Elka Anastasova
State Enterprise “RAW”
SD” Disposal Facility for RAW -Novi Han”
Eleventh Annual Meeting of the International Decommissioning Network (IDN), 5-7 December 2017
1964 1994 1961
ИРТ-
2000
Time
2004 2006 2000
Reconstruction
Works
1994 1996 1998
Back in
operation
SE “RAW”
was established
SD “DFRW - Novi han”
was joined to SE “RAW”
2012 2025 2008
SD “Decommissioning”
was joined to SE “RAW”
SD “National Disposal
Facility
for Radioactive Waste”
Decommissioning of the
SD “DFRW-Novi han”
The “DFRW-Novi Khan” accepts radioactive waste generated from nuclear
applications in industry, medicine, research and education in Bulgaria
SE “RAW”, SD “DFRW - Novi Khan”
Concrete trench, that consists of eight separate cells– 200 m3
Bore hole for spent sealed sources– 1 m3
Disposal vault for LLW and ILW – 237 m3
Facilities in operation by 1994.
Accepting and preparatory laboratory complex (APLC)
Abrasive decontamination Press System Unit for liquid RAW
treatment
Cementation Unit
In the Accepting and preparatory laboratory complex there is a system of specialized workplaces used for acceptance control and processing of LLW
The Hot Cell is used for
acceptance control and
dismantling of containers
with SRS, used in
medicine and industry
Hot cell
Compliance with the national strategy According to the national strategy for management of
SNF&RAW, by 2025 should start the real decommissioning activities of SD ” DFRW-Novi Han "
Availability of resources The main source of funding is the State Budget – there are two Funds established - "Decommissioning" and “RAW".
Legislation During the recent years the Bulgarian legislation in the field of nuclear energy is updated in conformity with the European legislation. Additionally, we follow the recommendations of the IAEA.
Stakeholders It is important to inform stakeholders about the
decommissioning program of the DFRW Novi Han and to be involved in public discussions and decision-making.
RAW management
The generated RAW streams according to their final point of management are divided into the following main types:
Materials that meet the criteria for conditional or unconditional release from regulatory control;
RAW streams, which after processing meet the criteria for disposal at the NDF – Radiana;
RAW streams that do not meet the NDF WAC– DSRS which are dismantled in the APLC and the HC and temporarily stored on the site in specialized containers and drums for future repackaging (encapsulation, placing in canisters, etc.) and transfer for disposal/long term storage in the future storage/disposal facility .
Technological and Safety issues
Free release Body at the SD “
Decommissionig 1-4 Unit”
SD “DFRW-Novi Han”
SD NDF-Radiana
SD”RAW-Kozloduy”
DSRS ?
The facilities of the “DFRW Novi Khan" are relatively
independent concerning their location, physical and
radiation protection, monitoring, etc. This condition allows
decommissioning of the facilities to be implement
separately in stages.
In the Preparatory Stage (By 2025) all the spent
radioactive sources (DSRS) and RAW located at the
surface of the site will be removed from the containers,
characterized, treated and packed according to their type
(the RAW stream to which they refer). Some of the RAW
packages are transferred to the SD “RAW-Kozloduy” for
subsequent preparation for disposal, while other parts are
temporarily stored in containers until a decision is made for their management.
•Removal and processing of the over-ground RAW
Apr.2016 Nov.2017
Characterization of the historical radioactive waste by gamma scanning
system
Gamma scanning system is
designed for identification and
quantification of gamma emitters in
packages of RAW by assessing the
measured gamma spectrum on the
surface of the package.
Repacking and labeling of the characterized drums
The Drums with
radioactive waste, are
sorted and labeled by
the following features:
-type of RAW -
compactable, building
waste, metal, soil, etc .;
- Specific activity;
- A gamma dose rate.
Year Industry Medicine Research
Activity, Ci Volume, Weight, cub.m., kg
Activity, Ci Volume, Weight, cub.m., kg
Activity, Ci Volume, Weight, cub.m., kg
1967 370 kg 0.102 118 kg 1968 93.158 400 kg 152.81 156 kg 0.239 731 kg 1969 114 1004.5 kg 0.297 5795 kg 1970 440 250 kg 2.232 1000 kg 1971 250 1.836 400 kg 975 kg 1972 442 0.441 2137 kg 1973 618 45 kg 826 kg 1974 752 100 kg 4.896 2685 kg 1975 938 1449 kg 3.177 323 kg 1467 kg 1976 703.2 3254 kg 3.087 73 kg 321 kg 1977 428 0.096 cub.m. 2.597 0.04 cub.m. 1.074 cub.m.
1978 662.5 0.3 cub.m. 3.69 0.02 cub.m. 0.69 cub.m. 1979 797.69 0.003 cub.m. 3.15 0.005 cub.m. 0.1 0.49 cub.m.
1980 1010 0.17 cub.m. 4.458 0.007 cub.m. 0.03 cub.m. 1981 695.5 0.005 cub.m. 2.671 0.003 cub.m. 0.059 0.345 cub.m.
1982 798.3 1.39 cub.m. 4.323 0.002 cub.m. 0.054 cub.m.
1983 1020 0.14 cub.m. 3.14 0.26 cub.m. 0.025 0.129 cub.m 1984 1438.6 0.16 cub.m 3.7 0.031 cub.m 1.28 6.6 cub.m 1985 2100 3.5 cub.m 1.328 0.033 cub.m 4(1?).23 cub.m
1986 1492.97 2.37 cub.m 1.93 0.0039 cub.m 1.7 cub.m 1987 4122.66 3.1 cub.m 3.93 0.045 cub.m 5.0 cub.m 1988 2451 9.138 cub.m 2.66 0.041 cub.m 0.184 2.123 cub.m 1989 1743.13 2.009 cub.m 1.92 0.452 cub.m 3.57 1.67 cub.m 1990 921.76 5.66 cub.m 1.007 0.765 cub.m 0.144 2.256 cub.m 1991 192.6 3.721 cub.m 0.957 0.087 cub.m 0.232 2.625 cub.m 1992 215 18.1 cub.m 0.5 0.019 1.9 cub.m 1993 74.79 1.26 15.1 1.26 1994 384.9 0.1 cub.m 0.1 cub.m 5.7 cub.m Общо 24899.758 211.997 7.112
Strategy for Decommissioning of SD “DFRW-Novi Han.” (cont)
The Decommissioning of the historical vaults and remediation of the site
of “DFRW-Novi Han“ will start after 2025. The resulting radioactive waste
will be processed and transferred to disposal facilities.
RAW Removal from the historical
vaults
and dismantling the vaults
RAW treatment, conditioning, packing and transfer for
long term storage/disposal
Site
remediation
Stages of the SD “DFRW-Novi Han”
Decommissioning
RAW Removal from
containers
at the surface of the site
Review of the existing
documentation - shipment
documentation,
operational records
END-POINT by 2030
The APLC and HC facilities will remain at the site of
DFRW- Novi Han by the completion of all DSRS
activities – dismantling, characterization,
decontamination, repackaging for future disposal/long
term storage.
Remediation of the waste-free site will be performed.
2017 2025 2030
THANK YOU FOR YOUR