STATE OF DELAWAREPILOT PROGRAM
FOR THE PROCUREMENT OFSOLAR RENEWABLE ENERGY CREDITS
Results and Observations from the SREC Procurement Agent
![Page 2: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/2.jpg)
KW Nameplate by Tier
![Page 3: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/3.jpg)
Effective SRECs by Tier
![Page 4: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/4.jpg)
Systems by Tier
![Page 5: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/5.jpg)
Operational vs. Development – KW
![Page 6: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/6.jpg)
Operational vs. Development – Effective SRECS
Total “stranded” operational annual effective SRECs across all tiers – 8,148
![Page 7: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/7.jpg)
Operational vs. Development – Actual SRECS
Total “stranded” operational annual actual SRECs across all tiers – 7,551
![Page 8: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/8.jpg)
Operational vs. Development – Number of Systems
![Page 9: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/9.jpg)
Operational vs. Development – Effective SRECS
Only systems with both DE labor/equipment
![Page 10: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/10.jpg)
Bid Results
Tier 2B Tier 3High $139.00 $176.00Low $120.00 $148.00Weighted Average $130.92 $154.45
![Page 11: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/11.jpg)
Tier 1 Interconnect Dates
![Page 12: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/12.jpg)
Interconnect Dates
• Tier 2A – 1 System 3/2011• Tier 2B – 3 Systems 6/2011, 1 System 1/2012• Tier 3 – 1 System 2/2011
![Page 13: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/13.jpg)
Existing Effective SRECsDPL Will Purchase
(Compliance year beginning June 1, 2011)
![Page 14: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/14.jpg)
Tier 1 Labor/Equipment SRECs Offered
![Page 15: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/15.jpg)
Tier 2A Labor/Equipment SRECs Offered
![Page 16: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/16.jpg)
Tier 2B Labor/Equipment SRECs Offered
![Page 17: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/17.jpg)
Tier 3 Labor/Equipment
![Page 18: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/18.jpg)
Existing/Proposed # Systems by Tier
![Page 19: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/19.jpg)
Existing/Proposed Systems by KW
![Page 20: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/20.jpg)
Existing/Proposed Systems by Effective SRECs
![Page 21: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/21.jpg)
Tier 1 All Systems Bid vs. Nameplate
![Page 22: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/22.jpg)
Tier 2A All Systems Bid vs. Nameplate
![Page 23: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/23.jpg)
Tier 2B All Systems Bid vs. Nameplate
![Page 24: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/24.jpg)
Tier 3 All Systems Bid vs. Nameplate
![Page 25: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/25.jpg)
Histogram of Systems / Owner Representatives
![Page 26: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/26.jpg)
Procurement Agent Observations
Program Strong Points•Parcel Requirement•Limit on a single system bidding in only one tier•Bid deposits – Significant gaming would have occurred without them.•Force Majeure section well written
![Page 27: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/27.jpg)
Procurement Agent Observations
System Mechanics•Longer Open Period for Tier 1 and 2A, minimum 2 weeks.•Set additional week to allow receipt of bid deposits – would allow for ACH/check•Eliminate the Owner Representative requirement•Needlessly adds complexity•Owner Rep can still be an option•Firm fixed price contract
![Page 28: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/28.jpg)
Procurement Agent Observations
Applications•Consider eliminating the following fields:
•Bid Deposit Form•Module Type – Info not used, confusing because changeable•Inverter Type – Info not used, confusing because changeable•Mounting Location – Info not used•First Year energy output – Redundant with SREC output•Other Supplemental Funding – Just need yes/no check
•Consider adding the following fields:•Bid Deposit Form
•Expected existing SRECs to sell•Expected commence date for proposed systems
•Transfer Agreement•Desired contract start date•Desired existing SRECs to sell
![Page 29: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/29.jpg)
Procurement Agent Observations
Solicitation Design•Add verbiage to cover system additions•Clarify metering definitions•Reexamine production bands (min/max SRECs), current system incentivizes overly optimistic production estimates with no minimum and only 110% maximum•Clearly define other supplemental funding, i.e. does it include low interest loans, tax credits like NMTC?
![Page 30: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/30.jpg)
Procurement Agent ObservationsSolicitation Design Cont.
•Partial Fills•Do we allow 110% production•Do we allow unfilled portion to bid in future solicitations
•Bidding partial systems that were not partial fills?
![Page 31: STATE OF DELAWARE PILOT PROGRAM FOR THE PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS](https://reader036.fdocuments.net/reader036/viewer/2022062501/56815f05550346895dcdc4d6/html5/thumbnails/31.jpg)
Procurement Agent ObservationsCommon Customer Comments/Complaints
•All existing systems should be eligible•No existing systems should be eligible•Bid deposit is too high, shouldn’t exist