Comprehensive Guidelines for Quality Monitoring under Second Tier of Quality Control Mechanism for the State Government Funded Projects/GOI schemes/Projects (other than PMGSY works) under execution by Panchayati Raj department. ANNEX URE- 1 1.Introduction: Ensuring the quality of road/bridge works is the responsibility of the Government of Andhra Pradesh who are implementing various programmes/projects, a two tier quality control mechanism is envisaged. The first tier is in- house quality control by the executive agencies (PIU, PRI, PR) and the contractor as per the agreement conditions and its primary function is to ensure quality control through enforcement of technical standards. Under the second tier of the quality control mechanism, periodic inspections are required to be carried out by the EEs/ DyEEs of V&QC wing and its main function is to monitor the quality and effectiveness of the enforcement process. In view of ensuring further uniformity in reporting and better monitoring of the performance of second tier of quality monitoring, it has now been decided to prescribe detailed guidelines and reporting formats for this tier. The functions of Second Tier Quality Control Mechanism: Checks to ensure that the first tier is properly operational. 1

Transcript of State Govt Guidelines (2nd Tier) (Autosaved)[1]

Page 1: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Comprehensive Guidelines for Quality Monitoring under Second Tierof Quality Control Mechanism for the State Government Funded Projects/GOI schemes/Projects (other than PMGSY works) under execution by Panchayati Raj department.

ANNEXURE-1

1. Introduction: Ensuring the quality of road/bridge works is the responsibility of the Government of Andhra Pradesh who are implementing various programmes/projects, a two tier quality control mechanism is envisaged. The first tier is in-house quality control by the executive agencies (PIU, PRI, PR) and the contractor as per the agreement conditions and its primary function is to ensure quality control through enforcement of technical standards. Under the second tier of the quality control mechanism, periodic inspections are required to be carried out by the EEs/ DyEEs of V&QC wing and its main function is to monitor the quality and effectiveness of the enforcement process. In view of ensuring further uniformity in reporting and better monitoring of the performance of second tier of quality monitoring, it has now been decided to prescribe detailed guidelines and reporting formats for this tier. The functions of Second Tier Quality Control Mechanism: Checks to ensure that the first tier is properly

operational. Independent quality tests to verify that the quality

control system is achieving its intended objectives. Detection of systemic flaws in the quality control

process and action to improve the process. Independent supervision of deterrent and punitive

measures in respect of the First Tier and the contractor.

For the time being, these guidelines are being restricted to the works of value Rs. 50.00 Lakhs and above. These guidelines are not applicable for PMGSY works.

1

Page 2: State Govt Guidelines (2nd Tier) (Autosaved)[1]

2. Organizing the Inspections under the Second Tier of Quality Mechanism:

a) The second tier of quality management will function from In-house QC wing of the State Government. This tier is headed by Chief Engineer, V&QC, Hyderabad at the state level and (7) E.Es each having 3–4 districts jurisdiction and (45) Dy EEs (2 in each district). The CE V&QC shall take the following action for organizing inspections under this tier: i) If road work involving earthwork in cutting or/and embankment, construction of sub-grade, construction of granular sub-base and construction of flexible/semi-rigid/rigid pavement, the stages of inspection shall be: Stage-I: When the sub-grade and granular sub-base work is in progress. Stage-II: When the granular sub-base work is completed and WBM/WMM material collection is in progress.Stage-III: When the base-course (WBM/WMM) is completed. Stage-IV: When the bituminous surface/CC/Semi-rigid road work is in progress or completed. ii) In case of bridge/Vented Causeways of all spans, it is required to inspect at four stages: Stage-I : When the foundation work is in progress or completed. Stage-II: When the execution of piers construction is in progress or completed.(sub-structure) and the approaches work are under progress/completed.Stage-III: When the Superstructure work is in progress or completed is completed and the approaches are under progress/completed.

iii) In case of Culvert upto 6 m span, the inspection shall be at two stages. Stage-I : when foundations & piers work is completed. Stage- II : when deck slab in progress/laid including railings.

(b) The S.Es of concerned district should draw up monthly schedule of inspections to be carried out by EEs/Dy.EEs of V&QC duly specifying the name of the road,

2

Page 3: State Govt Guidelines (2nd Tier) (Autosaved)[1]

name of mandal and number of inspections already done along with grades awarded and the road requiring inspection, one month in advance to CE V&QC. They should furnish their requisitions through E-mail to the CE,VQC and concerned EE VQC. (Format relating to request of SEs for inspections by VQC is enclosed at Annexure-4). (c) The C.E V&QC shall ensure inspection of road works by the EE/Dy.EE (V&QC) strictly as per provisions of these guidelines. The EEs/Dy.EEs(V&QC) shall carry out inspections as per these guidelines and additional guidelines, if any, issued by the State. The observations shall be recorded and reported by the EE/Dy.EE (V&QC) in manner and in the formats prescribed under various Stages of Inspection.

3. Inspection of Works by EE/DyEE (V&QC)

a) The inspection of by EE/Dy.EE(V&QC) shall be more thorough covering all aspects of construction.b) At the time of inspection of EE/Dy.EE (V&QC), the PIU/PRI/PR shall provide basic information about the work in Part I of Formats-I & 2. Item-wise requirements for monitoring the quality of road works by EE/Dy.EE(V&QC) are given in subsequent paragraphs. Accordingly, the EE/Dy.EE(V&QC) shall monitor the quality through observations and record their observations in Part II of Formats-I & 2.

c) Apart from above the inspection report shall cover the following aspects:

I) Design of pavement and CD works.

II) Provision made in the estimates.

III) Management of contract, deployment of qualified staff by the contractor and establishment of Quality Control Laboratory by the contractor.

IV) Work programme and progress of work.

3

Page 4: State Govt Guidelines (2nd Tier) (Autosaved)[1]

V) Execution Methodology and adherence to specifications.

VI) Arrangement at quality testing laboratories.

VII) Record of tests- quality control Registers and their upto date maintenance.

VIII) Accuracy of Quality Tests, Issuance of non-conformance reports (NCR) and action of contractors on NCRs.

IX) Inspection by Departmental officers/External Agencies and compliance of the instructions.

X) Provision and execution of CD works and side drains.

XI) Road furniture, Logo, Sign boards.

XII) Timely payments to the contractor.

XIII) Other issues including the Technical Knowledge of the staff of the executing agency and the contractor.

4 Grading of Works:

a) Upon inspection of Road/bridge work, the quality of every item and sub item of work would be evaluated by the EE/Dy.EE(V&QC) on the basis of methods of observations prescribed. The grading of work would be done with an intention to quantify the observations showing level of satisfaction in relation to prescribed specifications of the work/item under observation. The grading would be recorded in every item and abstracted at appropriate space provided in Part II of Annexure I.

b) The objective of the grading is to indicate to the PIU/PRI/PR that whether the material or workmanship is acceptable, or unacceptable. If the item is unacceptable, the improvement could be done by either replacement of the entire material/portion of work or by rectification in workmanship or material. Therefore, based on the type of item and method of observation, each item/ sub-item of work would be graded in any of the categories indicated as ‘Satisfactory (S)’,

4

Page 5: State Govt Guidelines (2nd Tier) (Autosaved)[1]

‘satisfactory but requires improvement (SRI) or ‘Unsatisfactory(U)’ as prescribed.

c) Based on grading, the PIU/PRI/PR shall take action for rectification of defect by replacement ,therefore, it is very important to record the defect as well as the suggestive method by which the rectification could be done. The EE/Dy.EE (V&QC) shall record, in the space provided in Part II observation sheet, the grade as well as clear and express reasons for grading the item of work as ‘SRI’ or ‘U’ along with his suggestions for improvement. The reasons and suggestions shall be recorded clearly in such a way that there are no ambiguities or contradictions with observations in other items.

5. Observations by EE/Dy.EE(V&QC) : The detailed method of making observations and grading of item/sub-item of works is given in paragraphs below.

I) Setting Out and Working Drawing: For systematic execution of work, appropriate setting out and availability of proper working drawing is to be ensured by PIU/PRI/PR. The EE/DyEE (V&QC) is required to see as to whether, appropriate setting out as required for the item of work ongoing at the time of inspection of EE/DyEE (V&QC) is in place or not. The following aspects need to be seen: (a) Bench Marks: As per specifications, the contractor is required to establish at least (4) reference bench marks per kilometer as also at or near all CD works. The levels of these reference bench marks are required to be approved by the engineer. The EE/DyEE(V&QC) is required to see as to whether, these bench marks exist and up-to-dated records of bench marks including approved adjustment have been maintained. (b) Centre Line: Centre line of the carriageway is required to be accurately established by the contractor and referenced through marker pegs and chainage board appropriately placed at defined intervals. The EE/Dy.EE(V&QC) shall check these markings. (c) Working Drawing: At every work site, clear working drawing having pre-commencement levels and levels of various items of work to be achieved after completion is required to be made available to the contractor. The EE/Dy.EE (V&QC) is

5

Page 6: State Govt Guidelines (2nd Tier) (Autosaved)[1]

expected to check the working drawing in reference to the level of execution at the time of inspection.

Frequency: At all stages of inspection, the EE/Dy.EE(V&QC)shall check the above aspects and record his observations.

Grading: If the PIU/PRI/PR has not established Bench Marks or Center Line or notprovided proper Working Drawing, ‘U’ grade would be awarded. If the above items have been carried out partially, ‘SRI’ grade would be awarded, otherwise, if all the items have been properly executed, ‘S’ grade would be awarded.

II) Site Clearance and Grubbing: As per specifications, clearing and grubbing is required to be performed by the PIU/PRI/PR. The EE/Dy.EE(V&QC) is expected to see as to whether clearance and grubbing as provided in the DPR/estimate is being carried out and disposal of material as provided in the specifications is being done. In case of up-gradation, scarifying the existing work may be involved. The EE/Dy.EE(V&QC) is required to see that scarifying activity is carried out as per specifications and proper provision for reuse of the salvageable material has been made.

Frequency: In Stage-I of inspection, the EE/Dy.EE(V&QC)shall check the above aspect and record his observations. In case, the above item is partly executed after first stage inspection of the EE/Dy.EE(V&QC), the observations in the subsequent stages would be made by the EE/Dy.EE(V&QC).

Grading: If the PIU/PRI/PR has carried out clearing and grubbing properly and hasappropriately reused the salvageable material, ‘S’ grade would be awarded. If the above items have been carried out partially, ‘SRI’ grade would be awarded, otherwise, if the above items have not been properly executed, ‘U’ grade would be awarded.

III) Quality Control Arrangements and Attention to Quality: As per the contract, the contractor is required to establish the field laboratory for conducting mandatory quality control tests for material and workmanship. The EE/DyEE

6

Page 7: State Govt Guidelines (2nd Tier) (Autosaved)[1]

(V&QC) is expected to check whether the requisite equipments for the testing of various item(s) of works ongoing at the time of inspection are there in the laboratory or not. This is also required to be seen that whether equipments are being used to actually testing material and workmanship and clear observations on this aspect are to be recorded. EE/DyEE(V&QC) is required to list out various items of works and quantities executed. Based on the prescription about mandatory tests, the EE/DyEE (V&QC) shall also list out various tests and their numbers for each item of work executed by the PIU/PRI/PR. It is mandatory to maintain the Quality Control Register Part-I & II. In case of ongoing works the EE/DyEE(V&QC) is expected to see, as to whether, appropriate entries in the abstract of Quality Control Register have been made, whether, test results for all the items of work executed upto the time of inspection are available in the Quality Control Register (Part-I). In Quality Control Register (Part-II) it is required to be seen that whether record of non-conformance is being maintained and whether appropriate non-conformance report have been issued.

Frequency: At all stages of inspection, the EE/DyEE(V&QC)shall check the above aspects and record his observations.

Grading: If field laboratory with sufficient equipments has been established and equipments are being used, record of tests is properly maintained and monitored through Quality Control Register Part I and II, all the tests as per prescribed frequency have been carried out ‘S’ grade would be awarded. If, any of the above items have been partly attended ‘SRI’ grade would be awarded and if, any of these items have not been attended by PIU/PRI/PR ‘U’ grade would be awarded.

IV) Geometrics: Under this item, the observations about road land width, road way width, carriage way width are required to be made and reported at various stages of construction at selected Reaches. Geometrical features such as camber, super elevation, horizontal curves, requisite transition curves and extra widening are required to be provided right from the levels of the sub-grade up to construction of bituminous layer. However, the observations about these geometric elements shall be recorded by the EE/DyEE(V&QC) in each stage of

7

Page 8: State Govt Guidelines (2nd Tier) (Autosaved)[1]

inspection. If, it is felt that the provisions about camber, super-elevation, extra widening etc. has not been made in DPR/Estimate but are required as per field conditions, in such cases, clear observations should be made in the space provided under ‘General Observations’ at the end of reporting format.

Frequency: At all stages of inspection, the EE/Dy.EE(V&QC)shall check the above aspect at a frequency of 2 per km except for super-elevation and extra widening at curves, which would be checked on at least 1 curve in each km and record his observations.

Grading: If the all the items of geometrics have been executed properly asprovided in DPR/estimate, ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded.

V) Earthwork: The road may be in either cutting (or) in embankment (or) there may be a combination of cutting and embankment in the same road. The observations about the quality are to be made for all the above types of works.

(a) Earthwork in Embankment and Sub-grade: For embankments and sub-grade, the following parameters are critical to quality of material and workmanship:

• Quality of Soil used in embankment or sub-grade (Soil Classification,)• Compaction of embankment or sub-grade.• Side slopes and profile upon completion. The EE/DyEE(V&QC) would be required to ascertain conformance of above parameters with the specifications. Appropriate hand-feel test for soil classification and test for field density at various levels of embankment are expected while the work is ongoing. These observations can also be made by digging appropriate pit in cases where embankment has been completed and the work of sub-base and base-course is ongoing. The EE/DyEE(V&QC) is expected to make the above observations while the work in this item is ongoing. If, execution of this item has been completed and somehow the sufficient observations had not been made during the execution of this item, the EE/DyEE(V&QC) shall make observations about this item by digging pit after completion of embankment.

8

Page 9: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Frequency: The EE/DyEE(V&QC) shall perform the tests as given below:

TYPE FREQUENCYVisual Classification of Soil at Sub-grade

In stage-I, minimum (1) test for earthwork in each half km (irrespective of the executed quantity)

Degree of Compaction of sub-grade

In stage-I, minimum (1) test for each half km length or part thereof (irrespective of the executed quantity)

Side Slopes Profile Minimum (1)per half km in stage –III/IV Grading: Material – If suitable soil has been used, ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded. Compaction – If degree of compaction is within the prescribed limits ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded. Side Slopes – In case work is nearing completion or has been completed and if side slopes and profile is as per provisions ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded.

(b) Earthwork in Cutting: The roads in hilly areas and rolling terrain may have earthwork in cutting. The following parameters are Critical to quality of earthwork in cutting:• Longitudinal gradient and• Slopes of cutting and stability.• Adequacy of slope protection• In case of only formation cutting, dressing and traffic worthiness of completed formation. The EE/DyEE(V&QC) is expected to make clear observations on the basis of actual recording of levels in the stretches fairly representative of the overall quality.

TYPE FREQUENCYStability and workmanship of Slope of Cuttings

At all stages of inspection in case of work of formation cutting- Minimum two critical locations with maximum height in each KM stretch of road (irrespective of the executed

9

Page 10: State Govt Guidelines (2nd Tier) (Autosaved)[1]

quantity).In case of hill road having formation cutting and pavement work, the above observation would be made at those stages of inspection when formation cutting work is ongoing.

Adequacy of slope protection If formation cutting is complete, dressing and traffic worthiness of formation

At stage –III and stage IV - minimum two critical locations with maximum height in each KM stretch of road (irrespective of the executed quantity).

Recording of Longitudinal Levels

At all stages of inspection in case of work of formation cutting-In a critical and fairly representative stretch of 200 meters in each KM (irrespective of the executed quantity).In case of hill road having formation cutting and pavement work, the above observation would be made at those stages of inspection when formation cutting work is ongoing.

Grading: If the longitudinal gradient and slope of cutting is as per provisions having adequate stability, ‘S’ grade would be awarded, if improvement is possible with respect to slope and stability of cuts, ‘SRI’ grade would be awarded, otherwise ‘U’ grade would be awarded.

VI) Sub-Base Course and Shoulders: Specifications provide for course gradedgranular sub-base for rural roads. Recently, gravel sub-base has also been allowed. For monitoring the quality of GSB, the following quality parameters are critical:• The conformance of the material to grading requirements and also to ensure that soil fraction passing through 75 micron sieve is not more than the prescribed percentage.• Plasticity characteristics of the fraction passing through 425 micron sieve are well within the prescribed limits.• Compaction.• Thickness of compacted layer.

10

Page 11: State Govt Guidelines (2nd Tier) (Autosaved)[1]

The EE/DyEE (V&QC) is expected to carry out actual field tests for all the above items for samples fairly representative of overall quality of the item.

TEST FREQUENCYGradation Test for GSB and Shoulder material.

In stage-I, minimum 1 test for every half KM (irrespective of the executed quantity).

Test for Liquid Limit and Plasticity Index

In stage-I, minimum 1 test for every half KM (irrespective of the executed quantity).

Degree of Compaction

In stage-II, minimum 1 test for every half KM length or part thereof (irrespective of the executed quantity).

Thickness of compacted layer

In stage-II, minimum 1 test for every half KM length or part thereof (irrespective of the executed quantity).

Grading for GSB: Material – If suitable GSB material has been used, ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded. Compaction and Thickness of Layer – If degree of compaction is within the prescribed limits and thickness of the layer is as provided in DPR/estimate, ‘S’ grade would be awarded, otherwise ‘U’ grade would be awarded.

VII) Base Course: In rural roads, generally base course of Water Bound Macadam(WBM) or Wet Mix Macadam(WMM) is being constructed. In WBM/WMM layer, the following items are critical to quality:• Gradation of course aggregates.• Gradation of fine aggregates (filler material and binding material).• Quantity of fine aggregates.• Adequacy of compaction.• Surface evenness.• Thickness of compacted layer. To ensure the conformance of course or fine aggregate to gradation requirements, EE/DyEE (V&QC) is expected to carry out sieve analysis.

11

Page 12: State Govt Guidelines (2nd Tier) (Autosaved)[1]

In case crushable aggregate has been used as filler material, the plasticity characteristics are critical; therefore, EE/DyEE (V&QC) is expected to test PI and LL. There is prescribed method under the specifications for spreading the course aggregate, dry rolling followed by application of fine aggregates and to be continued with dry rolling. This operation is further followed by wet rolling. However, it has been observed that in many cases course aggregates and fine aggregates are haphazardly mixed and spread without any control over the quantity of fine aggregates etc and rolled unsystematically. There is an urgent need to check this practice of substandard construction of WBM. While the work of WBM is ongoing, the EE/DyEE (V&QC) is expected to check the process of construction meticulously and report. In case WBM has been completed, it is still possible to fairly judge the levels of compaction. To ascertain that prescribed dry rolling and wet rolling has been carried out for achieving appropriate compaction, it is necessary to carry out volumetric analysis by excavating pit of specific size. The material in each layer of WBM is required to be carefully taken out of the pit and after necessary screening to separate out course and fine aggregates, the proportion of fine aggregates by volume of course aggregates should be calculated. If proper dry rolling and wet rolling is done, the WBM would appear solid compacted and the percentage of fine aggregates would generally not be more than 25% of volume of course aggregates. Appropriate allowance for crushing under the wheels of the roller may also be made depending on the aggregate impact value of the course aggregates. If volume of fine aggregate is more, it is obvious that specified rolling has not been carried out. To confirm the levels of compaction, the pit should be re-filled with only the course aggregates and it should be seen that sufficient loose course aggregate should still remain balance after filling up the pit. In case of WMM, the procedures adopted at para 406 of section 400 of MORD specifications shall apply.The most important factor is that during mixing, the water in the wet mix should not vary from the Optimum value after taking into consideration the evaporation losses at the time of compaction.The speed of the roller should not exceed 5 KM/hour. Rolling shall be continued till the density achieved is at least 100 percent of the maximum dry density for the

12

Page 13: State Govt Guidelines (2nd Tier) (Autosaved)[1]

material as determined by the method outlined in IS:2720(Part 7). After completion, the surface of any finished layer shall be well-closed, free from movement under compaction equipment or any compaction planes, ridges, cracks and loose material.

Frequency: The EE/DyEE(V&QC) shall record observations as given below:

Test FrequencyGradation Test for each layer of WBM/WMM

In Stage-II or III, minimum (1) test for every half KM for gradation of course aggregate and fine aggregate separately (irrespective of the executed quantity).

Test for Liquid Limit and Plasticity Index in case fine aggregates are crushable type.(WBM/WMM)

In Stage-II or III, minimum (1) test for every half KM (irrespective of the executed quantity).

Aggregate Impact Value of course aggregate material.(WBM/WMM)

In Stage-II , minimum (1) test for every half KM (irrespective of the executed quantity)

Volumetric Analysis for assessment of compaction of (WBM/WMM)

In Stage- III, minimum (1) test per every half KM. (irrespective of the executed quantity)

Surface Evenness usingStraight edge (WBM/WMM)

In Stage-III , minimum (2) tests per every half KM. (irrespective of the executed quantity)

Thickness of compactedlayer

In Stage-III, minimum 1 test per every half KM. (Average of left, right and centre for each test)

Grading for WBM: Material – If material of course aggregate and fine aggregate confirms to grading requirements and in case of use of crushable aggregate, it confirms to plasticity requirements, ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded.

13

Page 14: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Compaction, Surface evenness and Thickness of Layer – If by volumetric analysis, the proportion of fine aggregates to course aggregates is within the prescribed limits, the compaction of WBM/WMM layer is proper, thickness of the layer is as provided in DPR/estimate and surface evenness is within the prescribed limits, ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded. If during construction the process of construction of WBM with appropriate dry-rolling and wet-rolling is not being properly observed, the quality would be graded ‘U’ irrespective of any other observations or grading for this item.

VIII). Bituminous Construction: Generally under BT, the work of 20 mm pre-mix carpet followed by pre-mix/liquid seal coat is taken up over primed and tack coated WBM base-course. In some cases, construction of bituminous macadam or modified penetration macadam is also taken up. Mix-seal surfacing is also being constructed in some parts of the country. The requirements of quality monitoring for various components of the bituminous construction are given below:

(a) Preparation of Surface for Bituminous Construction: It is extremely important to properly brush off loose material and fine aggregates generally available on the surface of WBM/WMM, however, it has been observed that cleaning of WBM/WMM surfaces does not receive proper attention of the staff of PIU/PRI/PR. The PIU/PRI/PR. is expected to check this aspect meticulously. Even in cases where the bituminous construction has been completed, it is possible to fairly assess this aspect by carefully removing the bituminous layer and observing the availability of loose material between the WBM/WMM layer and bituminous layer.

(b) Priming Coat and Tack Coat: Application of priming coat over the non-bituminous base-course by slow setting emulsion is prescribed in the Specifications. Application of tack coat by rapid setting emulsion or even by viscosity grade straight-run bitumen is also prescribed. Application of adequate quantities of bituminous material is to be ensured for both of these items and can be checked by conducting simple tests of the rate of spread. In addition, a uniform unbroken spread of emulsion/straight-run bitumen has to be ensured for both the above items and can only be ensured through its application by

14

Page 15: State Govt Guidelines (2nd Tier) (Autosaved)[1]

mechanical spraying rather than spray by a perforated cane. Quality of emulsion with respect to proportion of water and bituminous material is critical in application of prime coat. The temperature at the time of application of straight-run bitumen is critical to the quality of tack coat. The PIU/PRI/PR staff is expected to make clear observations about these aspects. The EE/Dy.EE VQC shall conduct random inspections and make their observations on these aspects.

Frequency: If the work of prime coat and tack coat is ongoing the EE/Dy.EE(V&QC) shall carry out one test for rate of spread of binder. If the work in bituminous surface has been completed, the EE/Dy.EE(V&QC) shall carry out assessment of level of cleaning by removing bituminous layer at least at one spot in every 500 meters of the road.Grading: If the inspection is carried out during the execution of the above items, the quality grading of ‘S’ would be given if surface of base course has been properly cleaned and priming coat or tack coat using prescribed emulsion/ viscosity grade bitumen in prescribed quality and quantity has been laid. Otherwise ‘U’ grade would be given., In case, when the work is complete and upon removal of the bituminous layer if loose material is observed between the WBM layer and bituminous layer, ‘U’ grade would be given.

(c) 20 mm Thick Pre-mix Carpet/BM/MSS and Seal Coat: The following are critical to quality of bituminous layers:• Gradation of aggregate• Quantity of Binder• Mixing and laying temperature• Compacted thickness• Surface EvennessThe above aspects can be easily monitored when the work in this item is ongoing. While the work is ongoing, the assessment of quantity of binder may be made easily. The PIU/PRI/PR staff is expected to make clear observations about these aspects. However, when the work is complete, the EE/Dy/EE(V&QC) shall carry out bitumen extraction test and while interpreting the results, possible presence of binder used for tack coat should be appropriately accounted for.

Test Frequency

15

Page 16: State Govt Guidelines (2nd Tier) (Autosaved)[1]

In PMC/BM/MPM/Seal Coat, gradation Test for Course Aggregate (if the work in the item is ongoing)/visual observation in case of completed item of work

In Stage- IV, minimum (1) test on the day of inspection.

In PMC/BM/MPM, thickness of compacted layer and Bitumen Extraction Test

In Stage-IV, (1) test per every half KM for Bitumen extraction and (1) test per every half KM for thickness of layer.(The average of left, right and centre should be taken for each test )

Surface Evenness using straight edge

In Stage-IV, (2) tests per every half KM.

Frequency: The EE/DyEE(V&QC) shall record observations as given below:Grading: Grade ‘S’ would be given if the relevant item confirms to prescribedvalues. Otherwise, ‘U’ grade would be given.

IX). Shoulders: For shoulders, appropriate material, as provided in the DPR, is to be used and construction of the shoulder has to take place simultaneously with construction of other layers of pavements. For monitoring the quality of shoulders the following quality parameters are critical:• Quality of material.• Compaction.• Thickness of compacted layer.• Simultaneous construction and compaction of shoulder with other layers of pavement. The EE/Dy.EE(V&QC) is expected to carry out actual field tests for all the above items for samples fairly representative of overall quality of the item.

Test FrequencyQuality of Material In Stage-I,II and III minimum 1 test for

every half KM (irrespective of the executed quantity).

Degree of In Stage-II,III and IV minimum 1 test for

16

Page 17: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Compaction every half KM length or part thereof (irrespective of the executed quantity).

Thickness of compacted layer

In Stage-II ,III and IV minimum 1 test per every half KM

Frequency: The EE/DyEE(V&QC)shall record observations as given below:Test Frequency

Grading for Shoulder: Material – If material as provided in the DPR hasbeen used, ‘S’ grade would be awarded otherwise ‘U’ grade would be awarded.Compaction, Thickness of layer and Simultaneous Construction withSub-base and Base Course – If degree of compaction is within theprescribed limits and thickness of the layer is as provided in DPR andshoulder is being constructed, simultaneously with sub-base or base course,‘S’ grade would be awarded otherwise ‘U’ grade would be awarded.

X) Cross Drainage Works: There are a variety of CD works, taken up under various roads. Quality monitoring requirements for some common types of CD works are given below:

(a) Hume Pipe Culverts and Vented Cause-way: The following aspects are critical for quality of hume pipe culverts:• Adequacy of provision for face/main walls, wings and return walls has been made as per site conditions (whether these walls provided with appropriate design in appropriate length etc).• Quality of material and workmanship of face/main walls, wing and return walls.• Quality of hume-pipes• Adequacy of cushion over hume-pipes.• In case of vented cause-ways, quality and workmanship of surfacing over vented cause-way (generally, CC Pavement is constructed and quality monitoring as covered under CC Pavement would apply to this item also).

17

Page 18: State Govt Guidelines (2nd Tier) (Autosaved)[1]

While the work is ongoing the EE/Dy.EE(V&QC) shall check all the above aspects and report. In case of completed hume-pipe culverts also the above aspects can be checked and reported. In case of cause-ways, it is important to check, as to whether; main walls have been appropriately keyed on the banks of the drain taking them well beyond HFL to avoid out-flanking in high floods. The EE/Dy.EE(V&QC) shall make observations on all the above aspects during his inspection and report.

(b) Simply Supported Slab Culvert or Cement Concrete Box Culverts: Quality monitoring aspects for such works would be decided on case-to-case basis.

Grading: If quality of material and workmanship is as per provisions grade ‘S’ would be given. Otherwise ‘U’ would be given.

XI) Side Drains and Catch Water Drains: For ensuring appropriate surface drainage, provision of side drains and if required, catch water drains followed by integration of these drains to across drain is critical. In case of hill roads, provision of side drains along with catch-pits of appropriate size at appropriate locations followed by provision of appropriate cross drainage work is critical. The EE/Dy.EE(V&QC) at all stages of inspection is expected to make clear observations about the aspects given above. He should clearly mention the adequacy of the size of the side drain and shall observe clearly, whether, the longitudinal gradient of the side drains is adequate for ensuring disposal of water.

Grading: If quality of material and workmanship is as per provisions grade‘S’ would be given. Otherwise ‘U’ would be given.

XII) Cement Concrete/ Semi Rigid Pavement and Associated Pucca Side Drains: In case of cement concrete and other semi rigid pavements, the following are critical to quality:• Quality of cement concrete. • Workmanship of cement concrete• Joints• Thickness

18

Page 19: State Govt Guidelines (2nd Tier) (Autosaved)[1]

• Size and Shape of associated pucca side drains and their adequacy• Quality and Workmanship of material used in pucca side drains• Longitudinal levels of pucca side drains, their integration to cross drains or appropriateness of the provisions for disposal.• Cross drainage works While the work is ongoing, the EE/Dy.EE(V&QC) is expected to verify all the above items, however, while the work is complete, measurements about the thickness of CC Pavement, Surface conditions such as cracking etc may visually be seen, the register of cube test may be verified and based on visual observations, comments on quality of material and workmanship may be made. The aspects of size and shape of associated pucca side drains and their adequacy, Quality and Workmanship of material used in pucca side drains and Longitudinal levels of pucca side drains, their integration to cross drains or appropriateness of the provisions for disposal may be observed and recorded even if the work is complete. The EE/Dy.EE (V&QC) shall make observations about the above aspects during his inspection and report.

Grading: If quality of material and workmanship is as per provisions grade ‘S’ would be given. Otherwise ‘U’ would be given.

XIII) Road Furniture and Markings: Some funding agencies insist that every work is to be provided with Citizen Information Board and main board even before the actual grounding of the work. Logo boards and other road furniture are to be provided at appropriate time. The EE/Dy.EE(V&QC) shall check, as to whether, all Informatory Boards, as prescribed under the programme have been provided on the site and report. The EE/Dy.EE(V&QC) shall also check and report the quality of material and workmanship of road furniture and markings.

Grading: If quality of material and workmanship is as per provisions grade ‘S’would be given. Otherwise ‘U’ would be given.

19

Page 20: State Govt Guidelines (2nd Tier) (Autosaved)[1]

6) Observations on action regarding issues mentioned in earlier inspection reports of EE/DyEE(V&QC) or Third party Quality Monitors :

If the work being inspected by the EE/DyEE(V&QC) was earlier inspected by other EE/DyEE(V&QC)/others, the EE/DyEE(V&QC) shall make item and sub-item wise observations on the action by the PIU/PRI/PR regarding issues mentioned in reports of earlier inspections by EE/DyEE(V&QC) (or) any third party Quality Monitor and record these observations in the relevant item of work. In case, the EE/DyEE(V&QC) is verifying the Action Taken Report of PIU/PRI/PR on the observations of other EE/Dy.EE(V&QC) (or) any third party Quality Monitor, the EE/Dy.EE (V&QC) shall make his observations about verification in the separate sheet.

7) Sub-item/Item wise Grading and Overall Grading of Work: The sub-item wise grading of every item of work would be entered in the table at para 16 of Reporting Format 1 Part II and the item grading would be the lowest of the grading of sub-items within that item. The overall Item Grading would be calculated in the following manner.If, any of the items in item no. 5, 6, 7 and 8 are graded as ‘U’, overall grading of the work shall be ‘U’ i.e. ‘Unsatisfactory’.If, all the items given in above four items are ‘S’ but grading in any of other items is ‘U’ or ‘RI’, the overall grading of work shall be ‘S-RI’ i.e. Satisfactory but Requiring Improvement.If grading of all items is ‘S’, the overall grading of work shall be ‘S’ i.e. ‘Satisfactory’.Item No. Sub Item for Observation Awardable GradesItem No 1 Setting Out and Working Drawing (S –SRI--U)Item No 2 Site Clearance and Grubbing (S—SRI--U)Item No 3 Quality Arrangements (S—SRI--U)Item No 4 Geometrics (S—U)Item No 5 A Earth Work and Sub-grade in Embankment/ Cutting (S--U)Item No 5 B Earth Work in Cutting in Hilly/ Rolling Terrain (S--U)Item No 6 Sub-Base (S--U)Item No 7 Base Course – Water Bound Macadam (S—U)Item No 8 Bituminous Layer – Premix Carpet (PMC)/ Surface Dressing( S—U)

20

Page 21: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Item No 9 Shoulders (S—SRI—U)Item No.10 CD Works – Causeways of all spans and Culverts. (S—SRI—U) Item No 11 Side Drain and Catch Water Drain (S—SRI—U)Item No 12 CC/ Semi Rigid Pavements and Associated Pukka Drains (S—U)Item No 13 Road Furniture and Markings (S—U)Overall Grading (Web Generated) (S—SRI—U)

8) Submission of Hardcopy of Reports by EE/DyEE(V&QC): The EE/DyEE (V&QC) is expected to fill up the majority of observations in the prescribed formats during the inspection itself, however, in some items, in which the test results may take some time, the observations may be filled up latest by the next day. Immediately upon completion of the inspection but in all cases before the EE/DyEE(V&QC) leaves the district where he/she has performed inspection, he/she shall deliver the inspection report to the concerned PIU/PRI/PR and send a copy to CE V&QC.

9) Action on EE/DyEE(V&QC) Observations and Grade Improvement: Upon receipt of the inspection reports and observations of EE/DyEE(V&QC), the PIU/PRI/PR shall initiate action (if required) for rectification of defects (if any) pointed out in the observations. This shall be ensured by the PIU/PRI/PR that an Action Taken Report (ATR) on the unsatisfactory ‘U’ grade awarded, is furnished to the CE V&QC within 30 days of inspection. The CE V&QC shall scrutinize the ATRs with reference to the observations of EE/DyEE (V&QC) in the inspection report. The CE V&QC shall make his observations on the ATRs and communicate them to PIU/PRI/PR for necessary action. The process of verification of Action Taken Reports in the second tier would be carried out in the following manner:

(a) Every work is to be inspected minimum of 4 stages ( depending upon No. of items) during its execution, therefore, if there are any adverse observations ‘unsatisfactory’ about quality, the PIU/PRI/PR is required to rectify and report to SE concerned. The SE should satisfy himself about rectification of work, before forwarding to CE V&QC, however, the physical verification of the action taken should be done by EE/DyEE(VQC) or CE V&QC in their next inspection.

21

Page 22: State Govt Guidelines (2nd Tier) (Autosaved)[1]

(b) Quality grading of work in the last inspection of EE/DyEE(V&QC) would be considered and effect of earlier quality grading would not be taken into account subject to condition that if in earlier inspections, the work has been graded as ‘SRI’ and the action for rectification is taken by the PIU/PRI/PR followed by verification of action taken report by the EE/DyEE(V&QC).

(c) If work is observed ‘Unsatisfactory’ upon completion, the work would be treated as non-rectifiable and difficult to re-grade the work as ‘Satisfactory’, unless detailed justification by SE concerned is furnished supported by test reports and reasons for such defective work, would not be able to accept the work and the PIU/PRI/PR would be required to carry out rectification and get the work re-inspected. In view of the above, the improvement in quality grades awarded under second tier of quality mechanism would not be required.10) Monetary Limit and No. of inspections by EE/Dy.EE V&QC:

In partial fulfilment of the instructions laid down in the Circular Memos No. QC9/DEE3/V&QC/Circulars/08, Dt. 25/04/2008 & 20/01/2009,

A) The EE V&QC has to follow the procedure as under :

i) Invariably at least one time inspection of the works costing Rs. 50.00 Lakhs and above.

ii) Random verification of the inspection reports given by the Dy.EE, V&QC as and when necessary, for works costing Rs. 50.00 Lakhs and above excepting BT Layer(which should be inspected by the EE VQC only) for which the inspection report given by the Dy.EE, V&QC previously and to report as per his observations and to follow the Government circular regarding the variation between two inspection reports

iii) Mandatory Inspection of BT surface work costing Rs.50.00 Lakhs and above.

22

Page 23: State Govt Guidelines (2nd Tier) (Autosaved)[1]

B) The DyEE (V&QC) has to inspect & finalise all the works costing Rs. 50.00 Lakhs and above, compulsorily in four stages (except BT work),if CC/semi-rigid road work are also included in the estimate. 11) Selection and Performance Evaluation of EE/DyEE(V&QC): It is important to structure second tier quality monitoring in such a way that actual field realities are brought out, however, it is more important to ensure that the monitoring of EE/DyEE(V&QC) is correct and they carry out inspections properly and report truthfully. Therefore, it has been decided to evaluate the performance of EE/DyEE(V&QC) by adopting a scoring mechanism half yearly. About 5-10% of the inspection reports (or) 10 Inspection Reports whichever is higher will be evaluated by the evaluation committee members who may be the retired Engineer-in-Chiefs/Chief Engineers or Professors/Deputies of Osmania, JNTU, NIT Warangal etc., or both. The procedure regarding evaluation of EE/Dy.EE VQC is enclosed at Annexure

12) Tolerance limits/Rejections: The Engineer-in-Chief, PR Hyderabad (Sri D. Bhaskara Rao) vide U.O Note No.C.IV(1)/4084/2000 Dated 03/10/2000, has issued certain instructions to follow the guidelines in respect of Limits, Tolerances and Rejections as under:

a) Govt. Memo. No. 42243/Estt.1(1)/99-2 Dt. 9.2.2000 of PR & RD Dept.b) Cir. Memo. No. 7440/TEC/TA.15/AE.4/96-97 Dt. 24/01/2000 of ENC

R&Bc) Cir. Memo. No. 711/QC/D2/99, Dt. 15/04/99 of ENC R&B.

Further, the Govt. vide Memo No:15320/Vig-1/2005-1 dt:12/05/2006 of Panchayati Raj and Rural Development (VIG.1) department, issued guidelines/recommendations on rejections/tolerance limits stating that volumetric evaluation is inevitable in view of the huge number of works taken up at different levels and different magnitudes (Gram Panchayats, Mandals, Zillaparishads, Marketing, M.P Lads, Constituency development funds,) besides grants under FFWP,EAS, Employment generative schemes, Implementation of Government and Government of India schemes etc., The guidelines/recommendations issued in the reference cited will apply. The EE/DyEE(VQC) shall take action accordingly and propose recoveries/rejections as per procedure.

23

Page 24: State Govt Guidelines (2nd Tier) (Autosaved)[1]

13) Responsibility for Lapses :

As per para -3(B)(d) of Memo No:15320/Vig-1/2005-1 dt:12/05/2006, the Panchayati Raj and Rural Development (VIG.1) department, the EE/DyEE/AEE/AE(VQC) are to be held responsible, if the average deficiencies pointed by them as per the quality control checks conducted are 50% higher than the deficiencies pointed out by other inspecting agencies like Vigilance and Enforcement department etc., in the works which were already inspected and passed by EE/Dy.EE(V&QC). The recommendations in respect of responsibility for lapses given in the above reference will apply.

Annexure-I – Format 1 (Part I)

(Format for information to EE/DyEE(V&QC)/ ------------ for Inspection of Road Work including CD works)

PART I– Work Information (To be filled-up by PIU/PRI/PR) Whether Work is Ongoing /Completed

1.0 GENERAL:1.1 Date of Inspection Time:1.2 Name of EE/DyEE

24

Page 25: State Govt Guidelines (2nd Tier) (Autosaved)[1]

VQC1.3 District/ Mandal1.4 Name of Road1.5 Package No.1.6 Flexible pavement in

KmCC/other pavement in Mts Total in Km/Mts.

1.7 A/S Ref. No. Amount1.8 T/S Ref. No. Amount1.9 New connectivity/Up-gradation/Renewal1.10 Whether Plain/Rolling/Hilly Terrain

2.0 CONTRACT DETAILS2.1 Name of Contractor/Agency2.2 Agreement Value in Rs2.3 Date of work order2.4 Date of start of work2.5 Stipulated date of completion2.6 Actual date of completion (if completed)2.7 Mobilisation Advance Amount Rs...........Lakhs Date2.8 Machinery Advance Amount Rs...........Lakhs Date2.9 Whether Sub-Contracting Permitted Yes No2.10 Name of Sub-Contractor2.11 Details of Items & Quantities Sub- Contracted

2.12 Name & Title of Contractor’s Technical PersonnelSl. No

Name and Title Working since date

Qualification & Experience

3.0 In case of Entrustment to Village Committees/Others25

Page 26: State Govt Guidelines (2nd Tier) (Autosaved)[1]

3.1 Name & Title of Committee3.2 Authority to Entrust on nomination3.3 Value of Work in Rs Lakhs3.4 Value of Material Component in Rs Lakhs3.5 Value of Labour Component in Rs. Lakhs3.6 Date of start of work3.7 Stipulated date of completion3.8 Actual date of completion

4.0 Dates of Approval of Work Programme:

Programme Date of Submission

Date of Approval

Remarks

Work Programme

First Revision

Secong Revision

Third Revision

......................

5. PHYSICAL PROGRESS: (In case of Ongoing works only) Construction Programme and Physical Progress:Item Give

Completed%

Dates for completion as per approved programme

Start Date Completion Date

Delay in Months

Preparatory Work

DueActual

Earth Work DueActual

CD Works DueActual

Sub base incl. Shoulders

DueActual

26

Page 27: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Base Course (Non Bitu.) including shoulders

Due

Actual

Base /Wearing Course(Bitu.) including shoulders

Due

Actual

CC Pavement DueActual

Catch water/ side drains

DueActual

Road furniture, markings and Logo Board etc.,

Due

Actual

6.0 CONTRACT MANAGEMENT INFORMATION 6.1 Delays:

6.1.1 Information regarding achievement of milestones by the contractor:

a) % of work completed upto 1/4 period allowed for completion:........%b) % of work completed upto 1/2 period allowed for completion:........%c) % of work completed upto 3/4 period allowed for completion:........%

6.2.2 Whether delay is because of the contractor Yes/No ( If yes, give details of the action taken by the EE,PIU/PRI/PR.)

Sl NO. Details of delay Action Taken by EE ( give details of notices to Contractor and details of penalty amount imposed/with held

27

Page 28: State Govt Guidelines (2nd Tier) (Autosaved)[1]

6.2.3 Whether any delay because of the Employer Yes/No (If yes give details)

Sl NO. Details of delay Action Taken by EE ( give details of notices from Contractor etc.)

6.2.4 Whether any delay because of the other reasons Yes/No (If yes give details)

Sl NO. Details of delay Action Taken by EE ( give details of notices etc.,)

28

Page 29: State Govt Guidelines (2nd Tier) (Autosaved)[1]

7. QUALITY CONTROL TESTS:

7.1. What is the % of the tests conducted in presence of/by AEE/AE level officer:.............%7.2. What is the % of the tests conducted in presence of/by Dy.EE level officer: .............%7.3. What is the % of the tests conducted in presence of/by EE level officer:.............%

8. INSPECTIONS:

8.1 Whether site order book maintained: YES/NO

8.2 Inspection by Senior Level (i.e., SE or CE)

Date of Visit

Inspected by Observations Action Taken by EE,PIU/PRI/PR with Date

29

Page 30: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Name and Signature of EE, PIU/PRI/PR, Date:………

8.3 Whether the EE/DyEE VQC or Officer of the State Quality Control has inspected the work. YES/NO

(Give details of the observations made by SQM and the compliance carried out by EE/PIU/PRI/PR)

Date of Visit

Inspected by Observations Action Taken by EE,PIU/PRI/PR with Date

30

Page 31: State Govt Guidelines (2nd Tier) (Autosaved)[1]

9.0 Quality Control Monitoring

Indicate the Number of letters/notices sent to the contractor for bad quality of material/workmanship not meeting with the requirement. Its follow up action at PIU/PRI/PR Level or higher Level for rectification or rejection of works, reduction in rate and/or other administrative action initiated/taken.

31

Page 32: State Govt Guidelines (2nd Tier) (Autosaved)[1]

10.0 OTHER ISSUES (If required, the head of PIU/PRI/PR may bring other important issues to the notice of the EE/Dy.EE VQC, for advice/clarification)

ANNEXURE 1- Format 1 (Part 2) Part II– Observations of EE/DyEE(V&QC) for Ongoing/Completed Work(To be filled-up by EE/DyEE(VQC), use additional sheets, if required.)

1. SETTING OUT AND WORKING DRAWING: For all stages of work

Sl.No

Whether Benchmarks @ 4 per kmestablished(Y/N)

ExactLocations ofthe BenchMarks

Whether Center Line ofCarriage Way accuratelyestablished and referenced with Marker Pegs and Chainage Boards (Y/N)

Whether properly prepared WorkingDrawing for the workunder progress isavailable (Y/N)

32

Page 33: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grading: Grade: S /SRI/ U, If this item is graded SRI/U, write clear reasons and suggestions for improvement:

2. SITE CLEARANCE AND GRUBBING: For Stage I of Work

Sl.No

Whether Clearing andGrubbing being doneas per DPR/Estimate and Material obtained is being disposed offproperly (Y/N)

Whether the materialAvailable from scarifying existing work or clearing operations can be salvaged and reused (Y/N)

Name the reusable material obtainable from clearance or Scarification and indicate approximate quantity and its re-use by the PIU/PRI/PR.

Grading: Grade: S /SRI/ U, If this item is graded SRI/U, write clear reasons and suggestions for improvement:

3. QUALITY ARRANGEMENTS AND ATTENTION TO QUALITY – (For all stages of work)

A) Observations about Field Laboratory :

Sl.No.

Whether FieldlaboratoryEstablished (Y/N)

List the equipments available. Whether adequate Equipments as per requirement of work are available and are being used.(Y/N)

33

Page 34: State Govt Guidelines (2nd Tier) (Autosaved)[1]

B) Observations about Mandatory Tests :Detail out the quantities of various items of works and list the tests required. (Refer to abstract of QC Register Part-I)

Sl.No

Item of WorkExecuted

Quan-tity

Name of Test No. of TestsRequi-red

No. of TestsConducted by contractor/PIU/PRI/PR

34

Page 35: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Based on executedquantities whether allmandatory test conducted.

Whether QC Register Part I maintained as per provisions.

Whether QC Register Part II maintained and test results monitored as per provisions

Yes Partly No Yes Partly No Yes Partly No

Grading: Grade: S/ SRI/ U If this item is graded SRI/U, write clear reasons andsuggestions for improvement:

4. GEOMETRICS: The EE/Dy.EE(V&QC) should take at-least two measurements in 1 Km length and if it is found that the roadway and carriageway is inadequate EE/Dy.EE(V&QC) may take more observations: A) Observations –Road way width, Carriage way and Camber.

Ref.RD

RoadwayWidth(m)

Carriageway Width(m)

Camberin %

Ref.RD

RoadwayWidth(m)

CarriagewayWidth (m)

Camberin %

Grade awarded (S/U )

35

Page 36: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

B) Observations – Super-elevation and Extra Widening at curves.

Ref.RD

SuperElevation

ExtraWideningprovided (Y/N)

Ref. RD

SuperElevation

ExtraWideningprovided (Y/N)

Grade awarded(S/U )

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

OBSERVATIONS REGARDING THE QUALITY OF ITEMS OF WORK:

5A). Earthwork in plain Terrain :

i)Observations on Quality of Material. (Enclose test reports) Sl.No Location (RD) On Visual Classification

identify the Group Symbol and write

Quality of material is acceptable. (Y/N)

For Embankment Construction:

36

Page 37: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grade awarded (S/U )For Sub-Grade Construction:

Grade awarded (S/U )

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

ii)Observation on Workmanship (Enclose test reports)

Sl.No

Location(RD)

MDD kN/m3(As perrecord)

FieldMoistureContent

Degree of CompactionDegree of Compaction

Dry DensitykN/m3

Compactionadequate. (Y/N)

For Embankment Construction:

For Sub-Grade Construction:

37

Page 38: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

iii)Observation on Side slopes and profile:

Sl.No Location (RD) Whether Side Slopes Satisfactory (Y/N)

Whether profile is Satisfactory (Y/N)

5B) Observations - Earth work in Hilly/Rolling terrain or high Embankments:

Sl.No Location(RD)

Cut Slopes & Profile,whether appears to bestable. (Y/N)

Adequate slopeprotection worksexecuted. (Y/N)

Formation is properlydressed and trafficworthy. (Y/N)

ii) Observations – Longitudinal Gradient in case of road in hilly/rolling terrain:

38

Page 39: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Ref. BetweenRD…& RD…

LongitudinalGradient

S/U Ref. BetweenRD…& RD…

LongitudinalGradient

S/U

Grade: S /U If this item is graded U, write clear reasons and suggestions forimprovement:

6). Sub-Base : Observations - Quality of Material and Workmanship (Enclose test reports)

Sl.No

Location(RD)

Con-firmstoGrad-ing.(Y/N)

Suitablefromplasticityangle.(Y/N)

Whet-herComp-actionis ade-quate.(Y/N)

ObservedThicknessof Layer(in mm)

PrescribedThicknessprovided(Y/N)

39

Page 40: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

7). Base Course: Observations-A) Quality of Material and Workmanship of WBM/WMM (Enclose test reports)Location(RD)

Whether weightof each layer in Kgs within permissible limits (S)/Rejected(U)

Whether thickness of each layer in mm within permissible limits (S)/Rejected(U)

Whether gradation of coarse aggregate within permissible limits(S)/Rejected(U)

B)OTHER QUALITY PARAMETERS:Location(RD)

Filler material isnon-plastic to desired extent (Y/N)

Volume of Filler material as a percent of course aggregate

Whether compaction is adequate (Y/N)

Observations - Surface evenness: Surface evenness in about 200 m criticalrepresentative length of completed WBM/WMM:

40

Page 41: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

8) Bituminous Course : Premix Carpet/Surface Dressing/ BM/ MPM/MSS etc including Seal Coat: A) Observations during random inspections:

i) Observations-Quality of Material and Workmanship of BT Layer (in case of ongoing works): (Enclose test reports)

Observations about level of cleanliness of WBM/WMM surface prior to application of bituminous layer. (if work is ongoing observe the surface. If BT layer laid, Assess by carefully removing the BT layer.):

Observations about Quality of Prime Coat and Tack Coat with respect toquality of material and workmanship - Visual Observation - if work isongoing:

ii)In case of PMC/BM/MPM/MSS/ Seal Coat (In case of ongoing work)

Sl.No

Location(RD)

WhetherCourseAggregateconfirms

Whether thebinder is ofapproved

Write MixingTemperatureand whether

Write LayingTemperatureand whether

41

Page 42: State Govt Guidelines (2nd Tier) (Autosaved)[1]

tograding.(Y/N)

grade.(Y/N)

it is in permissiblelimits.(Y/N)

it is inpermissiblelimits.(Y/N)

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

B)Observations during mandatory inspections:i)Observations - Workmanship of BT layer PMC/BM/MPM/MSS (in case of BT completed): Enclose test reports.Sl.No

Location(RD)

Whether % BT content

within permissible limits (S)/

Rejected(U)

Whether % BT weight

within permissible limits (S)/

Rejected(U)

Whether % BT Thickness

within permissible limits (S)/

Rejected(U)

Whether surface

regularity within

permissible limits (Y/N)

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

42

Page 43: State Govt Guidelines (2nd Tier) (Autosaved)[1]

9). Observations - Quality of Shoulders: (Enclose test reports )

Sl.No

Reach ofObserva-tion

Thick-ness of layer (in mm)

Whetherquality of the material is acceptable. (Y/N)

Whether qualityof compactionworkman-ship is acceptable. (Y/N)

Whether Shouldersbeing constructedsimultaneously with sub-base andbase course (Y/N)

Grade: S/SRI/U If this item is graded SRI/U, write clear reasons and suggestions for improvement:

10) Cross Drainage Works : Observations - Quality of CDs :

Sl.No

RD at whichCD is located

Type of CD Whether quality of the material is acceptable. (Y/N)

Whether quality ofworkmanship is acceptable. (Y/N)

Grade: S/SRI/U If this item is graded SRI/U, write clear reasons and suggestions for improvement:

Also comment on adequacy of cushion over Hume pipes and any other

43

Page 44: State Govt Guidelines (2nd Tier) (Autosaved)[1]

observations:

11) Side Drains and Catch Water Drains:Observations:

Sl.No

Reference of RDs where side drain constructed

RD at which observation made

Whether general quality of the side drain/catch water drain is acceptable.(Y/N)

Whether side drains are integrated to cross drains(Y/N)

Grade: S/SRI/U If this item is graded SRI/U,write clear reasons and suggestions for improvement

12). CC/ Semi-Rigid (SR) Pavements and Associated Pucca Side Drains: ( Enclose test reports )

Sl.No

Reference of ThicknessRDs, CC/SRPavementsprovided.

RD atwhichobserva-tion made.

Thickness Generalquality ofmaterial isacceptable.(Y/N)

Generalquality ofworkmanshipacceptable(Y/N)

Thick-nessin mm

Accept-able(Y/N)

44

Page 45: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Comments about adequacy of face/main walls, wings and retaining walls:

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

13). Road Furniture and Markings

Observations - Quality Road Furniture and Markings:

13.1.1. Logo Boards Fixed: Yes/No13.1.2. 200m. Stones fixed: Yes/No13.1.3. 1 Km. Stone fixed: Yes/No 13.1.4. Guard Stones fixed on Curves: Yes/No13.1.5. Mandatory and Cautionary Signage Yes/No

Grade: S/U If this item is graded U, write clear reasons and suggestions forimprovement:

45

Page 46: State Govt Guidelines (2nd Tier) (Autosaved)[1]

14. General Observations of EE/DyEE(V&QC), (including the observations made during the interaction with PIU/PRI/PR staff and Contractor’s/ Consultant’s Engineers):

14.1. Observations about deficiency in project preparation (Give detailedobservations about deficiencies in general and items which have been left but are required as per site conditions):

14.2. Whether the work has been completed/is in progress as per workprogramme or the delay has occurred. If delay has occurred, whether theliquidated damages have been withhold or recovered:

14.3. Whether the work has been completed within the sanctioned cost, if not,what is the action taken by the PIU/PRI/PR (in case of complete works):

14.4. Observations about the action taken by the PIU/PRI/PR on the observations ofinspecting officers including EE/DyEE(V&QC) and Third Party Quality Monitors (Clearly offer comments about the action taken on the observations of Departmental Officers, EE/DyEE(V&QC) and Third Party Quality Monitors.)

14.5. Comments about difference in observations made by EE/DyEE(V&QC) in earlier inspections, the EE/DyEE(VQC) shall study the earlier inspection reports of EE/DyEE(V&QC) and Third Party Quality Monitors, if any and offer his clear comments about the differences in observations,if any).

46

Page 47: State Govt Guidelines (2nd Tier) (Autosaved)[1]

15. Other observations, if any:

16. Quality Grading of items and sub-items of work: The grading of every sub-item and item of work is given below.

Sl.No

Sub-Item for Observation Stage of Work Award-ableGrades

Awarded

Grades

1 2 3 4 5 Item 1 – Setting Out and Working Drawinga) Bench Mark and Centre

LineAll Stages S/SRI/U

b) Availability of Working Drawing

All Stages S/SRI/U

47

Page 48: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Item grade S/SRI/U Item 2 – Site Clearance and Grubbinga) Site Clearance and

GrubbingStage-I S/SRI/U

b) Re-use of Salvageable Material

Stage-I S/SRI/U

Item grade S/SRI/U Item 3—Quality Arrangementsa) Quality Arrangements All stages S/SRI/Ub) Number of Mandatory

Tests as per prescribed frequency

All stages S/SRI/U

c) Maintenance of QC Registers

All stages S/SRI/U

Item grade S/SRI/U Item 4---Geometricsa) Road way width minimum 1 per half Km

in every InspectionS/U

b) Carriageway width minimum 1 per half Km in every Inspection

S/U

c) Camber Minimum (2) per km S/Ud) Super-elevation & Extra

Widening at Curves Minimum (1) curve in each km

S/U

Item grade S/U

Item 5A - Earth Work and Sub-grade in Embankment/ Cuttinga) Quality of Material for

Embankment/Sub-gradeIn Stage-I, minimum (1) per half Km

S/U

b) Compaction In Stage-I, minimum (1) per half km

S/U

c) Side Slopes and Profile Minimum (1) per half Km S/U Item grade S/U

Item 5B - Earth Work in Cutting in Hilly/ Rolling Terraina) Stability and

Workmanship of Cut Slopes

Stage I and II, at 2 critical locations with maximum height of cutting in each km

S/U

48

Page 49: State Govt Guidelines (2nd Tier) (Autosaved)[1]

b) Adequacy of slope protection in general

All Stages S/U

c) Upon completion of formation cutting, dressing, traffic worthiness

At Stage II, at 2 critical locations with maximum height of cutting in each km

S/U

d) Longitudinal Gradient Stage I/II (1 critical and fairly representative stretch of 200m in each Km)

S/U

Item grade S/U

Item 6 - Sub-Basea) Quality of Material (Grain

size)Stage I , minimum (I) per half KM

S/U

b) Quality of Material (Plasticity)

Stage I ,minimum (I) per half KM

S/U

c) Compaction Stage II , minimum I per KM

S/U

d) Total thickness of layer Stage II , minimum (1) per half KM

S/U

Item Grade S/U

Item 7 - Base Course – Water Bound Macadama) Grain Size of Course

Aggregate In Stage II, minimum I test per half KM.

S/U

b) Test for Liquid Limit and Plasticity Index in case fine aggregates are crushable type

In Stage II, minimum 1 test per half KM

S/U

c) Volumetric Analysis for assessment of compaction of WBM/WMM

In Stage III, minimum 1 test per half KM

S/U

d) Surface Evenness using straight edge in completed WBM/WMM

In Stage III, minimum 1 test per half KM

S/U

e) Thickness of every layer of WBM

In Stage III, minimum 1 test per half KM

S/U

Item grade S/U

49

Page 50: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Item 8 Bituminous Layer – Premix Carpet (PMC)/ Surface Dressing (SD)

A) Random inspections of EE/DyEE VQC when work is on-going stage.a) Level of cleanliness of

WBM surface prior to application of bituminous layer

In Stage III, minimum 1test per every half KM

S/U

b) Quality of Prime Coat/ Tack Coat with respect to quality of material and workmanship

In Stage IV, minimum 1 observation on the day of inspection

S/U

c) Gradation Test for Course Aggregate

In Stage IV, (minimum 1 test per every half KM)

S/U

d) Grade of bitumen and temperature at the time of mixing and laying.

In Stage IV (Minimum 1 test on the day of inspection)

S/U

B) Mandatory inspections of EE when work is completed.e) Bitumen Extraction Test, In Stage IV (minimum 1

test per every half Km)S/U

f) Thickness of layer In Stage IV (minimum 1 test per half Km)

S/U

g) Surface Evenness in case of completed BT work

In Stage IV (minimum 1 test per half Km)

S/U

Item grade S/U

Item 9--Shouldersa) Quality of material for

shoulders, In Stages I,II,III (minimum I test per half KM)

S/SRI/U

b) Degree of compaction , In Stage II,II,IV (minimum 1 test per half Km)

S/SRI/U

c) Thickness of layer In Stage II,II,IV (minimum 1 test per half KM)

S/SRI/U

Item grade S/SRI/U

Item 10 – Cross Drainage Works – Causeways of all spans and

50

Page 51: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Culverts upto 6 m.spana) Quality of Material –

Concrete, Stone/ brick masonry, Hume pipes including size etc.

All stages S/SRI/U

b) Quality of Workmanship such as positioning of pipes, wing walls, cushion over H Pipes etc.

All stages S/SRI/U

Item grade S/SRI/U

Item 11 - Side Drain and Catch Water Draina) General quality of Side

Drains/Catch Water Drains and their integration with CDs.

All stages S/SRI/U

Item grade S/SRI/U

Item 12 - CC/ Semi Rigid Pavements and Associated Pukka Drains

a) Quality of Material – Concrete,Stone/ Concrete Block Pavement etc.

minimum I per 100 m. length of pavement.

S/U

b) Strength of CC in Concrete Pavement/ Concrete Block Pavement

minimum I per 100 m. length of pavement

S/U

c) Quality of Workmanship –Wearing surface texture, Adequacy of setting of concrete, Joints, Edges etc

minimum I observation per 100 m. Length of Pavement

S/U

d) Thickness of Layer minimum I observation per 100 m. Length of Pavement

S/U

Item grade S/U

13 - Road Furniture and Markingsa) Caution boards, Sign

boards, KM/HM stones Stage-IV S/U

51

Page 52: State Govt Guidelines (2nd Tier) (Autosaved)[1]

etc., its qualityb) Guard stones

Item grade S/U

Overall Grading of Work: The overall grading calculated on the basis of item and sub-item wise grading is given below :

Item No Item/sub-item for observation Grade awarded

Item No.1 Setting Out and Working Drawing

Item No.2 Site Clearance and Grubbing

Item No.3 Quality Arrangements

Item No.4 Geometrics

Item No.5a Earth Work and Sub-grade in Embankment/ Cutting

Item No.5b Earth Work in Cutting in Hilly/ Rolling Terrain

Item No.6 Sub-Base

Item No.7 Base Course – Water Bound Macadam

Item No.8 Bituminous Layer – Premix Carpet (PMC)/Surface Dressing (SD)

Item No.9 Shoulders

Item No.10 Cross Drainage Works – Causeways of allspans and Culverts upto 6 m. span.

Item No.11 Side Drain and Catch Water Drain

Item No.12 CC/ Semi Rigid Pavements and AssociatedPukka Drains

Item No.13 Road Furniture and Markings

Signature:Name:

52

Page 53: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Date: ..……….

Annexure-1 Format 2 (Part I)

PANCHAYAT RAJ ENGINEERING DEPARTMENT

FORMAT FOR INSPECTION OF BRIDGE WORK UNDER GOI/ STATE FUNDED SCHEMES OTHER THAN PMGSY

Part 1 – Work Information (to be filled by PIU/ PRI/PR

GENERAL:

1.1 Date of Inspection :

1.2 Name of E.E/ DY.EE,V&QC

1.3 State: ________ District : __________________Block_____________________

1.4 Name of the Road : From ____________________ to____________________

53

Page 54: State Govt Guidelines (2nd Tier) (Autosaved)[1]

1.5 Package No. _____________________ Through Road No. __________

1.6 Location of Bridge :

1.7 Estimated Cost Rs. : ________________________________

1.8 Date of Start

1.9 Date of Completion as per Agreement

1.10 Actual date of Completion( if work is completed)

2. PROGRESS

(In case of ongoing works only) Construction programme & Physical progress

Item % of Progress

Date of Starting as

per programme

Date of completion as

per programme

Actual Completion

Date

Delay in months

Lay out

Foundation

Sub-Structure

Supper structure

Protection Work

Approaches

3. PARTICULARS OF THE BRIDGE:

3.1 Type of the bridge :

3.2 Type of foundation :

3.3 No. of Spans / Spans length :

3.4 Width of Bridge :

54

RD

High level Submersible

Open Raft well Pile

……Spans of ………. m. c/c hhhj….……mmmm………………..

5.50 m. 7.50 m.

Page 55: State Govt Guidelines (2nd Tier) (Autosaved)[1]

3.5 R.T.L :

3.6 HFL /OFL :

3.7 Bed level (Lowest) :

3.8 Catchment area ____, Cross Section of Drain at HFL ____, Design discharge__

3.9 Type of river protection works if any : _________________________

3.10 Type of Substructure : _________________________

3.11 Type of Bearing : _________________________

3.12 Type of Superstructure : _________________________

3.13 Type of Returns : _________________________

3.14 Whether approaches are in cutting or filling : _________________________

3.15 Whether Bench Mark and alignment are established

near the bridge site (give location and RL) : _________________________

3.16 Type of Railing (Steel/RCC/Others) : _________________________

3.17 Type of Wearing coat : _________________________

4. QUALITY CONTROL :

4.1 Location of Field Laboratory : _________________________

4.2 Q.C. Test Records maintained by

(Name) : _________________________

4.3 Abstract of Q.C. Records maintained by

(Name) : _________________________

4.4 Quality of Concrete executed : _________________________

4.5 No. of cube tests done : _________________________

5. Inspection by E.E/ DY.EE, V&QC and action taken

55

Sr. No

Date of Visit

Inspected by (Name) Deficiencies observed

Action taken by PIU/ PRI/ PR with date

1

2

3

4

Page 56: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Date

Place : Name & Signature of PIU/ PRI/ PR

_________

56

Page 57: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Annexure-1 Format 2– Part 2PACKAGE NO ____________

PART – II (to be filled by E.E/ DY. EE, V&QC)

1. QUALITY ARRANGEMENTS AND ATTENTION TO QUALITY - For on-going work

Observations about Field Laboratory :

Whether Field Laboratory Established

(Y/N )

List the equipments available in field laboratory

Including first Aid-Box

Whether adequate equipments as per

requirement of work are available and are being used

(Y/N)

Observations about Mandatory Tests – The quantities of various items of works and list the tests required. (Refer to abstract of QC Register Part-I)

Sr. No.

Item of work executed Quantity Name of Test No of tests required

No. of tests conducted by PIU / PRI/ PR/

Contractor

57

Page 58: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Based on executed quantities, whether all mandatory tests

conducted

Whether QC Register Part-I maintained as per provision

Whether QC Register Part-II maintained and test results monitored as per provisions

Yes Partly No Yes Partly No Yes Partly No

 

     

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

2. FOUNDATION (Stage I)

58

Page 59: State Govt Guidelines (2nd Tier) (Autosaved)[1]

a) Ongoing (Work in progress)

Loca

tion

Ava

ilabi

lity

of

field

dra

win

g

Gra

de o

f

Whe

ther

mix

de

sign

en

clos

ed o

r no

t

Pas

sed

by

com

pete

nt

auth

ority

Qua

lity

of C

emen

t

Qua

lity

Of c

oars

e ag

greg

ate

Qua

lity

Of f

ine

aggr

egat

e

Qua

lity

of

Ste

el

Form

wor

k ar

rang

emen

t

1 2 3 4 5 6 7 8 9 10

Whe

ther

re

info

rcem

ent

chec

ked

by

com

pete

nt

auth

ority

Wor

kabi

lity

Of

Con

cret

e

Com

pact

ion

arra

ngem

ent

Thic

knes

s co

mpa

red

to

desi

gn

Cur

ing

arra

ngem

ents

Gra

de

awar

ded

11 12 13 14 15 16

Grading: S SRI U If this item is graded SRI/U, write clear

59

Page 60: State Govt Guidelines (2nd Tier) (Autosaved)[1]

reasons and suggestions for improvement :

b) Completed work

Location Grade of

concrete

Compressive

strength of

Concrete cube

as per QC

Register

Surface

acceptability

Workman

ship

Quality

assessment by

personal

judgment

Grade

awarded

1 2 3 4 5 6 7

60

Page 61: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grade:S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

3. SUBSTRUCTURE (Stage II)

a) Ongoing (Work in progress)

Loca

tion

Item

of w

ork

Mix

des

ign

/ Gra

de

of C

oncr

ete

Quality of material Workmanship

Arr

ange

men

t of

wee

p ho

les

Rub

ble

fillin

g be

hind

abut

men

t and

retu

rn

Cou

rse

Fine

Agg

rega

te

rein

forc

emen

t

Shu

tterin

g

Wor

kabi

lity

of

C.C

.

Com

pact

ion

Layi

ng o

f

1 2 3 4 5 6 7 8 9 10 11 12 13 14

61

Page 62: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

b) Completed work

Location Item of

work

Grade of

concrete

Compressive

strength of

Concrete

cube

Surface

acceptability

Size &

Shape

as per

design

Weep holes

Adequacy

(For

abutment

and return)

Riding

returns

Grade

awarded

1 2 3 4 5 6 7 8 9

62

Page 63: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

4. SUPERSTRUCTURE (Stage III)

a) Ongoing (Work in progress)

Loca

tion

Item

of w

ork

Mix

des

ign/

Gra

de o

f

Con

cret

e

Quality of material Workmanship

Cam

ber

Gra

de a

war

ded

Cem

ent

Rei

nfor

cem

ent

Ver

ifica

tion

of

prop

ertie

s of

lot w

ith

Shu

tterin

g

Wor

kabi

lity

of

C.C

.

Com

pact

ion

Rei

nfor

cem

ent

chec

king

with

1 2 3 4 5 6 7 8 9 10 11 12 13

63

Page 64: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

b) Completed work

Loca

tion

Item

of w

ork

Mix

des

ign

/ G

rade

of

Com

pres

sive

st

reng

th o

f co

ncre

te

Sur

face

ac

cept

abili

ty

Siz

e &

S

hape

as

per

desi

gn

Bea

ring

Kre

bs

Wea

ring

coat

Rai

ling

Exp

. Joi

nts

App

roac

h

slab

Sto

pper

Pro

tect

ion

Gra

de

awar

ded

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

64

Page 65: State Govt Guidelines (2nd Tier) (Autosaved)[1]

5. Contraction joint according to IS Code

(i) Type ____

(ii) Spacing Y/ N

(iii) Cross Section Y /N

6. Results of load test according to IS Y / N

If yes, comment required & copy of test result shall be enclosed.

7. APPROACHES (Stage II & III)

7.1 Embankment

Location Suitability of soil Compaction Side slopes Shoulders Grade

1 2 3 4 5 6

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

65

Page 66: State Govt Guidelines (2nd Tier) (Autosaved)[1]

7.2 Sub Base (G.S.B.)

Location Suitability of

Material

Thickness as compared to

design

Compaction Grade

1 2 3 4 5

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

66

Page 67: State Govt Guidelines (2nd Tier) (Autosaved)[1]

7.3 Base Course (Non Bituminous (WBM) and Bituminous (MPM)

Location Suitability of

Material

Thickness as compared to

design

Compaction Grade

1 2 3 4 5

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

7.4 Wearing Course

Location Suitability of

Material

Thickness as

compared to design

Surface

regularity

Camber Grade

1 2 3 4 5 6

67

Page 68: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grading: S SRI U

If this item is graded SRI/U, write clear reasons and suggestions for improvement :

8 ROAD FURNITURE AND MARKINGS :

Observations: : Quality of Road Furniture and Markings : (All stages)

Main Information Board Fixed : Yes No

Citizen Information Board Fixed :

Yes No

                             

68

Page 69: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Grade: S UIf this item is graded as U, write clear reasons and suggestions for improvement :

Observations: : Quality of Road Furniture and Markings : (Stage III)

8.1 Logo Boards fixed : Yes No

8.2 Guard stones fixed on approaches :

Yes No

8.3 Mandatory and caution signage : Yes No

                             

Grade : S UIf this item is graded as U, write clear reasons and suggestions for improvement :  

69

Page 70: State Govt Guidelines (2nd Tier) (Autosaved)[1]

9 Whether the work has been completed / is in progress as per work programme or the delay has occurred. If delay has occurred, whether the liquidated damages have been withheld or recovered

 

10Whether the work has been completed within the sanctioned cost, if not, what is the action taken by the PIU/PRI/ PR (in case of completed works);

11 Observations about the action taken by the PIU/ PRI/ PR on the observations of inspecting officers including E.Es/ Dy.EEs, V&QC. (Clearly offer comments about the

70

Page 71: State Govt Guidelines (2nd Tier) (Autosaved)[1]

action taken on the observations of Departmental. Officers).

12 Comments about difference in observations made by E.Es/ Dy.EEs, V&QC in earlier inspections (the E.Es/ Dy.EEs, V&QC shall study the earlier inspection reports

71

Page 72: State Govt Guidelines (2nd Tier) (Autosaved)[1]

of E.Es/ Dy.EE, V&QC, if any and offer his clear comments about the differences in observations, if any.)

13 Other Observations, if any:

(1).

(2).

(3).

(4).

14. Overall Grading of works: The overall grading calculated on the basis of item and sub-item wise grading is given below. The overall grading shall be ‘U’ if any of the grading of item no 2,3 or 4 is ‘U’. Overall grading shall be ‘SRI’ if item no. 2,3,4 are

72

Page 73: State Govt Guidelines (2nd Tier) (Autosaved)[1]

graded as ‘S’ and any of the item no. 1,5,6 are graded as ‘U’ or ‘SRI’. If all the items are graded as ‘S’, the overall grading will be ‘S’.

Item No. Sub Item for observation Awarded Grade

Item No. 1 Quality arrangements S / SRI / U

Item No. 2 Foundation S / SRI / U

Item No. 3 Sub structure S / SRI / U

Item No. 4 Super structure S / SRI / U

Item No. 5 Approaches S / SRI / U

Item No. 6 Road furniture & marking S / SRI / U

Overall grading S / SRI / U

Signature of E.E/ Dy.EE, V&QC

Date ………………………………. Name ………………….…

ANNEXURE--2

Guidelines for Performance Evaluation of the EE/Dy.EE VQC

73

Page 74: State Govt Guidelines (2nd Tier) (Autosaved)[1]

1. Background: Ensuring that the quality of the road works is the responsibility of the State Government, who is implementing the Programme, a two-tier Quality Control mechanism is stipulated. At the Second tier of the Quality Control structure, periodic inspections of works should be carried out by EEs/ Dy. EEs, V&QC. These officers are expected to carry out regular inspections and also get samples of material used tested in laboratories of the State Government as well as, in certain cases, independent laboratories, say established/ renowned engineering colleges or any laboratories notified by the State Government.

The main function of the 2nd tier of independent quality management is to improve the quality and effectiveness of the enforcement process. This includes

i) Checks to ensure that the 1st tier is properly functional

(ii) Independent quality tests to verify that the quality control system is achieving its intended objective

(iii) Detection of systemic flaws in the quality control process and action to improve the process

(iv) Independent supervision of deterrent and punitive measures in respect of the 1st tier and the Contractor.

Further, in order to be able to take an independent, impartial and dispassionate view of quality control, it is essential that the 2nd tier should have no stake in the outcome. In other words it should have nothing to do with the day-to–day or supervisory management or administration of contracts so that issues of legal action against the contractor, disciplinary proceeding against PIU officials, accountability to audit etc. do not colour its judgment or actions. Under the second tier of quality mechanism, detailed guidelines for monitoring of quality of the road works have also been prescribed. The method of inspection of works, making observations and reporting has been standardized with a view to minimize subjectivity in reporting. As per the guidelines, the EE/DY EE V&QC also has to upload the abstracts of the quality grading for each item of work along with requisite number of digital photographs in web site.

74

Page 75: State Govt Guidelines (2nd Tier) (Autosaved)[1]

2. Performance Review: As above, the Second tier of quality mechanism is an important aspect of the State Government projects/Schemes and the performance of EEs/ Dy. EEs V&QC is critical for the programme, therefore, the performance of EEs/ Dy.EEs V&QC needs to be evaluated by the State on regular basis. Assessment in respect of the following aspects is required to be covered during the performance evaluation:

a. Whether the EE/DY. EE V&QC has carried out inspection as per the guidelines prescribed under the 2nd tier;

b. Whether there is any lack of application of mind by EE/DY EE V&QC in recording observations;

c. Whether there is a tendency to avoid desirable technical observations;

d. Whether the EE/DY. EE V&QC has left inspection format incomplete without any reason;

e. Whether the EE/DY. EE V&QC has filled up formats mechanically without appropriate testing or observations in a professional manner.

f. Whether the EE/DY. EE V&QC has uploaded the quality grading abstracts and the requisite number of photographs in web site.

3. Independent Committee: The review of reports of EE/DY. EE V&QCs shall be carried out by an independent Performance Evaluation Committee constituted by the department. The Evaluation Committee may consist of the following:

a. One Professor/ Deputy from any University in A.P – Member

b. One Retired Engineer not below the level of CE – Member

c. CE V&QC - Convener

The performance evaluation of EE/DY EE V&QC shall be based on review of 5-10% of the inspection reports or number, say 10, whichever is more, for inspection conducted in last one year/ six months just preceding the month of review.

4. System for Performance Evaluation of the EE/Dy.EE VQC:

75

Page 76: State Govt Guidelines (2nd Tier) (Autosaved)[1]

The evaluation of every item and sub-item of inspection shall be carried out and the observations of the performance evaluator shall be quantified in terms of marks. Item and sub-item wise maximum marks shall be as per enclosed marking format (Evaluation Sheet). The marks obtained shall be filled up by the evaluator in the prescribed column. Based on the provision of specific item or sub-item of work, total maximum marks will not remain same in all cases and will vary depending upon the stage of the road work at which EE/DY EE V&QC has visited. Therefore, instead of absolute totals, a percentage will be taken for the evaluation.

Marking Methodology for Performance Evaluation of EE/DY. EE V&QCs:

Marking shall be done in the following manner given below. For easy understanding, guidelines for Quality Monitoring under Second Tier of Quality Mechanism including formats are attached for ready reference.

4.1 Setting out and Working Drawing: The EE/DY. EE V&QC is required to make observations on the basis of establishment of bench mark and center line and availability of drawings. Maximum marks would be 4 as detailed in performance evaluation sheet.

4.2 Site Clearance and grubbing: The EE/DY. EE V&QC is required to make observations on the basis of site clearance and use of salvageable martial. Maximum marks would be 2 as detailed in performance evaluation sheet.

4.3 Observations on Quality Arrangements: The observations of EE/DY EE V&QC on establishment of field laboratory, availability of equipments and use of equipments may be evaluated. For these items 3 marks are prescribed. The observation regarding mandatory tests, QC Register may be evaluated for these items 2 marks are prescribed. The results are required to be compared with the test results by the PIU in QC Register. It should be seen whether the EE/DY.EE V&QC has made efforts to verify these results and 1 mark is prescribed for this item.

4.4 Observations on Geometrics: In case of ongoing/ completed works, the EE/DY EE V&QC is supposed to measure the width of road way and carriage way, super elevation and extra widening at curves at a defined chainage and is

76

Page 77: State Govt Guidelines (2nd Tier) (Autosaved)[1]

required to offer the comments about the adequacy for which 6 marks are prescribed.

4.5 Observation on Quality of Items of Work: The EE/DY EE V&QC is required to make observations on the basis of detailed test in respect of all the items of construction. He is required to get test pits dug to facilitate observations. Sub-item wise marking will be done in the following manner:

(i) Earth work: Maximum marks 10. The marking will depend on the quality of observations made by EE/DY.EE V&QC in case of three sub-items detailed in performance evaluation sheet for item 5A or four sub-items for item 5B.

(ii) Sub-Base: Maximum marks 10. The marking will depend on the quality of observations made by EE/DY.EE V&QC in case of four sub-items detailed in performance evaluation sheet.

(iii) Base Course: Maximum marks 10. The marking will depend on the quality of observations made by EE/DY.EE V&QC in case of five sub-items detailed in performance evaluation sheet.

(iv) Bituminous Course: Maximum marks 10 for Bituminous Courses.. In case of on-going works, grading of aggregate, binder and temperatures are to be observed by EE/DY.EE V&QC. In case of completed work, the thickness and surface evenness is to be observed by EE/DY.EE V&QC.

(v) The marking will depend on the quality of observations made by EE/DY EE V&QC as detailed in performance evaluation sheet.

(vi) Shoulders: Maximum marks 5. The marking will depend on the quality of observations made by EE/DY.EE V&QC in case of three sub-items detailed in performance evaluation sheet.

(vii) Causeways/Bridges of all spans/CD Works: Maximum marks 21. The EE/DY EE V&QC has to see adequacy of CDs and its quality. The marking will depend on the quality of observations by EE/Dy.EE V&QC with respect to location, type and quality of CDs.

(viii) Side Drains and Catch Water Drains: Maximum marks 4. The EE/DY.EE V&QC has to see adequacy of drains and its quality. The marking will depend on the quality of observations made by EE/DY.EE V&QC.

77

Page 78: State Govt Guidelines (2nd Tier) (Autosaved)[1]

(ix) CC Pavement and Drains: Maximum marks 10. The EE/DY.EE V&QC has to see the quality of CC pavement / semi-rigid pavements etc. and drains including their integration with CDs. The marking will depend on the quality of observations by EE/DY EE V&QC as detailed in performance evaluation sheet.

(x) Road Furniture and Markings: Maximum mark 4. The EE/DY EE V&QC has to see the fixing of furniture and the quality. The marking will depend on the quality of observations by EE/DY.EE V&QC.

4.6 Inspection of roads under Maintenance: The State may also depute EE/DY.EE V&QCs to access maintenance activities being carried out in the completed road works. The EE/DY.EE V&QC is expected to clearly point out the defects noticed in road during his inspection and shall also report the current Pavement Condition Index (PCI) of the road.

4.7 Special Conditions:

a. Marking in case of Contradictory Remarks: If EE/Dy.EE V&QC has made such a remark in any item which is contradictory to remarks made in earlier part of the report, zero mark will be awarded in the item or sub-item where this remark has been given. Zero mark will also be awarded for that item or sub- item for which the earlier observations have been later contradicted.

b. Marks for not recording any observations: If the EE/DY.EE V&QC has not recorded any observations without giving reasons, Zero mark shall be awarded in that particular item/sub-item.

c. Marks in case of Incorrect Grading: If observations made for any item does not commensurate to the grading awarded to that item, zero mark would be awarded to the corresponding item.

d. Marking in case of wrong Overall grading: If the calculation of overall grading in the hard copy of the EE/DY.EE V&QC report is not as per guidelines, it would be a fair indicator of the care and sincerity of EE/DY.EE V&QC. No marking would be done in such a case and word “wrong overall grading” would be written on evaluation sheet.

4.8 Performance Ratings and Summarization:

78

Page 79: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Performance rating of the EE/DY.EE V&QC would depend on the average of marks obtained in all the evaluated reports. The summary sheet shall be filled up by the evaluator on the basis of average of observations in all the evaluated reports.

PERFORMANCE EVALUATION SHEET (FORMAT-3A)

79

Page 80: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Name of the EE/DyEE(V&QC)(if name coding not done) :

Code of EE/DyEE(V&QC) :

Name of Work :

Work Ongoing (or) Completed :

District :

Date of EE/DyEE(V&QC) Visited :

Sl.No

Item Sub Item Stage of Work

Max.Marks

MarkswhereverApplicable

MarksObtained

1 Setting out and working Drawing

Bench Mark and Centre line All Stages 1

Availability of working drawing All Stages 3

Total 4

2 Site clearance and grubbing

Site Clearance and Grubbing Stage I 1

Re-use of salvageable Material Stage I 1

Total 2

3 Quality arangements

Field Lab All Stages 3

No. of mandatory Test as per prescribed Frequency All Stages 2

Maintenance of QC Registers All Stages 1

Total 6

4 Geometrics

Road way width2 per km in

every inspection

1

Carriageway width2 per km in

every inspection

1

Camber 2 per km 2

Super-elevation & Extra Widening at curves

1 curve in eachkm

2

Total 6

80

Page 81: State Govt Guidelines (2nd Tier) (Autosaved)[1]

5A

Earthwork and Sub-Grade in

Embankment / Cutting

Quality of material for embankment/ sub-grade

In Stage-1, 2 per

km / In Stage-II or III,

1 per km

2

Compaction

In Stage-1, 2 per

km / In Stage-II or III,

2 per km.

6

Side slope and Profile 2 per km in Stage III 2

Total 10

Sl.No

Item Sub Item Stage of Work

Max.Marks

MarkswhereverApplicable

MarksObtain

ed

Stability and workmanship of cut slopes.

Stage I & II,at 2 critical

location with maximum height of cutting in each KM

2

Adequacy of Slope Protection All Stages - in general 1

5B

Earth work in cutting in hilly /rolling terrain

Upon completion of formation cutting, dressing, traffic

worthiness

All Stage I/II,at 2 criticallocations

withmaximumheight of cutting

in each km

2

Longitudinal Gradient

Stage I/II, 1 critical and

fairly representative stretch of 200mm on

each

5

Total 10

Grain Size In Stage-I , 2 per Km 2

Plasticity In Stage I , 2 per km 2

81

Page 82: State Govt Guidelines (2nd Tier) (Autosaved)[1]

6 Sub-base Compaction In Stage-II , 2 per Km 4

Total Thickness of Layers 2 per km 2

Total 10

7Base Course-Water

Bound Macadam /Wet Mix Macadam

Grain Size of Course Aggregate In Stage-II 2 per Km 2

Test for Liquid Limit and Plasticity Index in case fine

aggregates are crushable type

In Stage-II , 2 per km 2

Volumetric Analysis for assessment of Compaction of WBM/Density of compacted

layer in case of WMM

In Stage-II , 2 per Km. 2

Surface Evenness for WBM/WMM using straight

edge

In Stage-III, 2 tests per km 1

Thickness of every layer of WBM/WMM

In Stage-III, 2 per km 3

Total 10

8

Bituminous Layer -Premix Carpet(PMC/surface Dressing SD)

Level and Cleanliness of WBM/WMM surface prior to

application of bituminous2 per Km 1

Quality of Prime Coat and Tack Coat with respect of quality of

material

1 observation

on the day of inspection

1

Gradation Test for Course Aggregate (if the work in the

item is in progress)

1 test on the day of

inspection2

Grade of bitumen and temperature at the time of

mixing and laying (if the work in the item is in progress)

1 test on the day of

inspection2

Bitumen Extraction Test, if PMC is complete

2 tests per Km 1

Thickness of Layer 2 per Km 2

Surface evaluation in case of completed BT Work 2 per Km 1

Total 10

82

Page 83: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Quality of material In stage-I , 2 tests per

KM

1

9 ShouldersDegree of compaction In stage-II ,

2 tests per KM

2

Thickness of layer In stage-II or

III, 2 tests per KM

2

Total 5

Sl.No

Item Sub Item Stage of Work

Max.Marks

MarkswhereverApplicable

MarksObtain

ed

Causeways/Bridges of all spans,

Verification of SBC of soil under all piers

Stage - I 1

Checking of Pre-Measurements of steel for foundations, piers & deck slab etc.,

All stages 2

Verification of make & quality of bearings used for bridges Stage-II/I11 1

10 Quality and workmanship of Piers and abutments. All stages 4

Quality and workmanship of deckslab, joints, railings, weep holes etc.,

Stage-III 4

Necessity of Protection works, adequacy of slopes, Ventage clearances etc.,

Stage-IIIS 1

Abutments and culverts

Quality of material for embankment/ sub-grade concrete, stone/ Brick Masonry, Hume pipes including size etc.

All stages 4

Quality of workmanship

such as positioning of

pipes, wing walls, All stages 4

cushion over H pipes

Total 21

General quality of side

11 Side drain and drains/Catch water All stages 4

catch water Drain Drains and their

integration with CDS.

83

Page 84: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Total 4

CC/Semi-road Pavement

Associated Pukka Drains

Quality of Material, concrete, Stone/ concrete block pavement

I per 100 m length of pavement.

2

12 Strength of CC in concrete pavement/concrete block pavement

I per 100 m length of pavement.

2

Quality of workmanship, wearing surface texture. Adequacy of setting of concrete, joints, Edges etc

3

Thickness of layer I per 100 m

length of pavement.

3

Total 10

13 Road Furniture and

Markings

Cautionary boards, Signage boards, HM/KM Stones etc., Stage-IV 2

Guard Stones at CurvesStage-IV 2

Total 4

Whether the inspection

14 Entry in Web site has been entered in All 5

web site.

Total 5

Whether 10 photographs

per inspection are

uploaded by VQC All 2

Number of official

photographs Whether loaded

uploaded on web site

photographs reflect the

15 and quality quality of works All 4

inference available inspected by VQC

through them official properly.

84

Page 85: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Whether observations

of VQC official are

commensurate to All 4

quality of works seen in

photographs.

Total 10

Marks obtained to marks applicable = %

Signature of Evaluator :

Name of Evaluator :

Date:

SUMMARY OF PERFORMANCE (FORMAT- 3B) 1 Whether inspections performed generally as per guidelines:

Yes No

2 General observations about application of mind in recording observation:(Correlation in observations and grading)

Item Observations

Quality Arrangement

Quality of Work

Earth Work

Sub-base

Base-Course

Bituminous Course

85

Page 86: State Govt Guidelines (2nd Tier) (Autosaved)[1]

CD/Drainage/CC Pavement etc.

Furniture and Signage

3 Whether EE/DY EE V&QC has left portions of inspection format blank without recording any reasons:

Yes No4 Whether tendency to avoid desirable technicality noticed:

Yes No

5 Whether EE/DY EE V&QC has made contradictory remarks:

Yes No

6 Whether EE/DY EE V&QC could provide guidance to the PIU through his observations:

Yes No

7 Whether the EE/DY EE V&QC has reported the maintenance aspect of completed road works in the comprehensive manner:

Yes No

Name of Evaluator:

Signature of Evaluator

FORMAT-3C

EE/DY EE V&QC Securing Mark less than 50% ( To be discontinued)

EE/DY EE V&QC Securing Mark between 50% to 75% ( May be continued but placed under observation )

EE/DY EE V&QC Securing Mark grater than 75% would be continued

Name of EE/

Code % of Marks (average

Name of EE/

Code % of Marks (average

Name of EE/

Code % of Marks (average

86

Page 87: State Govt Guidelines (2nd Tier) (Autosaved)[1]

DY EE V&QC

of all reports)

DY EE V&QC

of all reports)

DY EE V&QC

of all reports)

FORMAT -4

FORMAT FOR REQUISITION OF QC INSPECTIONS

Name of District: Name of PR/PRI/PIU Division:

SL.NO

Name of Work and package Number.

Name of Grant

Est. Cost (RS In Lakhs)

Present Stage of work Q Cl Inspection needed in the month of

87

Page 88: State Govt Guidelines (2nd Tier) (Autosaved)[1]

Signature of Superintending Engineer

COMPREHENSIVE GUIDELINES ON SECOND TIER QUALITY CONTROL MECHANISM FOR THE WORKS SANCTIONED UNDER DIFFERENT GRANTS/LOANS ( OTHER THAN PMGSY)

INDEX

Sl Subject PAGE No.

88

Page 89: State Govt Guidelines (2nd Tier) (Autosaved)[1]

No. From To

1. Introduction and Guidelines of 2nd Tier quality control mechanism(Annexure -1 )

1 20

2. Formats for inspection of ROAD works including CD works/Culverts --- Format 1 (Parts 1 & 2)

21 49

3. Formats for inspection of BRIDGES---- Format 2 (Parts 1 & 2)

50 69

4. Guidelines for performance evaluation of the EE./DyEE VQC (Annexure -2 )

70 75

5 Performance evaluation sheets (Formats– 3A, 3B & 3C )

76 82

6 Format of requisition by S.Es for inspections under 2nd tier QC mechanism (Format—4)

83 83

89