STATE INFRASTRUCTURE AND INDUSTRIAL DEVELOPMENT CORPORATION OF UTTARAKHAND LIMITED (A Government of Uttarakhand Enterprise) Request for Proposal for the Operation and Maintenance of TipriMadanNegi Ropeway, Tehri, Garhwal December, 2019 State Infrastructure and Industrial Development Corporation of Uttarakhand Limited 29, IIE (IT PARK), Sahastradhara Road Dehradun-248001, Uttarakhand (India) CONTENTS

Transcript of STATE INFRASTRUCTURE AND INDUSTRIAL DEVELOPMENT CORPORATION OF UTTARAKHAND … · 2020. 3. 17. ·...

  • STATE INFRASTRUCTURE AND INDUSTRIAL DEVELOPMENT CORPORATION

    OF UTTARAKHAND LIMITED

    (A Government of Uttarakhand Enterprise)

    Request for Proposal for the

    Operation and Maintenance of TipriMadanNegi Ropeway, Tehri, Garhwal

    December, 2019

    State Infrastructure and Industrial Development Corporation of Uttarakhand Limited

    29, IIE (IT PARK), Sahastradhara Road

    Dehradun-248001, Uttarakhand (India)

    CONTENTS

  • Clause Topic Page No.

    Notice Inviting Proposal 4

    1. Preamble 6

    2. Objective 6

    3. Technical Details of Ropeway 6

    4. Scope of Work 7

    5. Eligibility Criteria 9

    6. Rate of Tickets to be Charged by the Operator 10

    7. Quoting of Rates and Bid Variable 10

    8. Renewal of Contract 10

    9. Language of the Proposal 11

    10. Proposal Documents 11

    11. Clarification on the Proposal Document 11

    12. Amendment of Proposal Document 11

    13. Proposal preparation and Submission Cost 11

    14. Authorization of the Applicant 12

    15. Submission of Proposal 12

    16. Earnest Money Deposit 12

    17. Validity 13

    18. Opening and Evaluation of The Proposal 13

    19. Evaluation of the price 13

    20. Award of Contract 13

    21. Security Deposit 14

    22. Agreement 14

    23. Period of Contract 14

    24. Standards to be adopted 14

    25. Insurance 15

    26. Rescue System 16

    27. Retrieved Materials 16

    28. Handing Over of Systems 16

    29. Payment Terms 16

    30. Interest 17

    31. Taxes 17

    32. Penalty and Liquidated Damages 17

    33. Termination of the Contract 17

    34. General Conditions 20

    35. Assignment/ Sub-Contracting 20

    36. Confidentiality 20

    37. Force Majeure 21

    38. Dispute Resolution Mechanism 22

    39. Jurisdiction of the Court 22

    Annexure

    I (Covering Letter) 23

    II Details of the Applicant 25

    III List of works handled in the last five years 26

  • 3 | P a g e

    IV Experience in providing ropeway O&M works as per clause 3(b) 27

    V Certificate/Declaration for not having blacklisted

    28

    VI Declaration for not having tampered the proposal document 29

    VII Price Bid 30

    VIII Checklist of Documents 31

    IX Details of Ropeway Project 32

    X Agreement (draft) 33

  • 4 | P a g e

    Notice Inviting Proposal (NIP)

    Notice Inviting proposalfor operation and Maintenance of Tipri

    MadanNegi ropeway, TehriGarhwal, Uttarakhand.

    STATE INFRASTRUCTURE AND INDUSTRIAL DEVELOPMENT

    CORPORATION OF UTTARAKHAND LTD.

    29, IIE, Sahastradhara Road (IT Park), Dehradun

    Phone No. 0135 – 2607292, 2708100

    Fax No. 0135 – 2708109 Web site : www.siidcul.com

    State Infrastructure and Industrial Development Corporation of Uttarakhand Limited

    (SIIDCUL) is established to promote Industrial development in the State, develop

    infrastructure and assist private initiative in Industry and Infrastructure and implement,

    manage projects and provide specialized financial, consultancy and construction and all such

    other activities to promote industries and develop Industrial Infrastructure in the State of

    Uttarakhand.

    A 12-Seater Twin track Bi-Cable Jig-Back Passenger Cum Goods Ropeway was in operation

    since 2009 and was established by Directorate of Rehabilitation, Tehri Dam Project through

    UshaBreco Limited under supervision of PWD. In 2012 it was directed to SIIDCUL by

    Principal Secretary (Industry) to take over the operation & maintenance of said ropeway

    project. The ropeway is designed to transport passengers as well as goods between Tipri

    (Drive side) and MadanNegi (Return side) in TehriGarhwal of Uttarakhand,(Technical details

    of Project can be seen onwebsite of SIIDCUL website https://www.siidcul.com).

    SIIDCUL invites submission of online Proposal under two bid system i.e. Technical and

    Financial Bids from competent/ Eligible applicants. Applicants are advised to study the RFP

    document carefully before submitting their proposals in response to this advertisement.

    Submission of the proposal in response to this advertisement shall be deemed to have been

    done after careful study and examination of the RFP document with full understanding of its

    terms, conditions and implications and actual site conditions. This RFP document is non-

    transferable.

    Proposal document

    fee

    RFP processing Fee INR 5,000/-(Rupees Five Thousand only) in the

    form of Demand Draft/Bankers Cheque issued by a Nationalized/

    Scheduled Bank in favour of SIIDCUL and payable at Dehradun or by

    NEFT/RTGS to SIIDCUL a/c no – IOB-042902000002450 IFSC code:

    IOBA0000429 Bank Indian Overseas Bank, Dehradun; the UTR slip to

    be submitted in the office of SIIDCUL on or before closing date and

    time for Tender Submission.

    EMD An earnest money amounting to INR 1,50,000/- (Rupees One lac Fifty

    Thousand only) has to be deposited only through Demand Draft

    /Banker’s Cheque issued by a Nationalized/Scheduled Bank in favour

    of SIIDCUL or by NEFT/RTGS to SIIDCUL a/c no – IOB-

    042902000002450 IFSC code: IOBA0000429 Bank Indian Overseas

    Bank, Dehradun; the UTR slip to be submitted in the office of

    SIIDCUL and payable at Dehradun to be submitted in the office of

    http://www.siidcul.com/

  • 5 | P a g e

    SIIDCUL on or before closing date and time for Proposal Submission.

    Bid Schedule

    Details of the Event Date & Time

    Date of online publication 18-03-2020

    Document Download start date 19-03-2020

    Document Download end date 18-04-2020

    Bid submission start date 19-03-2020

    Bid submission End date and

    time

    18-04-2020 at 1400hrs

    Date and time for opening of

    the Bid

    18-04-2020 at 1500 hrs

    Date of pre Bid meeting 01-04-2020 at 1230hrs

    Address SIIDCUL, IT-29, IIE IT Park, Sahastradhara Road, Dehradun 248001.

    Website RFP documents can be downloaded from the website

    www.uktenders.gov.in submission of bids shall be done through the

    website www.uktenders.gov.in .

    MD, SIIDCUL reserves all right to accept/reject any or all the proposals received or cancel

    the entire process at any stage without assigning any reason thereof.

    http://www.uktenders.gov.in/http://www.uktenders.gov.in/

  • 6 | P a g e

    RFP DOCUMENT

    1. PREAMBLE

    A 12-seater Twin track Bi-cable Jig back passenger cum goods ropeway was constructed across

    river Bhilangana in Tehri district by M/s. Usha Breco Ltd., 3rd floor, Parsvnath Majestic Arcade,

    18A, VaibhavKhand, Indrapuram, P.O. Sahibabad, Dist: Gaziabad – 201012 (U. P.), Email:

    [email protected] in 2009, vide Directorate of Rehabilitation, S. E. (Rehabilitation) bond

    no. 6/SE (R) Cable/2006 dated 05/06/2006 (Construction Division, PWD, Tehri under THDC

    rehabilitation circle). Funding for the project was done by Bhagirathi Valley Development

    Authority. M/s. UshaBreco Ltd. operated this ropeway from 17/11/2009 to 06/05/2010 and

    03/09/2010 to 09/10/2010, thereafter operation was stopped due to funding issues. Since,

    06/03/2013 State Infrastructure & Industrial Development Corporation of Uttarakhand Ltd.

    (SIIDCUL) was asked to operate this ropeway. Accordingly SIIDCUL is getting it operated as

    deposit work through UPRNN, Unit-1, Doon University, Kedarpuram, Dehradun

    2. OBJECTIVE

    SIIDCUL Board of Directors have directed that, instead of operating the ropeway through

    UPRNN on deposit work basis, SIIDCUL shall directly take up the operation of ropeway by

    engaging an operator on Viability Gap Funding (VGF) model.

    Hence this RFP is being floatedto invite proposals from prospective applicants for O & M of

    Tipri-Madannegi ropeway, as per the scope of work on VGF model. The revenue earned by the

    sale of tickets to users shall remain with the successful applicant and after considering this

    revenue, he will quote his minimum viability gap funding rates per month to be reimbursed from

    SIIDCUL for the O & M of ropeway, as per scope of work and other conditions of contract.

    3. TECHNICAL DETAILS OF ROPEWAY

    The technical details of the ropeway are as following:

    (i) Span of ropeway: 924 meters.

    (ii) Name of river: Bhilangana

    (iii) Drive side: Tipri (TehriGarhwal)

    (iv) Return side: MadanNegi (TehriGarhwal)

    (v) Design & Drawing details of ropeway are given in Annexure-IX.

    A brief description of the assignment and its objectives are given below in the “Scope of

    Work”.

    mailto:[email protected]

  • 7 | P a g e

    4. SCOPE OF WORK

    The successful applicant shall be responsible for operation and maintenance of the subjected

    Tipri-MadanNegi ropeway in accordance with the relevant provisions of Uttarakhand Ropeway

    Act 2014, which shall include but not limited to the following:

    (i) The successful applicant shall operate and maintain the Passenger & Goods Ropeways for

    a period of three years from the date of handing over of the systems, as per the operation

    timings permitted by the local administration. Maximum number of running hours in a day

    is envisaged at minimum 8 hours for ropeway (ropeway will not be operated in night

    hours). Ropeway shall be operated all days of the week. One day in a month shall be

    closure day for passengers, for maintenance. The operation time and days of ropeway may

    be changed as per directions of local administration/SIIDCUL.

    (ii) The successful Applicant shall supply all spares (both operating and emergency) for all the

    electrical and mechanical equipment and fixtures/ fittings at both the terminal stations of

    Ropeway including ropeway alignment lighting (Flood lights), communication systems etc.

    free of cost for the maintenance of the systems during the Contract period.

    (iii) Regular, preventive & predictive maintenance & testing schedule for the whole system

    along with lifecycle of the critical components shall be provided and got approved by the

    Chief Ropeway Inspector. All the mandatory tests shall be carried out as per approved

    schedule and test reports/certificates shall be submitted to SIIDCUL. Any spare/equipment

    to be replaced/repaired after the above tests, the same shall be carried out and get it tested

    for safe operation of the system before commencing the Operation at its own cost.

    (iv) The successful applicant shall also get the necessary tests done for the following

    components for the parameters as directed by Chief Ropeway Inspector, GoUK, 583,

    Opposite Govt. ITI Niranjanpur, Majra, Saharanpur Road, Dehradun – 248001:

    Civil Structure Foundation

    Structure – Terminal and Tower

    Wire Rope and Fittings

    Electromechanical Components

    Control System

    (v) The successful applicant shall provide the operation and maintenance manuals and will get

    it approved by Chief Ropeway Inspector, GoUK. The copy of approved O&M manuals

    shall be provided to SIIDCUL by the applicant, failing which he will be held responsible

    for any mis-happening.

    (vi) The existing Gen-set shall be operated & maintained properly with all spares including

    diesel, for uninterrupted operation of ropeway system.

    (vii) The successful Applicant shall provide and maintain an office at the site with modern

    communication like walky-talky at their cost for his Engineer and staff and such office

  • 8 | P a g e

    shall be open at all reasonable hours to receive instructions, notices or other

    communications. An assistant with walky-talky shall be appointed mandatorily by the

    successful applicant and deputed inside the cable car.

    (viii) The successful Applicant shall undertake to supply all spares free of cost for the

    maintenance of the systems during the contract period.

    (ix) The successful Applicant shall undertake all necessary approvals and compliances required

    from District Magistrate, Chief Ropeway Officer, Fire department etc. and also comply

    with all relevant provisions of Uttarakhand Ropeway Act 2014.

    (x) The successful Applicant shall undertake Maintenance of all Consumables General

    maintenance, oiling, greasing, general spares (line sheaves, liners, electric spares, hydraulic

    oil, gear oil, rope oil, AMC / Testing & Inspection - DG Set, Wireless / communication,

    Radiography checking of ropes, NDT of all critical parts, WDA of all lubricants, DPT of all

    welding joints, Checking of all lifting tools, Calibration of measuring instruments,

    Maintenance – For any kind of maintenance shutdown shall not be more than three days at

    max, DG set Diesel charges, Electricity charges and all required charges etc.

    (xi) Safety Norms – The successful bidder shall provide life jackets to all the passengers

    mandatorily.

    (xii) Manpower deployment

    a) The following minimum qualified, experienced and fit personnel are to be appointed

    for the O&M of the Ropeway. The successful bidder would have to provide the

    necessary details and respective signed resumes/biodata of these personnels before

    signing the agreement.

    Sl. No Designation Numbers Qualification

    i) Site in-charge

    1 No. Degree in Mechanical / Electrical Engineer

    with minimum seven years relevant

    experience

    ii) Engineers (Electrical & Mechanical)

    2 Nos.

    (1 no. Electrical

    & 1 no.

    Mechanical)

    Degree/ Diploma Mechanical / Electrical

    Engineer with minimum five years relevant

    experience

    iii) Operator 5 Nos.

    ITI (wireman/electrician) with 2 years

    relevant experience and Non-ITI skilled

    operators shall have 6 years of experience in

    relevant field.

    iv) Helper 2 Nos. Minimum 10th Standard Pass

  • 9 | P a g e

    v) Guard 4 Nos. Minimum 10th Standard Pass

    b) Frequent change of manpower will not be entertained. The person(s) deployed for a

    particular position shall work in that position for a period of at least 6 months from the

    date of joining continuously. Any change in persons from the site shall have the prior

    approval of SIIDCUL.

    (xiii) Issuance of ticket and collection of ticket charges from the users shall be the responsibility

    of successful applicant.

    5. ELIGIBILITY CRITERIA

    Clause Eligibility Criteria Supporting Document

    a)

    The Applicant shall be a registered

    legal entity and engaged in the business

    of ropeway manufacturing/ assembly/

    operation, maintenance for a period of

    3 years.

    In case of Private / Public Limited

    Companies,

    • Copy of Incorporation Certificate

    issued by the Registrar of Companies

    and Memorandum and Articles of

    Association

    In case of Partnership Firm

    • Registered Partnership deed

    List of works undertaken in the past 5

    years (as per Annexure- III), self attested

    copy of experience certificate issued by

    the competent authority of controlling

    organization to be not less than the level

    of project manager/Executive Engineer.

    b)

    The Applicant shall have Operated &

    Maintained satisfactorily at least One

    Fixed Grip Jig Back type

    Passenger/goods Ropeways with a

    capacity of 40 PPH for minimum 3

    years during last five years.

    (i) Work order issued by the clients.

    Experience in providing ropeway O&M

    works (as per Annexure- IV) along with

    Work orders / completion certificate

    issued by the client.

    c) The Applicant shall have PAN number

    issued by Income Tax Department PAN allotment Certificate.

    d) The Applicant shall be registered under

    GST number Registration certificate for GST.

  • 10 | P a g e

    e)

    The Applicant shall not have been

    blacklisted for supply of any items or

    services to SIIDCUL or any other

    Government agency.

    The self declaration form as per Annexure V

    6. RATE OF TICKETS TO BE CHARGED BY THE OPERATOR

    The operator shall charge from local passenger the fee of Rs. 10 only per crossing (one side) and

    Rs. 150 per transit (to and fro) from the tourists.

    7. QUOTING OF RATES AND BID VARIABLE

    The revenue earned by the contractor as per the fixed ticket rates mentioned in the RFP shall

    remain with the contractor only. Keeping this factor in view the viability gap funding per annum,

    required by the bidders for operation and maintenance of above said ropeway as per the scope of

    work, conditions mentioned in the RFP, shall be the bid variable, while quoting the above

    following must be taken note of :-

    a) The price shall be quoted in Indian Rupees. b) The price offer shall be prepared as per Annexure-VII. c) The rate shall include applicable taxes. d) The price shall be neatly and legibly written both in figures and words. If the rates quoted in

    figures and in words differ, the lower of these two will be adopted.

    e) Before quoting rates, the applicant shall inspect the existing ropeway system and shall include all possible essential requirements/ replacement if any in their rates along with the

    salary of technical team (Site in charge, Electrical Engineer, Mechanical Engineer, Operators,

    etc.) and salary of non-technical team (Guard etc.). Maintenance of all consumables, AMC/

    Testing and inspection charges, D. G. Set(62 KVA), Wireless etc., maintenance charges,

    annual shutdown 6 days, all operation charges (electricity charges, diesel charges, etc.), cost

    of insurance charges and any other charges including GST.

    f) Price bid shall not contain any commercial conditions. Variation in the commercial terms and conditions of the tender will not be accepted.

    8. RENEWAL OF THE CONTRACT

    SIIDCUL shall have the exclusive right of renewing the contract of successful applicant

    depending on the performance and compliances by the successful bidder during the contract

    period. However the successful bidder shall have no right of claim for such renewal. The

    decision of SIIDCUL shall be final and binding to the applicant.

    9. LANGUAGE OF THE PROPOSAL

    The Proposal prepared by the Applicant as well as all correspondences and documents relating to

    the Proposal shall be in English language only. If the supporting documents are in a language

    other than English/Hindi, the notarized translated English version of the documents shall also be

    enclosed. Proposal received without such translation copy will be rejected.

  • 11 | P a g e

    10. PROPOSAL DOCUMENTS

    The RFPis available online on SIIDCUL website: https://www.siidcul.com. and also on e-

    proposal portal of https:uktenders.gov.in. A non-refundable processing fee of Rs. 5,000 (Rupees

    Five Thousand only) in the form of Demand draft/Online in favour of the Managing Director,

    State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. while

    submitting the bid or online payment as per details provided in Notice Inviting Proposal above.

    11. CLARIFICATION ON THE PROPOSAL DOCUMENT

    Any discrepancies, omissions, ambiguities or conflicts in the RFP document or any doubts as to

    their meaning and any request for clarification must be notified to the Client, in writing, by 31-

    03-2020 (upto 17.00 hrs). Any request for clarification in writing or by e-mail([email protected])

    must be sent to the Client’s address “General Manager, SIIDCUL, 29, IIE (IT PARK),

    Sahastradhara Road, Dehradun-248001, Uttarakhand (India)”. The Client will upload replies to

    queries on its website :www.siidcul.com and e-procurement portal http://uktenders.gov.in .

    12. AMENDMENT OF PROPOSAL DOCUMENT

    SIIDCUL whether on its own initiative or as a result of a query, suggestion or comment of an

    Applicant or a Respondent, may modify the RFP document by issuing an addendum or a

    corrigendum at any time before the opening of the proposal. Any such addendum or corrigendum

    will be communicated to all the agencies who had purchased the RFP documents through e-

    procurement portal http://uktenders.gov.in and the same will be binding on all Applicants or

    Respondents, as the case may be.

    13. PROPOSAL PREPARATION AND SUBMISSION COST

    a) Applicant shall bear all costs associated with the preparation and submission of proposal

    including visits, if need be, for personal inspection of the site and SIIDCUL will in no case be

    responsible or liable for those costs, regardless of the conduct or outcome of the proposal

    process.

    b) Applicant to have no claim on SIIDCUL on the outcome of the proposal process. SIIDCUL

    reserves the right to accept, in its sole and unfettered discretion, any proposal or reject any

    proposal.

    c) No claim for compensation etc. will be entertained by SIIDCUL for rejected proposals on any

    ground whatsoever.

    14. AUTHORISATION OF THE APPLICANT

    The proposal shall be signed on each page by the Applicant or by the person who is duly

    authorized for the same by the Applicant. A letter of authorization from the Board of Directors or

    mailto:[email protected]

  • 12 | P a g e

    Managing Director of Applicant organization authorizing the Proposal Submitting Authority

    shall be enclosed. The proposal received without letter of authorization will be summarily

    rejected.

    15. SUBMISSION OF PROPOSAL

    a) Format & Signing of Bid: The Bidders shall provide all the information online sought

    under this RFP. The Authority will evaluate only those Bids that are received in the

    required formats and complete in all respects.

    b) Submission of Bid: The Bidder shall submit the Price Bid in the format as specified in

    the RFP document online through www.uktenders.gov.in.

    c) Technical bid documents: The documents of Technical Bid shall also be submitted

    online through www.uktenders.gov.in in the format as specified. Bids not submitted in

    the prescribed forms/formats will be summarily rejected. Bidders are advised to fill all

    information clearly and legibly in prescribed format.

    16. EARNEST MONEY DEPOSIT

    a) The Proposal shall be accompanied by an Earnest Money Deposit (EMD) to the value of Rs.

    1,50,000/- (Rupees One Lakh Fifty Thousand only) in the form of a Demand Draft or

    Banker’s cheque drawn on any Indian Nationalised/Scheduled Commercial Bank in favour of

    the Managing Director, State Infrastructure and Industrial Development Corporation of

    Uttarakhand Ltd.”, payable at Dehradun or online payment as per details provided in Notice

    Inviting Proposal above. The EMD in any other form will not be accepted. The Earnest

    Money Deposit will be returned to the unsuccessful Applicant after signing of the contract

    agreement with the successful bidder.

    b) EMD will be retained in the case of successful Applicant and it will not earn any interest and

    will be dealt with, as provided in the terms and conditions of the proposal.

    c) Any request of Applicant, under any circumstances claiming exemption from payment of

    EMD will be rejected and their Part II price offer will not be opened.

    d) The amount remitted towards EMD is liable to be forfeited in case the Applicant fails to

    execute the contract after submission of the proposal or after acceptance of the offer by

    SIIDCUL or fail to sign the Agreement or to remit the Security Deposit.

    17. VALIDITY

    The amount quoted in the Proposal shall be valid for the acceptance by the SIIDCUL, for a

    minimum period of 120 days from the date of opening of the Proposal. The accepted amount is

    valid during entire contract period. Escalation in the amount will not be entertained under any

    circumstances.

    http://www.uktenders.gov.in/http://www.uktenders.gov.in/

  • 13 | P a g e

    18. OPENING AND EVALUATION OF THE PROPOSAL

    a) The proposals received up to 2.00 PM as per the office clock on 18-04-2020 will be taken

    up for opening. Proposals received after specified date and time will not be accepted. The

    Proposal will be opened by the evaluation Committee authorized by SIIDCUL at 03.00

    PM on the same day in the presence of the available Applicants / representatives of the

    Applicants who choose to be present. The Applicant or their authorized agents are allowed

    to be present at the time of opening of the proposals.

    b) If the date fixed for opening of the proposal happens to be a Government holiday, the

    sealed proposals will be received up to 3.00 PM on the next working day and opened at

    04.00 PM on the same day.

    c) The Technical bid will be evaluated by the Committee of SIIDCUL in terms of the

    qualification Criteria. The Committee reserves the right to disqualify any of the proposal

    in case the Committee is not satisfied with the documents furnished.

    19. EVALUATION OF THE PRICE

    a) The Applicant whose quote is lowest for Operation and Maintenance of ropeway will be

    adjudged as L1.

    b) SIIDCUL will not be responsible for any erroneous calculation of tax rates or any subsequent

    changes in rates or structure of applicable taxes. All differences arising out as above shall be

    fully borne by the successful applicant.

    20. AWARD OF CONTRACT

    The Applicant who has quoted lowest price (L1) will be invited for negotiations. Upon

    finalization of negotiated rate, SIIDCUL will issue the Letter of Acceptance (LoA) to the

    successful applicant.

    On receipt of the Letter of Acceptance from the SIIDCUL, the successful Applicant shall remit a

    Security Deposit (SD) of 10% of the total value of the contract, by way of Demand Draft

    drawn on any scheduled commercial bank in favour of the “Managing Director, State

    Infrastructure and Industrial Development Corporation of Uttarakhand Ltd.”, payable at

    Dehradun. within 15 (fifteen) working days from the date of receipt of Letter of Acceptance. The

    EMD shall be adjusted with the security deposit.

    21. SECURITY DEPOSIT

    a) Any other amount pending with SIIDCUL will not be adjusted under any circumstances,

    against the Security Deposit if so requested.

    b) If the Security Deposit amount is not paid within the time specified, the EMD remitted by the

    Applicant shall be forfeited, besides cancelling the communication of acceptance of the

  • 14 | P a g e

    Proposal.

    c) Security Deposit amount remitted will not earn any interest.

    22. AGREEMENT

    The successful Applicant shall execute an agreement as may be drawn up to suit the conditions

    on a non-judicial stamp paper of value, as prescribed in law on the date of remittance of Security

    Deposit and shall pay for all stamps and legal expenses incidental thereto. In the event of failure

    to execute the agreement, within the time prescribed, the EMD/SD amount remitted by the

    Applicant will be forfeited besides cancelling the Proposal.

    23. PERIOD OF CONTRACT

    The contract period will be maximum of Three years from the date of agreement and the

    agreement shall be Pre-closed with one month prior notice before the contract period as desired

    by the SIIDCUL. In the event of pre-closure of agreement by the contractor an prior notice of six

    months before the pre-closure needs to be given by the contractor to SIIDCUL. In such event the

    EMD and security deposit of the contractor shall forfeited.

    24. STANDARDS TO BE ADOPTED

    a) The materials and workmanship of all works shall confirm to the latest Bureau of Indian

    Standards, Important among them are:

    (i) IS 3973-1934: Code of Practice for the Selection, Installation and Maintenance of Wire

    Ropes

    (ii) IS 5228-2003: Fixed grip monocable ropeway

    (iii) IS 5229-1998: monocable automatic grip (detachable) ropeways

    (iv) IS 7403-1974: selection of standard Worm & helical gear boxes.

    b) The above list is not exhaustive. Reference shall be made to other relevant codes whenever

    necessary and wherever applicable. It shall not be necessary to append and specify such

    standards and codes with the RFP documents and they shall be deemed to be an inseparable

    part of the RFP document and agreement to be entered into. When the codes or specifications

    are silent on certain aspects, the construction shall conform to sound engineering practice. In

    case of any dispute arising out of the interpretation of the above, the decision of SIIDCUL

    shall be final and binding on the successful applicant. These shall be bound to this document

    and become part and parcel of the agreement.

    25. INSURANCE

    a) The Successful applicant shall insure the plant and machineries for their full value against all

    risk by fire, burglary, strikes, riots and civil commotion and natural calamities like floods,

  • 15 | P a g e

    earthquake, explosion etc. before commencing the works and keep the policy alive till the

    end of the Operation and Maintenance period. The policies shall be in the name of SIIDCUL

    from insurance companies approved by IRA. The Value of the successful applicant’s All

    Risk Policy (CAR) shall be that of the total value of existing systems /works to be carried out

    by the applicant.

    b) The Successful applicant shall take suitable insurance policy value as detailed below to meet

    all Personal /Public/ labour liabilities and claims during the Operation and Maintenance

    period.

    (i) Public liability – For any one accident Rs. 2.00 crores, For any one-year Rs. 4.00

    crores

    (ii) Personal accident – For one person Rs.5.00 Lakhs

    (iii) Medical reimbursement - For one person Rs. 2.00 Lakhs

    c) The Successful applicant will be responsible for the premium in connection with extending

    the period(s) of insurance covers.

    d) The Successful applicant shall be entirely responsible for any loss/ injury or damage to

    persons, animals or things and for all damage to property which may arise from any act or

    omission on the part of the successful applicant.

    e) The Successful applicant shall be entirely responsible for any loss or damage to the public,

    passengers, operators, plants and machineries due to any deficiency / negligence on the part

    of the successful applicant/his personnel during the O&M until the plant is taken over.

    f) The liability under this clause shall cover also, inter alia, any damage to structures, whether

    immediately adjacent to the works or otherwise, any damage to roads, streets, footpaths,

    bridges as well as damage caused to the buildings and other structures and works forming the

    subject matter of this Contract. The Successful applicant shall also be responsible for any

    damage caused to the buildings and other structures and works forming the subject matter of

    this Contract due to rain, wind, frost or other inclemency of weather.

    g) The Successful applicant shall indemnify and keep indemnified SIIDCUL and hold him

    harmless in respect of all and any loss and expenses arising from any such injury or damage

    to persons or property as aforesaid and also against any claim made in respect of injury or

    damage, whether under any statute or otherwise and also in respect of any award or

    compensation or damage consequent upon such claim.

    h) The Successful applicant shall reinstate all damage of every sort mentioned in this clause so

    as to deliver up the whole of the works complete and perfect in every respect and so as to

    make good or otherwise satisfy all claims for damage to property of third parties including

    neighboring buildings etc.

    i) SIIDCUL shall also be protected against all claims in respect of damages to third parties

    including the SIIDCUL’s staff, visitors, neighbors and other passers-by which may be made

    against SIIDCUL by any person in respect of anything which may arise in respect of the

    works or in consequence thereof or due to accidents on account of the incidental risks which

  • 16 | P a g e

    may occur during the execution of works/operation& Maintenance and the successful

    applicant shall, at his own expense, effect and maintain, until the virtual completion of the

    O&M Contract, with an Insurance Company approved by SIIDCUL a policy of Insurance in

    the name of SIIDCUL against such risks and deposit such policy or policies before

    commencement of the works.

    j) The Successful applicant shall also indemnify SIIDCUL against all claims made upon

    SIIDCUL, whether under the Workmen’s Compensation Act or any other statute in force

    during the currency of this Contract or at Common Law in respect of any employee of the

    successful applicant or of any Sub-applicant and shall at his own expense effect and maintain

    until the completion of the O&M Contract, with an insurance company, approved by

    SIIDCUL, a Policy of Insurance against such risks and deposit such policy or policies with

    SIIDCUL from time to time during the currency of this Contract.

    26. RESCUE SYSTEM

    Latest system for easy and quick emergency rescue of passengers in sufficient quantity shall be

    provided by the successful applicant (Minimum 2 sets). The successful applicant has to conduct

    Mock-up rescue operation to train the operating personnel as instructed by the safety committee

    once in 3 months.

    27. RETRIEVED MATERIALS

    The retrieved materials/worn out spares shall be listed out then & there and shall be removed

    from the site by the successful applicant after approval of SIIDCUL.

    28. HANDING OVER OF SYSTEMS

    The Ropeway Systems (Both Passenger & Goods) as a whole shall be handed over to the

    SIIDCUL in good working condition to the satisfaction of SIIDCUL & Safety/Expert committee

    and fit for public use after the completion of contract period.

    29. PAYMENT TERMS

    a) Payment will be made on quarterly basis on the contracted rate for three years.

    b) No interest will be paid for the payment due for the bills submitted.

    c) All payments shall be made in Indian currency.

    30. INTEREST

    SIIDCUL shall not be liable to pay any interest to successful applicant on his deposits with

    SIIDCUL or any deferred payments.

  • 17 | P a g e

    31. TAXES

    (i) The Govt. taxes and other levies, if any shall be borne by the Applicant.

    (ii) Income Tax

    Income Tax, if applicable, will be deducted at source, while releasing the payment against R.A-

    Bill/Total Bill.

    32. PENALTY AND LIQUIDATED DAMAGES

    a) In case the Successful applicant fails to employ equivalent substitute for the O&M staff

    within twenty-four hours a penalty of Rs. 2500/- per day of default for each person in the

    case of Engineers and Rs. 1500/ - per day of default for each person in the case of

    Technician and Rs.1000/- per day of default for each person in the case of Operator shall be

    levied & deducted from the payments due to the successful applicant. Biometric attendance

    will be taken as the basis for the levying penalty.

    b) All essential spares shall be listed and kept ready for immediate replacement. O&M shall

    not be stopped for any type of break down for more than 48 Hours except for regular

    scheduled maintenance. The delay beyond 48 hours will attract a liquidated damage of 2

    times of daily average collection of previous month for first year of operation and

    corresponding month of previous year from subsequent years for every 24 hours and part

    thereof.

    c) If the stoppage is more than 48 hours due to major break down caused due to the reason

    beyond the control of the successful applicant, the successful applicant has to take

    expeditious action to rectify the defects and bring back the system for safe operation within

    the mutually agreed time period.

    33. TERMINATION OF CONTRACT

    a) Termination by Default

    (i) SIIDCUL may without prejudice to any other remedy for breach of contract, by written

    notice of default with a notice period of one month, sent to the Successful Applicant,

    terminate the contract in whole or part,

    • if the Successful Applicant fails to Operate & Maintain a Twin track Bi-Cable Jig-

    Back Ropeway of 60 PPH specified in the details, or fails to fulfill the requirements

    as per the Proposal conditions or within any extension thereof granted by

    SIIDCUL; or

    • if the Successful Applicant fails to perform any of the obligation(s) under the

    contract; or

    if the Successful Applicant, in the judgment of SIIDCUL, has engaged in

    fraudulent and corrupt practices in competing for or in executing the Contract. if

  • 18 | P a g e

    the activities of the successful applicant or his men is found be detrimental to the

    interest of the SIIDCUL.

    (ii) In the event SIIDCUL terminates the Contract in whole or in part, SIIDCUL may opt

    up on terms and in such manner as it deems appropriate, the services of the other

    Applicants. However, the Successful Applicant shall continue the performance of the

    contract to the extent not terminated.

    b) Termination for Insolvency

    (i) In the event of the Applicant

    • Becoming bankrupt or insolvent, or

    • Making a composition or arrangement with or assignment in favour of his creditors,

    or

    • Agreeing to carry out the Contract under a committee of inspection of his creditors,

    or

    • Being a company, having a winding up order made or (except for purposes or

    reconstruction), a resolution for voluntary winding up passed, or a receiver or

    manager of his business or undertaking duly appointed or possession taken by or on

    behalf of the holders of any debentures secured by a floating charge, of any

    property comprised in or subject to the floating charge, the employment of the

    Successful applicant under this Contract shall be forthwith automatically

    determined but the said employment may be reinstated and continued if SIIDCUL

    and the Successful applicant, his trustee in bankruptcy, liquidator, receiver or

    manager as the case may be shall so agree.

    (ii) SIIDCUL may at any time terminate the Contract by giving written notice with a notice

    period of one month to the Successful Applicant, if the Successful Applicant becomes

    bankrupt or otherwise insolvent. In this event, termination will be without compensation

    to the Successful Applicant, provided that such termination will not prejudice or affect

    any right of action or remedy that has accrued or will accrue thereafter to SIIDCUL.

    c) Corrupt Practice

    (i) SIIDCUL shall be entitled to terminate the employment of the Successful Applicant

    under this Contract

    (ii) If the Successful Applicant shall have offered or given or agreed to give to any person

    any gift or consideration of any kind as an inducement or reward for doing or forbearing

    to do or for having done or forborne to do any action in relation to the obtaining or

    execution of this Contract with SIIDCUL, or For showing or forbearing to show favour

    or disfavor to any person in relation to this Contract, or any other Contract with

    SIIDCUL or if the like acts shall have been done by any person employed by the

    Successful Applicant or acting on his behalf (whether with or without the knowledge of

  • 19 | P a g e

    the Successful Applicant) or if in relation to this Contract or any other Contract with

    SIIDCUL the Successful Applicant or any person employed by him or acting on his

    behalf shall have committed any offence under the prevention of corruption act, or shall

    have given any fee or reward the receipt of which is an offence under the Local

    Government Act

    d) Consequences

    (i) In the event of the employment of the Successful Applicant being terminated as

    aforesaid and so long as it has not been reinstated and continued, the following shall be

    the respective rights and duties of SIIDCUL and Successful Applicant.

    (ii) The Retention money & Security Deposit shall stand forfeited in favour of SIIDCUL.

    (iii) The Successful applicant shall deliver to the Expert committee all Manuals and other

    documents made by or for the Successful Applicant in connection with the O&M

    Works.

    (iv) SIIDCUL may employ and pay other persons to carry out and complete the works and

    he or they may enter upon the Works and use all temporary buildings, plant, machinery,

    appliances, goods and materials intended for, delivered to and placed on or adjacent to

    the works and may purchase all materials and goods necessary for the carrying out the

    completion of the Works.

    (v) The Successful applicant shall if so required by SIIDCUL / Expert committee within 14

    days of the date of termination assign to SIIDCUL without payment the benefit of any

    Agreement for the supply of materials or goods and/or for the execution of any works

    for the purposes of this Contract but on the terms that a supplier or Subapplicant shall

    be entitled to make any reasonable objection to any further assignment thereof by

    SIIDCUL. In any case SIIDCUL may pay any supplier or Sub-applicant for any

    materials or goods delivered or Works executed for the purpose of the Contract

    (whether before or after the date of determination), in so far as the price thereof has not

    already been paid by the Successful applicant. Payments made under this paragraph

    may be deducted from any sum due or to become due to the Successful Applicant.

    (vi) The Successful applicant shall as and when required in writing by SIIDCUL / Expert

    committee so to do (but not before) remove from the works any temporary buildings,

    plant, tool, equipments, goods and materials belonging to or hired by him. If within a

    reasonable time after any such requirements has been made the Successful applicant,

    has not complied therewith then SIIDCUL may (but without being responsible for any

    loss or damage) remove and sell any such property of the Successful applicant, holding

    the proceeds less all costs incurred to the credit of the Successful Applicant.

    (vii) The Successful applicant shall not be released from any of his obligations or liabilities

    under the Contract prior to the date of termination.

  • 20 | P a g e

    (viii) The Successful applicant shall allow or pay to SIIDCUL in the manner hereinafter

    appearing the amount of any direct loss and/or damage caused to SIIDCUL by the

    termination. Until after completion of the works under this Clause SIIDCUL shall not

    be bound by any provisions of this Contract to make any further payment to the

    Successful applicant , but upon such completion and the verification within a reasonable

    time of the accounts thereof the Expert committee shall certify the amount of expense

    properly incurred by SIIDCUL and the amount of any direct loss and/or damage caused

    to SIIDCUL by the determination and if such amounts when added to the monies paid

    to the Successful applicant before the date of determination exceed the total amount

    which would have been payable on due completion in accordance with this Contract,

    the difference shall be a debit payable to SIIDCUL by the Successful applicant and if

    the said amounts, when added to the said monies be less than the said total amount, the

    difference shall be a debit payable by SIIDCUL to the Successful applicant.

    34. GENERAL CONDITIONS

    a) Conditional Proposal in any form will not be accepted.

    b) Any notice regarding any problems, to the supplier shall deemed to be sufficiently served, if

    given in writing at his usual or last known place of business.

    c) SIIDCUL reserves the right to relax or waive or amend any of the proposal conditions.

    d) SIIDCUL reserves the right to reject any or all the proposals without assigning any reason

    thereof.

    35. ASSIGNMENT/SUB-CONTRACTING

    a) The successful applicant shall not assign or sub-let this Contract or any part thereof

    without the prior written consent of SIIDCUL. This consent shall not, however be denied

    unreasonably.

    b) Any sub-contracting by the successful applicant shall not relieve him of his responsibility for

    performance of his obligations under this contract.

    36. CONFIDENTIALITY

    All process details, engineering data, drawings, documents, correspondence, decisions and orders

    concerning the Contract shall be treated as confidential and/or restricted in nature by both parties

    and they shall not divulge or allow access to them by any unauthorized person.

    37. FORCE MAJEURE

    a) Neither SIIDCUL nor the Successful Applicant shall be liable to the other for any delay or

  • 21 | P a g e

    failure in the performance of the irrespective obligations due to causes or contingencies

    beyond their reasonable control such as:

    Natural phenomena including but not limited to earthquakes, flood sand epidemics, Acts of

    God, any Government authority, domestic or foreign including but not limited to war

    declared or undeclared, priorities and quarantine restrictions. Accidents or disruptions

    including, but not limited to fire, explosions, breakdown of essential machinery or

    equipment.

    b) If at any time during the continuance of this Contract the performance by either party under

    this Contract of any of its obligations is rendered impossible by reasons of Force Majeure

    then, provided written notice of the happening of the event of Force Majeure is given by the

    affected party to the other within 15 days, of the occurrence thereof and provided that such

    event of Force Majeure has not resulted from the negligence or failure of the affected party

    to perform its obligations, the affected party shall not be liable for fulfillment of any of its

    obligations pursuant to this Contract during the continuance of the event of Force Majeure.

    c) So soon as practicable, upon the cessation of the Force Majeure conditions, the affected party

    shall continue performance of its obligations under the Contract.

    d) The affected party shall take steps to remedy and mitigate the effects of the Force Majeure

    event on its ability to perform its obligations under the Contract.

    e) Time for performance of the relative obligation suspended by the Force Majeure shall then

    stand extended by the period for which such cause lasts. If the Contract shall be terminated

    under the provision of the above clause, the Successful Applicant shall with all reasonable

    diligence remove from the Site all the Successful Applicant’s equipments.

    f) Any extension of time granted by SIIDCUL in terms of above clause, shall neither entitle the

    Successful Applicant to any claim for increase in prices nor shall it release him from any of

    the obligations under the Contract. If the performance of the Contract as a whole is delayed

    by reason of the Force Majeure conditions continuing to persist for a continuous period

    exceeding 30 Working days, SIIDCUL will grant due extension of Time for the time lost.

    g) SIIDCUL shall not be held responsible or be called upon to make good any losses / costs

    incurred by the Successful Applicant consequent to the happening of any of the event under

    clause above.

    38. DISPUTE RESOLUTION MECHANISM

    (A) All disputes and differences of any kind whatsoever arising out of or in connection with the

    Contract, whether during the progress of the works shall be referred by the successful

    applicant to the SIIDCUL and the SIIDCUL shall within a reasonable time after their

    presentation make and notify decisions thereon in writing. The decisions, directions,

    clarifications, measurements, drawings and certificates of the SIIDCUL shall be final and

  • 22 | P a g e

    binding upon the successful applicant during the progress of the works and shall not be set

    aside on account of non observance of any formality, any omission, delay or error in

    proceeding in or about the same or on any other ground or for any reason.

    (B) If the successful applicant is dissatisfied with the decisions of the SIIDCUL or if the

    SIIDCUL fails to make a decision on any reference within a reasonable time, then and if in

    any such case, the successful applicant may after 90 days of the reference to the SIIDCUL

    refer the matters to Dispute resolution committee consisting of following members:

    a) Principal Secretary/ Secretary Industries Department

    b) Managing Director, SIIDCUL

    c) Director of Applicant Agency

    d) Representative of Finance Department SIIDCUL.

    e) Technical Representative of SIIDCUL

    The decision of above committee will be binding on both parties. The language of the

    Proceedings shall be in English/Hindi. The governing law shall be the laws in the State of

    Uttarakhand and of India, as applicable.

    39. JURISDICTION OF THE COURT

    Any dispute arising out of non-fulfillment of any of the terms and conditions of this

    Proposal/Agreement or Civil or Criminal matter or any other dispute will be subject to the

    jurisdiction of the relevant court at Dehradun, and High Court at Nainital only.

    We agree to the above terms and conditions.

    SIGNATURE OF THE APPLICANT:

    DATE :

    NAME IN BLOCK LETTERS:

    DESIGNATION:

    ADDRESS:

  • 23 | P a g e

    From,

    Name:

    Address:

    Ph:

    Fax: E-mail:

    To,

    The General Manager,

    SIIDCUL, 29, IIE (IT PARK),

    Sahastradhara Road, Dehradun-248001,

    Uttarakhand (India)

    Sir,

    Sub: Proposal for the Operation and Maintenance of Tipri – MadanNegi Ropeway project at

    TehriGarhwal of Uttarakhand” inclusive of all men & materials for three years-

    Submission-Reg.

    Ref: Your Proposal Notice Dt ..........

    With reference to your proposal notice, we submit herewith our proposal containing the

    specification and commercial terms for the Operation and Maintenance of Tipri – MadanNegi Ropeway

    project at TehriGarhwal of Uttarakhand inclusive of all men & materials for three year as per SIIDCUL

    specifications.

    We enclose the following documents:

    1) Proposal conditions duly signed in each page

    2) Demand Draft or Banker’s Cheque for Rs. 1,50,000/- (Rupees One Lakh only) only) towards

    EMD (DD/ Banker’s Cheque No. …………………. dated ……………………. drawn on

    ……………………………………………… Bank in favour of “Managing Director, State

    Infrastructure and Industrial Development Corporation of Uttarakhand Ltd.”, payable at

    Dehradun.

    3) Letter of Authorization for authorized signatory from the applicant organisation.

    4) Details of the applicant (as per Annexure-II).

    5) List of works handled in the last five years (as per Annexure-III).

    6) Experience in providing ropeway O&M works as per clause 3 (b) (as per Annexure- IV).

    7) Declaration for not having black listed either by SIIDCUL or by any other Govt. agencies (as per

    Annexure-V).

    Signature of the applicant with seal

    ANNEXURE I

    Date: ___________

  • 24 | P a g e

    8) Declaration for not having tampered the Proposal documents downloaded from Internet

    (Annexure-VI).

    9) The copy of certificate of incorporation/registration.

    10) Copy of Memorandum and Articles of Association.

    11) Copy of Registered Partnership deed, in case of Partnership Firm.

    12) Copy of PAN allotment Certificate issued by Income Tax Department.

    13) Copy of GST Registration Certificate.

    14) Latest I.T return.

    15) Price Bid as per Annexure-VII of the proposal document

    16) Notarized translated English version of the documents if the language of any documents isother

    than English/Hindi.

    Yours faithfully,

    Signature of the applicant with seal

    Encl: As stated above

  • 25 | P a g e

    ANNEXURE II

    DETAILS OF THE APPLICANT

    1. Name of the Applicant

    2. Registered Office Address

    Telephone Number: Fax : Email : Website, if any

    3. Contact Person

    Name: Designation: Phone: Mobile: Email:

    4. Legal Status Partnership/Pvt. Limited/Public Limited/LLP others (Pl. mention)

    5. Date of Incorporation 6. Brief profile of the

    applicant along with organizational chart (Please enclose as a separate sheet)

    7. Addresses of Offices along with phone number, fax and email (Please enclose a separate sheet incase more than one office)

    (i)

    8. Number of staffs on regular payroll

    Technical:

    Administration: 11. PAN Number 13. Goods & Service Tax

    Registration Number

  • 26 | P a g e

    ANNEXURE III

    LIST OF WORKS HANDLED IN THE LAST FIVE YEARS (Please provide the details for each project along with work order from the client)

    Name of the work

    Description of the Project Name & address of the client

    Contact Person & Phone number Commencement date

    Completion date

  • 27 | P a g e

    ANNEXURE IV

    EXPERIENCE IN PROVIDING ROPEWAY O&M WORKS

    Sl. No Name and

    Place of Work

    Capacity of

    ropeway

    Name & address

    of the client

    Name and

    designation of

    Contact Person

    along with

    Phone number

    Period of

    contract Contract

    Value

    (Rs. in

    lakhs)

    Work

    Order

    enclosed

    (Yes/No)

    Work

    completion

    certificate

    enclosed

    (Yes/No) From To

    1.

    2.

    (Please provide the details for each project along with work order/ completion certificate from the client)

  • 28 | P a g e

    ANNEXURE V

    CERTIFICATE

    Date: …………………….

    Certified that M/s ........................................................ / the firm /company or its partners / share

    holders had not been blacklisted by SIIDCUL nor by any Government Agencies and no criminal

    suit is pending in any court of law.

    SIGNATURE OF THE APPLICANT

    (with seal and address)

  • 29 | P a g e

    ANNEXURE VI

    DECLARATION FORM

    Date: __________

    a) I/We ....................................................................................................... having our

    office at .... do declare that I/We have carefully read all the conditions of proposal

    sent to me/us by the SIIDCUL for the proposals floated vide proposal ref.

    no………………………. for the Operation and Maintenance of Tipri – MadanNegi

    Ropeway project at TehriGarhwal of Uttarakhand inclusive of all men &

    materials,spares replacements and consumable for Three years and complete the

    entire contract within time schedule fixed and as per the all proposal conditions.

    b) I/We have downloaded the proposal document from the internet website

    www.siidcul.com and e-procurement portal http://uktenders.gov.inand I /We have not

    tampered / modified the proposal document in any manner. In case, if the same is

    found to be tampered / modified, I/ We understand that my/our proposal will be

    summarily rejected and full Earnest Money Deposit will be forfeited and I /We

    am/are liable to be banned from doing business with SIIDCUL or prosecuted.

    SIGNATURE OF THE APPLICANT

    (with seal and address)

    http://eprocure.gov.in/

  • 30 | P a g e

    ANNEXURE VII

    PRICE BID

    Description of Item Amount

    (Per

    Year)

    (Rs.)

    GST

    (Rs.)

    Total

    amount

    (Per

    Year)

    (Rs.)

    Operation and Maintenance of Tipri –

    MadanNegi Ropeway project at Tehri

    Garhwal of Uttarakhand inclusive of all

    Men & Materials cost, all taxes and

    Levi.

    Total

    Amount in Words: Rupees only

    SIGNATURE OF THE APPLICANT

  • 31 | P a g e

    ANNEXURE VIII

    CHECKLIST OF DOCUMENTS

    Documents to be enclosed:

    1. A covering letter on your letter head addressed to “The General Manager, SIIDCUL, 29,

    IIE (IT PARK), Sahastradhara Road, Dehradun-248001, Uttarakhand (India)” (as per

    Annexure-I)

    2. Proposal conditions duly signed in each page

    3. Demand Draft or Banker’s Chequeor by NEFT/RTGS to SIIDCUL a/c no – IOB-

    042902000002450 IFSC code: IOBA0000429 Bank Indian Overseas Bank, Dehradun;

    the UTR slip to be submitted in the office of for Rs. 1,50,000/- (Rupees One Lakh only)

    towards EMD (DD/ Banker’s Cheque No. ……………… dated ………………. Drawn

    on ………………………………………….. Bank in favour of “Managing Director,

    State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd.”,

    payable at Dehradun

    4. Letter of Authorization for authorized signatory from the applicant organisation.

    5. Details of the applicant (as per Annexure-II).

    6. List of works handled in the last five years (as per Annexure-III).

    7. Experience in providing ropeway O&M works as per clause (as per Annexure-IV).

    8. Declaration for not having black listed either by SIIDCUL or by any other Govt. agencies

    (as per Annexure-V).

    9. Declaration for not having tampered the Proposal documents downloaded from Internet

    (Annexure-VI).

    10. The copy of certificate of incorporation/registration.

    11. Copy of Memorandum and Articles of Association.

    12. Copy of Registered Partnership deed, in case of Partnership Firm.

    13. Copy of PAN allotment Certificate issued by Income Tax Department.

    14. Copy of Goods and Service Tax (GST) Registration Certificate.

    15. Latest I.T return. 16. Price Bid as per Annexure- VII of the Proposal Document.

  • 32 | P a g e

    ANNEXURE IX

    DETAILS OF ROPEWAY PROJECT

  • 33 | P a g e

    AGREEMENT

    THIS AGREEMENT entered into on this the _______day of

    ____________of Two Thousand Twenty

    BETWEEN

    State Infrastructure and Industrial Development Corporation of

    Uttarakhand Limited (SIIDCUL) Dehradun, (hereinafter referred

    to as “Concessioning authority”), having its corporate

    registered office at 29, IIE IT Park, Sahastradhara Road,

    Dehradun 248001; (hereinafter referred to as “the

    Concessioning Authority” or “SIIDCUL”), “Which term shall

    unless excluded by or is repugnant to the context, be deemed

    to include its heirs, representative, successors and assigns

    of the concessionaire,”

    AND

    CONCESSIONAIRE…………

    WHEREAS the Concessionaire is desirous to render the services

    to SIIDCUL on the terms and conditions mentioned herein.

    NOW, THEREOF, this indenture witnesses:

    1. That the contract for the said work shall be valid for

    the period of 3 (Three) years from the date

    ___________________, unless terminated earlier on account of

    following:-By giving 30 (Thirty) days’ notice in writing from

    SIIDCUL without assigning any reason.

    2. That in addition to above rates the concessionaire is

    liable to pay all Govt. Taxes including GST (presently @18%)

    applicable at the rates declared by Govt. of India/State

    Govt./ union Territory from time to time.

    3. That the Concessionaire shall deposit an earnest money

    amounting to Rs. 1,50000/- (Rupees One lac Fifty Thousand

    only) in the form of Demand Draft/NEFT/RTGS/ FDR pledged in

    favor of SIIDCUL/Bank Guarantee of a Nationalized / Scheduled

    Bank in favour of SIIDCUL for a period of 37 months. In the

    event of the Concessionaire committing any breach of the terms

    & conditions of the agreement, SIIDCUL may without prejudice

  • 34 | P a g e

    to other rights and remedies be entitled to forfeit/adjust the

    total amount of Security Deposit or any part thereof. In Such

    an event he shall pay in the same manner as stated above such

    additional sum immediately as he may be called upon by SIIDCUL

    to pay, so that the Security Deposit shall at all times during

    the continuance of these presents, be for the same amount. On

    the expiration or earlier determination of the licence SIIDCUL

    shall return the Security Deposit or part thereof which has

    not been forfeited as aforesaid, to the concessionaire,

    without interest

    4. That the Concessionaire shall equip himself with all

    necessary NOCs permits, licence and such other permissions as

    may be required under the law in force at any time with regard

    to the operation of the subject agreement.

    5. The Concessionaire shall not terminate the contract

    before the expiry of the period of the agreement except by Six

    months notice in writing. The agreement can be terminated by

    SIIDCUL by giving one month notice in writing without

    assigning any reason thereto.

    6. SIIDCUL and the Concessionaire further agree that they

    are bound by the General Terms & conditions mentioned in the

    RFP respectively annexed hereto.

    7. The RFP document, NIT, General Terms & Conditions, Letter

    of Award, handing over/taking over Note shall also form part

    and parcel of this agreement and the concessionaire and

    SIIDCUL are bound by the same.

    For and on behalf of

    State Infrastructure & Industrial Development

    Corporation of Uttarakhand Ltd.

    1. Witness:

    -For and on behalf of

    Concessionaire

  • STATE INFRASTRUCTURE AND INDUSTRIAL DEVELOPMENT CORPORATION OF UTTARAKHAND LIMITED(A Government of Uttarakhand Enterprise)December, 2019CONTENTSRFP DOCUMENT1. PREAMBLE2. OBJECTIVE3. TECHNICAL DETAILS OF ROPEWAY4. SCOPE OF WORK5. ELIGIBILITY CRITERIA6. RATE OF TICKETS TO BE CHARGED BY THE OPERATOR7. QUOTING OF RATES AND BID VARIABLE8. RENEWAL OF THE CONTRACT9. LANGUAGE OF THE PROPOSAL10. PROPOSAL DOCUMENTS11. CLARIFICATION ON THE PROPOSAL DOCUMENT12. AMENDMENT OF PROPOSAL DOCUMENT13. PROPOSAL PREPARATION AND SUBMISSION COST14. AUTHORISATION OF THE APPLICANT15. SUBMISSION OF PROPOSAL16. EARNEST MONEY DEPOSIT17. VALIDITY18. OPENING AND EVALUATION OF THE PROPOSAL19. EVALUATION OF THE PRICE20. AWARD OF CONTRACT21. SECURITY DEPOSIT22. AGREEMENT23. PERIOD OF CONTRACT24. STANDARDS TO BE ADOPTED25. INSURANCE26. RESCUE SYSTEM27. RETRIEVED MATERIALS28. HANDING OVER OF SYSTEMS29. PAYMENT TERMS30. INTEREST31. TAXES(ii) Income Tax32. PENALTY AND LIQUIDATED DAMAGES33. TERMINATION OF CONTRACTa) Termination by Defaultb) Termination for Insolvencyc) Corrupt Practiced) Consequences34. GENERAL CONDITIONS35. ASSIGNMENT/SUB-CONTRACTING36. CONFIDENTIALITY37. FORCE MAJEURE38. DISPUTE RESOLUTION MECHANISM39. JURISDICTION OF THE COURT

    EXPERIENCE IN PROVIDING ROPEWAY O&M WORKS