State Facilities Summary - Oregon...Current Replacement Value (CRV) 4,947 Total Facilities 6.4 M...
Transcript of State Facilities Summary - Oregon...Current Replacement Value (CRV) 4,947 Total Facilities 6.4 M...
-
2017State Facilities Summary
Department of Administrative Services/Chief Financial Office/Facilities Planning Unit
-
Portfolio/In A Nutshell
We don't expect to grow much, but need to modernize for the future.
We own many buildings, but less than 600 are considered major facilities.
We are broadly-dispersed, but highly-concentrated in Salem/Metro Areas.
Most of our major facilities support Corrections and Administration.
Facilities last 50 years on average. With 580 major facilities, we should be re-placing/overhauling 11 facilities/biennium. If not, we are under-investing.
12345
-
Portfolio/How Much
58.5 MTotal Gross Square Footage
6.2 KTotal Facilities
-
Portfolio/How Much
-
Portfolio/How Much
22% Leases
22.8 MGross Square Footage (GSF)
4.8 BCurrent Replacement Value (CRV)
4,947Total Facilities
6.4 MLeased SF
$10.6 MTotal Montly Rent
1,500Total Leases
78% State-Owned Facilities (Agencies)
-
Portfolio/Agency Totals
Agency Total GSF Total CRV Total Facilities
Corrections (DOC) 5,243,800 $1,521,377,334 330
Administrative Services (DAS) 4,683,017 $716,332,056 109
Military (OMD) 3,355,874 $732,317,678 421
Transportation (ODOT) 3,220,291 $509,319,193 1,315
Parks and Recreation (OPRD) 1,290,836 $278,240,699 1,890
Fish and Wildlife (ODFW) 875,741 $67,504,323 234
Forestry (ODF) 839,852 $117,135,064 396
Youth Authority (OYA) 788,431 $171,938,388 94
Health Authority (OHA) 763,335 $311,127,546 50
Education (ODE) 360,492 $45,353,876 23
Public Safety (DPSST) 345,428 $76,756,969 22
Veterans' Affairs (DVA) 324,604 $83,230,417 3
Liquor Control (OLCC) 283,714 $37,049,006 2
Employment (OED) 121,654 $12,257,767 10
State Lottery 98,222 $164,347,768 1
State Lands (DSL) 81,696 $7,727,431 4
PERS 60,235 $60,235 1
Agriculture (ODA) 20,666 $1,506,066 11
Aviation 16,039 $7,424,177 31
Total 22,773,927 $4,861,005,992 4,947
State-Owned Facilities By Agency (Ranked By GSF)
-
12%583
Portfolio/Major Facilities by Value
89%$4.3B
72%16.3M
Total Facilities > $1M CRV
Total GSF > $1M CRV
Total CRV > $1M CRV
-
Portfolio/Major Facility Age*
Today 1860
41 YearsAverage Age
65%Built Before 1993
35%Code Compliant
1993 Seismic Code Compliance
363Buildings Not Built to Seismic Code
*Facilities >$1M CRV
SEISM
IC RISK
-
Portfolio/LocationTop 5 Locations Of State-Owned Facilities (By GSF)City GSF CRV Facilities %/Total GSF
Salem 8,645,266 $1,758,992,916 416 38.0%
Portland 1,350,461 $245,579,412 140 5.9%
Ontario 1,164,309 $351,660,836 70 5.1%
Umatilla 897,154 $236,043,884 29 3.9%
Clackamas 827,243 $175,372,855 70 3.6%
Top 5 Locations Of State-Owned Facilities (By Count)City Facilities GSF CRV %/Total Facilities
Salem 416 8,645,266 $1,758,992,916 8.7%
Sublimity 161 138,869 $40,472,549 3.4%
Warrenton 143 553,326 $118,140,197 3.0%
Portland 140 1,350,461 $245,579,412 2.9%
Newport 130 106,834 $21,844,723 2.7%
-
Portfolio/Program Distribution*
53%Public Safety
*Facilities >$1M CRV
22%Administration
25%Others Combined
Budget Program Area
8.7 MGross Square Footage (GSF)
$2.4 BCurrent Replacement Value
324Total Facilities
3.7 MGross Square Footage (GSF)
$748 MCurrent Replacement Value
36Total Facilities
-
Program Area GSF %/Total GSF CRV Facilities
Public Safety 8,762,855 53% $2,384,237,895 324
Administration 3,656,669 22% $748,072,738 36
Transportation 1,621,434 10% $329,517,436 108
Natural Resources 848,395 5% $249,642,817 79
Human Services 643,930 4% $302,686,517 14
Economic and Community Development 409,937 2% $93,099,977 9
Education 271,865 2% $43,641,595 12
Lottery 98,222 1% $164,347,768 1
Total 16,313,307 98% $4,315,246,743 583
Budget Program Area by GSF (Facilities >$1M CRV)
Portfolio/Program Distribution
-
State Employee Position Growth Trend — 2003 - 2017
Portfolio/Growth Trend
State-Owned Facility Growth Trend (Cumulative MGSF/Facilities >$1M) — 2003 - 2017
Biennieum 2003-05 LAB* 2005-07 LAB* 2007-09 LAB* 2009-11 LAB* 2011-13 LAB* 2013-15 LAB* 2015-17 GB1
Positions 37,689 37,984 39,386 40,754 39,659 40,237 40,428
Annual Change BASE 295 1,402 1,368 -1,095 578 191
%/Annual Change BASE 0.78% 3.69% 3.47% -2.69% 1.46% 0.47%*Biennial position counts do not include Oregon University System (OUS)/Higher Education Coordinating Commission (HECC). 1Governor's Budget only.
Construction Year 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
MGSF (Cumulative) 13.08 13.16 13.34 13.79 14.38 14.39 14.60 14.79 15.57 15.67 15.80 15.99 15.99
Annual Growth (MGSF) BASE 0.07 0.18 0.45 0.59 0.01 0.21 0.20 0.78 0.10 0.12 0.19 0.00
%/Annual Growth BASE 0.6% 1.4% 3.4% 4.3% 0.1% 1.4% 1.3% 5.3% 0.6% 0.8% 1.2% 0.0%
-
48%Facility Condition Assessment (FCA)
Metrics/Data Sources
FCA — CompleteAdministrative ServicesCorrectionsLiquor ControlYouth Authority
FCA — In-ProgressFish and WildlifeForestryTransportation
30%Agency Self-Reported
22%FCA In-Progress
Self-ReportedAgricultureAviation EducationEmploymentHealth AuthorityMilitaryParks and RecreationPERSPublic SafetyState LandsState LotteryVeterans' Affairs
-
• Current Replacement Value (CRV) — The estimated cost to replace the facility in-kind.
• Facility Condition Index (FCI) — A calculated measure of facility condition relative to its cur-rent replacement value (expressed as a percentage).
• Priority 1: Currently Critical — Projects that require immediate action in order to address code and accessibility violations that affect life safety.
• Priority 2: Potentially Critical — Projects to maintain facility integrity and accommodate cur-rent agency program requirements.
• Priority 3: Necessary/Not Yet Critical — Projects to address building systems, components and site work that have reached or exceeded their useful life, but still functioning.
Metrics/Terminology
-
0-5%Good
Metrics/Facility Condition
FCI Condition Rating Scale
In new or well-maintained condition with no visual evidence of wear, soiling or other deficiencies.
5-10%Fair
Subject to wear and soiling, but is still in a serviceable and functioning condition.
10-60%Poor
Subjected to hard or long-term wear. Nearing the end of its useful or serviceable life.
>60%Very Poor
Has reached the end of its useful or serviceable life. Renewal now necessary.
FCI = Deferred Maintenance + Capital RenewalCurrent Replacement Value
-
Metrics/FCI by Agency
Agency Facilities GSF CRV Current FCI 10-Year FCI FCA Status
Administrative Services (DAS) 109 4,683,017 $716,332,056 1.9% 12.1% Complete
Corrections (DOC) 330 5,243,800 $1,521,377,334 10.4% 20.9% Complete
Liquor Control (OLCC) 2 283,714 $37,049,006 11.9% 38.9% Complete
Youth Authority (OYA) 94 788,431 $171,938,388 17.8% 28.5% Complete
Fish and Wildlife (ODFW) 234 875,741 $67,504,323 11.7% N/A In-Progress
Forestry (ODF) 396 839,852 $117,135,064 N/A N/A In-Progress
Transportation (ODOT) 1,315 3,220,291 $509,319,193 2.2% 215% In-Progress
Agriculture (ODA) 11 20,666 $1,506,066 N/A N/A Self-Report
Aviation 31 16,039 $7,424,177 31% N/A Self-Report
Education (ODE) 23 360,492 $45,353,876 7.9% 46.6% Self-Report
Employment (OED) 10 121,654 $12,257,767 18% 0% Self-Report
Health Authority (OHA) 50 763,335 $311,127,546 0% 3% Self-Report
Military (OMD) 421 3,355,874 $732,317,678 19% N/A Self-Report
Parks and Recreation (OPRD) 1,890 1,290,836 $278,240,699 0% 0% Self-Report
PERS 1 60,235 $60,235 0% 0% Self-Report
Public Safety (DPSST) 22 345,428 $76,756,969 0% N/A Self-Report
State Lands (DSL) 4 81,696 $7,727,431 1.1% N/A Self-Report
State Lottery 1 98,222 $164,347,768 N/A N/A Self-Report
Veterans' Affairs (DVA) 3 324,604 $83,230,417 3.3% N/A Self-Report
Total 4,947 22,773,927 $4,861,005,992
Current (2016) and 10-Year (2026) Facility Condition Index (FCI) By Agency
-
Metrics/FCI by Percent of Facilities*
Administrative Services45 Buildings 51+25+22+2+E2+5+71+22+E
2016 FCI 2026 FCI
9% 29%Year ■ Good ■ Fair ■ Poor ■ V Poor2016 51% 24% 22% 2%
2026 2% 4% 71% 22%
Corrections290 Buildings 49+12+34+5+E7+9+61+23+E
2016 FCI 2026 FCI
11% 26%Year ■ Good ■ Fair ■ Poor ■ V Poor2016 49% 12% 34% 5%
2026 7% 9% 61% 23%
*FCA Agencies
-
Metrics/FCI by Percent of Facilities*
Youth Authority65 Buildings 24+8+65+3+E2+5+71+22+E
2016 FCI 2026 FCI
19% 60%Year ■ Good ■ Fair ■ Poor ■ V Poor2016 25% 8% 65% 3%
2026 2% 5% 71% 23%
Liquor Control2 Buildings 0+0+100+0+E 0+0+50+50+E
2016 FCI 2026 FCI
38% 49%Year ■ Good ■ Fair ■ Poor ■ V Poor2016 0% 0% 100% 0%
2026 0% 0% 50% 50%
*FCA Agencies
-
Metrics/Renewal Cost by Agency
Agency 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total
■ DAS $7,330,893 $6,844,725 $27,303,787 $2,248,296 $2,619,290 $5,502,935 $3,252,812 $5,042,721 $24,145,684 $16,956,100 $101,247,243■ DOC $6,207,486 $12,618,329 $11,922,627 $30,595,552 $27,629,123 $15,874,683 $14,473,530 $7,356,615 $15,287,725 $16,655,389 $158,621,060■ OLCC $280,522 $160,876 $55,246 $490,148 $346,154 $207,817 $335,625 $205,958 $560,320 $333,230 $2,975,895■ OYA $2,144,195 $1,774,903 $2,197,592 $1,665,693 $998,023 $1,759,041 $2,490,519 $1,452,179 $3,263,200 $30,877,211 $48,622,555Total $15,963,097 $21,398,833 $41,479,252 $34,999,689 $31,592,589 $23,344,476 $20,552,486 $14,057,472 $43,256,929 $64,821,930 $311,466,753
10-Year Renewal Cost Outlook By Agency — FCA Agencies
Year
2017
$30
$0
$15
Cos
t ($M
)
2018 2019 2020 2021 2022 2023 2024 2025 2026
-
Metrics/Renewal Cost by Priority10-Year Renewal Cost Outlook By Priority (1-3) — FCA Agencies
Agency 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total
■ Priority 1 $2,433,023 $2,917,846 $4,363,243 $5,845,550 $3,914,389 $1,668,771 $2,762,221 $450,676 $22,945,545 $5,370,211 $52,671,474■ Priority 2 $5,636,438 $2,693,445 $437,715 $3,726,263 $1,037,671 $1,029,734 $4,296,293 $945,363 $2,325,561 $3,752,465 $25,880,946■ Priority 3 $7,806,636 $15,787,542 $36,678,294 $25,427,877 $26,640,530 $20,645,971 $13,493,972 $12,660,233 $17,985,823 $55,699,255 $232,826,132Total $15,876,097 $21,398,833 $41,479,252 $34,999,689 $31,592,589 $23,344,476 $20,552,486 $14,056,272 $43,256,929 $64,821,930 $311,378,552
2017
$60
$0
$30
Cos
t ($M
)
2018 2019 2020 2021 2022 2023 2024 2025 2026
Year