/ State Level Environment Impact Assessment Authority-Karnataka (Constituted by MoEF, Government of India, under section 3(3) of E(P) Act, 1986) No. SEIAA22 IND 2013 Date: 26-07-2016 Sub: Establishment of Nandur- Kesartagi Industrial Area 2 nd Phase at Nandur- Kesartagi Villages, Gulbarga Taluk & District by Karnataka Industrial Area Development Board (KIADB)- Issue of Environmental Clearance- reg. ***** To, CEO & Executive Member Karnataka Industrial Area Development Board (KIADB) 4th & 5 th Floors, Khanija Bhavan, East wing, No.49, Race Course Road, Bengaluru-560 001 Sir, This has reference to your applications dated 30tl~July 2013addressed to SEIAA, Karnataka and subsequent letters addressed to SEIAAjSEAC, Karnataka seeking prior environmental clearance for the above project under the EIA Notification, 2006. The proposal has been appraised as per prescribed procedure in the light of provisions under the EIA Notification, 2006 on the basis of the~mandatory documents enclosed with the application viz., the Application in Form 1, prefeasibility report, EIA Report and the additional clarifications furnished in response to the observations of the State Expert Appraisal Committee (SEAC),Karnataka. SEAC has recommended for issue of Environmental Clearance in its meetings held on 27th& 28 tl1 January 2016. 2. It is, inter-alia, noted that Karnataka Industrial Area Development Board (K~ADBj, have propose~ for establishment of Nandur- Kes~J;;'~)~ \\-.::.;~:~~~ Area 2ndPhase for establishment of Orange and Green cate ,1tt.\1~ J. ~~~.;~. Total plot area of 198.36Acres (80.15 Ha) [Details of t !.~s enclosed<t~:'~~\ Annexure-I]. Out of 198.36 Acres, 120.087Acres are~/Jt~'fbr ~~~~~ttt~larea>:~~.~t~\ 3.868 Acres area is for Commercial area, 18.705Ak;!~(artta'is':-:fof\Parks, \~:.:\~ 6.645Acres area is for Buffer, 9.997 Acres area is f~!~~{\meriiti~s' & 'utilities, \:~;:.\\ 0.515 Acres area is earmarked for Strom water dratn}~9.005Acres,area-is for ! S:} Parking and 29.535Acre area is ea.rmarked for Ro~ds'~!*t~out pla~'>isen,.~~:9sed /.::i~~l as Annexure-Il]. Total water requirement for the mdU~~111~~ area lS~}~J~ .'):{/ (Domestic: 113KLD+ Industrial: 579KLD+Green belt: 5'3~.:·~\Rl will b:€:fue!, '(~:~j' Room No. 706, 7th Floor, 4th Gate, M.S. Building, Bangalore - 560 001 Phone: O~~~~fi'~p~ i22254377 Website: http://seiaa,kar.nic.in http://seiaa.karnataka.gov.in http://environmen'tCrear-8flC'e.nic.in e-mail: [email protected]

Transcript of State Level Environment Impact Assessment...

Page 1: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

/

State Level Environment Impact Assessment Authority-Karnataka(Constituted by MoEF, Government of India, under section 3(3) of E(P) Act, 1986)

No. SEIAA22IND 2013 Date:26-07-2016

Sub: Establishmentof Nandur- Kesartagi Industrial Area 2nd

Phaseat Nandur- KesartagiVillages,GulbargaTaluk &District by Karnataka Industrial Area DevelopmentBoard(KIADB) - Issueof EnvironmentalClearance-reg.

*****

To,

CEO& ExecutiveMemberKarnatakaIndustrial AreaDevelopmentBoard(KIADB)4th& 5thFloors,KhanijaBhavan,Eastwing, No.49,RaceCourseRoad,Bengaluru-560001

Sir,

This hasreferenceto your applicationsdated30tl~July 2013addressedtoSEIAA, Karnataka and subsequent letters addressed to SEIAAjSEAC,Karnataka seekingprior environmental clearancefor the aboveproject underthe EIA Notification, 2006.The proposal hasbeenappraisedasper prescribedprocedure in the light of provisions under the EIA Notification, 2006on thebasis of the~mandatory documents enclosedwith the application viz., theApplication in Form 1, prefeasibility report, EIA Report and the additionalclarifications furnished in response to the observations of the State ExpertAppraisal Committee (SEAC),Karnataka.SEAChasrecommendedfor issueofEnvironmentalClearancein its meetingsheld on 27th& 28tl1January2016.

2. It is, inter-alia, noted that KarnatakaIndustrial AreaDevelopmentBoard

(K~ADBj, have propose~ for establishment of Nandur- Kes~J;;'~)~ \\-.::.;~:~~~Area 2ndPhasefor establishmentof OrangeandGreencate ,1tt.\1~ J. ~~~.;~.

Total plot area of 198.36Acres(80.15Ha) [Details of t !.~s enclosed<t~:'~~\Annexure-I]. Out of 198.36Acres, 120.087Acres are~/Jt~'fbr ~~~~~ttt~larea>:~~.~t~\3.868 Acres area is for Commercial area, 18.705Ak;!~(artta'is':-:fof\ Parks, \~:.:\~6.645Acresarea is for Buffer, 9.997Acres area is f~!~~{\meriiti~s'& 'utilities, \ :~;:.\\0.515Acres area is earmarked for Strom water dratn}~9.005Acres,area-is for !S:}Parking and 29.535Acre areais ea.rmarkedfor Ro~ds'~!*t~out pla~'>isen,.~~:9sed/.::i~~las Annexure-Il]. Total water requirement for the mdU~~111~~area lS~}~J~ .'):{/

(Domestic:113KLD + Industrial: 579KLD+ Greenbelt:5'3~.:·~\Rlwill b:€:fue!, '(~:~j'Room No. 706, 7th Floor, 4th Gate, M.S. Building, Bangalore - 560 001 Phone: O~~~~fi'~p~ i22254377

Website: http://seiaa,kar.nic.in http://seiaa.karnataka.gov.in http://environmen'tCrear-8flC'e.nic.in

e-mail: [email protected]

Page 2: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpact·AssessmentAuthority~Karmitaka(Constituted by MoEF,Government of Indiaunder section3(3) of E(P)Acf,·1986) .

SEIAA 22 IND 2013 Establishmentof Nandur KesartagiIndustrial Areaby Karnataka Industrial Areas Development Board (KlADB)

from Bore.well (Ground water). Total waste water generated is 481 KLD(Domesticeffluent: 96 KLD + Industrial effluent: 385 KLD). Domesticwastewater will be treatedin CommonSewageTreatmentPlant of 1 No X 150KLDand industrial effluent will be treated in CommonEffluent TreatmentPlant of2 No's X 250KLD capacity.It is proposedto install DG setof capacity1 No X250KVA for emergencypower backup. Total power requirement is IMW willbesourcedfrom GESCOM.Theprojectcostis Rs.144.52Crores.

3. The project proposal has been considered by SEAC on 6th & 7th

September2013andToRswere issuedvide letter dated28thSeptember2013forconducting Environment Impact AssessmentStudy. The EIA has beenconductedby M/ s. Ramky Enviro EngineersLimited, "Ramky House", 6-3-1089/G/16, Gulmohar Avenue, 1st Floor, Rajbhavan Road, Somajiguda,Hyderbad-500 082 who are accredited from NABET vide No.NABET/EIA/RA005 rev.01/010Dated13thJune2014.Public consultationwasheld on 10thApril 2015.The final EIA report was submitted on 29thSeptember2015.

4. Basedon the information submitted by you and presentationmadebyEnvironmental consultant, M/ s. Ramky Enviro EngineersLimited, "RamkyHouse", 6-3-1089/G/16, Gulmohar Avenue, 1st Floor, Rajbhavan Road,Somajiguda,Hyderbad-500082.The StateLevel Expert Appraisal Committee(SEAC)examinedtheproposalin themeetingheld on 11th,12th& 13thJanuary2016 and 27th& 28th January 2016 and has recommended for issue ofEnvironmentalClearance.

5. TheSEIAA Karnatakahasconsideredthe project in its meetingheld on8th February 2016 and after due consideration of the relevant documentssubmitted by the project proponent and additional clarifications furnished inresponseto its observationsand the appraisal and recommendationof theSEACand decidedto accordEnvironmentalClearancein accordancewith theprovisions of Environmental Impact AssessmentNotification-2006 and itssubsequentamendments,subject to strict complianceof the following termsandconditions- .

A- SPECIFIC CONDITIONS, .

Page 3: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpactAssessmentAuthority-Karnataka(Constituted by MoEF, Government of India under section 3(3) of E(P)Act, 1986)

SEIAA 22 IND 2013 Establishment of Nandur Kesartagi Industrial Areaby Karnataka Industrial Areas Development Board (KIADB)

from day one.Thecell alsoensuresthat the cellmanages/ maintainsallthe environmental aspects such as sewage treatment, solid wastedisposal,maintenanceof greenbelt areas,etc.

3. All required sanitaryand hygienicmeasuresshould be in placebeforestarting construction activities and to be maintained throughout theconstruction.phase.Sufficient number of toilets/bathrooms shall beprovidedwith requiredmobile toilets,mobileSTPfor constructionworkforce.

4. A First Aid Room should be provided in the Project both duringconstructionandoperationof theproject.

5. Adequatedrinking water and sanitary facilities should be provided forconstructionworkers at the site. The safedisposal of wastewaterandsolidwastesgeneratedduring theconstructionphaseshouldbeensured.

6. Provisionshallbemadefor thehousingof constructionlabourerswithinthe site with all necessaryinfrastructures.The housingmay be in theform of temporarystructuresto be removedafter the completionof theproject.Thefacilitiesshall includethecreche.

7. Provision should be made for the supply of fuel (keroseneor cookinggas); utensils such as pressurecookers etc. to the labourers duringconstructionphase.

8. All the labourersto be engagedfor constructionshould be screenedforhealthand adequatelytreatedbeforeengagingthem to work at the siteand detailed report submitted to SEIAA. Safety standards as perNationalBuilding Code(NBC)shouldbeensured.

9. Fordis-infectionof wastewaterwhich is not meantfor recyclingfor toiletflushing, use ultra violet radiation and not chlorination. For treatedwastewater meant for reuse for toilet flushing, disinfect by usingchlorination.

10.All the topsoil excavatedduring constructionactivitiesshouldbestoredfor usein horticulture / landscapedevelopmentwithin theprojectsite.

11.Disposalof muck, constructiondebrisduring constructionphaseshouldnot createany adverseeffecton the neighbouringcommunitiesand bedisposedtaking the necessaryprecautionsfor generalsafetyand healthaspectsof people,.only in approvedsiteswith theapprovalof competentauthority.

12.Soilandgroundwater samplesshouldbetestedat theprojectsiteduring.theconstructionphaseto ascertainthat thereis no threatto groundwater

. .quality by leachingof heavyme~.~~~:9.::;,other toxic contaminantsandreport submittedto SEIAA. .:;..;;:\~~\Jf>,.i..: T ASS~;~

13.Constructionspoils,inclutit~~.it~~~--rfuit~f~ and otherhazardous""~\ '" .~ "'.,,"

materi~ls,must not be !!~9yedJ~:~~~~~minate\::'.\.\~ercoursesand thedumpsitesfor suchma~l'.:la1must>1J.e;·s.ecuredSO\ t!li." t they should notI 1 ~ 1 d ~.ji {~:::! ;t;~i.i:'·F<";i<.\ • \ ':~ \\eac1~ntot le groun Wi~:~r "'\::':{~':""<" ,,' \ ':~;''::!I

14.Thedieselgener~torse,r.:~qbeused..~l.?:rIt;9\-S?,nstrur~~~f1phaseshoul?beof low sulphur dieseltYr~\~ndshoul]\RQl;,l.f8-rJIl to ,E.:(f,? Rulesprescnbed

\."...~\ . '. .''''''j'''~' , ""'''11for air andnoiseemissiolQ.:!~;;mdards.·,;,~;~,~~~, ,/.~:II

.\.,1 ~"\ . ~~. rv /. • "1

\~?,~", .., <''' /~, •••~~.~~ , 3~,;.'/;':,-.:..~,,\*<"".'\, (,"J/ "i --- ~ ".;. ~\.'\

'-'.- ::,~.~ ~{I\~{'\'I:::--;/-....::.:"_. ~>f'>\ _.-;:;---'-. :.....•;::..::!::.=·~7.:..~,..,·-

Page 4: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpactAssessmentAuthority-Karnataka(Constituted by MoEF,Government of India under section3(3) of E(P)Act, 1986)

SEIAA 22 IND 2013 Establishmentof Nandur KesartagiIndustrial Areaby Karnataka Industrial Areas Development Board (KIADB)

15.Thedieselrequiredfor operatingDGsetsshallbestoredin undergroundtanksand if required,clearancefrom Chief Controller of Explosivesshallbetaken.

16.Vehicleshired for bringing constructionmaterial to the site should be ingood condition and should conform to the applicable air and noiseemissionstandardsandshouldbeoperatedonly during non-peakhours.

17.Ambient noise levels should conform to the residential standardsbothduring day and night. Incrementalpollution loads on the ambient airand noise quality should be closely monitored during constructionphase.Adequate measuresto reduce air and noise pollution duringconstructionkeepingin mind CPCBnormsonnoiselimits.

18.Fly ashshouldbeusedasbuilding material in theconstructionasper theprovisionsof Fly AshNotification of September1999andamendedasonAugust 2003.

19.Readymixedconcretemust beusedin building construction.20.Stormwater control and its re-useasper CGWBand BISstandardsfor

variousapplications.21.Water demand during construction should be reducedby use of pre-

mixed concrete,curing agentsand other bestpracticesand only tertiarytreatedwater shallbeusedfor constructionasperG.O.No. FEE1~8ENV2003dated14.08.2003.

22.No ground water is to be drawn without permission from theCentral/StateGroundWaterAuthority.

23.Separationof grey and black water should be done by the useof dualplumbing line for separationof greyandblackwater.

24.Treatment of 100%grey water by decentralizedtreatment should bedone.

25.Theprovision of EnergyConservationBuilding code,2006shall be fullycomplied with.

26.Roof should meetprescriptive requirementasper EnergyConservationBuilding Code,2007by usingappropriatethermal insulationmaterial.

2TOpaque wall should meet prescriptive requirement as per EnergyConservationBuilding Code,2007which is proposed to be mandatoryfor all air conditionedspaceswhile it is optional for non-air conditionedspacesby use of appropriate thermal insulation material to fulfil

_.-:-requirement.,28.TheProponentshall obtain the constructionmaterial suchasstonesand

jelly ~tc: 0n:¥.<;,J1~§~~~:~proved quarries. and, oth~r.,constructionmatenals~~!(~ 1)e-pF~~~t~~m theauthonzedagencies/trad.e~s.

29.}'he pr0E.~~f sh~~,.~btama~~~Q~~1from the competentauthonti~sfors:ru~t1~~/safet~~\~f5:~~~ebUIld~tf~\,due to. earthq~a~e~adequacy of~lrefIg~~?,ge~~~~:~.t'jetc. as p~~.:tre~atIonal Building Code (NBC)mclu~~~gprotec.t~p{lmeas?resfor.11g~~tenmgetc. .

30.ThePt~~ct a.u~l~oHt,~hall"~psur~'_!~1~tno water bodiesarepolluted dueto proJ~~.~CtIVltIes.: ,t .. ",-.::..<:,:,>~_ ./ ,.~~:'/:! .:

" .\-~, - ! ~,.?'. ....... '" ' .: .

'\~'\) '\ -:»'>-,\~,~;' ~~I ".\~<;$~'-- 'i"' /~~-f',. . .~, »< e-, ,V":j' 4...~ ••••.. ' J ~-- ..---",''''''''c\.'~~/~~~,\ t//·~ ~ y. f)..\"~\~/

~":..~~~~~~;::;;':;'/

Page 5: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpactAssessmentAuthority-Karnataka(Constituted by MoEF, Government of India under section 3(3)of E(P)Act, 1986)

SEIAA 22 IND 2013 Establishmentof Nandur KesartagiIndustrial Areaby Karnataka Industrial Areas Development Board (KIADB)

31.Safetystandardsas per National Building Code (NBC), 2005should befollowed andensured.

32.The project Authorities shall ensure that the National Building Code,2005is compliedwith andadheredto.

33.Theprojectauthorities shall not useKharabland if any, for any purposeand keep available to the general public duly displaying a board aspublic property. No structure of any kind be put up in the Kharablandandshallbeafforestedandmaintainedasgreenbelt only.

34.The authorities should include the condition while issuing plots to theprospectiveindividual industries that they should develop greenbeltofat least33 % of theplot area.

35.The industrial units in the industrial area and the associatedfacilitiesshall be strictly in accordancewith the norms laid down by theKarnatakaStateGovernmentandKSPCB/CPCB.

36.The project authorities shall strictly adhere to the commitmentsmadewith regard to establishmentof CSTP1CETP,buffer zone, green belt,conditionsto be incorporatedin the leasedocumentwhile allotting plotsto individual industries,environmentsafetyaspectsetc.

37.Theproject Authorities shall ensurethe time specificationprescribedbythe Honourable High Court of Karnatakain WP. No. 1958/2011 (LB -RES- PIL) on 04.12.2012for different activities involved in constructionwork.

38.The existing water body, canalsand rajakaluveand other drainageandwater bound structuresif any shall beretainedunalteredwith duebufferzoneof 15meteralroundmaintainedunder treecover.

39.The project authorities shall leave30 mtrs buffer from the boundary oflake and 15meterson either side of the channell nala and otherwaterbodies if any and this shall be free from any permanentstructures.Thebuffer somaintainedshall be plantedwith indigenous treespeciessuchas Neem, Akash Mallige, Mahagoni, Honge, KadambaFicus,etc. andmaintainedasgreenbelt.

40.The natural sloping pattern of the project site other than the area"excavatedfor the purpose of construction of proposed building shallremainunaltered.and thenatural hydrology of the areabemaintainedasit is to ensurenatural flow of stormwater

41. Lakesand otherwater bodieswithin and/or at the vicinity of the project. . - areashallbeprotectedandconserved..42.Theprojest1\!lthority will undertakeall relevantmeasures,asindicated

du~ '-;t~eRU~~ing for impro~ing the Socio-economicconditions~_ " rounamg--a-l>~a-:.~ .

434~'pr?~f:'0;:>~~th~rit~~~ allow ?nly the Orangeand Greencategory;'~~J{lQus~les';1:\11tr)'~tnctlya'S..p~posed 111 the layout plan.

II. OB~'atiortPJ{~-$~.t;!; \ 'f.~\i;::~the proJe~tAu1:~,oritySh~tn~plement all the recommendationsmadein

• ~ ". - -" > .""-.- '.

\:.~~~~~reEnvi :.0;~t~!Imp,~!;WssessmentIEMP report and risk assessment...,r~port v... .,.. _. .'.,-,;, I -..,•...'\' ~.r. • -~ -.•~:;:~,.v- -c..•••4;•." •••.... ~••/ i

\~?':;~<."':.,;~;;.;.,s;~,::, /' '),~: }'~."...,r" cv- .>: ;i. 'j/ 5~I (\ - ---;:.I\.'>!:~~~;;.~'!~~(1/ ~ i:'J:;~p..\ ~7'

''::'..~~~~~~

Page 6: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpactAssessmentAuthority-Karnataka(Constituted by MoEF,Government of India under section3(3) of E(P)Act, 1986)

SEIAA 22 IND 2013 EstablishmentofNandurKesartagiIndustrialAreaby Karnataka Industrial Areas Development Board (KIADB)

2. The installation of the Common SewageTreatment Plant (CSTP)/CommonEffluent TreatmentPlant (CETP)shall be got certified by anindependentexpert and a report in this regard should be submitted tothe SEIAA before the project is commissionedfor operation. Treatedeffluent emanatingfrom CSTP/ CETPshall be recycled/reused to themaximum extent possible. Treatment of 100% grey water bydecentralizedtreatment should be done. Dischargeof treated sewageshallconformto the norms& standardsof the KarnatakaStatePollutionControl Board. Treatedsewageshould be usedfor flushing, gardening,etc. as proposed.Necessarymeasuresshould be made to mitigate theodour problemfrom CSTP/ CETP.

3. Thesolid wastegeneratedshould be properly collectedand segregated.Wet garbageshouldbecompostedanddry / inert solid wasteshouldbedisposed off to the approved sites for land filling after recoveringrecyclablematerial.

4. Dieselpower generatingsetsproposedas sourceof backup power forelevatorsand commonareaillumination during operationphaseshouldbe of enclosedtype and conform to rulesmadeunder the Environment(Protection)Act, 1986.Theheight of stackof DGsetsshouldbeequaltothe height neededfor the combinedcapacityof all proposedDG sets.Uselow sulphur diesel.Thelocationof theDGsetsmaybedecidedwithin consultationwith KarnatakaStatePollutionControl Board.

5. Noise should be controlled to ensure that it does not exceed theprescribedstandards.During night time thenoiselevelsmeasuredat theboundary of the building shall be restrictedto the permissiblelevels tocomplywith theprevalentregulations.

6. Theprojectproponentshallensuredevelopmentof aminimum of 33% ofthe project area which shall include the buffer zone and green beltdeveloped by individual industries. The project Authority mayundertake compensatory green belt development through avenueplantation in the adjoining roadsand in the civic amenityareaif thereisany shortfallwithin theprojectsitein theunavoidablecircumstances.

7. Weepholesin the compoundwalls shall be provided to ensurenaturaldrainageof rain water in thecatchmentareaduring themonsoonperiod.

8. Rain water harvesting for roof run- off and surfacerun- off, as plansubmittedshouldbeimplemented.Beforerechargingthesurfacerun off,

. - ~pre-treatmentmustbedoneto removesuspendedmatter,oil and grease.. The borew~ll for .rainwaterrecharging should be kep.~.;&~

abovethehighestgroundwater table... /7\*~-··--·--·--·-.~~>t;~~~~9. Thegro~ndw~ter level and its quality shouldb: ~~.l¥~(ed,~eF._r.Jt~arlyin~~>'\

consultationWIthCentralGroundWaterAuthont/~/ «::·~.tYi~<\:i \ .10.Trafficcongestionneartheentry andexit points filjfVthe tK?~~~~~~J?ining ...\

the proposed project site must be avoided. P#t~~ngsh>Q~~4~'be<;f~lly :..' ,\internalizedandno public spaceshouldbeutilize~~\ "'~\<.>. . ....~.: .:~]!J

11. A Report on the energy conservationmeasure~~tf{)~irmingt~~:~rt~!1&~r~'-ilconservatio,nnorms finalize by Bureauof EnergY'~~~cy s~J!II-lfe .1

.~/ •••) J .----- " ,

,~.:.:,( ;.') ..., ~ 1.( "",f!:. ..,y~~:-~~~~~~.:~~=-~~~.,

Page 7: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpactAssessmentAuthority-Karnataka(Constituted by MoEF, Government of India under section 3(3) of E(P) Act, 1986)

SEIAA 22 IND 2013 Establishmentof Nandur KesartagiIndustrial Area

by Karnataka Industrial Areas Development Board (KIADB)

preparedincorporatingdetailsaboutbuilding materials& technology,R& U Factorsetc and submit to the SEIAA, Karnatakain threemonthstime.

12. Energy conservationmeasureslike installation of CFLs/TFLs for thelighting the areasoutside the building should be integral part of theprojectdesignandshouldbe in placebeforeprojectcommissioning.UseCFLsand TFLsshould be properly collectedand disposedoff/ sent forrecycling as per the prevailing guidelines/ rules of the regulatoryauthority to avoid mercury contamination.Useof solar panelsmay bedoneto theextentpossible.

13. Adequatemeasuresshould be taken to prevent odour problem fromsolidwasteprocessingplant andCSTP/CETP.

14.The building should have adequatedistancebetween them to allowmovementof freshair andpassageof natural light, air andventilation.

15.The project authorities shall strictly comply with the rules andregulations under Manufacture, Storage and Import of HazardousChemicalsRules,1989asamendedin October1994andJanuary2000.alltransportationof HazardousChemicalsshall be as per the MVA, 1989.Authorizationfrom the KSPCBshall be obtainedfor collection,treatment,storage,anddisposalof hazardouswastes.

16.The project authorities must strictly comply with the rules' andregulationswith regardto handling and disposalof hazardouswastesinaccordancewith the Hazardous and other Wastes(ManagementandTransboundaryMovement)Rules,2016.Authorization from the KSPCBmust be obtained for collection/treatment/ storage/disposal ofhazardouswastes.

17.Application of solar energyshould be incorporatedfor illumination ofcommon areas,lighting for gardensand street lighting in addition toprovision for solarwater heating. A hybrid systemor fully solarsystemfor lighting and heating should be provided. Details in this regard

-' shouldbesubmittedto theSEIAA.18.The individual industries shall take all necessaryclearancesincluding

Environmentclearancein accordancewith the law. TheprojectAuthorityshall incorporatesuchcondition in the lease/ saledeed/Agreement.

19.The:projectauthoritiesshall bifurcatethe industrial plots and residentialplots, if anywith a thick andtall vegetativebarrier greenbelt.

20.The project Authority shall incorporate a c().,~ the prospective, lease/saledeed/Agreement with indi~j~~}~<t~~-!W~~rr~t they also

,.shallabideby theconditionsof this ~~/ <-,:~, r:__'" '--<:~~~'.:'~B. GENERAL CONDITIONS: !fo~~/r,2c"?>:F~ '\.:. .

1. A separateEnvironmentManage~~~ celi:;'~1;h'q~ali£iedst~t~:·~all besetup for implementationof thest\!f>,~iatedenv'it~~erttal safe~~£#rds.

2. The project authorities sh~ll strictl~.il~\hereto t~~;i~~~~tio¥~~~l{adeby),.tJ'le KarnatakaStatePollutionContr~9~~d (KSP@1lJ;:". ./~)I

'-~::..»»: ~ r.>:~v:;/ 7"~~lt0~K' i\~-"~;~

"'-:::,::.••.\J,~ ~/--~:-.~ ..=.::::..::.~-::;.--

Page 8: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpactAssessmentAuthority-Karnataka(Constituted by MoEF,Goverrunent of India under section3(3) of E(P)Act, 1986)

SEIAA 22 IND 2013 Establishment of Nandur Kesartagi Industrial Areaby Karnataka Industrial Areas Development Board (KlADB)

3. At no time, the emissionsshallexceedthe prescribedlimits. In the eventof failure of any pollution control systemadoptedby the unit, the unitshallbe immediatelyput out of operationand shallnot berestarteduntilthedesiredefficiencyhasbeenachieved.

. 4. No further expansionor modifications in the plant shall be carried outwithout prior approval of the SEIAA/Ministry of Environment andForestsas the casemay be. In caseof deviations or alterationsin theprojectproposalfrom thosesubmitted to this Authority for clearance,afreshreferenceshall bemadeto the Authority to assessthe adequacyofconditions imposed and to add additional environmental protectionmeasuresrequired,if any.

5. The project authorities shall strictly comply with the rules andregulations under Manufacture, Storage and Import of HazardousChemicalsRules,1989 as amendedin October1994 and January2000.Authorization from the KSPCB shall be obtained for collection,treatment,storage,anddisposalof hazardouswastes.

6. The project authorities must strictly comply with the rules andregulationswith regardto handling and disposalof hazardouswastesinaccordancewith the Hazardous and other Wastes(ManagementandTransboundaryMovement)Rules,2016.Authorization from the KSPCBmust be obtained for collection/treatment/ storage/disposal ofhazardouswastes.

7. Application of solar energy should be incorporatedfor illumination ofcommon areas,lighting for gardensand street lighting in addition toprovision for solarwater heating. A hybrid systemor fully solarsystemfor lighting and heating should be provided. Details in this' regardshouldbesubmittedto theSEIAA.

8. Theoverall noiselevels in and around the plant areashall bekept wellwithin -the standards (85 dBA) by providing noise control measures. including acoustichoods,silencers,enclosuresetc.on all sourcesof noisegeneration.The ambient noise levels shall conform to the standardsprescribedunder Environment (Protection)Act, Rules,1989 viz. DBA(daytime) and70dBA (night time).

9. The project proponent shall also comply with all the environmentalprotectionmeasuresandsafeguardsasper the information provided.

10~ The implementationof the projectvis-a-visenvironmentalaction- plans sIlall be monitored by MoEF, Regional Office at Bangalore/KSPCB/ -CPCBand the Department of Environment...,.~Bangalore.A sixmonthly compliancestatusreport sh~~~~~~b~t~:£~':c~monitoring agencies. .£< .;:/ "'",.4~~~,

11... Theprojectproponentshall inform the pub1J~Jhatt.\1e;~pi?JJ~cthas '\~~~\/11. -c , ( ! '.:h~· -~_~.. \ >.t I'

beenaccordedenvironmentalclearanceby the S~I:~~ anp.:·9o.l?.i§~~·9fthe \::;..,.~\cleara.nceletter are availablewith the KSPC~a~tf;~ay alS8~9~:;Seen..at ;\~\\Website of the State Ecology and Envlro~~pt depart:t*.~nt~·at j ::;J!!http:// seia~.kar.nic.in. .'" . http://:f~~~~:karna:a~~:§.gY~~:t,;,;..J/http://envlronmentclearance.mc.mThISshallbead~~r,:~I~edwlthli,j:t~eR .'$~/

;·~D}:~§i~~'?j?jf

Page 9: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironment ImpactAssessmentAuthority-Karnataka(Constituted by MoEF, Government of India under section3(3) of E(P) Act, 1986)

SEIAA 22 IND 2013 Establislunent of Nandur Kesartagi Industrial Areaby Karnataka Industrial Areas Development Board (KIADB)

days from the date of issueof the clearanceletter, at least in two localnewspapersthat arewidely circulatedin the regionof which oneshall bein the vernacular languageof the locality concernedand a copy of thesameshall be forwarded to the RegionalOffice of MoEFat Bangalore/KSPCB/ CPCB/ the Department of Ecology & Environment,Government of Karnataka, Bangalore and Regional Director(Environment),Departmentof Ecology& Environment,GovernmentofKarnataka,Kalaburgi.

12.The project authorities shall inform the Regional Office of MoEF atBangalore/ KSPCB/ CPCB/ theDepartmentof Ecology& Environment,Government of Karnataka, Bangalore and Regional Director(Environment),Departmentof Ecology& Environment,GovernmentofKarnataka,Kalaburgi, the date of financial closureand final approval ofthe project by the concernedauthorities and the date of start of theproject.

13.The SEIAA, Karnataka may revoke or suspend the clearance, ifimplementationof any of theaboveconditionsis not satisfactory.

14.The SEIAA, Karnataka reserves the right to stipulate additionalconditions, if found necessary.The company in a time bound mannerwill implement these conditions.

15.Theaboveconditionswill be enforced,inter-alia under the provisionsofthe Water (Prevention & Control of Pollution) Act, 1981, theEnvironment (Protection) Act, 1986 Hazardous and other Wastes(ManagementandTransboundaryMovement)Rules,2016and thePublicLiability InsuranceAct, 1991alongwith their amendments andrules.

16.The issue of Environment Clearancedoesn't confer any right to theproject proponent to operate / run the project without obtainingstatutoryclearances/ sanctionsform all otherconcernedAuthorities.

17.Concealing factual data or submission of false/fabricated data andfailure to comply with any of the conditionsmentionedabovemay resultin withdrawal of this clearanceandattractactionunder theprovisionsof'Environmental (Protection)Act, 1986.

18.Any appeal against this environmental clearanceshall lie with theNational Green Tribunal, if preferred, within a period of 30 days asprescribedunderSection16of theNationalGreenTribunal Act, 2010.

. ~9:-0fficialsfrom the Departmentof Environment and Ecology,Bangalore/~egional.Of~ic,~<~t,.~~~l~~:P.,~~galorewho would be monit~ring theImplementa" \\\~ve.,.Efl'V.y.'o~~~!f:talsafeguards should be gIven fullcooperatk ~'~-acl1iti~sand dONl~~ts/ data by the project proponentsduring tt~>{nsp.~l~t1~t:t'Acomp\e!~:~~etof all the documentssubmittedto MoEf(t-!SEI1\~;~1}~~~$beforwa~<!~~to theRegionalOffic,eo~MoEFatBangal~.~!I KSPC~~t\trp~~,B/ theDTg~ftmentof Ecology& Environment,Gover1l;~~t ofl~~riflt~~a, ~~~galore and Regional Director(Enviro~~rt), DepW':~':"T:~f~~fECl)l~'gy& Environment,GovernmentofKarnatak;~;~alaburg'. :;;;:,,§~ / -¥/! .

~\:;..;;"" . ~ en. /.'\:,., .. -, .-' ~I.sh\:~"...:;.:.<; ",/.;:~~ ff,<:.".( I.v I •.-.- ,------:~, h. \~ /

'~:"~~ \- _bw' • ., f\ -;;,~~'t'~~./.~ -,. -r- ~-.\•.j" •.•.~\ ~ ,.~;::?.•..."::::. ....:.::;..~::....'.-.;:::-:..:;.~-. 9

Page 10: State Level Environment Impact Assessment Authority-Karnatakakiadb.in/wp-content/uploads/2017/01/90-91-Nandur-KIADB-EC-26.07.1… · State Level Environment Impact Assessment Authority-Karnataka

StateLevelEnvironmentImpactAssessmentAuthority-Karnataka(Constituted by MoEF,Government of India under section3(3) of E(P)Act, 1986)

SEIAA 22 IND 2013 Establishment of Nandur Kesartagi Industrial Areaby Karnataka Industrial Areas Development Board (KIADB)

20. In thecaseof any change(s)in the scopeof the project,the projectwouldrequirea freshappraisalby this Authority.

21. The Authority reservesthe right to add additional safeguardmeasuressubsequently,if found necessary,and to take action including revokingof the environment clearanceunder the provisions of the Environment(Protection) Act, 1986, to ensure effective implementation of thesuggestedsafeguardmeasuresin a timebound andsatisfactorymanner.

22. All other statutory clearancessuchasthe approvalsfor storageof dieselfrom Chief Controller of Explosives,Fire Department, Civil AviationDepartment,ForestConservationAct, 1980 andWildlife (Protection)Act,1972 etc.shall be obtained,asapplicableby projectproponentsfrom thecompetentauthorities.

23.Thesestipulationswould beenforcedamongothersunder theprovisionsof water (Prevention and Control of Pollution) Act, 1974, the Air(Prevention and Control of Pollution) act 1981, the Environment(Protection)Act, 1986, the Public Liability (Insurance)Act, 1991 and EIANotification, 2006.

24.Under the provisionsof Environment (Protection)Act, 1986, legal actionshall be initiated against the project proponent if it was found thatconstruction of the project has been started without obtainingenvironmentalclearance.

A:\.~;;~Kf~ClAS~ff;'~;,.:;; \ '\,\ --.-.- .•...,) .-.'"_ ••..• ..,..,- -.. .,. \t"'~

//A "'/ <, "'y,~i~.~

i~~~/~'~'~,'c. <11t\\ \. ;-..~ 1"•• ,:.", > _ \. ',,0" # -,;:1\ •..••~\. ~".l~_~_ i~ ::~~~_ / .~.!,~\,\.> . \ "~,:.~~:",, r:» , .).. J'.~.:/'.;~~\.. ~\{~ ...if.~.cv- - // r/I

Capy)o~_ ~., //~~~j1. 1-;'<~S,~e·~rK\{~~istry of Environment, Forestsand Climate Change,

Iria~.p¥rf~ran Bhavan,[or BaghRoad,Aliganj, New Delhi -110 003.2. The Member Secretary, Karnataka State Pollution Control Board,

Bengaluru.3. The APCCF,RegionalOffice, Ministry of Environment & Forests(SZ),.~endriY.aSadan,IV Floor, E & F wings, 17thMain Road,Koramangala. II Block,Bengaluru- 560 034.

4. Regional Director (Environment), Ecology and EnvironmentDepartment,Government of Karnataka,Timmapuri Chowk, VallabhaiPatelCircle,TempleRoadNearCourt, Kalaburgi.

5. GuardFile.

Yoursfaithfully,

(RAMACHANDRA) '2;61 ~JGMemberSecretary,SEIAA,Karnataka.

10