COMMISSION
MAY 1 6 2018
Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.
The Cases received pursuant to Ind. Code ch. 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.
Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is directed to prepare and send notice to the parties advising them of the determination.
Any approved civil penalties are due within 90 days of the date of this Order unless payment arrangements are made with the Secretary of the Commission.
Any approved trainings must be completed no later than 180 days from the date of this Order or the alternative civil penalty noted in the attached recommendation is due.
IT IS SO ORDERED.
HUSTON, FREEMAN, AND ZIEGNER CONCUR; OBER ABSENT;
APPROVED: MAY 1 6 2018
I hereby certify that the above is a true and correct copy of the Order as approved.
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Matthew Wichlinski Citizens Gas 16532 3/20/2018 8/21/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
I"! Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
Ill Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Warren
Additional Information:-----------------------
APPROVED: Dan Meiners · Vice Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Tony Lackey Other Party: Case Number:
Northern Indiana Public Service Company 16554
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
\Q. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other-------------------------~
Abstentions: Selking
APPROVED: 222-' -Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Brooks Construction Co., Inc. Northern Indiana Public Service Company 16556 3/20/2018 7/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1·26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special insn·uctions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Po1holing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ -<-3"'4-'/ ee()=:.=------------------0 Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Premier Car Ports Other Party: Case Number:
Northern Indiana Public Service Company 16557
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
;!f. Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
ij_ Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Larry Kreft Other Party: Case Number:
Northern Indiana Public Service Company 16559
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
18 Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
B & B Roofing & Constrnction, Inc. Northern Indiana Public Service Company 16560
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ ~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Brooks Construction Co., Inc.
Case Number: 16562 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Scott Szczypiorski Other Party: Case Number:
Northern Indiana Public Service Company 16563
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
& Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
m Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Ironclad Excavating, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16564
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ --'~"-L-5_0-0 ________________ _ D Other _________________________ ~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chainnan
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Atlee Wickey Other Party: Case Number:
Northern Indiana Public Service Company 16565
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
I([ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
fil.I Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: -=-Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Glen Franzen Other Party: Case Number:
Northern Indiana Public Service Company 16566
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
jil Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
li!l Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Reparr
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
All Star Construction & Excavating, Inc. Northern Indiana Public Service Company 16567 3/20/2018 7/7/2017
The IURC Pipeline Safety Division finds the following violation( s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
fS. Civil penalty of$ _Lj....,_,~-=-----------------D Other-------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Northern Indiana Public Service Company All Star Construction & Excavating, Inc. 16568 3/20/2018 7/7/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Ti,kets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
K Civilpenaltyof$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ----------------------------Abstentions: Selking
Additional Information:------------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Trine University, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16569
Date of Advisory Meeting: 3/20/2018 Date of Damage: 717/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special insn·uctions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
Qi. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Walsh & Kelly
Case Number: 16570 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/7/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines D Potholing
D Dig Tickets
D Demolitions
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
II'!. Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company PG X, Inc.
Case Number: 16571 Date of Advisory Meeting: 3/20/2018 Date of Damage: 717/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Winona Lake Restoration LLC Other Party: Case Number:
Northern Indiana Public Service Company 16572
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/7/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines
D Dig Tickets
D Demolitions
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
ii!!. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Craig Excavating LLC Other Party: Case Number:
Northern Indiana Public Service Company 16573
Date of Advisory Meeting: 3/20/2018 Date of Damage: 717/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
S. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
I
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Town of Greentown Other Party: Case Number:
Northern Indiana Public Service Company 16574
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
8 Warning letter (Special instructions:)
!"f Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Manchester, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16576
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other -------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Cornerstone Homes & Construction LLC Northern Indiana Public Service Company 16578
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ___________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Schwartz Barn Restoration Other Party: Case Number:
Northern Indiana Pnblic Service Company 16580
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Area Plumbing & Sewer Co., Inc.
Case Number: 16581 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
Ill. Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ___________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Sikma Plumbing, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16582
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
1\1. Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Hoosierland Excavating Other Party: Case Number:
Northern Indiana Public Service Company 16583
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Frank Kustron Other Party: Case Number:
Northern Indiana Public Service Company 16584
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
II Warning letter (Special insu·uctions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Winona Lake Restoration LLC Northern Indiana Pnblic Service Company 16586 3/20/2018 7/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
Ii'!-' Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ______ ~-------------------
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Fordale Construction Other Party: Case Number:
Northern Indiana Public Service Company 16587
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
°"' Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
Additional Information:-----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Steve Ritchie Other Party: Case Number:
Northern Indiana Public Service Company 16589
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
g._ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
iK:J Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Zachary Storm Other Party: Case Number:
Northern Indiana Public Service Company 16590
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(l)
The Advisory Committee recommends the following penalty:
fil. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
ii.J. Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D Wbite Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Rick Nettrouer Vectren Energy Delivery 16596 3/20/2018 7/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
let- Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
Iii Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Acme Plumbing & Drain Service Vectren Energy Delivery
Case Number: 16597 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
12!. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
ilt Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Culy Contracting, Inc. Vectren Energy Delivery 16598 3/20/2018 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines D Potholing
0 Dig Tickets 0 Probing
D Demolitions
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other -------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Midwest Paving 16599 3/20/2018 7/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
l5J. Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Drainage Construction Unlimited, Inc. Vectren Energy Delivery
Case Number: 16600 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)
The Advisory .Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000 3 oeio 3,oaO
liil Civil penalty of ${,see, can mitigate $r;500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions:
Additional Information: _.P-'-"'OJ..,'_,.\t.d.....,__.....;-\i2:....:;.._W.._._..ll.!""'..._f\_,___-'l'....:.l\'---'C"-'a.:=.u..1r<'...=-_._\ 5=-=gc.:.~=O....:.._
-£il~ Ben Warren ----..._
APPROVED:
Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery BM B, Inc. 16601 3/20/2018 7/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Charles Blevens Vectren Energy Delivery 16602 3/20/2018 7/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Berry-It, Inc. Vectren Energy Delivery 16603 3/20/2018 717/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
O Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
~
0
Civil penalty of$ _4_..,._0_.0..,.,0.___--'('-=~=.......<3'--', 00""""'""0.___+-'--'1..,.~_.,I,,..... 000""""''--'-n-o"'-=--_,-\j-'-' c..LJ--"-'--'=---Other esccJ~'on')
-----------==.:-=---'-------'----------~
Abstentions:
Additional Information:
APPROVED:
---------------------~
Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Affordable Fence Builders LLC Vectren Energy Delivery
Case Number: 16604 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/7/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)·
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
W E Simmons & Sons Vectren Energy Delivery 16606 3/20/2018 7/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(3)(b)
The Advisory Committee recommends the following penalty:
")( Warning letter (Special instructions:)
0 Clearance Zone 0 Failure to Plan
0 Damaging Lines 0 Potholing
0 Dig Tickets
0 Demolitions
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
~ Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of$1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other -------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
White Construction, Inc. Vectren Energy Delivery 16612 3/20/2018 7/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Petro Towery Vectren Energy Delivery 16613 3/20/2018 7/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
IA. Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
APPROVED: Ben Warren Chainnan
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
RT Moore, Co. Vectren Energy Delivery 16615 3/20/2018 7/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(out)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _S=+-,oo~~o~----------------0 Other
-------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Energy Delivery Other Party: Case Number:
Drainage Construction Unlimited, Inc. 16617
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Conunittee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --~-----~-------------------
Abstentions:
Additional Information:------------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Luminaire Service 16618 3/20/2018 7/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Conunittee reconunends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
Di.. Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Thomas Naas Builders Vectren Energy Delivery 16619 3/20/2018 7/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
!'!. Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other --------------------------Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Patriot Electric Co., LLC Vectren Energy Delivery 16620 3/20/2018 7/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(3)(b)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery B MB, Inc. 16622 3/20/2018 7/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines
D Dig Tickets
D Demolitions
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
!fl.. Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
G E S General Contractors LLC Vectren Energy Delivery
Case Number: 16623 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Atlas Excavating, Inc. Vectren Energy Delivery 16695 3/20/2018 8/112017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special insn·uctions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
ll1l- Civil penalty of$ -=S~,_e00 _________________ _ D Other
-~~~~~~~~~~~~~~~~~~~~~~~~~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Fishero & Fishero, Inc. Vectren Energy Delivery 16696 3/20/2018 8/1/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
C(! Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Johnson County REMC 16697 3/20/2018 8/1/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
L Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
APPROVED: Ben Warren Chaillnan
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
William Talbert Vectren Energy Delivery 16699 3/20/2018 8/1/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
[l. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date ofDarnage:
Blankenberger Brothers, Inc. Vectren Energy Delivery 16702 3/20/2018 8/1/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Im- Civil penalty of$ _5=''-'00-0'-=--='------------------D Other-------------------------~
Abstentions:
APPROVED: z 17-_· --Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery James H Drew Corp. 16705 3/20/2018 8/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
[l Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
l(t Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
C C & T Construction, Inc. Vectren Energy Delivery 16707 3/20/2018 8/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ ~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Forest Lawn Cemetery Vectren Energy Delivery 16710 3/20/2018 8/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ ~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Smith Projects, Inc. 16713 3/20/2018 8/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Connnittee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
iill Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
2 Brothers Fencing LLC Vectren Energy Delivery 16715 3/20/2018 8/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Ryan Drown Vectren Energy Delivery 16716 3/20/2018 8/5/2017
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
tiq Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Lineal Contracting 16717 3/20/2018 8/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
,Ji.! Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
APPROVED: Ben Warren Chafilnan
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vive Exterior Design, LLC Vectren Energy Delivery 16718 3/20/2018 8/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
® Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~igTickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Miller Pipeline, LLC 16719 3/20/2018 817/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Conunittee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
8 Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Miller
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Siteworx LLC 16724 3/20/2018 8/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
OS. Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery The Uncloggables 16725 3/20/2018 8/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines
D Dig Tickets
[I Demolitions
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
Ii!! Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Energy Delivery Other Party: Case Number:
City of Evansville (Water & Sewer Departments) 16728
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
K Civilpenaltyof$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Bowen Engineering Corporation Vectren Energy Delivery
Case Number: 16729 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Reparr
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
IJ!.. Civil penalty of$ _._5"""-L,=$1'\)""""""'"'------------------
o Other -------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Robert Beadles Vectren Energy Delivery 16731 3/20/2018 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
iif Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
li'I Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
West Trailer Park Vectren Energy Delivery 16732 3/20/2018 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
Qil,. Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Asplundh Construction Corp. 16733 3/20/2018 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Vectren Energy Delivery Crider & Crider Construction 16734
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ~---------------------------
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Brooks Striping 16735 3/20/2018 8/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
II!. Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------0 Other _________________________ ~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Kenneth Centers Vectren Energy Delivery 16736 3/20/2018 8/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Ricks Drain Care 16738 3/20/2018 8/1112017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
O Training or $5,000 civil penalty if fail to complete training
I& Civil penalty of$1,000
O Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other -------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery City of Anderson 16740 3/20/2018 8/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special insn·uctions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Energy Delivery Other Party: Case Number:
Bowen Engineering Corporation 16744
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
.!!J, Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ----------------------------Abstentions:
APPROVED: Ben Warren Chairman
I
0
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Jeff Partain Vectren Energy Delivery 16745 3/20/2018 8/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
~Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Mister Quik Home Services Vectren Energy Delivery 16748 3/20/2018 8/15/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines
D Dig Tickets
D Demolitions
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
M Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Brackney, Inc. Vectren Energy Delivery 16751 3/20/2018 8/15/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Conunittee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
!>'!. Civil penalty of$ --'5"",'""'W"""'------------------D Other
~~~~~~~~~~~~~~~~~~~~~~~~~~
Abstentions:
APPROVED: Ben Warren Chainnan
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Concreteplus Foundations LLC Vectren Energy Delivery
Case Number: 16753 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/16/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
Civil penalty of$ Y'OOO ($2, 000 ;- j? lOOO ~o ti cAltl-' Other e-::,c_tjccb'on. J
Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Goran Brboric Other Party: Case Number:
Northern Indiana Public Service Company 16754
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failnre to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Paul Wert Other Party: Case Number:
Northern Indiana Public Service Company 16755
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Albert Jones Other Party: Case Number:
Northern Indiana Public Service Company 16756
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
ti!. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
Qil Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: MarkGypson Other Party: Case Number:
Northern Indiana Public Service Company 16757
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/16/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines
ji(j Dig Tickets
D Demolitions
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Griffin Irrigation Other Party: Case Number:
Northern Indiana Public Service Company 16758
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/17/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
Oil Warning letter (Special instructions:)
R Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Jerardo Robles Other Party: Case Number:
Northern Indiana Public Service Company 16759
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/17/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
fJ.. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
It!- Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Reparr
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------0 Other _________________________ ~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
BradCronmiller 'fop Gea..,;r (-\~ G,-r00p L/_.,C. Northern Indiana Public Service Company
Case Number: 16760 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/17/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
£2l- Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$--------------~-------
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: C D Concrete LLC Other Party: Case Number:
Northern Indiana Public Service Company 16761
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Fourway Communications, LLC Other Party: Case Number:
Northern Indiana Public Service Company 16763
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
® Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Hipskind Concrete Other Party: Case Number:
Northern Indiana Public Service Company 16764
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
O Civil penalty of$1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Civil penalty of$ -~$~{7(Ji) _________________ _
O Other -------------------------~
Abstentions: Selking
Additional Information: -----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Premium Concrete Services, Inc.
Case Number: 16765 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
g, Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Dunigan Bros., Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16766
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/19/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
e5I. Civil penalty of$ __..'2>_,_,_, "60.:.._ __________________ _
D Other~------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Rieth-Riley Construction Co., Inc. Northern Indiana Public Service Company 16769
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/19/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of$1,000
O · Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Ill. Civilpenaltyof$ (a,eoo ~5.ooo .,.. S \,llCQ no ·hcit.el- escaJa.i,'f>nJ 0 Other
-------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company True Line Fence (Merrilville)
Case Number: 16770 Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/19/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
O Training or $5,000 civil penalty if fail to complete training
~ Civilpenaltyof$1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Michelle L Kessler Other Party: Case Number:
Northern Indiana Public Service Company 16772
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/20/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
&. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
Kl Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Walls By Walls, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16773
Date of Advisory Meeting: 3/20/2018 Date of Damage: 7/21/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
ltl.. Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Cash Transport, LLC Fonntaintown Gas Company, Inc 16814 3/20/2018 8/26/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special insn·uctions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
~ Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions:
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Dunigan Bros., Inc.
Case Number: 16818 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017
TheIURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
lm.. Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other --------------------------Abstentions: Selking
Additional Information:-----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Matthew Miller Other Party: Case Number:
Northern Indiana Public Service Company 16819
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
g Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: City of Knox Other Party: Case Number:
Northern Indiana Public Service Company 16820
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
e<I Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
!liL Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Shady Acres Repair, SAR LLC Other Party: Case Number:
Northern Indiana Public Service Company 16821
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/15/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions:
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Taylor Gage Concrete, LLC Other Party: Case Number:
Northern Indiana Public Service Company 16822
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
& Training or $5,000 civil penalty if fail to complete training
0 Civilpenaltyof$1,000
0 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Fred Bailey Other Party: Case Number:
Northern Indiana Pnblic Service Company 16824
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
fig. Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: A Slide Hammer LLC Other Party: Case Number:
Northern Indiana Public Service Company 16826
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
{Jl._ Training or $ 5, 000 civil penalty if fail to comp 1 ete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
Additional Information:-----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lance Brockmann Other Party: Case Number:
Northern Indiana Public Service Company 16827
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
fl- Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Residential Electrical Systems Other Party: Case Number:
Northern Indiana Pnblic Service Company 16828
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
"!<.... Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines D Potholing
0 Dig Tickets
D Demolitions
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
II Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Northern Indiana Public Service Company PirTano Construction Company, Inc. 16829 3/20/2018 8/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
Di! Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Northwest Indiana Fence Co. Other Party: Case Number:
Northern Indiana Public Service Company 16830
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special insu·uctions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
Ill-. Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _L\-'+-, roQ"'""""-"'-------------------
0 Other --------------------------Abstentions: Selking
Additional Information: __,_[~\>"""ccU""""'a.1""' ..... ~"""'&~__...\a:..:.[..:::::C.'--f'at-'-="'-'=lQC}=---+o-=-=-----+.rovi {\ I (\ QL\G i 7 3 8'
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Solid Finish Construction Inc.
Case Number: 16831 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
ii Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ----------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Northern Indiana Public Service Company Indiana American Water Co. DBA Indiana American 16832 3/20/2018 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D Wbite Lining
D Training or $5,000 civil penalty if fail to complete training
!l'I. Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ___________________________ _
Abstentions: Selking
Additional Information:------------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Northern Indiana Public Service Company Other Party: Case Number:
John Boettcher Sewer & Excavating Contractor, LTD 16833
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory C01mnittee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
6l Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Patriot Cable Other Party: Case Number:
Northern Indiana Public Service Company 16834
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
& Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of$1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other ----------------------------Abstentions: Selking
APPROVED: Ben Warren Chainnan
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lawn Care 4 Aces LLC Other Party: Case Number:
Northern Indiana Pnblic Service Company 16835
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Daroaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
/fJ. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other -------------------------~
Abstentions: Selking
Additional Information: rel)bi cJ.ed £/ew llt
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Travis Dearinger Other Party: Case Number:
Northern Indiana Pnblic Service Company 16836
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
D Clearance Zone D Failure to Plan
D Damaging Lines D Potholing
~ Dig Tickets
D Demolitions
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Dewes Excavating, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16837
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
IR Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Litco Mechanical Other Party: Case Number:
Northern Indiana Public Service Company 16838
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
f(l.. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
Additional Information: Vl'i!:tvtcled //ew J f-
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Ritschard Brothers, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16839
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Northern Indiana Public Service Company All Star Construction & Excavating, Inc. 16840
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
® Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: A-Hope OS Systems, LLC Other Party: Case Number:
Northern Indiana Pnblic Service Company 16841
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
Ii!. Warning letter (Special instructions:)
!II Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
,!lJ Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Todo Excavation & Grading, Inc. Northern Indiana Public Service Company 16842
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
IB Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Mr. Underground
Case Number: 16843 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Cmmnittee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
l'!l Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Eventt Norris
Case Number: 16844 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
S. Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ___________________________ _
Abstentions: Selking
Additional Information:------------------------
APPROVED: =-Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: K & M Concrete LLC Other Party: Case Number:
Northern Indiana Pnblic Service Company 16845
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
. 0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
!1'J-. Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ _____________________ _
0 Other ___________ ~-------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Asplundh Construction Corp. Northern Indiana Public Service Company 16846 3/20/2018 8/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
121- Civil penalty of$ __,,5-"'-'-, =Ee()='-------------------
0 Other-------------------------~
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Caribbean Pools, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16847
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/7/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
i2l. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
ii!!. Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Meyers Development Other Party: Case Number:
Northern Indiana Public Service Company 16848
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/7/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company The Robert Henry Corporation
Case Number: 16851 Date of Advisory Meeting: 3/20/2018 Date of Damage: 817/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other --------------------------Abstentions: Selking
Additional Information:-----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Charles Wentworth Other Party: Case Number:
Northern Indiana Public Service Company 16852
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
If!'.. Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Clayton Julian Other Party: Case Number:
Northern Indiana Public Service Company 16853
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
!!.! Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
!!!. Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 Whlte Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ ~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: City of Wabash Other Party: Case Number:
Northern Indiana Public Service Company 16854
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
g Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions: Selking
APPROVED: --== Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: William Herman Other Party: Case Number:
Northern Indiana Public Service Company 16855
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
l!'l.. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
0 Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other _________________________ _
Abstentions: Selking
Additional Information:----------------------
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Carey Excavation, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16856
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other-------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Greg Logan Other Party: Case Number:
Northern Indiana Public Service Company 16857
Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________ ~-------
D Other _________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Hire Construction, Inc.
Case Number: 16858 Date of Advisory Meeting: 3/20/2018 Date of Damage: 8/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
ll!J Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Selking
APPROVED: Ben Warren Chairman
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Geiger Excavating, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 17229
Date of Advisory Meeting: 3/20/2018 Date of Damage: 9/19/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civilpenaltyof$1,000
f)J.. Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other -------------------------~
Abstentions: Selking
APPROVED: Ben Warren Chainnan